메뉴 건너뛰기




Volumn 38, Issue 3, 2011, Pages 2797-2808

CBR-based cost prediction model-II of the design phase for multi-family housing projects

Author keywords

Construction cost; Design; Model; Predictions

Indexed keywords

ATTRIBUTE WEIGHT; CBR; CONSTRUCTION COSTS; CONSTRUCTION PROJECTS; CORRELATION ANALYSIS; COST MANAGEMENT; COST PREDICTION; DESIGN MANAGEMENT; DESIGN PHASE; DESIGN STAGE; DEVELOPED MODEL; ERROR RATIO; HOUSING PROJECTS; PREDICTIONS; PROJECT CHARACTERISTICS;

EID: 78049528481     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2010.08.071     Document Type: Article
Times cited : (24)

References (26)
  • 4
    • 13944265044 scopus 로고    scopus 로고
    • Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
    • M. Attalla, and T. Hegazy Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression Journal of Construction Engineering and Management, ASCE 129 4 2003 405 411
    • (2003) Journal of Construction Engineering and Management, ASCE , vol.129 , Issue.4 , pp. 405-411
    • Attalla, M.1    Hegazy, T.2
  • 8
    • 77953505890 scopus 로고    scopus 로고
    • Construction Industry Institute (CII) The University of Texas at Austin, Texas
    • Construction Industry Institute (CII), (1998). Improving early estimates: Best practices guide. The University of Texas at Austin, Texas.
    • (1998) Improving Early Estimates: Best Practices Guide
  • 9
    • 33748765247 scopus 로고    scopus 로고
    • Determining attribute weights in a CBR model for early cost prediction of structural systems
    • S. Dogan, D. Arditi, and H. Günaydin Determining attribute weights in a CBR model for early cost prediction of structural systems Journal of Construction Engineering and Management, ASCE 132 10 2006 1092 1098
    • (2006) Journal of Construction Engineering and Management, ASCE , vol.132 , Issue.10 , pp. 1092-1098
    • Dogan, S.1    Arditi, D.2    Günaydin, H.3
  • 10
    • 38149069676 scopus 로고    scopus 로고
    • Using decision trees for determining attribute weights in a case-based model of early cost prediction
    • S. Dogan, D. Arditi, and H. Günaydin Using decision trees for determining attribute weights in a case-based model of early cost prediction Journal of Construction Engineering and Management, ASCE 134 2 2008 146 152
    • (2008) Journal of Construction Engineering and Management, ASCE , vol.134 , Issue.2 , pp. 146-152
    • Dogan, S.1    Arditi, D.2    Günaydin, H.3
  • 14
    • 78049527516 scopus 로고    scopus 로고
    • A CBR-based cost prediction model for the design phase of public multi-family housing construction projects
    • Jeju, South Korea
    • Hong, T.; Hyun, C.; & Moon, H. (2009). A CBR-based cost prediction model for the design phase of public multi-family housing construction projects. ICCPM/ICCEM 2009, Jeju, South Korea.
    • (2009) ICCPM/ICCEM 2009
    • Hong, T.1    Hyun, C.2    Moon, H.3
  • 17
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
    • S. Leu, and C. Yang GA-based multicriteria optimal model for construction scheduling Journal of Construction Engineering and Management, ASCE 125 6 1999 420 427 (Pubitemid 30509596)
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.-S.1    Yang, C.-H.2
  • 18
    • 0038823873 scopus 로고    scopus 로고
    • A case-based procurement advisory system for construction
    • D. Luu, S. Ng, and S. Chen A case-based procurement advisory system for construction Advances in Engineering Software 34 7 2003 429 438
    • (2003) Advances in Engineering Software , vol.34 , Issue.7 , pp. 429-438
    • Luu, D.1    Ng, S.2    Chen, S.3
  • 20
    • 0031080586 scopus 로고    scopus 로고
    • Parameter estimation of nonlinear Muskingum models using genetic algorithm
    • S. Mohan Parameter estimation of nonlinear Muskingum models using genetic algorithm Journal of Hydraulic Engineering, ASCE 123 2 1997 137 142
    • (1997) Journal of Hydraulic Engineering, ASCE , vol.123 , Issue.2 , pp. 137-142
    • Mohan, S.1
  • 22
    • 0034817767 scopus 로고    scopus 로고
    • EQUAL: A case-based contractor prequalifier
    • S. Ng EQUAL: A case-based contractor prequalifier Automation in Construction 19 2 2001 443 457
    • (2001) Automation in Construction , vol.19 , Issue.2 , pp. 443-457
    • Ng, S.1
  • 23
    • 78049530424 scopus 로고
    • Property Services Agencies (PSA) UK: Bliss Books
    • Property Services Agencies (PSA), (1987). Significant Items Estimating. UK: Bliss Books.
    • (1987) Significant Items Estimating
  • 24
    • 35348919418 scopus 로고    scopus 로고
    • Construction planning method using case-based reasoning (CONPLA-CBR)
    • H. Ryu, H. Lee, and M. Park Construction planning method using case-based reasoning (CONPLA-CBR) Journal of Computing in Civil Engineering, ASCE 21 6 2007 410 422
    • (2007) Journal of Computing in Civil Engineering, ASCE , vol.21 , Issue.6 , pp. 410-422
    • Ryu, H.1    Lee, H.2    Park, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.