-
1
-
-
0031140322
-
A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines
-
Cerdá J, Henning GP, Grossmann IE (1997) A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines. Industrial & Engineering Chemistry Research 36: 1695-1707
-
(1997)
Industrial & Engineering Chemistry Research
, vol.36
, pp. 1695-1707
-
-
Cerdá, J.1
Henning, G.P.2
Grossmann, I.E.3
-
2
-
-
19044376949
-
Campaign planning for multi-stage batch processes in the chemical industry
-
Grunow M, Günther HO, Lehmann M (2002) Campaign planning for multi-stage batch processes in the chemical industry. OR Spectrum 24: 281-314
-
(2002)
OR Spectrum
, vol.24
, pp. 281-314
-
-
Grunow, M.1
Günther, H.O.2
Lehmann, M.3
-
3
-
-
0034306985
-
Knowledge-based predictive and reactive scheduling in industrial environments
-
Henning GP, Cerdá J (2000) Knowledge-based predictive and reactive scheduling in industrial environments. Computers and Chemical Engineering 24: 2315-2338
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 2315-2338
-
-
Henning, G.P.1
Cerdá, J.2
-
4
-
-
0034661353
-
A novel formulation for short-term scheduling of multistage multi-product batch plants
-
Hui C-W, Gupta A (2000) A novel formulation for short-term scheduling of multistage multi-product batch plants. Computers and Chemical Engineering 24: 1611-1617
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 1611-1617
-
-
Hui, C.-W.1
Gupta, A.2
-
5
-
-
0032216021
-
Effective continuous-time formulation for the short-term scheduling. 1. Multipurpose batch processes
-
Ierapetritou, M.G., Floudas, C. (1998a). Effective continuous-time formulation for the short-term scheduling. 1. Multipurpose batch processes. Industrial & Engineering Chemistry Research 37: 4341-4359
-
(1998)
Industrial & Engineering Chemistry Research
, vol.37
, pp. 4341-4359
-
-
Ierapetritou, M.G.1
Floudas, C.2
-
6
-
-
0032216046
-
Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
-
Ierapetritou MG, Floudas CA (1998b) Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes. Industrial & Engineering Chemistry Research 37: 4360-4374
-
(1998)
Industrial & Engineering Chemistry Research
, vol.37
, pp. 4360-4374
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
7
-
-
0004123519
-
-
ILOG S.A. France
-
ILOG OPL Studio 3.1 (2000) User's manual. ILOG S.A. France
-
(2000)
User's Manual
-
-
-
8
-
-
0004123519
-
-
ILOG S.A. France
-
ILOG CPLEX 7.0 (2000) User's manual. ILOG S.A. France
-
(2000)
User's Manual
-
-
-
9
-
-
0442264226
-
Planning and scheduling in the process industry
-
Kallrath J (2002) Planning and scheduling in the process industry. OR Spectrum 24: 219-250
-
(2002)
OR Spectrum
, vol.24
, pp. 219-250
-
-
Kallrath, J.1
-
10
-
-
0031186347
-
Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling
-
Karimi IA, McDonald CM (1997) Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling. Industrial & Engineering Chemistry Research 36: 2701-2714
-
(1997)
Industrial & Engineering Chemistry Research
, vol.36
, pp. 2701-2714
-
-
Karimi, I.A.1
McDonald, C.M.2
-
12
-
-
0027676050
-
Production planning for the rational use of energy in multiproduct continuous plants
-
Kondili E, Shah N, Pantelides CC (1993b) Production planning for the rational use of energy in multiproduct continuous plants. Computers and Chemical Engineering 17: S123-S128
-
(1993)
Computers and Chemical Engineering
, vol.17
-
-
Kondili, E.1
Shah, N.2
Pantelides, C.C.3
-
13
-
-
0034307307
-
Optimal scheduling of batch plants satisfying multiple product orders with different due dates
-
Méndez CA, Henning GP, Cerdá J (2000) Optimal scheduling of batch plants satisfying multiple product orders with different due dates. Computers and Chemical Engineering 24: 2223-2245
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 2223-2245
-
-
Méndez, C.A.1
Henning, G.P.2
Cerdá, J.3
-
14
-
-
0035339828
-
A MILP continuous time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
-
Méndez CA, Henning GP, Cerdá J (2001) A MILP continuous time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Computers and Chemical Engineering 25: 701-711
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 701-711
-
-
Méndez, C.A.1
Henning, G.P.2
Cerdá, J.3
-
15
-
-
0037093434
-
An MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities
-
Méndez CA, Cerdá J (2002) An MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities. Computers and Chemical Engineering 26: 687-695
-
(2002)
Computers and Chemical Engineering
, vol.26
, pp. 687-695
-
-
Méndez, C.A.1
Cerdá, J.2
-
16
-
-
0001690679
-
A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
-
Pinto JM, Grossmann IE (1995) A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Industrial & Engineering Chemistry Research 34: 3037-3051
-
(1995)
Industrial & Engineering Chemistry Research
, vol.34
, pp. 3037-3051
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
17
-
-
0029717404
-
A simple continuous-time process scheduling formulation and a novel solution algorithm
-
Schilling G, Pantelides CC (1996) A simple continuous-time process scheduling formulation and a novel solution algorithm. Computers and Chemical Engineering 20: S1221-S1226
-
(1996)
Computers and Chemical Engineering
, vol.20
-
-
Schilling, G.1
Pantelides, C.C.2
-
18
-
-
0013610501
-
Optimal scheduling of multipurpose continuous plants
-
San Francisco, CA, Paper 233i
-
Schilling G, Pineau Y, Pantelides CC, Shah N (1994) Optimal scheduling of multipurpose continuous plants. Presented at AIChe Annual Meeting. San Francisco, CA, Paper 233i
-
(1994)
AIChe Annual Meeting
-
-
Schilling, G.1
Pineau, Y.2
Pantelides, C.C.3
Shah, N.4
-
19
-
-
0000594166
-
The optimal operation of mixed production facilities - A general formulation and some approaches for the solution
-
Zhang X, Sargent RWH (1994) The optimal operation of mixed production facilities - A general formulation and some approaches for the solution. Fifth International Symposium on Process Systems Engineering, pp 171-178
-
(1994)
Fifth International Symposium on Process Systems Engineering
, pp. 171-178
-
-
Zhang, X.1
Sargent, R.W.H.2
-
20
-
-
0344528710
-
The optimal operation of mixed production facilities -Extensions and improvements
-
Zhang X, Sargent RWH (1998) The optimal operation of mixed production facilities -Extensions and improvements. Computers and Chemical Engineering 22: 1287-1295
-
(1998)
Computers and Chemical Engineering
, vol.22
, pp. 1287-1295
-
-
Zhang, X.1
Sargent, R.W.H.2
|