Case-based reasoning: Foundational issues, methodological variations, and system approaches
-
Aamodt, A., and Plaza, E. 1994. Case-based reasoning: foundational issues, methodological variations, and system approaches. AI Communication, 7(1): 39-59.
-
(1994)
AI Communication
, vol.7
, Issue.1
, pp. 39-59
-
-
Aamodt, A.1
Plaza, E.2
-
2
-
-
50349086988
-
The fundamentals of case-based reasoning: Application to a building defect problem
-
Abdullah, S. 1997. The fundamentals of case-based reasoning: application to a building defect problem. Malaysian Journal of Computer Science, 10(1): 10-26.
-
(1997)
Malaysian Journal of Computer Science
, vol.10
, Issue.1
, pp. 10-26
-
-
Abdullah, S.1
-
3
-
-
33744950644
-
Hybrid genetic algorithms and case-based reasoning systems for customer classification
-
doi:10.1111/j.1468-0394.2006.00329.x
-
Ahn, H., Kim, K.J., and Han, I. 2005. Hybrid genetic algorithms and case-based reasoning systems for customer classification. Expert Systems with Applications, 23: 127-144. doi:10.1111/j.1468-0394.2006.00329.x.
-
(2005)
Expert Systems With Applications
, vol.23
, pp. 127-144
-
-
Ahn, H.1
Kim, K.J.2
Han, I.3
-
4
-
-
0033100590
-
Preliminary cost estimation of highway construction using neural networks
-
Al-Tabtabai, H., Alex, A.P., and Tantash, M. 1999. Preliminary cost estimation of highway construction using neural networks. Cost Engineering, 41(3): 19-24.
-
(1999)
Cost Engineering
, vol.41
, Issue.3
, pp. 19-24
-
-
Al-Tabtabai, H.1
Alex, A.P.2
Tantash, M.3
-
5
-
-
33847026525
-
A case-based reasoning cost estimating model using experience by analytic hierarchy processes
-
doi:10.1016/j.buildenv.2006.06.007
-
An, S.H., Kim, G.H., and Kang, K.I. 2007. A case-based reasoning cost estimating model using experience by analytic hierarchy processes. Building and Environment, 42(7): 2573-2579. doi:10.1016/j.buildenv.2006.06.007.
-
(2007)
Building and Environment
, vol.42
, Issue.7
, pp. 2573-2579
-
-
An, S.H.1
Kim, G.H.2
Kang, K.I.3
-
6
-
-
0032638318
-
Using case-based reasoning to predict the outcome of construction litigation
-
doi:10.1111/0885-9507.00157
-
Ardit, D., and Tokdemir, O. 1999. Using case-based reasoning to predict the outcome of construction litigation. Computer-Aided Civil Infrastructure Engineering, 14 (6): 385-393. doi:10.1111/0885-9507.00157.
-
(1999)
Computer-Aided Civil Infrastructure Engineering
, vol.14
, Issue.6
, pp. 385-393
-
-
Ardit, D.1
Tokdemir, O.2
-
7
-
-
56349153507
-
Web-based CBR system applied to early cost budgeting for pavement maintenance project
-
doi:10.1016/j.eswa.2008.01.025
-
Chou, J.S. 2009. Web-based CBR system applied to early cost budgeting for pavement maintenance project. Expert Systems with Applications, 36(2): 2947-2960. doi:10.1016/j.eswa.2008.01.025.
-
(2009)
Expert Systems With Applications
, vol.36
, Issue.2
, pp. 2947-2960
-
-
Chou, J.S.1
-
8
-
-
0035137161
-
Case-based reasoning approach in bid decision making
-
doi:10.1061/(ASCE)0733-9364(2001)127:1(35)
-
Chua, D.K.H., Li, D.Z., and Chan, W.T. 2001. Case-based reasoning approach in bid decision making. Journal of Construction Engineering and Management, 127(1): 35-45. doi:10.1061/(ASCE)0733-9364(2001)127:1(35).
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.1
, pp. 35-45
-
-
Chua, D.K.H.1
Li, D.Z.2
Chan, W.T.3
-
9
-
-
0002231440
-
Cost estimation of timber bridges using neural networks
-
Creese, R., and Li, L. 1995. Cost estimation of timber bridges using neural networks. Cost Engineering, 37(5): 17-22.
-
(1995)
Cost Engineering
, vol.37
, Issue.5
, pp. 17-22
-
-
Creese, R.1
Li, L.2
-
10
-
-
3142520906
-
Handbook of genetic algorithms
-
New York
-
Davis, L. 1991. Handbook of genetic algorithms. Van Nostrand Reinhold, New York.
-
(1991)
Van Nostrand Reinhold
-
-
Davis, L.1
-
11
-
-
0031678358
-
Integration of reasoning systems in architectural modelling activities
-
doi:10.1016/S0926- 5805(97)00056-3
-
Demirkan, H. 1998. Integration of reasoning systems in architectural modelling activities. Automation in Construction, 7(2-3): 229-236. doi:10.1016/S0926- 5805(97)00056-3.
-
(1998)
Automation In Construction
, vol.7
, Issue.2-3
, pp. 229-236
-
-
Demirkan, H.1
-
12
-
-
0009115069
-
Boiler erection scheduling using product models and case-based reasoning
-
doi:10.1061/(ASCE)0733-9364(1997)123:3(338)
-
Dzeng, R.J., and Tommelein, I.D. 1997. Boiler erection scheduling using product models and case-based reasoning. Journal of Construction Engineering and Management, 123(3): 338-347. doi:10.1061/(ASCE)0733-9364(1997)123:3(338).
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.3
, pp. 338-347
-
-
Dzeng, R.J.1
Tommelein, I.D.2
-
13
-
-
1642618562
-
Product modelling to support case-based construction planning and scheduling
-
10.1016/j.autcon.2003.10.002
-
Dzeng, R.J, and Tommeleing, I.D. 2004. Product modelling to support case-based construction planning and scheduling. Automation in Construction, 13(3): 341-360. doi:10.1016/j.autcon.2003.10.002.
-
(2004)
Automation In Construction
, vol.13
, Issue.3
, pp. 341-360
-
-
Dzeng, R.J.1
Tommeleing, I.D.2
-
14
-
-
2142669180
-
An artificial neural system for cost estimation of construction projects
-
Elhag, T.M.S., and Boussabaine, A.H. 1998. An artificial neural system for cost estimation of construction projects, 14th Annual ARCOM Conference September, 1: 219-226.
-
(1998)
14th Annual ARCOM Conference September
, vol.1
, pp. 219-226
-
-
Elhag, T.M.S.1
Boussabaine, A.H.2
-
16
-
-
0003722376
-
-
optimization, and machine learning. Addison-Wesley Publishing Company, Inc
-
Goldberg, D.E. 1989. Genetic algorithms in search, optimization, and machine learning. Addison-Wesley Publishing Company, Inc.
-
(1989)
Genetic Algorithms In Search
-
-
Goldberg, D.E.1
-
17
-
-
0005291827
-
The hybrid systems for credit rating
-
Han, I., Jo, H., and Shin, K.S. 1997. The hybrid systems for credit rating. Journal of Korean Operations Research and Management Science Society, 22(3): 163-173.
-
(1997)
Journal of Korean Operations Research and Management Science Society
, vol.22
, Issue.3
, pp. 163-173
-
-
Han, I.1
Jo, H.2
Shin, K.S.3
-
18
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
Hegazy, T., and Ayed, A. 1998. Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 24(3): 210-218.
-
(1998)
Journal of Construction Engineering and Management
, vol.24
, Issue.3
, pp. 210-218
-
-
Hegazy, T.1
Ayed, A.2
-
19
-
-
0028320021
-
Developing practical neural network applications using back-propagation
-
10.1111/j.1467-8667.1994.tb00369.x
-
Hegazy, T., Fazio, P., and Moselhi, O. 1994. Developing practical neural network applications using back-propagation. Computer-Aided Civil Infrastructure Engineering, 9(2): 145-159. doi:10.1111/j.1467-8667.1994.tb00369.x.
-
(1994)
Computer-Aided Civil Infrastructure Engineering
, vol.9
, Issue.2
, pp. 145-159
-
-
Hegazy, T.1
Fazio, P.2
Moselhi, O.3
-
21
-
-
78049528481
-
-
doi:10.1016/j.eswa.2010.08.071
-
Hong, T.H., Hyun, C.T., and Moon, H.S. 2011. CBR-based cost prediction model II of the design phase for multi-family housing projects. Expert Systems with Applications, 38(3): 2797-2808. doi:10.1016/j.eswa.2010.08.071.
-
(2011)
CBR-based Cost Prediction Model II of the Design Phase For Multi-family Housing Projects. Expert Systems With Applications
, vol.38
, Issue.3
, pp. 2797-2808
-
-
Hong, T.H.1
Hyun, C.T.2
Moon, H.S.3
-
22
-
-
77955338136
-
Data preprocessing-based parametric cost model building project: Case studies of Korean construction projects
-
doi:10.1061/ (ASCE)CO.1943-7862.0000197
-
Ji, S.H., Park, M., and Lee, H.S. 2010. Data preprocessing-based parametric cost model building project: case studies of Korean construction projects. Journal of Construction Engineering and Management, 136(8): 844-853. doi:10.1061/ (ASCE)CO.1943-7862.0000197.
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.8
, pp. 844-853
-
-
Ji, S.H.1
Park, M.2
Lee, H.S.3
-
23
-
-
75649121877
-
Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction
-
doi:10.1061/(ASCE)CO. 1943-7862.0000140
-
Kandil, A., El-Rayes, K., and El-Anwar, O. 2010. Optimization research: enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction and Management, 136(1): 17-25. doi:10.1061/(ASCE)CO. 1943-7862.0000140.
-
(2010)
Journal of Construction and Management
, vol.136
, Issue.1
, pp. 17-25
-
-
Kandil, A.1
El-Rayes, K.2
El-Anwar, O.3
-
24
-
-
77956856396
-
A study on a model for neural networks training using genetic algorithms for predicting cost estimates of apartment projects at the early project stage
-
Kim, G.H., and Kang, K.I. 2003. A study on a model for neural networks training using genetic algorithms for predicting cost estimates of apartment projects at the early project stage. Journal of Architectural Institute of Korea, 19(10): 133-142.
-
(2003)
Journal of Architectural Institute of Korea
, vol.19
, Issue.10
, pp. 133-142
-
-
Kim, G.H.1
Kang, K.I.2
-
25
-
-
84872939930
-
Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation
-
doi:10.3846/13923730.2012.737829
-
Kim, S. 2013. Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation. Journal of Civil Engineering and Management, 19(1): 86-96. doi:10.3846/13923730.2012.737829.
-
(2013)
Journal of Civil Engineering and Management
, vol.19
, Issue.1
, pp. 86-96
-
-
Kim, S.1
-
26
-
-
84994360479
-
Comparing cost prediction methods for apartment housing project: CBR versus ANN
-
doi:10.3130/jaabe.4.113
-
Kim, S.Y., Choi, J.W., Kim, G.H., and Kang, K.I. 2005. Comparing cost prediction methods for apartment housing project: CBR versus ANN. Journal of Asian Architecture and Building Engineering, 4(1): 113-120. doi:10.3130/jaabe.4.113.
-
(2005)
Journal of Asian Architecture and Building Engineering
, vol.4
, Issue.1
, pp. 113-120
-
-
Kim, S.Y.1
Choi, J.W.2
Kim, G.H.3
Kang, K.I.4
-
27
-
-
84898933169
-
Bayesian markov chain monte carlo model for determining optimum tender price in multifamily housing projects
-
doi:10.1061/(ASCE)CP.1943-5487. 0000297. [In press.]
-
Kim, S., Kim, G.H., and Lee, D. 2013. Bayesian markov chain monte carlo model for determining optimum tender price in multifamily housing projects. Journal of Computing in Civil Engineering, doi:10.1061/(ASCE)CP.1943-5487. 0000297. [In press.]
-
(2013)
Journal of Computing In Civil Engineering
-
-
Kim, S.1
Kim, G.H.2
Lee, D.3
-
29
-
-
77953481735
-
A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects
-
doi:10.1139/L10-007
-
Koo, C.W., Hong, T.H., Hyun, C.T., and Koo, K.J. 2010. A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects. Canadian Journal of Civil Engineering, 37(5): 739-752. doi:10.1139/L10-007.
-
(2010)
Canadian Journal of Civil Engineering
, vol.37
, Issue.5
, pp. 739-752
-
-
Koo, C.W.1
Hong, T.H.2
Hyun, C.T.3
Koo, K.J.4
-
30
-
-
0029316314
-
Designing a comprehensive business performance evaluation system: An analytic hierarchical model
-
Lee, H.S., Kwak, W., and Han, I.G. 1998. Designing a comprehensive business performance evaluation system: an analytic hierarchical model. Engineering Economist, 40: 343-357.
-
(1998)
Engineering Economist
, vol.40
, pp. 343-357
-
-
Lee, H.S.1
Kwak, W.2
Han, I.G.3
-
31
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
doi:10.1061/(ASCE)0733-9364(1999)125:6(420)
-
Leu, S., and Yang, C. 1999. GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6): 420-427. doi:10.1061/(ASCE)0733-9364(1999)125:6(420).
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.1
Yang, C.2
-
32
-
-
0012513437
-
Neural networks for construction cost estimation
-
doi:10.1080/09613219508727476
-
Li, H. 1995. Neural networks for construction cost estimation. Building Research and Information, 23(5): 279-284. doi:10.1080/09613219508727476.
-
(1995)
Building Research and Information
, vol.23
, Issue.5
, pp. 279-284
-
-
Li, H.1
-
33
-
-
0032089543
-
Similarity measures for retrieval in case-based reasoning systems
-
doi:10.1080/088395198117730
-
Liao, T.W., Zhang, Z., and Mount, C.R. 1998. Similarity measures for retrieval in case-based reasoning systems. Applied Artificial Intelligence, 12: 267-288. doi:10.1080/088395198117730.
-
(1998)
Applied Artificial Intelligence
, vol.12
, pp. 267-288
-
-
Liao, T.W.1
Zhang, Z.2
Mount, C.R.3
-
35
-
-
33745325166
-
Predicting construction cost using multiple regression techniques
-
doi:10.1061/(ASCE)0733-9364(2006)132:7(750)
-
Lowe, D.J., Emsley, M.W., and Harding, A. 2006. Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7): 750-758. doi:10.1061/(ASCE)0733-9364(2006)132:7(750).
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.7
, pp. 750-758
-
-
Lowe, D.J.1
Emsley, M.W.2
Harding, A.3
-
36
-
-
2642515847
-
CBRefurb: Case-based cost estimation, case based reasoning: Prospects for application
-
Marir, F., and Watson, I. 1995. CBRefurb: case-based cost estimation, case based reasoning: Prospects for application. IEE Colloquium, 7: 1-5.
-
(1995)
IEE Colloquium
, vol.7
, pp. 1-5
-
-
Marir, F.1
Watson, I.2
-
38
-
-
0001025286
-
An integrated knowledge-based system for alternative design and materials selection and cost estimating
-
doi:10.1016/S0957-4174(97)00086-9
-
Mohamed, A., and Celik, T. 1998. An integrated knowledge-based system for alternative design and materials selection and cost estimating. Expert Systems with Applications, 14(3): 329-339. doi:10.1016/S0957-4174(97)00086-9.
-
(1998)
Expert Systems With Applications
, vol.14
, Issue.3
, pp. 329-339
-
-
Mohamed, A.1
Celik, T.2
-
39
-
-
2142763581
-
-
Ph.D. thesis, Department of Building, Civil, and Environment Engineering, Concordia University, Montreal, Canada
-
Morcous, G. 2000. Case-based reasoning for modelling bridge deterioration. Ph.D. thesis, Department of Building, Civil, and Environment Engineering, Concordia University, Montreal, Canada.
-
(2000)
Case-based Reasoning For Modelling Bridge Deterioration
-
-
Morcous, G.1
-
40
-
-
2142770817
-
Case-based reasoning system for modelling infrastructure deterioration
-
doi:10.1061/(ASCE)0887-3801(2002)16:2(104)
-
Morcous, G., Rivard, H., and Hanna, A.M. 2002. Case-based reasoning system for modelling infrastructure deterioration. Journal of Computing in Civil Engineering, 16(2): 104-114. doi:10.1061/(ASCE)0887-3801(2002)16:2(104).
-
(2002)
Journal of Computing In Civil Engineering
, vol.16
, Issue.2
, pp. 104-114
-
-
Morcous, G.1
Rivard, H.2
Hanna, A.M.3
-
41
-
-
0026381932
-
Neural networks as tools in construction
-
doi:10.1061/(ASCE)0733-9364(1991)117:4(606)
-
Moselhi, O., Hegazy, T., and Fazio, P. 1991. Neural networks as tools in construction. Journal of Construction Engineering and Management, 117(4): 606-625. doi:10.1061/(ASCE)0733-9364(1991)117:4(606).
-
(1991)
Journal of Construction Engineering and Management
, vol.117
, Issue.4
, pp. 606-625
-
-
Moselhi, O.1
Hegazy, T.2
Fazio, P.3
-
42
-
-
0000356302
-
Examining the feasibility of a case-based reasoning model for software effort estimation
-
doi:10.2307/249573
-
Mukhopadhyay, T., Vicinanza, S.S., and Prietula, M.J. 1992. Examining the feasibility of a case-based reasoning model for software effort estimation. MIS Quarterly, 16(2): 155-171. doi:10.2307/249573.
-
(1992)
MIS Quarterly
, vol.16
, Issue.2
, pp. 155-171
-
-
Mukhopadhyay, T.1
Vicinanza, S.S.2
Prietula, M.J.3
-
43
-
-
0034817767
-
EQUAL: A case-based contractor prequalifier
-
doi:10.1016/S0926-5805(00)00079-0
-
Ng, S.T. 2001. EQUAL: a case-based contractor prequalifier. Automation in Construction, 10(4): 443-457. doi:10.1016/S0926-5805(00)00079-0.
-
(2001)
Automation In Construction
, vol.10
, Issue.4
, pp. 443-457
-
-
Ng, S.T.1
-
44
-
-
0032186599
-
Verification and validation of case-based prequalification system
-
doi:10.1061/(ASCE)0887-3801(1998)12:4(215)
-
Ng, S.T., and Smith, N.J. 1998. Verification and validation of case-based prequalification system. Journal of Computing in Civil Engineering, 12(4): 215-226. doi:10.1061/(ASCE)0887-3801(1998)12:4(215).
-
(1998)
Journal of Computing In Civil Engineering
, vol.12
, Issue.4
, pp. 215-226
-
-
Ng, S.T.1
Smith, N.J.2
-
46
-
-
0036776641
-
A case-based reasoning with the feature weights derived by analytic hierarchy process for bankruptcy prediction
-
doi:10.1016/S0957-4174(02)00045-3
-
Park, C.S., and Han, I. 2002. A case-based reasoning with the feature weights derived by analytic hierarchy process for bankruptcy prediction. Expert Systems with Applications, 23(3): 255-264. doi:10.1016/S0957-4174(02)00045-3.
-
(2002)
Expert Systems With Applications
, vol.23
, Issue.3
, pp. 255-264
-
-
Park, C.S.1
Han, I.2
-
47
-
-
84892376508
-
A guide to the project management body of knowledge. Project Management Institute
-
PMI
-
PMI. 2008. A guide to the project management body of knowledge. Project Management Institute, Project Management Process Groups Interactions and Process Poster.
-
(2008)
Project Management Process Groups Interactions and Process Poster
-
-
-
48
-
-
0034515584
-
Designing a competent simple genetic algorithm for search and optimization
-
Reed, P., Minsker, B., and Goldberg, D.E. 2000. Designing a competent simple genetic algorithm for search and optimization. Water Resources Research, 26(12): 3757-3761.
-
(2000)
Water Resources Research
, vol.26
, Issue.12
, pp. 3757-3761
-
-
Reed, P.1
Minsker, B.2
Goldberg, D.E.3
-
50
-
-
0031119806
-
Case-based approach for steel bridge fabrication errors
-
doi:10. 1061/(ASCE)0887-3801(1997)11:2(84)
-
Roddis, W.M.K., and Bocox, J. 1997. Case-based approach for steel bridge fabrication errors. Journal of Computing in Civil Engineering, 11(2): 84-91. doi:10. 1061/(ASCE)0887-3801(1997)11:2(84).
-
(1997)
Journal of Computing In Civil Engineering
, vol.11
, Issue.2
, pp. 84-91
-
-
Roddis, W.M.K.1
Bocox, J.2
-
51
-
-
35348919418
-
Construction planning methodology using case-based reasoning (CONPLA-CBR)
-
doi:10.1061/(ASCE)0887-3801(2007)21:6(410)
-
Ryu, H.K., Lee, H.S., and Park, M. 2007. Construction planning methodology using case-based reasoning (CONPLA-CBR). Journal of Computing in Civil Engineering, 21(6): 410-422. doi:10.1061/(ASCE)0887-3801(2007)21:6(410).
-
(2007)
Journal of Computing In Civil Engineering
, vol.21
, Issue.6
, pp. 410-422
-
-
Ryu, H.K.1
Lee, H.S.2
Park, M.3
-
52
-
-
0027610822
-
Case-based design and creativity
-
doi:10.1016/0926-5805(93)90031-
-
Schmitt, G. 1993. Case-based design and creativity. Automation in Construction, 2(1): 11-19. doi:10.1016/0926-5805(93)90031-
-
(1993)
Automation In Construction
, vol.2
, Issue.1
, pp. 11-19
-
-
Schmitt, G.1
-
53
-
-
2142763089
-
Towards a knowledge-based assessment of conceptual cost estimates
-
doi:10.1080/ 0961321032000172373
-
R. Serpell, A.F. 2004. Towards a knowledge-based assessment of conceptual cost estimates. Building Research and Information, 32(2): 157-164. doi:10.1080/ 0961321032000172373.
-
(2004)
Building Research and Information
, vol.32
, Issue.2
, pp. 157-164
-
-
Serpell, R.1
-
54
-
-
0003112429
-
Case-based reasoning supported by genetic algorithms for corporate bond rating
-
doi:10.1016/S0957-4174(98)00063-3
-
Shin, K.S., and Han, I. 1999 Case-based reasoning supported by genetic algorithms for corporate bond rating. Expert Systems with Applications, 16(2): 85-95. doi:10.1016/S0957-4174(98)00063-3.
-
(1999)
Expert Systems With Applications
, vol.16
, Issue.2
, pp. 85-95
-
-
Shin, K.S.1
Han, I.2
-
55
-
-
0032647146
-
Information modelling for case-based construction planning of highway bridge projects
-
doi:10.1016/S0965-9978(98)00128-8
-
Tah, J.H.M., Carr, V., and Howes, R. 1999. Information modelling for case-based construction planning of highway bridge projects. Advances in Engineering Software, 30(7): 495-509. doi:10.1016/S0965-9978(98)00128-8.
-
(1999)
Advances In Engineering Software
, vol.30
, Issue.7
, pp. 495-509
-
-
Tah, J.H.M.1
Carr, V.2
Howes, R.3
-
56
-
-
0033232380
-
Comparative cost analysis of using high performance concrete in tall building construction by artificial neural networks
-
Tam, C.M., and Fang, C.F. 1999. Comparative cost analysis of using high performance concrete in tall building construction by artificial neural networks. Structural Journal, 96(6): 927-936.
-
(1999)
Structural Journal
, vol.96
, Issue.6
, pp. 927-936
-
-
Tam, C.M.1
Fang, C.F.2
-
58
-
-
2642579411
-
Predicting accuracy of early cost estimates using factor analysis and multivariate regression
-
doi:10.1061/ (ASCE)0733-9364(2003)129:2(198)
-
Trost, S.M., and Oberlender, G.D. 2003. Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, 129(2): 198-204. doi:10.1061/ (ASCE)0733-9364(2003)129:2(198).
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.2
, pp. 198-204
-
-
Trost, S.M.1
Oberlender, G.D.2
-
59
-
-
5244233854
-
NIRMANI: A case-based expert system for integrated design & Estimating. Application and Innovations in Expert Systems
-
Oxford: SGES Publications
-
Watson, I.D., and Perera, R.S. 1995. NIRMANI: a case-based expert system for integrated design & Estimating. Application and Innovations in Expert Systems, Proceedings of Expert Systems'95, Oxford: SGES Publications. pp. 335-348.
-
(1995)
Proceedings of Expert Systems'95
, pp. 335-348
-
-
Watson, I.D.1
Perera, R.S.2
-
60
-
-
23044474458
-
Neural network modelling of highway construction costs
-
doi:10.1061/(ASCE)0733-9364(2005)131:7(765)
-
Wilmot, C.G., and Mei, B. 2005. Neural network modelling of highway construction costs. Journal of Construction Engineering and Management, 131(7): 765-771. doi:10.1061/(ASCE)0733-9364(2005)131:7(765).
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.7
, pp. 765-771
-
-
Wilmot, C.G.1
Mei, B.2
-
61
-
-
0032073403
-
Applying case-based reasoning technique to retaining wall selection
-
doi:10.1016/ S0926-5805(97)00072-1
-
Yau, N.J, and Yang, J.B. 1998. Applying case-based reasoning technique to retaining wall selection. Automation in Construction, 7(4): 271-283. doi:10.1016/ S0926-5805(97)00072-1.
-
(1998)
Automation In Construction
, vol.7
, Issue.4
, pp. 271-283
-
-
Yau, N.J.1
Yang, J.B.2
|