-
2
-
-
0028735184
-
Building construction detailed estimating practices in Saudi Arabia
-
K. Al-Harbi, D. Johnston, and H. Fayadh Building construction detailed estimating practices in Saudi Arabia Journal of construction Engineering and Management, ASCE 120 4 1994 774 784
-
(1994)
Journal of Construction Engineering and Management, ASCE
, vol.120
, Issue.4
, pp. 774-784
-
-
Al-Harbi, K.1
Johnston, D.2
Fayadh, H.3
-
4
-
-
13944265044
-
Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
-
M. Attalla, and T. Hegazy Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression Journal of Construction Engineering and Management, ASCE 129 4 2003 405 411
-
(2003)
Journal of Construction Engineering and Management, ASCE
, vol.129
, Issue.4
, pp. 405-411
-
-
Attalla, M.1
Hegazy, T.2
-
7
-
-
0035137161
-
Case-based reasoning approach in bid decision making
-
D. Chua, D. Li, and W. Chan Case-based reasoning approach in bid decision making Journal of Construction Engineering and Management, ASCE 127 1 2001 35 45
-
(2001)
Journal of Construction Engineering and Management, ASCE
, vol.127
, Issue.1
, pp. 35-45
-
-
Chua, D.1
Li, D.2
Chan, W.3
-
8
-
-
77953505890
-
-
Construction Industry Institute (CII) The University of Texas at Austin, Texas
-
Construction Industry Institute (CII), (1998). Improving early estimates: Best practices guide. The University of Texas at Austin, Texas.
-
(1998)
Improving Early Estimates: Best Practices Guide
-
-
-
9
-
-
33748765247
-
Determining attribute weights in a CBR model for early cost prediction of structural systems
-
S. Dogan, D. Arditi, and H. Günaydin Determining attribute weights in a CBR model for early cost prediction of structural systems Journal of Construction Engineering and Management, ASCE 132 10 2006 1092 1098
-
(2006)
Journal of Construction Engineering and Management, ASCE
, vol.132
, Issue.10
, pp. 1092-1098
-
-
Dogan, S.1
Arditi, D.2
Günaydin, H.3
-
10
-
-
38149069676
-
Using decision trees for determining attribute weights in a case-based model of early cost prediction
-
S. Dogan, D. Arditi, and H. Günaydin Using decision trees for determining attribute weights in a case-based model of early cost prediction Journal of Construction Engineering and Management, ASCE 134 2 2008 146 152
-
(2008)
Journal of Construction Engineering and Management, ASCE
, vol.134
, Issue.2
, pp. 146-152
-
-
Dogan, S.1
Arditi, D.2
Günaydin, H.3
-
12
-
-
0003610254
-
-
6th ed. Pearson Education, Inc. Upper Saddle River, NJ
-
J. Hair, W. Black, B. Babin, R. Anderson, and R. Tatham Multivariate data analysis with readings 6th ed. 2006 Pearson Education, Inc. Upper Saddle River, NJ
-
(2006)
Multivariate Data Analysis with Readings
-
-
Hair, J.1
Black, W.2
Babin, B.3
Anderson, R.4
Tatham, R.5
-
14
-
-
78049527516
-
A CBR-based cost prediction model for the design phase of public multi-family housing construction projects
-
Jeju, South Korea
-
Hong, T.; Hyun, C.; & Moon, H. (2009). A CBR-based cost prediction model for the design phase of public multi-family housing construction projects. ICCPM/ICCEM 2009, Jeju, South Korea.
-
(2009)
ICCPM/ICCEM 2009
-
-
Hong, T.1
Hyun, C.2
Moon, H.3
-
17
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
-
S. Leu, and C. Yang GA-based multicriteria optimal model for construction scheduling Journal of Construction Engineering and Management, ASCE 125 6 1999 420 427 (Pubitemid 30509596)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
18
-
-
0038823873
-
A case-based procurement advisory system for construction
-
D. Luu, S. Ng, and S. Chen A case-based procurement advisory system for construction Advances in Engineering Software 34 7 2003 429 438
-
(2003)
Advances in Engineering Software
, vol.34
, Issue.7
, pp. 429-438
-
-
Luu, D.1
Ng, S.2
Chen, S.3
-
20
-
-
0031080586
-
Parameter estimation of nonlinear Muskingum models using genetic algorithm
-
S. Mohan Parameter estimation of nonlinear Muskingum models using genetic algorithm Journal of Hydraulic Engineering, ASCE 123 2 1997 137 142
-
(1997)
Journal of Hydraulic Engineering, ASCE
, vol.123
, Issue.2
, pp. 137-142
-
-
Mohan, S.1
-
22
-
-
0034817767
-
EQUAL: A case-based contractor prequalifier
-
S. Ng EQUAL: A case-based contractor prequalifier Automation in Construction 19 2 2001 443 457
-
(2001)
Automation in Construction
, vol.19
, Issue.2
, pp. 443-457
-
-
Ng, S.1
-
23
-
-
78049530424
-
-
Property Services Agencies (PSA) UK: Bliss Books
-
Property Services Agencies (PSA), (1987). Significant Items Estimating. UK: Bliss Books.
-
(1987)
Significant Items Estimating
-
-
-
24
-
-
35348919418
-
Construction planning method using case-based reasoning (CONPLA-CBR)
-
H. Ryu, H. Lee, and M. Park Construction planning method using case-based reasoning (CONPLA-CBR) Journal of Computing in Civil Engineering, ASCE 21 6 2007 410 422
-
(2007)
Journal of Computing in Civil Engineering, ASCE
, vol.21
, Issue.6
, pp. 410-422
-
-
Ryu, H.1
Lee, H.2
Park, M.3
|