메뉴 건너뛰기




Volumn 21, Issue 6, 2007, Pages 410-422

Construction planning method using case-based reasoning (CONPLA-CBR)

Author keywords

Assessments; Construction management; Data analysis; Scheduling

Indexed keywords

CONSTRUCTION EQUIPMENT; DATA REDUCTION; SCHEDULING;

EID: 35348919418     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3801(2007)21:6(410)     Document Type: Article
Times cited : (43)

References (33)
  • 1
    • 0028401306 scopus 로고
    • Case-based reasoning: Foundational issues, methodological variations, and system approaches
    • Aamodt, A., and Plaza, P. (1994). " Case-based reasoning: Foundational issues, methodological variations, and system approaches.. " AI Comm., 7 (1), 39-59.
    • (1994) AI Comm. , vol.7 , Issue.1 , pp. 39-59
    • Aamodt, A.1    Plaza, P.2
  • 2
    • 0025598377 scopus 로고
    • Formal development of line-of-balance technique
    • Al Sarraj, Z. M. (1990). " Formal development of line-of-balance technique.. " J. Constr. Eng. Manage., 116 (4), 689-704.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.4 , pp. 689-704
    • Al Sarraj, Z.M.1
  • 3
    • 0345479976 scopus 로고    scopus 로고
    • Decision support for case-based applications
    • Althoff, K., and Bartsch-Spörl, B. (1996). " Decision support for case-based applications.. " Wirtschaftsinformatick, 38 (1), 6-14.
    • (1996) Wirtschaftsinformatick , vol.38 , Issue.1 , pp. 6-14
    • Althoff, K.1    Bartsch-Spörl, B.2
  • 4
    • 0011101946 scopus 로고    scopus 로고
    • On the use of taxonomies for representing case features and local similarity measures
    • L.Gierl and M.Lenz, eds., Univ. of Rostock, Rostock, Germany
    • Bergmann, R. (1998). " On the use of taxonomies for representing case features and local similarity measures.. " Proc., 6th German Workshop on Case-Based Reasoning, L. Gierl, and, M. Lenz, eds., Univ. of Rostock, Rostock, Germany, 23-32.
    • (1998) Proc., 6th German Workshop on Case-Based Reasoning , pp. 23-32
    • Bergmann, R.1
  • 5
    • 0035137161 scopus 로고    scopus 로고
    • Case-based reasoning approach in bid decision making
    • Chua, D. K. H., Li, D. Z., and Chan, W. T. (2001). " Case-based reasoning approach in bid decision making.. " J. Constr. Eng. Manage., 127 (1), 35-45.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 35-45
    • Chua, D.K.H.1    Li, D.Z.2    Chan, W.T.3
  • 6
    • 0037480774 scopus 로고    scopus 로고
    • Thematic mapping-From unstructured documents to taxonomies
    • McLean, Va.
    • Chung, C., (2002). " Thematic mapping-From unstructured documents to taxonomies.. " Proc., Conf. on Information and Knowledge Management, McLean, Va., 608-610.
    • (2002) Proc., Conf. on Information and Knowledge Management , pp. 608-610
    • Chung, C.1
  • 8
    • 0031678358 scopus 로고    scopus 로고
    • Integration of reasoning systems in architectural modeling activities
    • Demirkan, H. (1998). " Integration of reasoning systems in architectural modeling activities.. " Autom. Constr., 7 (2), 229-236.
    • (1998) Autom. Constr. , vol.7 , Issue.2 , pp. 229-236
    • Demirkan, H.1
  • 10
    • 0009115069 scopus 로고    scopus 로고
    • Boiler erection scheduling using product models and case-based reasoning
    • Dzeng, R.-J., and Tommelein, I. D. (1997). " Boiler erection scheduling using product models and case-based reasoning.. " J. Constr. Eng. Manage., 123 (3), 338-347.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 338-347
    • Dzeng, R.-J.1    Tommelein, I.D.2
  • 11
    • 1642618562 scopus 로고    scopus 로고
    • Product modeling to support case-based construction planning and scheduling
    • Dzeng, R.-J., and Tommelein, I. D. (2004). " Product modeling to support case-based construction planning and scheduling.. " Autom. Constr., 13 (3), 341-360.
    • (2004) Autom. Constr. , vol.13 , Issue.3 , pp. 341-360
    • Dzeng, R.-J.1    Tommelein, I.D.2
  • 13
    • 0000802988 scopus 로고    scopus 로고
    • Linear scheduling model: Development of controlling activity path
    • Harmelink, D. J., and Rowings, J. E. (1998). " Linear scheduling model: Development of controlling activity path.. " J. Constr. Eng. Manage., 124 (4), 263-268.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 263-268
    • Harmelink, D.J.1    Rowings, J.E.2
  • 15
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • Johnston, D. W. (1981). " Linear scheduling method for highway construction.. " J. Constr. Div., 107 (2), 247-261.
    • (1981) J. Constr. Div. , vol.107 , Issue.2 , pp. 247-261
    • Johnston, D.W.1
  • 16
    • 0031119806 scopus 로고    scopus 로고
    • Case-based approach for steel bridge fabrication errors
    • Kim Roddis, W. M., and Bocox, J. (1997). " Case-based approach for steel bridge fabrication errors.. " J. Comput. Civ. Eng., 11 (2), 84-91.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.2 , pp. 84-91
    • Roddis, W.M.1    Bocox, J.2
  • 18
    • 0003091264 scopus 로고
    • Building a case-based help desk application
    • Kregsman, M., and Barletta, R. (1993). " Building a case-based help desk application.. " IEEE Expert, 8 (6), 18-26.
    • (1993) IEEE Expert , vol.8 , Issue.6 , pp. 18-26
    • Kregsman, M.1    Barletta, R.2
  • 20
    • 0032012890 scopus 로고    scopus 로고
    • Case- and constraint-based project planning for apartment construction
    • Lee, K. J., Kim, H. W., Lee, J. K., and Kim, T. H. (1998b). " Case- and constraint-based project planning for apartment construction.. " Am. Assoc. for Artificial Intelligence, 19 (1), 13-24.
    • (1998) Am. Assoc. for Artificial Intelligence , vol.19 , Issue.1 , pp. 13-24
    • Lee, K.J.1    Kim, H.W.2    Lee, J.K.3    Kim, T.H.4
  • 22
    • 2142770817 scopus 로고    scopus 로고
    • Case-based reasoning system for modeling infrastructure deterioration
    • Morcous, G., Rivard, H., and Hanna, A. M. (2002). " Case-based reasoning system for modeling infrastructure deterioration.. " J. Comput. Civ. Eng., 16 (2), 104-114.
    • (2002) J. Comput. Civ. Eng. , vol.16 , Issue.2 , pp. 104-114
    • Morcous, G.1    Rivard, H.2    Hanna, A.M.3
  • 23
    • 0034817767 scopus 로고    scopus 로고
    • EQUAL: A case-based contractor prequalifier
    • Ng, S. T. (2001). " EQUAL: A case-based contractor prequalifier.. " Autom. Constr., 10, 443-457.
    • (2001) Autom. Constr. , vol.10 , pp. 443-457
    • Ng, S.T.1
  • 24
    • 0032186599 scopus 로고    scopus 로고
    • Verification and validation of case-based prequalification system
    • Ng, S. T., and Smith, N. J. (1998). " Verification and validation of case-based prequalification system.. " J. Comput. Civ. Eng., 12 (4), 215-226.
    • (1998) J. Comput. Civ. Eng. , vol.12 , Issue.4 , pp. 215-226
    • Ng, S.T.1    Smith, N.J.2
  • 29
    • 0002362492 scopus 로고
    • Episodisches Wissen und fallbasiertes SchlieΒen: Aufgaben für die Wissensdiagnostik und die Wissenspsychologie
    • Strube, G., and Janetzko, D. (1990). " Episodisches Wissen und fallbasiertes SchlieΒen: Aufgaben für die Wissensdiagnostik und die Wissenspsychologie.. " Schweiz Z. Psychol. Anwend, 49 (4), 211-221.
    • (1990) Schweiz Z. Psychol. Anwend , vol.49 , Issue.4 , pp. 211-221
    • Strube, G.1    Janetzko, D.2
  • 31
    • 0001899045 scopus 로고    scopus 로고
    • Improved heterogeneous distance functions
    • Wilson, D. R., and Martinez, T. R. (1997). " Improved heterogeneous distance functions.. " J. Artif. Intell. Res., 6, 1-34.
    • (1997) J. Artif. Intell. Res. , vol.6 , pp. 1-34
    • Wilson, D.R.1    Martinez, T.R.2
  • 32
    • 0032073403 scopus 로고    scopus 로고
    • Applying case-based reasoning technique to retaining wall selection
    • Yau, N. J., and Yang, J. B. (1998). " Applying case-based reasoning technique to retaining wall selection.. " Autom. Constr., 7, 271-283.
    • (1998) Autom. Constr. , vol.7 , pp. 271-283
    • Yau, N.J.1    Yang, J.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.