-
1
-
-
0033871635
-
Scheduling no-wait robotic cells with two and three machines
-
A. Agnetis, Scheduling no-wait robotic cells with two and three machines, European J. Oper. Res., 123 (2000), pp. 303-314.
-
(2000)
European J. Oper. Res.
, vol.123
, pp. 303-314
-
-
Agnetis, A.1
-
2
-
-
0034315580
-
Part sequencing in three machine no-wait robotic cells
-
A. Agnetis and D. Pacciarelli, Part sequencing in three machine no-wait robotic cells, Oper. Res. Lett., 27 (2000), pp. 185-192.
-
(2000)
Oper. Res. Lett.
, vol.27
, pp. 185-192
-
-
Agnetis, A.1
Pacciarelli, D.2
-
3
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing
-
E. Akçali, K. Nemoto, and R. Uzsoy, Cycle-time improvements for photolithography process in semiconductor manufacturing, IEEE Trans. Semiconductor Manufacturing, 14 (2001), pp. 48-56.
-
(2001)
IEEE Trans. Semiconductor Manufacturing
, vol.14
, pp. 48-56
-
-
Akçali, E.1
Nemoto, K.2
Uzsoy, R.3
-
4
-
-
4243868705
-
Ordonnancement dans des cellules robotisées
-
Thèse de doctorat, Université Joseph Fourier, Grenoble, France
-
N. Brauner, Ordonnancement dans des cellules robotisées, Thèse de doctorat, Université Joseph Fourier, Grenoble, France, 1999.
-
(1999)
-
-
Brauner, N.1
-
5
-
-
0013112614
-
-
Internal note, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France
-
N. Brauner and G. Finke, Final Results on the One-Cycle Conjecture in Robotic Cells, Internal note, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France, 1997.
-
(1997)
Final Results on the One-Cycle Conjecture in Robotic Cells
-
-
Brauner, N.1
Finke, G.2
-
6
-
-
0002804434
-
On the conjecture in robotic cells: New simplified proof for the three-machine case
-
N. Brauner and G. Finke, On the conjecture in robotic cells: New simplified proof for the three-machine case, INFOR, 37 (1999), pp. 20-36.
-
(1999)
INFOR
, vol.37
, pp. 20-36
-
-
Brauner, N.1
Finke, G.2
-
7
-
-
0035816116
-
Cycles and permutations in robotic cells
-
N. Brauner and G. Finke, Cycles and permutations in robotic cells, Math. Comput. Modelling, 34 (2001), pp. 565-591.
-
(2001)
Math. Comput. Modelling
, vol.34
, pp. 565-591
-
-
Brauner, N.1
Finke, G.2
-
8
-
-
0035546060
-
Optimal moves of the material handling system in a robotic cell
-
N. Brauner and G. Finke, Optimal moves of the material handling system in a robotic cell, Internat. J. Production Economics, 74 (2001), pp. 269-277.
-
(2001)
Internat. J. Production Economics
, vol.74
, pp. 269-277
-
-
Brauner, N.1
Finke, G.2
-
9
-
-
3543073493
-
Complexity of one-cycle robotic flow-shops
-
N. Brauner, G. Finke, and W. Kubiak, Complexity of one-cycle robotic flow-shops, J. Scheduling, 6 (2003), pp. 355-372.
-
(2003)
J. Scheduling
, vol.6
, pp. 355-372
-
-
Brauner, N.1
Finke, G.2
Kubiak, W.3
-
10
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
A. Che, C. Chu, and F. Chu, Multicyclic hoist scheduling with constant processing times, IEEE Trans. Robotics and Automation, 18 (2002), pp. 69-80.
-
(2002)
IEEE Trans. Robotics and Automation
, vol.18
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
11
-
-
0037448766
-
A polynomial algorithm for 2-degree cyclic robot scheduling
-
A. Che, C. Chu, and E. Levner, A polynomial algorithm for 2-degree cyclic robot scheduling, European J. Oper. Res., 145 (2003), pp. 31-44.
-
(2003)
European J. Oper. Res.
, vol.145
, pp. 31-44
-
-
Che, A.1
Chu, C.2
Levner, E.3
-
12
-
-
0032000755
-
Cyclic scheduling with time window constraints
-
H. Chen, C. Chu, and J. Proth, Cyclic scheduling with time window constraints, IEEE Trans. Robotics and Automation, 14 (1998), pp. 144-152.
-
(1998)
IEEE Trans. Robotics and Automation
, vol.14
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.3
-
13
-
-
0034367676
-
Cyclic scheduling in robotic flowshops
-
Y. Crama, V. Katz, J. van de Klundert, and E. Levner, Cyclic scheduling in robotic flowshops, Ann. Oper. Res., 96 (2000), pp. 97-124.
-
(2000)
Ann. Oper. Res.
, vol.96
, pp. 97-124
-
-
Crama, Y.1
Katz, V.2
van de Klundert, J.3
Levner, E.4
-
14
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Y. Crama and J. van de Klundert, Cyclic scheduling of identical parts in a robotic cell, Oper. Res., 45 (1997), pp. 952-965.
-
(1997)
Oper. Res.
, vol.45
, pp. 952-965
-
-
Crama, Y.1
van de Klundert, J.2
-
15
-
-
0002604088
-
Cyclic scheduling in 3-machine robotic flow shops
-
Y. Crama and J. van de Klundert, Cyclic scheduling in 3-machine robotic flow shops, J. Scheduling, 2 (1999), pp. 35-54.
-
(1999)
J. Scheduling
, vol.2
, pp. 35-54
-
-
Crama, Y.1
van de Klundert, J.2
-
16
-
-
23944522312
-
Sequencing and scheduling in robotics cells: Recent developments
-
M. Dawande, H. N. Geismar, S. Sethi, and C. Sriskandarajah, Sequencing and scheduling in robotics cells: Recent developments, J. Scheduling, 8 (2005), pp. 387-426.
-
(2005)
J. Scheduling
, vol.8
, pp. 387-426
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.3
Sriskandarajah, C.4
-
17
-
-
0036769403
-
On throughput maximization in constant travel-time robotic cells
-
M. Dawande, C. Sriskandarajah, and S. Sethi, On throughput maximization in constant travel-time robotic cells, Manufacturing and Service Operations Management, 4 (2002), pp. 296-312.
-
(2002)
Manufacturing and Service Operations Management
, vol.4
, pp. 296-312
-
-
Dawande, M.1
Sriskandarajah, C.2
Sethi, S.3
-
19
-
-
4043145060
-
Robotic cells with parallel machines: Throughput maximization in constant travel-time cells
-
H. N. Geismar, M. Dawande, and C. Sriskandarajah, Robotic cells with parallel machines: Throughput maximization in constant travel-time cells, J. Scheduling, 7 (2004), pp. 375-395.
-
(2004)
J. Scheduling
, vol.7
, pp. 375-395
-
-
Geismar, H.N.1
Dawande, M.2
Sriskandarajah, C.3
-
20
-
-
9644308134
-
Approximation algorithms for k-unit cyclic solutions in robotic cells
-
H. N. Geismar, M. Dawande, and C. Sriskandarajah, Approximation algorithms for k-unit cyclic solutions in robotic cells, European J. Oper. Res., 162 (2005), pp. 291-309.
-
(2005)
European J. Oper. Res.
, vol.162
, pp. 291-309
-
-
Geismar, H.N.1
Dawande, M.2
Sriskandarajah, C.3
-
21
-
-
3242715937
-
Increasing throughput for robotic cells with parallel machines and multiple robots
-
H. N. Geismar, N. Ramanan, and C. Sriskandarajah, Increasing throughput for robotic cells with parallel machines and multiple robots, IEEE Trans. Automat. Sci. Engrg., 1 (2004), pp. 84-89.
-
(2004)
IEEE Trans. Automat. Sci. Engrg.
, vol.1
, pp. 84-89
-
-
Geismar, H.N.1
Ramanan, N.2
Sriskandarajah, C.3
-
22
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
N. Hall, H. Kamoun, and C. Sriskandarajah, Scheduling in robotic cells: Classification, two and three machine cells, Oper. Res., 45 (1997), pp. 421-439.
-
(1997)
Oper. Res.
, vol.45
, pp. 421-439
-
-
Hall, N.1
Kamoun, H.2
Sriskandarajah, C.3
-
23
-
-
0002868454
-
Scheduling in robotic cells: Complexity and steady state analysis
-
N. Hall, H. Kamoun, and C. Sriskandarajah, Scheduling in robotic cells: Complexity and steady state analysis, European J. Oper. Res., 109 (1998), pp. 43-63.
-
(1998)
European J. Oper. Res.
, vol.109
, pp. 43-63
-
-
Hall, N.1
Kamoun, H.2
Sriskandarajah, C.3
-
24
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
N. Hall and C. Sriskandarajah, A survey of machine scheduling problems with blocking and no-wait in process, Oper. Res., 44 (1996), pp. 510-525.
-
(1996)
Oper. Res.
, vol.44
, pp. 510-525
-
-
Hall, N.1
Sriskandarajah, C.2
-
25
-
-
0033312656
-
Scheduling in robotic cells: Heuristics and cell design
-
H. Kamoun, N. Hall, and C. Sriskandarajah, Scheduling in robotic cells: Heuristics and cell design, Oper. Res., 47 (1999), pp. 821-835.
-
(1999)
Oper. Res.
, vol.47
, pp. 821-835
-
-
Kamoun, H.1
Hall, N.2
Sriskandarajah, C.3
-
26
-
-
0345757595
-
Cyclic scheduling in a robotic production line
-
V. Kats and E. Levner, Cyclic scheduling in a robotic production line, J. Scheduling, 5 (2002), pp. 23-41.
-
(2002)
J. Scheduling
, vol.5
, pp. 23-41
-
-
Kats, V.1
Levner, E.2
-
27
-
-
0043185002
-
Exact solution of a cyclic scheduling problem
-
(in Russian)
-
V. Kats and Z. Mikhailetsky, Exact solution of a cyclic scheduling problem, Autom. Remote Control, 4 (1990), pp. 187-190 (in Russian).
-
(1990)
Autom. Remote Control
, vol.4
, pp. 187-190
-
-
Kats, V.1
Mikhailetsky, Z.2
-
29
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single-hoist electroplating line
-
L. Lei and T. Wang, Determining optimal cyclic hoist schedules in a single-hoist electroplating line, IIE Trans., 26 (1994), pp. 25-33.
-
(1994)
IIE Trans.
, vol.26
, pp. 25-33
-
-
Lei, L.1
Wang, T.2
-
30
-
-
0031095268
-
An improved algorithm for cyclic robotic flowshop scheduling in a robotic cell
-
E. Levner, V. Kats, and V. Levit, An improved algorithm for cyclic robotic flowshop scheduling in a robotic cell, European J. Oper. Res., 97 (1997), pp. 500-508.
-
(1997)
European J. Oper. Res.
, vol.97
, pp. 500-508
-
-
Levner, E.1
Kats, V.2
Levit, V.3
-
32
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput
-
T. Perkinson, P. McLarty, R. Gyurcsik, and R. Cavin, Single-wafer cluster tool performance: An analysis of throughput, IEEE Trans. Semiconductor Manufacturing, 7 (1994) pp. 369-373.
-
(1994)
IEEE Trans. Semiconductor Manufacturing
, vol.7
, pp. 369-373
-
-
Perkinson, T.1
McLarty, P.2
Gyurcsik, R.3
Cavin, R.4
-
33
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput
-
T. Perkinson, R. Gyurcsik, and P. McLarty, Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput, IEEE Trans. Semiconductor Manufacturing, 9 (1996), pp. 384-400.
-
(1996)
IEEE Trans. Semiconductor Manufacturing
, vol.9
, pp. 384-400
-
-
Perkinson, T.1
Gyurcsik, R.2
McLarty, P.3
-
34
-
-
0003438602
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
M. Pinedo, Scheduling: Theory, Algorithms, and Systems, Prentice-Hall, Englewood Cliffs, NJ, 1995.
-
(1995)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
35
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
S. Sethi, C. Sriskandarajah, G. Sorger, J. Blazewicz, and W. Kubiak, Sequencing of parts and robot moves in a robotic cell, Internat. J. Flexible Manufacturing Systems, 4 (1992), pp. 331-358.
-
(1992)
Internat. J. Flexible Manufacturing Systems
, vol.4
, pp. 331-358
-
-
Sethi, S.1
Sriskandarajah, C.2
Sorger, G.3
Blazewicz, J.4
Kubiak, W.5
-
36
-
-
0032391968
-
Scheduling large robotic cells without buffers
-
C. Sriskandarajah, N. Hall, and H. Kamoun, Scheduling large robotic cells without buffers, Ann. Oper. Res., 76 (1998), pp. 287-321.
-
(1998)
Ann. Oper. Res.
, vol.76
, pp. 287-321
-
-
Sriskandarajah, C.1
Hall, N.2
Kamoun, H.3
-
38
-
-
0031276238
-
A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots, IEEE Trans. Semiconductor Manufacturing, 10 (1997), pp. 418-424.
-
(1997)
IEEE Trans. Semiconductor Manufacturing
, vol.10
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
39
-
-
0030212052
-
Simple performance models for integrated processing tools
-
S. Wood, Simple performance models for integrated processing tools, IEEE Trans. Semiconductor Manufacturing, 9 (1996), pp. 320-328.
-
(1996)
IEEE Trans. Semiconductor Manufacturing
, vol.9
, pp. 320-328
-
-
Wood, S.1
|