메뉴 건너뛰기




Volumn 66, Issue , 2014, Pages 165-185

Robust optimization and stochastic programming approaches for medium-term production scheduling of a large-scale steelmaking continuous casting process under demand uncertainty

Author keywords

Continuous casting; Demand uncertainty; Robust optimization; Scheduling; Steelmaking; Two stage stochastic programming

Indexed keywords

CONTINUOUS CASTING; OPTIMIZATION; PRODUCTION CONTROL; PRODUCTION ENGINEERING; STEELMAKING; STOCHASTIC PROGRAMMING;

EID: 84901242416     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2014.02.028     Document Type: Article
Times cited : (56)

References (36)
  • 1
    • 58549106334 scopus 로고    scopus 로고
    • Novel hybrid algorithm for scheduling steel-making continuous casting production
    • Atighehchian A., Bijari M., Tarkesh H.A. Novel hybrid algorithm for scheduling steel-making continuous casting production. Computers & Operations Research 2009, 36:2450-2461.
    • (2009) Computers & Operations Research , vol.36 , pp. 2450-2461
    • Atighehchian, A.1    Bijari, M.2    Tarkesh, H.A.3
  • 2
    • 84901221720 scopus 로고    scopus 로고
    • A survey of the application of non-optimization techniques in an integrated steel plants. In preparation for submission to interactive transactions of operation research
    • Basu S., Dutta G., Seth R. A survey of the application of non-optimization techniques in an integrated steel plants. In preparation for submission to interactive transactions of operation research 2014, www.iimahd.ernet.in/~goutam/survey2.htm.
    • (2014)
    • Basu, S.1    Dutta, G.2    Seth, R.3
  • 3
    • 33748751184 scopus 로고    scopus 로고
    • A mixed-integer linear programming model for the continuous casting planning
    • Bellabdaoui A., Teghem J. A mixed-integer linear programming model for the continuous casting planning. International Journal of Production Economics 2006, 104:260-270.
    • (2006) International Journal of Production Economics , vol.104 , pp. 260-270
    • Bellabdaoui, A.1    Teghem, J.2
  • 4
    • 0346607177 scopus 로고    scopus 로고
    • A survey of mathematical programming applications in integrated steel plants
    • Dutta G., Fourer R. A survey of mathematical programming applications in integrated steel plants. Manufacturing & Service Operations Management 2001, 3:387-400.
    • (2001) Manufacturing & Service Operations Management , vol.3 , pp. 387-400
    • Dutta, G.1    Fourer, R.2
  • 5
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • Floudas C.A., Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers and Chemical Engineering 2004, 8:2109-2129.
    • (2004) Computers and Chemical Engineering , vol.8 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 6
    • 25144491255 scopus 로고    scopus 로고
    • Mixed integer linear programming in process scheduling: modeling, algorithms, and applications
    • Floudas C.A., Lin X. Mixed integer linear programming in process scheduling: modeling, algorithms, and applications. Annals of Operation Research 2005, 139:131-162.
    • (2005) Annals of Operation Research , vol.139 , pp. 131-162
    • Floudas, C.A.1    Lin, X.2
  • 8
    • 84863359995 scopus 로고    scopus 로고
    • Analysis of random disturbances on shop floor in modern steel production dynamic environment
    • Hou D.L., Li T.K. Analysis of random disturbances on shop floor in modern steel production dynamic environment. Procedia Engineering 2012, 29:663-667.
    • (2012) Procedia Engineering , vol.29 , pp. 663-667
    • Hou, D.L.1    Li, T.K.2
  • 9
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes
    • Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes. Industrial and Engineering Chemistry Research 1998, 37:4341-4359.
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 10
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. Continuous and semi-continuous process
    • Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling. 2. Continuous and semi-continuous process. Industrial and Engineering Chemistry Research 1998, 37:4360-4374.
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 11
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
    • Janak S.L., Lin X., Floudas C.A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies. Industrial and Engineering Chemistry Research 2004, 43:2516-2533.
    • (2004) Industrial and Engineering Chemistry Research , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 14
    • 33845624253 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty. II Uncertainty with known probability distribution
    • Janak S.L., Lin X., Floudas C.A. A new robust optimization approach for scheduling under uncertainty. II Uncertainty with known probability distribution. Computers and Chemical Engineering 2007, 31:171-195.
    • (2007) Computers and Chemical Engineering , vol.31 , pp. 171-195
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 15
    • 38849197825 scopus 로고    scopus 로고
    • Improving unit-specific event based continuous-time approaches for batch processes: Integrality gap and task splitting
    • Janak S.L., Floudas C.A. Improving unit-specific event based continuous-time approaches for batch processes: Integrality gap and task splitting. Computers and Chemical Engineering 2008, 32:913-955.
    • (2008) Computers and Chemical Engineering , vol.32 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 16
    • 79955548378 scopus 로고    scopus 로고
    • Optimal event point determination for short-term scheduling of multipurpose batch plants via unit-specific event-based continuous-time approaches
    • Li J., Floudas C.A. Optimal event point determination for short-term scheduling of multipurpose batch plants via unit-specific event-based continuous-time approaches. Industrial and Engineering Chemistry Research 2010, 49:7446-7469.
    • (2010) Industrial and Engineering Chemistry Research , vol.49 , pp. 7446-7469
    • Li, J.1    Floudas, C.A.2
  • 17
    • 84866929231 scopus 로고    scopus 로고
    • Production scheduling of a large-scale steelmaking continuous casting process via unit-specific event-based continuous-time models: Short-term and medium-term scheduling
    • Li J., Xiao X., Tang Q.H., Floudas C.A. Production scheduling of a large-scale steelmaking continuous casting process via unit-specific event-based continuous-time models: Short-term and medium-term scheduling. Industrial and Engineering Chemistry Research 2012, 51:7300-7319.
    • (2012) Industrial and Engineering Chemistry Research , vol.51 , pp. 7300-7319
    • Li, J.1    Xiao, X.2    Tang, Q.H.3    Floudas, C.A.4
  • 18
    • 38849148294 scopus 로고    scopus 로고
    • Processing scheduling under uncertainty: Review and challenges
    • Li Z., Ierapetritou M. Processing scheduling under uncertainty: Review and challenges. Computers and Chemical Engineering 2008, 32:715-727.
    • (2008) Computers and Chemical Engineering , vol.32 , pp. 715-727
    • Li, Z.1    Ierapetritou, M.2
  • 19
    • 80052829888 scopus 로고    scopus 로고
    • A comparative theoretical and computational study on robust counterpart optimization: I, Robust linear optimization and robust mixed-integer linear optimization
    • Li Z., Ding R., Floudas C.A. A comparative theoretical and computational study on robust counterpart optimization: I, Robust linear optimization and robust mixed-integer linear optimization. Industrial and Engineering Chemistry Research 2011, 50:10567-10603.
    • (2011) Industrial and Engineering Chemistry Research , vol.50 , pp. 10567-10603
    • Li, Z.1    Ding, R.2    Floudas, C.A.3
  • 20
    • 84861168114 scopus 로고    scopus 로고
    • A comparative theoretical and computational study on robust counterpart optimization: II. Probabilistic guarantees on constraint satisfaction
    • Li Z., Tang Q., Floudas C.A. A comparative theoretical and computational study on robust counterpart optimization: II. Probabilistic guarantees on constraint satisfaction. Industrial and Engineering Chemistry Research 2012, 51:6769-6788.
    • (2012) Industrial and Engineering Chemistry Research , vol.51 , pp. 6769-6788
    • Li, Z.1    Tang, Q.2    Floudas, C.A.3
  • 21
    • 84901221721 scopus 로고    scopus 로고
    • Optimal scenario reduction framework based on distance of uncertainty distribution and output performance: I. Single reduction via mixed integer linear optimization
    • Accepted
    • Li Z., Floudas C.A. Optimal scenario reduction framework based on distance of uncertainty distribution and output performance: I. Single reduction via mixed integer linear optimization. Computers and Chemical Engineering 2013, Accepted.
    • (2013) Computers and Chemical Engineering
    • Li, Z.1    Floudas, C.A.2
  • 22
    • 84901221722 scopus 로고    scopus 로고
    • Optimal scenario reduction framework based on distance of uncertainty distribution and output performance: II sequential reduction (to be submitted).
    • Li Z., Floudas C.A. Optimal scenario reduction framework based on distance of uncertainty distribution and output performance: II sequential reduction 2013 (to be submitted).
    • (2013)
    • Li, Z.1    Floudas, C.A.2
  • 23
    • 0037036735 scopus 로고    scopus 로고
    • Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
    • Lin X., Floudas C.A., Modi S., Juhasz N.M. Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant. Industrial and Engineering Chemistry Research 2002, 41:3884-3906.
    • (2002) Industrial and Engineering Chemistry Research , vol.41 , pp. 3884-3906
    • Lin, X.1    Floudas, C.A.2    Modi, S.3    Juhasz, N.M.4
  • 24
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: I Bounded uncertainty
    • Lin X., Janak S.L., Floudas C.A. A new robust optimization approach for scheduling under uncertainty: I Bounded uncertainty. Computers and Chemical Engineering 2004, 28:1069-1085.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 1069-1085
    • Lin, X.1    Janak, S.L.2    Floudas, C.A.3
  • 25
    • 70449590249 scopus 로고    scopus 로고
    • A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry
    • Missbauer H., Hauber W., Stadler W. A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry. International Journal of Production Research 2009, 47:4147-4172.
    • (2009) International Journal of Production Research , vol.47 , pp. 4147-4172
    • Missbauer, H.1    Hauber, W.2    Stadler, W.3
  • 26
    • 9644281095 scopus 로고    scopus 로고
    • Production scheduling in a steelmaking continuous casting plant
    • Pacciarelli D., Pranzo M. Production scheduling in a steelmaking continuous casting plant. Computers and Chemical Engineering 2004, 28:2823-2835.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 2823-2835
    • Pacciarelli, D.1    Pranzo, M.2
  • 27
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: A comparative study
    • Shaik M.A., Janak S.L., Floudas C.A. Continuous-time models for short-term scheduling of multipurpose batch plants: A comparative study. Industrial and Engineering Chemistry Research 2006, 45:6190-6209.
    • (2006) Industrial and Engineering Chemistry Research , vol.45 , pp. 6190-6209
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.A.3
  • 28
    • 35549009402 scopus 로고    scopus 로고
    • Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework
    • Shaik M.A., Floudas C.A. Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework. Computers and Chemical Engineering 2008, 32:260-274.
    • (2008) Computers and Chemical Engineering , vol.32 , pp. 260-274
    • Shaik, M.A.1    Floudas, C.A.2
  • 30
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • Tang L.X., Liu J.Y., Rong A.Y., Yang Z.H. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research 2001, 133:1-20.
    • (2001) European Journal of Operational Research , vol.133 , pp. 1-20
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 32
    • 37149016932 scopus 로고    scopus 로고
    • A predictive reactive scheduling method for color-coating production in steel industry
    • Tang L.X., Wang X.P. A predictive reactive scheduling method for color-coating production in steel industry. Int J Adv Manuf 2008, 35:633-645.
    • (2008) Int J Adv Manuf , vol.35 , pp. 633-645
    • Tang, L.X.1    Wang, X.P.2
  • 33
    • 68849109211 scopus 로고    scopus 로고
    • Operational planning of large-scale industrial batch plants under demand due date and amount uncertainty. I. Robust optimization framework
    • Verderame P.M., Floudas C.A. Operational planning of large-scale industrial batch plants under demand due date and amount uncertainty. I. Robust optimization framework. Industrial and Engineering Chemistry Research 2009, 48:7214-7231.
    • (2009) Industrial and Engineering Chemistry Research , vol.48 , pp. 7214-7231
    • Verderame, P.M.1    Floudas, C.A.2
  • 35
    • 84879026101 scopus 로고    scopus 로고
    • Production rescheduling based on stability under uncertainty for continuous slab casting
    • Worapradya K., Buranathiti T. Production rescheduling based on stability under uncertainty for continuous slab casting. Proceedings of ASIMMOD, January 22-23 2009, 170-176.
    • (2009) Proceedings of ASIMMOD, January 22-23 , pp. 170-176
    • Worapradya, K.1    Buranathiti, T.2
  • 36
    • 84879019790 scopus 로고    scopus 로고
    • Scheduling of steelmaking and continuous casting process under processing time uncertainty
    • Yu S.P., Pang X.F., Chai T.Y., Zheng B.L. Scheduling of steelmaking and continuous casting process under processing time uncertainty. Control and Decision 2009, 24(10):1-6.
    • (2009) Control and Decision , vol.24 , Issue.10 , pp. 1-6
    • Yu, S.P.1    Pang, X.F.2    Chai, T.Y.3    Zheng, B.L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.