-
1
-
-
0028401306
-
Case-based reasoning: Foundational issues, methodological variations, and system approaches
-
Aamodt, A., and Plaza, P. (1994). " Case-based reasoning: Foundational issues, methodological variations, and system approaches.. " AI Comm., 7 (1), 39-59.
-
(1994)
AI Comm.
, vol.7
, Issue.1
, pp. 39-59
-
-
Aamodt, A.1
Plaza, P.2
-
2
-
-
0025598377
-
Formal development of line-of-balance technique
-
Al Sarraj, Z. M. (1990). " Formal development of line-of-balance technique.. " J. Constr. Eng. Manage., 116 (4), 689-704.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.4
, pp. 689-704
-
-
Al Sarraj, Z.M.1
-
3
-
-
0345479976
-
Decision support for case-based applications
-
Althoff, K., and Bartsch-Spörl, B. (1996). " Decision support for case-based applications.. " Wirtschaftsinformatick, 38 (1), 6-14.
-
(1996)
Wirtschaftsinformatick
, vol.38
, Issue.1
, pp. 6-14
-
-
Althoff, K.1
Bartsch-Spörl, B.2
-
4
-
-
0011101946
-
On the use of taxonomies for representing case features and local similarity measures
-
L.Gierl and M.Lenz, eds., Univ. of Rostock, Rostock, Germany
-
Bergmann, R. (1998). " On the use of taxonomies for representing case features and local similarity measures.. " Proc., 6th German Workshop on Case-Based Reasoning, L. Gierl, and, M. Lenz, eds., Univ. of Rostock, Rostock, Germany, 23-32.
-
(1998)
Proc., 6th German Workshop on Case-Based Reasoning
, pp. 23-32
-
-
Bergmann, R.1
-
5
-
-
0035137161
-
Case-based reasoning approach in bid decision making
-
Chua, D. K. H., Li, D. Z., and Chan, W. T. (2001). " Case-based reasoning approach in bid decision making.. " J. Constr. Eng. Manage., 127 (1), 35-45.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 35-45
-
-
Chua, D.K.H.1
Li, D.Z.2
Chan, W.T.3
-
6
-
-
0037480774
-
Thematic mapping-From unstructured documents to taxonomies
-
McLean, Va.
-
Chung, C., (2002). " Thematic mapping-From unstructured documents to taxonomies.. " Proc., Conf. on Information and Knowledge Management, McLean, Va., 608-610.
-
(2002)
Proc., Conf. on Information and Knowledge Management
, pp. 608-610
-
-
Chung, C.1
-
8
-
-
0031678358
-
Integration of reasoning systems in architectural modeling activities
-
Demirkan, H. (1998). " Integration of reasoning systems in architectural modeling activities.. " Autom. Constr., 7 (2), 229-236.
-
(1998)
Autom. Constr.
, vol.7
, Issue.2
, pp. 229-236
-
-
Demirkan, H.1
-
9
-
-
84942810704
-
-
Univ. of Ulster, Ulster, Ireland.
-
Dubitzky, W., Büchner, A. G., and Azuaje, F. J. (1999). " Viewing knowledge management as a case-based reasoning application.. " Univ. of Ulster, Ulster, Ireland.
-
(1999)
Viewing Knowledge Management As A Case-based Reasoning Application
-
-
Dubitzky, W.1
Büchner, A.G.2
Azuaje, F.J.3
-
10
-
-
0009115069
-
Boiler erection scheduling using product models and case-based reasoning
-
Dzeng, R.-J., and Tommelein, I. D. (1997). " Boiler erection scheduling using product models and case-based reasoning.. " J. Constr. Eng. Manage., 123 (3), 338-347.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 338-347
-
-
Dzeng, R.-J.1
Tommelein, I.D.2
-
11
-
-
1642618562
-
Product modeling to support case-based construction planning and scheduling
-
Dzeng, R.-J., and Tommelein, I. D. (2004). " Product modeling to support case-based construction planning and scheduling.. " Autom. Constr., 13 (3), 341-360.
-
(2004)
Autom. Constr.
, vol.13
, Issue.3
, pp. 341-360
-
-
Dzeng, R.-J.1
Tommelein, I.D.2
-
12
-
-
0029544391
-
Conceptual structural design in SEED
-
Fenves, S. J., Rivard, H., Gomez, N., and Chiou, S.-C. (1995). " Conceptual structural design in SEED.. " J. Archit. Eng., 1 (4), 179-186.
-
(1995)
J. Archit. Eng.
, vol.1
, Issue.4
, pp. 179-186
-
-
Fenves, S.J.1
Rivard, H.2
Gomez, N.3
Chiou, S.-C.4
-
13
-
-
0000802988
-
Linear scheduling model: Development of controlling activity path
-
Harmelink, D. J., and Rowings, J. E. (1998). " Linear scheduling model: Development of controlling activity path.. " J. Constr. Eng. Manage., 124 (4), 263-268.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 263-268
-
-
Harmelink, D.J.1
Rowings, J.E.2
-
15
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston, D. W. (1981). " Linear scheduling method for highway construction.. " J. Constr. Div., 107 (2), 247-261.
-
(1981)
J. Constr. Div.
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.W.1
-
16
-
-
0031119806
-
Case-based approach for steel bridge fabrication errors
-
Kim Roddis, W. M., and Bocox, J. (1997). " Case-based approach for steel bridge fabrication errors.. " J. Comput. Civ. Eng., 11 (2), 84-91.
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.2
, pp. 84-91
-
-
Roddis, W.M.1
Bocox, J.2
-
18
-
-
0003091264
-
Building a case-based help desk application
-
Kregsman, M., and Barletta, R. (1993). " Building a case-based help desk application.. " IEEE Expert, 8 (6), 18-26.
-
(1993)
IEEE Expert
, vol.8
, Issue.6
, pp. 18-26
-
-
Kregsman, M.1
Barletta, R.2
-
20
-
-
0032012890
-
Case- and constraint-based project planning for apartment construction
-
Lee, K. J., Kim, H. W., Lee, J. K., and Kim, T. H. (1998b). " Case- and constraint-based project planning for apartment construction.. " Am. Assoc. for Artificial Intelligence, 19 (1), 13-24.
-
(1998)
Am. Assoc. for Artificial Intelligence
, vol.19
, Issue.1
, pp. 13-24
-
-
Lee, K.J.1
Kim, H.W.2
Lee, J.K.3
Kim, T.H.4
-
22
-
-
2142770817
-
Case-based reasoning system for modeling infrastructure deterioration
-
Morcous, G., Rivard, H., and Hanna, A. M. (2002). " Case-based reasoning system for modeling infrastructure deterioration.. " J. Comput. Civ. Eng., 16 (2), 104-114.
-
(2002)
J. Comput. Civ. Eng.
, vol.16
, Issue.2
, pp. 104-114
-
-
Morcous, G.1
Rivard, H.2
Hanna, A.M.3
-
23
-
-
0034817767
-
EQUAL: A case-based contractor prequalifier
-
Ng, S. T. (2001). " EQUAL: A case-based contractor prequalifier.. " Autom. Constr., 10, 443-457.
-
(2001)
Autom. Constr.
, vol.10
, pp. 443-457
-
-
Ng, S.T.1
-
24
-
-
0032186599
-
Verification and validation of case-based prequalification system
-
Ng, S. T., and Smith, N. J. (1998). " Verification and validation of case-based prequalification system.. " J. Comput. Civ. Eng., 12 (4), 215-226.
-
(1998)
J. Comput. Civ. Eng.
, vol.12
, Issue.4
, pp. 215-226
-
-
Ng, S.T.1
Smith, N.J.2
-
29
-
-
0002362492
-
Episodisches Wissen und fallbasiertes SchlieΒen: Aufgaben für die Wissensdiagnostik und die Wissenspsychologie
-
Strube, G., and Janetzko, D. (1990). " Episodisches Wissen und fallbasiertes SchlieΒen: Aufgaben für die Wissensdiagnostik und die Wissenspsychologie.. " Schweiz Z. Psychol. Anwend, 49 (4), 211-221.
-
(1990)
Schweiz Z. Psychol. Anwend
, vol.49
, Issue.4
, pp. 211-221
-
-
Strube, G.1
Janetzko, D.2
-
31
-
-
0001899045
-
Improved heterogeneous distance functions
-
Wilson, D. R., and Martinez, T. R. (1997). " Improved heterogeneous distance functions.. " J. Artif. Intell. Res., 6, 1-34.
-
(1997)
J. Artif. Intell. Res.
, vol.6
, pp. 1-34
-
-
Wilson, D.R.1
Martinez, T.R.2
-
32
-
-
0032073403
-
Applying case-based reasoning technique to retaining wall selection
-
Yau, N. J., and Yang, J. B. (1998). " Applying case-based reasoning technique to retaining wall selection.. " Autom. Constr., 7, 271-283.
-
(1998)
Autom. Constr.
, vol.7
, pp. 271-283
-
-
Yau, N.J.1
Yang, J.B.2
-
33
-
-
35348900603
-
-
Ph.D. thesis, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin-Madison, Madison, Wis.
-
Yi, J. S. (2003). " CAMP (Case Matching Prediction): A dynamic forecasting model for periodic expenditures of residential building projects.. " Ph.D. thesis, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin-Madison, Madison, Wis.
-
(2003)
CAMP (Case Matching Prediction): A Dynamic Forecasting Model for Periodic Expenditures of Residential Building Projects
-
-
Yi, J.S.1
|