메뉴 건너뛰기




Volumn 67, Issue , 2014, Pages 83-102

Simultaneous regular and non-regular production scheduling of multipurpose batch plants: A real chemical-pharmaceutical case study

Author keywords

Campaign and short term scheduling; MILP models; Multipurpose batch plants; Resource Task Network; Rolling horizon

Indexed keywords

INTEGER PROGRAMMING; PRODUCTION CONTROL;

EID: 84899008060     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2014.03.017     Document Type: Article
Times cited : (28)

References (45)
  • 1
    • 38349145692 scopus 로고    scopus 로고
    • Optimal supply chain management with detailed scheduling
    • Amaro A.C., Barbosa-Póvoa A.P.F.D. Optimal supply chain management with detailed scheduling. Ind Eng Chem Res 2008, 47(1):116-132.
    • (2008) Ind Eng Chem Res , vol.47 , Issue.1 , pp. 116-132
    • Amaro, A.C.1    Barbosa-Póvoa, A.P.F.D.2
  • 2
    • 50849132548 scopus 로고    scopus 로고
    • Planning and scheduling of industrial supply chains with reverse flows: a real pharmaceutical case-study
    • Amaro A.C., Barbosa-Póvoa A.P.F.D. Planning and scheduling of industrial supply chains with reverse flows: a real pharmaceutical case-study. Comput Chem Eng 2008, 32:2606-2635.
    • (2008) Comput Chem Eng , vol.32 , pp. 2606-2635
    • Amaro, A.C.1    Barbosa-Póvoa, A.P.F.D.2
  • 3
    • 33947623717 scopus 로고    scopus 로고
    • A critical review on the design and retrofit of batch plants
    • Barbosa-Povoa A.P. A critical review on the design and retrofit of batch plants. Comput Chem Eng 2007, 31:833-855.
    • (2007) Comput Chem Eng , vol.31 , pp. 833-855
    • Barbosa-Povoa, A.P.1
  • 5
    • 0030417871 scopus 로고    scopus 로고
    • Decomposition techniques for the solution of large-scale scheduling problems
    • Bassett M.H., Pekny J.F., Reklaitis G.V. Decomposition techniques for the solution of large-scale scheduling problems. AIChE J 1996, 42:3373-3387.
    • (1996) AIChE J , vol.42 , pp. 3373-3387
    • Bassett, M.H.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 6
    • 0035795519 scopus 로고    scopus 로고
    • An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants
    • Castro P., Barbosa-Povoa A., Matos H. An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants. Ind Eng Chem Res 2001, 40:2059-2068.
    • (2001) Ind Eng Chem Res , vol.40 , pp. 2059-2068
    • Castro, P.1    Barbosa-Povoa, A.2    Matos, H.3
  • 7
    • 0038337833 scopus 로고    scopus 로고
    • Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations: a case study approach
    • Castro P., Barbosa-Povoa A.P., Matos H.A. Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations: a case study approach. Ind Eng Chem Res 2003, 42:3346-3360.
    • (2003) Ind Eng Chem Res , vol.42 , pp. 3346-3360
    • Castro, P.1    Barbosa-Povoa, A.P.2    Matos, H.A.3
  • 8
    • 43449083507 scopus 로고    scopus 로고
    • Optimal equipment allocation for high plant flexibility: an industrial case study
    • Castro P., Novais Q., Carvalho A. Optimal equipment allocation for high plant flexibility: an industrial case study. Ind Eng Chem Res 2008, 47:2742-2761.
    • (2008) Ind Eng Chem Res , vol.47 , pp. 2742-2761
    • Castro, P.1    Novais, Q.2    Carvalho, A.3
  • 9
    • 0000685021 scopus 로고    scopus 로고
    • RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants
    • Dimitriadis A., Shah N., Pantelides C. RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants. Comput Chem Eng 1997, 21:S1061-S1066.
    • (1997) Comput Chem Eng , vol.21
    • Dimitriadis, A.1    Shah, N.2    Pantelides, C.3
  • 10
    • 34548563859 scopus 로고    scopus 로고
    • Planning models for parallel batch reactors with sequence-dependent changeovers
    • Erdirik-Dogan M., Grossmann I.E. Planning models for parallel batch reactors with sequence-dependent changeovers. AIChE J 2007, 53:2284-2300.
    • (2007) AIChE J , vol.53 , pp. 2284-2300
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 11
    • 84858304484 scopus 로고    scopus 로고
    • Scheduling of multistage multiproduct batch plants operating in a campaign-mode
    • Fumero Y., Corsano G., Montagna J.M. Scheduling of multistage multiproduct batch plants operating in a campaign-mode. Ind Eng Chem Res 2012, 51:3988-4001.
    • (2012) Ind Eng Chem Res , vol.51 , pp. 3988-4001
    • Fumero, Y.1    Corsano, G.2    Montagna, J.M.3
  • 12
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou M., Floudas C. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Ind Eng Chem Res 1998, 37:4341-4359.
    • (1998) Ind Eng Chem Res , vol.37 , pp. 4341-4359
    • Ierapetritou, M.1    Floudas, C.2
  • 13
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak S.L., Lin X., Floudas C.A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Ind Eng Chem Res 2004, 43:2516-2533.
    • (2004) Ind Eng Chem Res , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 14
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-I. MILP formulation
    • Kondili E., Pantelides C., Sargent R. A general algorithm for short-term scheduling of batch operations-I. MILP formulation. Comput Chem Eng 1993, 17:211-227.
    • (1993) Comput Chem Eng , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.2    Sargent, R.3
  • 15
    • 77949786665 scopus 로고    scopus 로고
    • A review on integrated process planning and scheduling
    • Li X., Gao L., Zhang C., Shao X. A review on integrated process planning and scheduling. Int J Manuf Res 2010, 5:161-180.
    • (2010) Int J Manuf Res , vol.5 , pp. 161-180
    • Li, X.1    Gao, L.2    Zhang, C.3    Shao, X.4
  • 16
    • 38849148294 scopus 로고    scopus 로고
    • Process scheduling under uncertainty: review and challenges
    • Li Z., Ierapetritou M. Process scheduling under uncertainty: review and challenges. Comput Chem Eng 2008, 32:715-727.
    • (2008) Comput Chem Eng , vol.32 , pp. 715-727
    • Li, Z.1    Ierapetritou, M.2
  • 17
    • 0037036735 scopus 로고    scopus 로고
    • Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
    • Lin X., Floudas C.A., Modi S., Juhasz N.M. Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant. Ind Eng Chem Res 2002, 41:3884-3906.
    • (2002) Ind Eng Chem Res , vol.41 , pp. 3884-3906
    • Lin, X.1    Floudas, C.A.2    Modi, S.3    Juhasz, N.M.4
  • 18
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias C.T., Grossmann I.E. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Ind Eng Chem Res 2003, 42:3056-3074.
    • (2003) Ind Eng Chem Res , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 19
    • 70249093672 scopus 로고    scopus 로고
    • Integration of production planning and scheduling: overview, challenges and opportunities
    • Maravelias C.T., Sung C. Integration of production planning and scheduling: overview, challenges and opportunities. Comput Chem Eng 2009, 33:1919-1930.
    • (2009) Comput Chem Eng , vol.33 , pp. 1919-1930
    • Maravelias, C.T.1    Sung, C.2
  • 20
    • 0018651022 scopus 로고
    • Production planning and scheduling for multi-purpose batch chemical plants
    • Mauderli A., Rippin D. Production planning and scheduling for multi-purpose batch chemical plants. Comput Chem Eng 1979, 3:199-206.
    • (1979) Comput Chem Eng , vol.3 , pp. 199-206
    • Mauderli, A.1    Rippin, D.2
  • 21
    • 33748102266 scopus 로고    scopus 로고
    • State-of-the-art review of optimization methods for short-term scheduling of batch processes
    • Mendez C.A., Cerda J., Grossmann I.E., Harjunkoski I., Fahl M. State-of-the-art review of optimization methods for short-term scheduling of batch processes. Comput Chem Eng 2006, 30:913-946.
    • (2006) Comput Chem Eng , vol.30 , pp. 913-946
    • Mendez, C.A.1    Cerda, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 22
    • 0035339828 scopus 로고    scopus 로고
    • An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • Méndez C., Henning G., Cerda J. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Comput Chem Eng 2001, 25:701-711.
    • (2001) Comput Chem Eng , vol.25 , pp. 701-711
    • Méndez, C.1    Henning, G.2    Cerda, J.3
  • 25
    • 0027676057 scopus 로고
    • A hierarchical approach for campaign planning of multipurpose batch plants
    • Papageorgiou L.G., Pantelides C.C. A hierarchical approach for campaign planning of multipurpose batch plants. Comput Chem Eng 1993, 17:S27-S32.
    • (1993) Comput Chem Eng , vol.17
    • Papageorgiou, L.G.1    Pantelides, C.C.2
  • 26
    • 0030085944 scopus 로고    scopus 로고
    • Optimal campaign planning/scheduling of multipurpose batch/semicontinuous plants. 1. Mathematical formulation
    • Papageorgiou L.G., Pantelides C.C. Optimal campaign planning/scheduling of multipurpose batch/semicontinuous plants. 1. Mathematical formulation. Ind Eng Chem Res 1996, 35:488-509.
    • (1996) Ind Eng Chem Res , vol.35 , pp. 488-509
    • Papageorgiou, L.G.1    Pantelides, C.C.2
  • 27
    • 0030084421 scopus 로고    scopus 로고
    • Optimal campaign planning/scheduling of multipurpose batch/semicontinuous plants. 2. A mathematical decomposition approach
    • Papageorgiou L.G., Pantelides C.C. Optimal campaign planning/scheduling of multipurpose batch/semicontinuous plants. 2. A mathematical decomposition approach. Ind Eng Chem Res 1996, 35:510-529.
    • (1996) Ind Eng Chem Res , vol.35 , pp. 510-529
    • Papageorgiou, L.G.1    Pantelides, C.C.2
  • 28
    • 18244384039 scopus 로고    scopus 로고
    • Optimal design and retrofit of batch plants with a periodic mode of operation
    • Pinto T., Barbosa-Póvoa A.P.F.D., Novais A.Q. Optimal design and retrofit of batch plants with a periodic mode of operation. Comput Chem Eng 2005, 29:1293-1303.
    • (2005) Comput Chem Eng , vol.29 , pp. 1293-1303
    • Pinto, T.1    Barbosa-Póvoa, A.P.F.D.2    Novais, A.Q.3
  • 29
    • 50549092936 scopus 로고    scopus 로고
    • A tighter continuous time formulation for the cyclic scheduling of a mixed plant
    • Pochet Y., Warichet F. A tighter continuous time formulation for the cyclic scheduling of a mixed plant. Comput Chem Eng 2008, 32:2723-2744.
    • (2008) Comput Chem Eng , vol.32 , pp. 2723-2744
    • Pochet, Y.1    Warichet, F.2
  • 30
    • 0029520801 scopus 로고
    • Scheduling approaches for the batch process industries
    • Reklaitis G. Scheduling approaches for the batch process industries. ISA Trans 1995, 34:349-358.
    • (1995) ISA Trans , vol.34 , pp. 349-358
    • Reklaitis, G.1
  • 31
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G., Pantelides C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Comput Chem Eng 1996, 20:S1221-S1226.
    • (1996) Comput Chem Eng , vol.20
    • Schilling, G.1    Pantelides, C.2
  • 32
    • 0033135220 scopus 로고    scopus 로고
    • Optimal periodic scheduling of multipurpose plants
    • Schilling G., Pantelides C. Optimal periodic scheduling of multipurpose plants. Comput Chem Eng 1999, 23:635-655.
    • (1999) Comput Chem Eng , vol.23 , pp. 635-655
    • Schilling, G.1    Pantelides, C.2
  • 33
    • 34248351474 scopus 로고
    • Optimal periodic scheduling of multipurpose batch plants
    • Shah N., Pantelides C., Sargent R. Optimal periodic scheduling of multipurpose batch plants. Ann Oper Res 1993, 42:193-228.
    • (1993) Ann Oper Res , vol.42 , pp. 193-228
    • Shah, N.1    Pantelides, C.2    Sargent, R.3
  • 34
    • 1942436302 scopus 로고    scopus 로고
    • Pharmaceutical supply chains: key issues and strategies for optimisation
    • Shah N. Pharmaceutical supply chains: key issues and strategies for optimisation. Comput Chem Eng 2004, 28:929-941.
    • (2004) Comput Chem Eng , vol.28 , pp. 929-941
    • Shah, N.1
  • 35
    • 80051785207 scopus 로고    scopus 로고
    • Discrete and continuous time representations and mathematical models for large production scheduling problems: a case study from the pharmaceutical industry
    • Stefansson H., Sigmarsdottir S., Jensson P., Shah N. Discrete and continuous time representations and mathematical models for large production scheduling problems: a case study from the pharmaceutical industry. Eur J Oper Res 2011, 215(2):383-392. 10.1016/j.ejor.2011.06.021.
    • (2011) Eur J Oper Res , vol.215 , Issue.2 , pp. 383-392
    • Stefansson, H.1    Sigmarsdottir, S.2    Jensson, P.3    Shah, N.4
  • 36
    • 79955536361 scopus 로고    scopus 로고
    • Computational study of network-based mixed-integer programming approaches for chemical production scheduling
    • Sundaramoorthy A., Maravelias C.T. Computational study of network-based mixed-integer programming approaches for chemical production scheduling. Ind Eng Chem Res 2011, 50:5023-5040. 10.1021/ie101419z.
    • (2011) Ind Eng Chem Res , vol.50 , pp. 5023-5040
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 37
    • 11144302512 scopus 로고    scopus 로고
    • Planning in pharmaceutical supply chains with outsourcing and new product introductions
    • Sundaramoorthy A., Karimi I. Planning in pharmaceutical supply chains with outsourcing and new product introductions. Ind Eng Chem Res 2004, 43:8293-8306.
    • (2004) Ind Eng Chem Res , vol.43 , pp. 8293-8306
    • Sundaramoorthy, A.1    Karimi, I.2
  • 38
    • 84875000745 scopus 로고    scopus 로고
    • Reformulations and branching methods for mixed-integer programming chemical production scheduling models
    • Velez S., Maravelias C.T. Reformulations and branching methods for mixed-integer programming chemical production scheduling models. Ind Eng Chem Res 2013, 52:3832-3841.
    • (2013) Ind Eng Chem Res , vol.52 , pp. 3832-3841
    • Velez, S.1    Maravelias, C.T.2
  • 39
    • 77951681272 scopus 로고    scopus 로고
    • Planning and scheduling under uncertainty: a review across multiple sectors
    • Verderame P.M., Elia J.A., Li J., Floudas C.A. Planning and scheduling under uncertainty: a review across multiple sectors. Ind Eng Chem Res 2010, 49:3993-4017.
    • (2010) Ind Eng Chem Res , vol.49 , pp. 3993-4017
    • Verderame, P.M.1    Elia, J.A.2    Li, J.3    Floudas, C.A.4
  • 40
    • 84861209435 scopus 로고    scopus 로고
    • Improved three-index unit-specific event-based model for short-term scheduling of batch plants
    • Vooradi R., Shaik M.A. Improved three-index unit-specific event-based model for short-term scheduling of batch plants. Comput Chem Eng 2012, 43:148-172. 10.1016/j.compchemeng.2012.03.014.
    • (2012) Comput Chem Eng , vol.43 , pp. 148-172
    • Vooradi, R.1    Shaik, M.A.2
  • 41
    • 4143112202 scopus 로고    scopus 로고
    • Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation
    • Wu D., Ierapetritou M. Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation. Comput Chem Eng 2004, 28:2271-2286.
    • (2004) Comput Chem Eng , vol.28 , pp. 2271-2286
    • Wu, D.1    Ierapetritou, M.2
  • 42
    • 34548447064 scopus 로고    scopus 로고
    • Hierarchical approach for production planning and scheduling under uncertainty
    • Wu D., Ierapetritou M. Hierarchical approach for production planning and scheduling under uncertainty. Chem Eng Process Process Intens 2007, 46:1129-1140.
    • (2007) Chem Eng Process Process Intens , vol.46 , pp. 1129-1140
    • Wu, D.1    Ierapetritou, M.2
  • 43
    • 0041805288 scopus 로고    scopus 로고
    • Decomposition approaches for the efficient solution of short-term scheduling problems
    • Wu D., Ierapetritou M.G. Decomposition approaches for the efficient solution of short-term scheduling problems. Comput Chem Eng 2003, 27:1261-1276.
    • (2003) Comput Chem Eng , vol.27 , pp. 1261-1276
    • Wu, D.1    Ierapetritou, M.G.2
  • 44
    • 70249088300 scopus 로고    scopus 로고
    • Dinkelbach's algorithm as an efficient method to solve a class of MINLP models for large-scale cyclic scheduling problems
    • You F., Castro P.M., Grossmann I.E. Dinkelbach's algorithm as an efficient method to solve a class of MINLP models for large-scale cyclic scheduling problems. Comput Chem Eng 2009, 33:1879-1889.
    • (2009) Comput Chem Eng , vol.33 , pp. 1879-1889
    • You, F.1    Castro, P.M.2    Grossmann, I.E.3
  • 45
    • 0028546642 scopus 로고
    • Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes
    • Zentner M., Pekny J., Reklaitis G., Gupta J. Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes. J Process Control 1994, 4:259-280.
    • (1994) J Process Control , vol.4 , pp. 259-280
    • Zentner, M.1    Pekny, J.2    Reklaitis, G.3    Gupta, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.