메뉴 건너뛰기




Volumn 40, Issue 7, 2013, Pages 1804-1818

A hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry

Author keywords

Hybrid methods; Mixed integer programming; Multi stage lotsizing and scheduling; Production rates; Pulp and paper industry; Variable Neighbourhood Search

Indexed keywords

HYBRID METHOD; LOT-SIZING AND SCHEDULING; MIXED INTEGER PROGRAMMING; PRODUCTION RATES; PULP AND PAPER INDUSTRY; VARIABLE NEIGHBOURHOOD SEARCH;

EID: 84875936813     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2013.01.015     Document Type: Article
Times cited : (36)

References (23)
  • 1
    • 0036604813 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling on parallel machines
    • H. Meyr Simultaneous lotsizing and scheduling on parallel machines European Journal of Operational Research 139 2 2002 277 292
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 277-292
    • Meyr, H.1
  • 2
    • 0023456043 scopus 로고
    • Solving multi-item capacitated lot-sizing problems using variable redefinition
    • C. Eppen Solving multi-item capacitated lot-sizing problems using variable redefinition Operations Research 35 6 1987 832 848
    • (1987) Operations Research , vol.35 , Issue.6 , pp. 832-848
    • Eppen, C.1
  • 3
    • 33750728882 scopus 로고    scopus 로고
    • Meta-heuristics for dynamic lot sizing a review and comparison of solution approaches
    • R. Jans, and Z. Degraeve Meta-heuristics for dynamic lot sizing a review and comparison of solution approaches European Journal of Operational Research 177 3 2007 1855 1875
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1855-1875
    • Jans, R.1    Degraeve, Z.2
  • 4
    • 0008655177 scopus 로고    scopus 로고
    • The general lotsizing and scheduling problem
    • B. Fleischmann, and H. Meyr The general lotsizing and scheduling problem OR Spectrum 19 1997 11 21
    • (1997) OR Spectrum , vol.19 , pp. 11-21
    • Fleischmann, B.1    Meyr, H.2
  • 6
    • 14344257769 scopus 로고    scopus 로고
    • India's pulp and paper industry: Productivity and energy efficiency
    • Schumacher K, Sathaye J. India's pulp and paper industry: productivity and energy efficiency. Tech. Rep., LBNL-41843; 1999.
    • (1999) Tech. Rep., LBNL-41843
    • Schumacher, K.1    Sathaye, J.2
  • 9
    • 37149016109 scopus 로고    scopus 로고
    • Synchronized production-distribution planning in a single-plant multi-destination network
    • N. Rizk, A. Martel, and S. D'Amours Synchronized production-distribution planning in a single-plant multi-destination network Journal of the Operational Research Society 59 1 2008 90 104
    • (2008) Journal of the Operational Research Society , vol.59 , Issue.1 , pp. 90-104
    • Rizk, N.1    Martel, A.2    D'Amours, S.3
  • 10
    • 33845515674 scopus 로고    scopus 로고
    • Increased capacity in kraft pulp mills lignin separation and reduced steam demand compared with recovery boiler upgrade
    • E. Axelsson, M. Olsson, and T. Berntsson Increased capacity in kraft pulp mills lignin separation and reduced steam demand compared with recovery boiler upgrade Nordic Pulp and Paper Research Journal 21 4 2006 485 492
    • (2006) Nordic Pulp and Paper Research Journal , vol.21 , Issue.4 , pp. 485-492
    • Axelsson, E.1    Olsson, M.2    Berntsson, T.3
  • 11
    • 53249097337 scopus 로고    scopus 로고
    • Excess heat from kraft pulp mills trade-offs between internal and external use in the case of sweden-part 2: Results for future energy market scenarios
    • J. Jonsson, I. Svensson, T. Berntsson, and B. Moshfegh Excess heat from kraft pulp mills trade-offs between internal and external use in the case of sweden-part 2: results for future energy market scenarios Energy Policy 36 11 2008 4186 4197
    • (2008) Energy Policy , vol.36 , Issue.11 , pp. 4186-4197
    • Jonsson, J.1    Svensson, I.2    Berntsson, T.3    Moshfegh, B.4
  • 13
    • 0344236266 scopus 로고    scopus 로고
    • Metaheuristics in combinatorial optimization overview and conceptual comparison
    • C. Blum, and A. Roli Metaheuristics in combinatorial optimization overview and conceptual comparison ACM Computing Surveys 35 2003 268 308
    • (2003) ACM Computing Surveys , vol.35 , pp. 268-308
    • Blum, C.1    Roli, A.2
  • 16
  • 17
    • 0346093875 scopus 로고    scopus 로고
    • Using tabu search with ranking candidate list to solve production planning problems with setups
    • Y.-F. Hung, C.-P. Chen, C.-C. Shih, and M.-H. Hung Using tabu search with ranking candidate list to solve production planning problems with setups Computers & Industrial Engineering 45 4 2003 615 634
    • (2003) Computers & Industrial Engineering , vol.45 , Issue.4 , pp. 615-634
    • Hung, Y.-F.1    Chen, C.-P.2    Shih, C.-C.3    Hung, M.-H.4
  • 18
    • 69249213631 scopus 로고    scopus 로고
    • A hybrid optimization approach for multi-level capacitated lot-sizing problems
    • C. Almeder A hybrid optimization approach for multi-level capacitated lot-sizing problems European Journal of Operational Research 200 2 2010 599 606
    • (2010) European Journal of Operational Research , vol.200 , Issue.2 , pp. 599-606
    • Almeder, C.1
  • 20
    • 0033903519 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
    • H. Meyr Simultaneous lotsizing and scheduling by combining local search with dual reoptimization European Journal of Operational Research 120 2 2000 311 326
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 311-326
    • Meyr, H.1
  • 22
    • 57049159782 scopus 로고    scopus 로고
    • Scheduling of a continuous plant with recycling of byproducts a case study from a tissue paper mill
    • P.M. Castro, J. Westerlund, and S. Forssell Scheduling of a continuous plant with recycling of byproducts a case study from a tissue paper mill Computers & Chemical Engineering 33 1 2009 347 358
    • (2009) Computers & Chemical Engineering , vol.33 , Issue.1 , pp. 347-358
    • Castro, P.M.1    Westerlund, J.2    Forssell, S.3
  • 23
    • 84867183641 scopus 로고    scopus 로고
    • Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries
    • V. Camargo, F. Toledo, and B. Almada-Lobo Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries Journal of the Operational Research Society 63 2012 1613 1630
    • (2012) Journal of the Operational Research Society , vol.63 , pp. 1613-1630
    • Camargo, V.1    Toledo, F.2    Almada-Lobo, B.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.