메뉴 건너뛰기




Volumn 19, Issue 1, 2013, Pages 86-96

Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation

Author keywords

analytic hierarchy process; case based reasoning; cost estimation; highway

Indexed keywords

BASED ON CASE-BASED REASONING; CBR; CBR SYSTEMS; CONTROLLING COSTS; COST DATA; COST ESTIMATING SYSTEMS; COST ESTIMATIONS; COST INFORMATION; COST PREDICTION; DECISION MAKERS; FEASIBILITY STUDIES; HIGHWAY; HIGHWAY PROJECTS; HYBRID FORECASTING; OPTIMAL SOLUTIONS; PROJECT DEVELOPMENT; SOUTH KOREA;

EID: 84872939930     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/13923730.2012.737829     Document Type: Article
Times cited : (42)

References (57)
  • 1
    • 0028401306 scopus 로고
    • Case-based reasoning: Foundational issues methodological variations, and system approaches
    • Aamodt, A.; Plaza, E. 1994. Case-based reasoning: foundational issues, methodological variations, and system approaches, AI Communications 7(1): 39-59.
    • (1994) AI Communications , vol.7 , Issue.1 , pp. 39-59
    • Aamodt, A.1    Plaza, E.2
  • 3
    • 0035197791 scopus 로고    scopus 로고
    • Application of the AHP in project management
    • DOI 10.1016/S0263-7863(99)00038-1
    • Al-Harbi, K. M. A. 2001. Application of the AHP in project management, International Journal of Project Management 19(1): 19-27. http://dx.doi.org/10. 1016/S0263-7863(99)00038-1 (Pubitemid 32020455)
    • (2001) International Journal of Project Management , vol.19 , Issue.1 , pp. 19-27
    • Al-Harbi, K.M.A.-S.1
  • 4
    • 0033100590 scopus 로고    scopus 로고
    • Preliminary cost estimation of highway construction using neural networks
    • Al-Tabtabai, H.; Alex, A. P.; Tantash, M. 1999. Preliminary cost estimation of highway construction using neural networks, Cost Engineering 41(3): 19-24.
    • (1999) Cost Engineering , vol.41 , Issue.3 , pp. 19-24
    • Al-Tabtabai, H.1    Alex, A.P.2    Tantash, M.3
  • 5
    • 33847026525 scopus 로고    scopus 로고
    • A case-based reasoning cost estimating model using experience by analytic hierarchy process
    • An, S.-H.; Kim, G.-H.; Kang, K.-I. 2007. A case-based reasoning cost estimating model using experience by analytic hierarchy process, Building Environment 42(7): 2573-2579. http://dx.doi.org/10.1016/j.buildenv.2006.06.007
    • (2007) Building Environment , vol.42 , Issue.7 , pp. 2573-2579
    • An, S.-H.1    Kim, G.-H.2    Kang, K.-I.3
  • 6
    • 0033156950 scopus 로고    scopus 로고
    • Comparison of case-based reasoning and artificial neural networks
    • Arditi, D.; Tokdemir, O. 1999. Comparison of case-based reasoning and artificial neural networks, Journal of Computing in Civil Engineering ASCE 13(3): 162-169. http://dx.doi.org/10.1061/(ASCE)0887-3801(1999)13: 3(162
    • (1999) Journal of Computing in Civil Engineering ASCE , vol.13 , Issue.3 , pp. 162-169
    • Arditi, D.1    Tokdemir, O.2
  • 7
    • 84872944897 scopus 로고    scopus 로고
    • Knowledge discovery in residential construction project cost data
    • 15-17 September, 1999, Liverpool, UK
    • Boussabaine, A. H.; Elhag, T. M. S. 1999. Knowledge discovery in residential construction project cost data, in Proc. of the 15th Annual ARCOM Conference, 15-17 September, 1999, Liverpool, UK, 489-498.
    • (1999) th Annual ARCOM Conference , pp. 489-498
    • Boussabaine, A.H.1    Elhag, T.M.S.2
  • 8
    • 77950188031 scopus 로고    scopus 로고
    • Developing a CBR-based adjudication system for fatal construction industry occupational accidents
    • Chen, W. T.; Chang, P.-Y.; Chou, K.; Mortis, L. E. 2010. Developing a CBR-based adjudication system for fatal construction industry occupational accidents, Expert Systems with Applications 37(7): 4867-4880. http://dx.doi.org/10.1016/j.eswa.2009.12.028
    • (2010) Expert Systems with Applications , vol.37 , Issue.7 , pp. 4867-4880
    • Chen, W.T.1    Chang, P.-Y.2    Chou, K.3    Mortis, L.E.4
  • 9
    • 56349153507 scopus 로고    scopus 로고
    • Web-based CBR system applied to early cost budgeting for pavement maintenance project
    • Chou, J.-S. 2009. Web-based CBR system applied to early cost budgeting for pavement maintenance project, Expert Systems with Applications 36(2): 2947-2960. http://dx.doi.org/10.1016/j.eswa.2008.01.025
    • (2009) Expert Systems with Applications , vol.36 , Issue.2 , pp. 2947-2960
    • Chou, J.-S.1
  • 10
    • 34547664902 scopus 로고    scopus 로고
    • Internet-based preliminary highway construction cost estimating database
    • DOI 10.1016/j.autcon.2007.03.001, PII S0926580507000416
    • Chou, J.-S.; O'Connor, J. T. 2007. Internet-based preliminary highway construction cost estimating database, Automation in Construction 17(1): 65-74. http://dx.doi.org/10.1016/j.autcon.2007.03.001 (Pubitemid 47223675)
    • (2007) Automation in Construction , vol.17 , Issue.1 , pp. 65-74
    • Chou, J.-S.1    O'Connor, J.T.2
  • 11
    • 27644590365 scopus 로고    scopus 로고
    • Preliminary cost estimates using probabilistic simulation for highway bridge replacement projects
    • April, 2005, American Society of Civil Engineers, San Diego, California, USA
    • Chou, J.-S.; Wang, L.; Chong, W. K.; O'Connor, J. T. 2005. Preliminary cost estimates using probabilistic simulation for highway bridge replacement projects, in Construction Research Congress 2005, April, 2005, American Society of Civil Engineers, San Diego, California, USA, 467-471. http://dx.doi.org/10. 1061/40754(183)92
    • (2005) Construction Research Congress 2005 , pp. 467-471
    • Chou, J.-S.1    Wang, L.2    Chong, W.K.3    O'Connor, J.T.4
  • 12
    • 0035137161 scopus 로고    scopus 로고
    • Case-based reasoning approach in bid decision making
    • DOI 10.1061/(ASCE)0733-9364(2001)127:1(35)
    • Chua, D. K. H.; Li, D. Z.; Chan, W. T. 2001. Case-based reasoning approach in bid decision making, Journal of Construction Engineering and Management ASCE 127(1): 35-45. http://dx.doi.org/10.1061/(ASCE)0733-9364(2001) 127:1(35 (Pubitemid 32158957)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 35-45
    • Chua, D.K.H.1    Li, D.Z.2    Chan, W.T.3
  • 13
    • 0035401215 scopus 로고    scopus 로고
    • Group preference aggregation with the AHP - Implications for multiple-issue agendas
    • DOI 10.1016/S0377-2217(00)00121-1, PII S0377221700001211
    • Chwolka, A.; Raith, M. G. 2001. Group preference aggregation with the AHP-implications for multiple-Issues agendas, European Journal of Operational Research 132(1): 176-186. http://dx.doi.org/10.1016/S0377-2217(00)00121-1 (Pubitemid 32288120)
    • (2001) European Journal of Operational Research , vol.132 , Issue.1 , pp. 176-186
    • Chwolka, A.1    Raith, M.G.2
  • 14
    • 34547672917 scopus 로고    scopus 로고
    • A case-based decision support tool for bid mark-up estimation of international construction projects
    • DOI 10.1016/j.autcon.2007.02.009, PII S0926580507000374
    • Dikmen, I.; Birgonul, M. T.; Gur, A. K. 2007. A case-based decision support tool for bid mark-up estimation of international construction projects, Automation in Construction 17(1): 30-44. http://dx.doi.org/10.1016/j.autcon. 2007.02.009 (Pubitemid 47223673)
    • (2007) Automation in Construction , vol.17 , Issue.1 , pp. 30-44
    • Dikmen, I.1    Birgonul, M.T.2    Gur, A.K.3
  • 15
    • 0031678358 scopus 로고    scopus 로고
    • Integration of reasoning systems in architectural modelling activities
    • Demirkan, H. 1998. Integration of reasoning systems in architectural modelling activities, Automation in Construction 7(2-3): 229-236. http://dx.doi.org/10.1016/S0926-5805 (97)00056-3
    • (1998) Automation in Construction , vol.7 , Issue.2-3 , pp. 229-236
    • Demirkan, H.1
  • 16
    • 38149069676 scopus 로고    scopus 로고
    • Using decision trees for determining attribute weights in a case-based model of early cost prediction
    • Doan, S. Z.; Arditi, D.; Günaydin, H. M. 2008. Using decision trees for determining attribute weights in a case-based model of early cost prediction, Journal of Construction Engineering and Management ASCE 134(2): 146-152. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134: 2(146
    • (2008) Journal of Construction Engineering and Management ASCE , vol.134 , Issue.2 , pp. 146-152
    • Doan, S.Z.1    Arditi, D.2    Günaydin, H.M.3
  • 17
    • 0000048723 scopus 로고
    • Remarks on the analytic hierarchy process
    • Dyer, J. S. 1990. Remarks on the analytic hierarchy process, Management Science 36(3): 249-258. http://dx.doi.org/10.1287/mnsc.36.3.249
    • (1990) Management Science , vol.36 , Issue.3 , pp. 249-258
    • Dyer, J.S.1
  • 18
    • 0026854294 scopus 로고
    • Group decision support with the Analytic Hierarchy Process
    • Dyer, R. F.; Forman, E. H. 1992. Group decision support with the Analytic Hierarchy Process, Decision Support Systems 8(2): 99-124. http://dx.doi.org/10. 1016/0167-9236(92) 90003-8
    • (1992) Decision Support Systems , vol.8 , Issue.2 , pp. 99-124
    • Dyer, R.F.1    Forman, E.H.2
  • 19
    • 0009115069 scopus 로고    scopus 로고
    • Boiler erection scheduling using product models and case-based reasoning
    • Dzeng, R.-J.; Tommelein, I. D. 1997. Boiler erection scheduling using product models and case-based reasoning, Journal of Construction Engineering and Management ASCE 123(3): 338-347. http://dx.doi.org/10.1061/(ASCE)0733- 9364(1997)123:3(338 (Pubitemid 127590575)
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.3 , pp. 338-347
    • Dzeng, R.-J.1    Tommelein, I.D.2
  • 20
    • 1642618562 scopus 로고    scopus 로고
    • Product modelling to support case-based construction planning and scheduling
    • Dzeng, R.-J.; Tommelein, I. D. 2004. Product modelling to support case-based construction planning and scheduling, Automation in Construction 13(3): 341-360. http://dx.doi.org/10.1016/j.autcon.2003.10.002
    • (2004) Automation in Construction , vol.13 , Issue.3 , pp. 341-360
    • Dzeng, R.-J.1    Tommelein, I.D.2
  • 22
    • 84890007909 scopus 로고    scopus 로고
    • GA [online], [cited 5 August 2011] Available from Internet
    • GA 2008. Introduction to genetic algorithm [online], [cited 5 August 2011]. Available from Internet http://lancet.mit.edu/~mbwall/presentations/ IntroToGAs/
    • (2008) Introduction to Genetic Algorithm
  • 23
    • 0023451328 scopus 로고
    • The theory of ratio scale estimation: Saaty's analytic hierarchy process
    • Harker, P. T.; Vargas, L. G. 1987. The theory of ratio scale estimation: Saaty's analytic hierarchy process, Management Science 33(11): 1383-1403. http://dx.doi.org/10.1287/mnsc.33.11.1383
    • (1987) Management Science , vol.33 , Issue.11 , pp. 1383-1403
    • Harker, P.T.1    Vargas, L.G.2
  • 24
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • Hegazy, T.; Ayed, A. 1998. Neural network model for parametric cost estimation of highway projects, Journal of Construction Engineering and Management ASCE 124(3): 210-218. http://dx.doi.org/10.1061/(ASCE)0733-9364 (1998)124:3(210 (Pubitemid 128562880)
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 25
    • 0028320021 scopus 로고
    • Developing practical neural network applications using back-propagation
    • Hegazy, T.; Fazio, P.; Moselhi, O. 1994. Developing practical neural network applications using back-propagation, Computer-Aided Civil and Infrastructure Engineering 9(2): 145-159. http://dx.doi.org/10.1111/j.1467-8667. 1994.tb00369.x
    • (1994) Computer-Aided Civil and Infrastructure Engineering , vol.9 , Issue.2 , pp. 145-159
    • Hegazy, T.1    Fazio, P.2    Moselhi, O.3
  • 27
    • 77956862211 scopus 로고    scopus 로고
    • CBR revision model for improving cost prediction accuracy in multifamily housing projects
    • Ji, C. Y.; Hong, T. H.; Hyun, C. T. 2010. CBR revision model for improving cost prediction accuracy in multifamily housing projects, Journal of Management in Engineering ASCE 26(4): 229-236. http://dx.doi.org/10.1061/(ASCE) ME.1943-5479.0000018
    • (2010) Journal of Management in Engineering ASCE , vol.26 , Issue.4 , pp. 229-236
    • Ji, C.Y.1    Hong, T.H.2    Hyun, C.T.3
  • 28
    • 84872976914 scopus 로고    scopus 로고
    • Development of quantity-based reinforced concrete structural construction cost estimating system using CBR+GA model
    • Kang, B. J.; Cho, J. H.; Lee, J. S.; Lee, J. S.; Chun, J. Y. 2010. Development of quantity-based reinforced concrete structural construction cost estimating system using CBR+GA model, Architectural Institute of Korea 26(3): 139-146.
    • (2010) Architectural Institute of Korea , vol.26 , Issue.3 , pp. 139-146
    • Kang, B.J.1    Cho, J.H.2    Lee, J.S.3    Lee, J.S.4    Chun, J.Y.5
  • 29
    • 77956856396 scopus 로고    scopus 로고
    • A study on a model for neural networks training using genetic algorithms for predicting cost estimates of apartment projects at the early project stage
    • Kim, G. H.; Kang, K. I. 2003. A study on a model for neural networks training using genetic algorithms for predicting cost estimates of apartment projects at the early project stage, Journal of Architectural Institute of Korea 19(10): 133-142.
    • (2003) Journal of Architectural Institute of Korea , vol.19 , Issue.10 , pp. 133-142
    • Kim, G.H.1    Kang, K.I.2
  • 30
    • 18144382336 scopus 로고    scopus 로고
    • Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
    • DOI 10.1061/(ASCE)0887-3801(2005)19:2(208)
    • Kim, G. H.; Seo, D. S.; Kang, K. I. 2005. Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates, Journal of Computing in Civil Engineering ASCE 19(2): 208-211. http://dx.doi.org/10.1061/(ASCE)0887-3801(2005)19: 2(208 (Pubitemid 40609907)
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.2 , pp. 208-211
    • Kim, G.H.1    Seo, D.S.2    Kang, K.I.3
  • 31
    • 77958131753 scopus 로고    scopus 로고
    • Preliminary cost estimation model using case-based reasoning and genetic algorithms
    • Kim, K. J.; Kim, K. 2010. Preliminary cost estimation model using case-based reasoning and genetic algorithms, Journal of Computing in Civil Engineering ASCE 24(6): 499-505. http://dx.doi.org/10.1061/(ASCE)CP.1943-5487. 0000054
    • (2010) Journal of Computing in Civil Engineering ASCE , vol.24 , Issue.6 , pp. 499-505
    • Kim, K.J.1    Kim, K.2
  • 33
    • 77953481735 scopus 로고    scopus 로고
    • A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects
    • Koo, C. W.; Hong, T. H.; Hyun, C. T.; Koo, K. J. 2010. A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects, Canadian Journal of Civil Engineering 37(5): 739-752. http://dx.doi.org/10.1139/L10-007
    • (2010) Canadian Journal of Civil Engineering , vol.37 , Issue.5 , pp. 739-752
    • Koo, C.W.1    Hong, T.H.2    Hyun, C.T.3    Koo, K.J.4
  • 34
    • 0032012890 scopus 로고    scopus 로고
    • Case and constraint-based project planning for apartment construction
    • Lee, K. J.; Kim, H. W.; Lee, J. K.; Kim, T. H. 1998. Case and constraint-based project planning for apartment construction, AI Magazine 19(1): 13-34.
    • (1998) AI Magazine , vol.19 , Issue.1 , pp. 13-34
    • Lee, K.J.1    Kim, H.W.2    Lee, J.K.3    Kim, T.H.4
  • 35
    • 23244439235 scopus 로고    scopus 로고
    • Formulating procurement selection criteria through case-based reasoning approach
    • DOI 10.1061/(ASCE)0887-3801(2005)19:3(269)
    • Luu, D. T.; Ng, S. T.; Chen, S. E. 2005. Formulating procurement selection criteria through case-based reasoning approach, Journal of Computing in Civil Engineering ASCE 19(3): 269-276. http://dx.doi.org/10.1061/(ASCE) 0887-3801(2005)19:3(269 (Pubitemid 41092939)
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.3 , pp. 269-276
    • Luu, D.T.1    Ng, S.T.2    Chen, S.E.3
  • 36
    • 2642515847 scopus 로고
    • CBRefurb: Case-based cost estimation case based reasoning: Prospects for application
    • Marir, F.; Watson, I. 1995. CBRefurb: case-based cost estimation, case based reasoning: prospects for application, IEE Colloquium 7: 1-5.
    • (1995) IEE Colloquium , vol.7 , pp. 1-5
    • Marir, F.1    Watson, I.2
  • 38
    • 0036717772 scopus 로고    scopus 로고
    • Modeling bridge deterioration using case-based reasoning
    • DOI 10.1061/(ASCE)1076-0342(2002)8:3(86)
    • Morcous, G.; Rivard, H.; Hanna, A. M. 2002. Modeling bridge deterioration using case-based reasoning, Journal of Infrastructure Systems 8(3): 86-95. http://dx.doi.org/10. 1061/(ASCE)1076-0342(2002)8:3(86 (Pubitemid 35016335)
    • (2002) Journal of Infrastructure Systems , vol.8 , Issue.3 , pp. 86-95
    • Morcous, G.1    Rivard, H.2    Hanna, A.M.3
  • 39
    • 0000356302 scopus 로고
    • Examining the feasibility of a case-based reasoning model for software effort estimation
    • Mukhopadhyay, T.; Vicinanza, S. S.; Prietula, M. J. 1992. Examining the feasibility of a case-based reasoning model for software effort estimation, MIS Quarterly 16(2): 155-171. http://dx.doi.org/10.2307/249573
    • (1992) MIS Quarterly , vol.16 , Issue.2 , pp. 155-171
    • Mukhopadhyay, T.1    Vicinanza, S.S.2    Prietula, M.J.3
  • 41
    • 0036776641 scopus 로고    scopus 로고
    • A case-based reasoning with the feature weights derived by analytic hierarchy process for bankruptcy prediction
    • DOI 10.1016/S0957-4174(02)00045-3, PII S0957417402000453
    • Park, C.-S.; Han, I. 2002. A case-based reasoning with the feature weights derived by analytic hierarchy process for bankruptcy prediction, Expert Systems with Applications 23(3): 255-264. http://dx.doi.org/10.1016/S0957-4174 (02)00045-3 (Pubitemid 34991878)
    • (2002) Expert Systems with Applications , vol.23 , Issue.3 , pp. 255-264
    • Park, C.-S.1    Han, I.2
  • 42
    • 76049118472 scopus 로고    scopus 로고
    • Application of AHP technique
    • Podvezko, V. 2009. Application of AHP technique, Journal of Business Economics and Management 10(2): 181-189. http://dx.doi.org/10.3846/1611-1699. 2009.10.181-189
    • (2009) Journal of Business Economics and Management , vol.10 , Issue.2 , pp. 181-189
    • Podvezko, V.1
  • 45
    • 0031119806 scopus 로고    scopus 로고
    • Case-based approach for steel bridge fabrication errors
    • Roddis, W. M. K.; Bocox, J. 1997. Case-based approach for steel bridge fabrication errors, Journal of Computing in Civil Engineering 11(2): 84-91. http://dx.doi.org/10. 1061/(ASCE)0887-3801(1997)11:2(84 (Pubitemid 127611704)
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.2 , pp. 84-91
    • Roddis, W.M.K.1    Bocox, J.2
  • 46
    • 0000544458 scopus 로고
    • Axiomatic foundation of the analytic hierarchy process
    • Saaty, T. L. 1986. Axiomatic foundation of the analytic hierarchy process, Management Science 32(7): 841-855. http://dx.doi.org/10.1287/mnsc.32.7. 841
    • (1986) Management Science , vol.32 , Issue.7 , pp. 841-855
    • Saaty, T.L.1
  • 47
    • 84985790721 scopus 로고
    • Concept, theory, and techniques: Rank generation, preservation, and reversal in the analytic hierarchy decision process
    • Saaty, T. L. 1987. Concept, theory, and techniques: rank generation, preservation, and reversal in the analytic hierarchy decision process, Decision Sciences 18(2): 157-177. http://dx.doi.org/10.1111/j.1540-5915.1987.tb01514.x
    • (1987) Decision Sciences , vol.18 , Issue.2 , pp. 157-177
    • Saaty, T.L.1
  • 48
    • 0025700933 scopus 로고
    • How to make a decision: The analytic hierarchy process
    • Saaty, T. L. 1990. How to make a decision: the analytic hierarchy process, European Journal of Operational Research 48(1): 9-26. http://dx.doi.org/10.1016/0377-2217(90) 90057-I
    • (1990) European Journal of Operational Research , vol.48 , Issue.1 , pp. 9-26
    • Saaty, T.L.1
  • 49
    • 0027610822 scopus 로고
    • Case-based design and creativity
    • DOI 10.1016/0926-5805(93)90031-R
    • Schmitt, G. 1993. Case-based design and creativity, Automation in Construction 2(1): 11-19. http://dx.doi.org/10.1016/0926-5805(93)90031-R (Pubitemid 23712647)
    • (1993) Automation in construction , vol.2 , Issue.1 , pp. 11-19
    • Schmitt Gerhard1
  • 50
    • 0003112429 scopus 로고    scopus 로고
    • Case-based reasoning supported by genetic algorithms for corporate bond rating
    • PII S0957417498000633
    • Shin, K.-S.; Han, I. 1999. Case-based reasoning supported by genetic algorithms for corporate bond rating, Expert Systems with Applications 16(2): 85-95. http://dx.doi.org/10.1016/S0957-4174(98)00063-3 (Pubitemid 129667273)
    • (1999) Expert Systems with Applications , vol.16 , Issue.2 , pp. 85-95
    • Shin, K.-S.1    Han, I.2
  • 51
    • 0032647146 scopus 로고    scopus 로고
    • Information modelling for case-based construction planning of highway bridge projects
    • Tah, J. H. M.; Carr, V.; Howes, R. 1999. Information modelling for case-based construction planning of highway bridge projects, Advances in Engineering Software 30(7): 495-509. http://dx.doi.org/10.1016/S0965-9978(98) 00128-8
    • (1999) Advances in Engineering Software , vol.30 , Issue.7 , pp. 495-509
    • Tah, J.H.M.1    Carr, V.2    Howes, R.3
  • 52
    • 0033232380 scopus 로고    scopus 로고
    • Comparative cost analysis of using high performance concrete in tall building construction by artificial neural networks
    • Tam, C. M.; Fang, C. F. 1999. Comparative cost analysis of using high performance concrete in tall building construction by artificial neural networks, ACI Structural Journal 96(6): 927-936.
    • (1999) ACI Structural Journal , vol.96 , Issue.6 , pp. 927-936
    • Tam, C.M.1    Fang, C.F.2
  • 53
    • 70450211678 scopus 로고    scopus 로고
    • Highway construction data collection and treatment in preparation for statistical regression analysis
    • Williams, R. C.; Hildreth, J. C.; Vorster, M. C. 2009. Highway construction data collection and treatment in preparation for statistical regression analysis, Journal of Construction Engineering and Management 135(12): 1299-1306. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000112
    • (2009) Journal of Construction Engineering and Management , vol.12 , Issue.135 , pp. 1299-1306
    • Williams, R.C.1    Hildreth, J.C.2    Vorster, M.C.3
  • 54
    • 23044474458 scopus 로고    scopus 로고
    • Neural network modeling of highway construction costs
    • DOI 10.1061/(ASCE)0733-9364(2005)131:7(765)
    • Wilmot, C. G.; Mei, B. 2005. Neural network modelling of highway construction costs, Journal of Construction Engineering and Management ASCE 131(7): 765-771. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131: 7(765 (Pubitemid 41068297)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.7 , pp. 765-771
    • Wilmot, C.G.1    Mei, B.2
  • 55
    • 0029722695 scopus 로고    scopus 로고
    • Applications of case-based reasoning in construction engineering and management
    • 17-19 June, 1996, American Society of Civil Engineers, Anaheim, California
    • Yang, J.; Yau, U. 1996. Applications of case-based reasoning in construction engineering and management, in Proc. of the 3rd Congress on Computing in Civil Engineering, 17-19 June, 1996, American Society of Civil Engineers, Anaheim, California, 663-669.
    • (1996) rd Congress on Computing in Civil Engineering , pp. 663-669
    • Yang, J.1    Yau, U.2
  • 56
    • 0032073403 scopus 로고    scopus 로고
    • Applying case-based reasoning technique to retaining wall selection
    • Yau, N.-J.; Yang, J.-B. 1998. Applying case-based reasoning technique to retaining wall selection, Automation in Construction 7(4): 271-283. http://dx.doi.org/10.1016/S0926-5805(97)00072-1
    • (1998) Automation in Construction , vol.7 , Issue.4 , pp. 271-283
    • Yau, N.-J.1    Yang, J.-B.2
  • 57
    • 0002425683 scopus 로고
    • The analytic hierarchy process-A survey of the method and its applications
    • Zahedi, F. 1986. The analytic hierarchy process-A survey of the method and its applications, Interfaces 16(4): 96-108. http://dx.doi.org/10.1287/inte. 16.4.96
    • (1986) Interfaces , vol.16 , Issue.4 , pp. 96-108
    • Zahedi, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.