메뉴 건너뛰기




Volumn 24, Issue 4, 2002, Pages 403-429

An MILP-based approach to the short-term scheduling of make-and-pack continuous production plants

Author keywords

Continuous production plants; MILP mathematical model; Optimal campaign scheduling

Indexed keywords


EID: 0442269145     PISSN: 01716468     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00291-002-0103-5     Document Type: Article
Times cited : (39)

References (20)
  • 1
    • 0031140322 scopus 로고    scopus 로고
    • A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines
    • Cerdá J, Henning GP, Grossmann IE (1997) A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines. Industrial & Engineering Chemistry Research 36: 1695-1707
    • (1997) Industrial & Engineering Chemistry Research , vol.36 , pp. 1695-1707
    • Cerdá, J.1    Henning, G.P.2    Grossmann, I.E.3
  • 2
    • 19044376949 scopus 로고    scopus 로고
    • Campaign planning for multi-stage batch processes in the chemical industry
    • Grunow M, Günther HO, Lehmann M (2002) Campaign planning for multi-stage batch processes in the chemical industry. OR Spectrum 24: 281-314
    • (2002) OR Spectrum , vol.24 , pp. 281-314
    • Grunow, M.1    Günther, H.O.2    Lehmann, M.3
  • 3
    • 0034306985 scopus 로고    scopus 로고
    • Knowledge-based predictive and reactive scheduling in industrial environments
    • Henning GP, Cerdá J (2000) Knowledge-based predictive and reactive scheduling in industrial environments. Computers and Chemical Engineering 24: 2315-2338
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2315-2338
    • Henning, G.P.1    Cerdá, J.2
  • 4
    • 0034661353 scopus 로고    scopus 로고
    • A novel formulation for short-term scheduling of multistage multi-product batch plants
    • Hui C-W, Gupta A (2000) A novel formulation for short-term scheduling of multistage multi-product batch plants. Computers and Chemical Engineering 24: 1611-1617
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 1611-1617
    • Hui, C.-W.1    Gupta, A.2
  • 5
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for the short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou, M.G., Floudas, C. (1998a). Effective continuous-time formulation for the short-term scheduling. 1. Multipurpose batch processes. Industrial & Engineering Chemistry Research 37: 4341-4359
    • (1998) Industrial & Engineering Chemistry Research , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.2
  • 6
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
    • Ierapetritou MG, Floudas CA (1998b) Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes. Industrial & Engineering Chemistry Research 37: 4360-4374
    • (1998) Industrial & Engineering Chemistry Research , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 7
    • 0004123519 scopus 로고    scopus 로고
    • ILOG S.A. France
    • ILOG OPL Studio 3.1 (2000) User's manual. ILOG S.A. France
    • (2000) User's Manual
  • 8
    • 0004123519 scopus 로고    scopus 로고
    • ILOG S.A. France
    • ILOG CPLEX 7.0 (2000) User's manual. ILOG S.A. France
    • (2000) User's Manual
  • 9
    • 0442264226 scopus 로고    scopus 로고
    • Planning and scheduling in the process industry
    • Kallrath J (2002) Planning and scheduling in the process industry. OR Spectrum 24: 219-250
    • (2002) OR Spectrum , vol.24 , pp. 219-250
    • Kallrath, J.1
  • 10
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling
    • Karimi IA, McDonald CM (1997) Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling. Industrial & Engineering Chemistry Research 36: 2701-2714
    • (1997) Industrial & Engineering Chemistry Research , vol.36 , pp. 2701-2714
    • Karimi, I.A.1    McDonald, C.M.2
  • 11
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations - I. MILP Formulation
    • Kondili E, Pantelides CC, Sargent RWH (1993a) A general algorithm for short-term scheduling of batch operations - I. MILP Formulation. Computers and Chemical Engineering 17: 211-227
    • (1993) Computers and Chemical Engineering , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 12
    • 0027676050 scopus 로고
    • Production planning for the rational use of energy in multiproduct continuous plants
    • Kondili E, Shah N, Pantelides CC (1993b) Production planning for the rational use of energy in multiproduct continuous plants. Computers and Chemical Engineering 17: S123-S128
    • (1993) Computers and Chemical Engineering , vol.17
    • Kondili, E.1    Shah, N.2    Pantelides, C.C.3
  • 13
    • 0034307307 scopus 로고    scopus 로고
    • Optimal scheduling of batch plants satisfying multiple product orders with different due dates
    • Méndez CA, Henning GP, Cerdá J (2000) Optimal scheduling of batch plants satisfying multiple product orders with different due dates. Computers and Chemical Engineering 24: 2223-2245
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2223-2245
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 14
    • 0035339828 scopus 로고    scopus 로고
    • A MILP continuous time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • Méndez CA, Henning GP, Cerdá J (2001) A MILP continuous time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Computers and Chemical Engineering 25: 701-711
    • (2001) Computers and Chemical Engineering , vol.25 , pp. 701-711
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 15
    • 0037093434 scopus 로고    scopus 로고
    • An MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities
    • Méndez CA, Cerdá J (2002) An MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities. Computers and Chemical Engineering 26: 687-695
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 687-695
    • Méndez, C.A.1    Cerdá, J.2
  • 16
    • 0001690679 scopus 로고
    • A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
    • Pinto JM, Grossmann IE (1995) A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Industrial & Engineering Chemistry Research 34: 3037-3051
    • (1995) Industrial & Engineering Chemistry Research , vol.34 , pp. 3037-3051
    • Pinto, J.M.1    Grossmann, I.E.2
  • 17
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G, Pantelides CC (1996) A simple continuous-time process scheduling formulation and a novel solution algorithm. Computers and Chemical Engineering 20: S1221-S1226
    • (1996) Computers and Chemical Engineering , vol.20
    • Schilling, G.1    Pantelides, C.C.2
  • 18
    • 0013610501 scopus 로고
    • Optimal scheduling of multipurpose continuous plants
    • San Francisco, CA, Paper 233i
    • Schilling G, Pineau Y, Pantelides CC, Shah N (1994) Optimal scheduling of multipurpose continuous plants. Presented at AIChe Annual Meeting. San Francisco, CA, Paper 233i
    • (1994) AIChe Annual Meeting
    • Schilling, G.1    Pineau, Y.2    Pantelides, C.C.3    Shah, N.4
  • 19
    • 0000594166 scopus 로고
    • The optimal operation of mixed production facilities - A general formulation and some approaches for the solution
    • Zhang X, Sargent RWH (1994) The optimal operation of mixed production facilities - A general formulation and some approaches for the solution. Fifth International Symposium on Process Systems Engineering, pp 171-178
    • (1994) Fifth International Symposium on Process Systems Engineering , pp. 171-178
    • Zhang, X.1    Sargent, R.W.H.2
  • 20
    • 0344528710 scopus 로고    scopus 로고
    • The optimal operation of mixed production facilities -Extensions and improvements
    • Zhang X, Sargent RWH (1998) The optimal operation of mixed production facilities -Extensions and improvements. Computers and Chemical Engineering 22: 1287-1295
    • (1998) Computers and Chemical Engineering , vol.22 , pp. 1287-1295
    • Zhang, X.1    Sargent, R.W.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.