메뉴 건너뛰기




Volumn 131, Issue 7, 2005, Pages 765-771

Neural network modeling of highway construction costs

Author keywords

Bids; Construction costs; Cost estimates; Forecasting; Highway construction; Neural networks; Predictions

Indexed keywords

BIDS; CONSTRUCTION COSTS; COST ESTIMATES; HIGHWAY CONSTRUCTION; PREDICTIONS;

EID: 23044474458     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:7(765)     Document Type: Article
Times cited : (120)

References (22)
  • 1
    • 0002596236 scopus 로고    scopus 로고
    • Regularization neural network for construction cost estimation
    • Adeli, H., and Wu, M. (1998). "Regularization neural network for construction cost estimation." J. Constr. Eng. Manage. 124(1), 18-24.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 18-24
    • Adeli, H.1    Wu, M.2
  • 2
    • 0027648632 scopus 로고
    • Forecasting construction cost escalation
    • Blair, A. N., Lye, L. M., and Campbell, W. J. (1993). "Forecasting construction cost escalation." Can. J. Civ. Eng., 20, 602-612.
    • (1993) Can. J. Civ. Eng. , vol.20 , pp. 602-612
    • Blair, A.N.1    Lye, L.M.2    Campbell, W.J.3
  • 3
    • 23044457630 scopus 로고    scopus 로고
    • Neurofuzzy modeling of projects duration
    • School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K.
    • Boussabaine, A. H. (1999). "Neurofuzzy modeling of projects duration." Research Rep. No. 4, School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K., 1-39.
    • (1999) Research Rep. No. 4 , vol.4 , pp. 1-39
    • Boussabaine, A.H.1
  • 4
    • 23044468079 scopus 로고    scopus 로고
    • Tender price estimation using ANN methods
    • School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K.
    • Boussabaine, A. H., and Elhag, T. M. S. (1999). "Tender price estimation using ANN methods." Research Rep. No. 3, School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K., 1-57.
    • (1999) Research Rep. No. 3 , vol.3 , pp. 1-57
    • Boussabaine, A.H.1    Elhag, T.M.S.2
  • 5
    • 0028417085 scopus 로고
    • Estimating construction productivity: Neural-network-based approach
    • Chao, L. C., and Skibniewski, M. J. (1994). "Estimating construction productivity: Neural-network-based approach." J. Comput. Civ. Eng., 8(2), 234-251.
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.2 , pp. 234-251
    • Chao, L.C.1    Skibniewski, M.J.2
  • 6
    • 0029273779 scopus 로고
    • Neural networks of estimating construction technology acceptability
    • Chao, L. C., and Skibniewski, M. J. (1995). "Neural networks of estimating construction technology acceptability." J. Constr. Eng. Manage. 121(1), 130-142.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.1 , pp. 130-142
    • Chao, L.C.1    Skibniewski, M.J.2
  • 7
    • 5244317236 scopus 로고    scopus 로고
    • Model for construction budget performance - A neural network approach
    • Chua, D. K. H., Kog, Y. C., Loh, P. K., and Jaselskis, E. J. (1997). "Model for construction budget performance - A neural network approach." J. Constr. Eng. Manage. 123(3), 214-222.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 214-222
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3    Jaselskis, E.J.4
  • 8
    • 23044447033 scopus 로고    scopus 로고
    • Factors affecting cost and duration of construction projects
    • School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K.
    • Elhag, T. M. S., and Boussebaine, A. H. (1998a). "Factors affecting cost and duration of construction projects." EPSRC Research Rep. Phase (I), School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K., 1-14.
    • (1998) EPSRC Research Rep. Phase (I) , pp. 1-14
    • Elhag, T.M.S.1    Boussebaine, A.H.2
  • 9
    • 23044503582 scopus 로고    scopus 로고
    • Statistical analysis and cost models development
    • School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K.
    • Elhag, T. M. S., and Boussebaine, A. H. (1998b). "Statistical analysis and cost models development." Research Rep. No. 2, School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K., 1-64.
    • (1998) Research Rep. No. 2 , vol.2 , pp. 1-64
    • Elhag, T.M.S.1    Boussebaine, A.H.2
  • 10
    • 13944258195 scopus 로고    scopus 로고
    • Baseline market forecasts for state highway construction engineering, maintenance and administration programs 1997-2001
    • Center for Interdisciplinary Transportation Studies, Univ. of North Carolina, Charlotte, N.C.
    • Hartgen, D. T., Bowman, V. B., and Horner, M. W. (1997). "Baseline market forecasts for state highway construction engineering, maintenance and administration programs 1997-2001." Transportation Publication Number 151, Center for Interdisciplinary Transportation Studies, Univ. of North Carolina, Charlotte, N.C.
    • (1997) Transportation Publication Number 151 , vol.151
    • Hartgen, D.T.1    Bowman, V.B.2    Horner, M.W.3
  • 11
    • 13944266837 scopus 로고
    • Comparative performance of transportation system: Pitfalls and prospects
    • Sydney, Australia
    • Hartgen, D. T., and Talvitie, A. P. (1995). "Comparative performance of transportation system: Pitfalls and prospects." Proc., World Conf. on Transit Research, Sydney, Australia, 1-20.
    • (1995) Proc., World Conf. on Transit Research , pp. 1-20
    • Hartgen, D.T.1    Talvitie, A.P.2
  • 12
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • Hegazy, T., and Ayed, A. (1998). "Neural network model for parametric cost estimation of highway projects." J. Constr. Eng. Manage. 124(3), 210-218.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 13
    • 0022435824 scopus 로고
    • Model for forecasting highway construction cost
    • Transportation Research Board, Washington, D.C.
    • Herbsman, Z. (1986). "Model for forecasting highway construction cost." Transportation Research Record. 1056, Transportation Research Board, Washington, D.C., 47-54.
    • (1986) Transportation Research Record. 1056 , vol.1056 , pp. 47-54
    • Herbsman, Z.1
  • 15
    • 0019689404 scopus 로고
    • Forecasting engineering costs: Two case studies
    • Koppula, S. D. (1981). "Forecasting engineering costs: Two case studies." J. Constr. Div., Am. Soc. Civ. Eng., 107(4), 733-743.
    • (1981) J. Constr. Div., Am. Soc. Civ. Eng. , vol.107 , Issue.4 , pp. 733-743
    • Koppula, S.D.1
  • 16
    • 23044449027 scopus 로고
    • 1977 becomes the new base year for FHWA's bid price index
    • Mirack, F. (1981). "1977 becomes the new base year for FHWA's bid price index." Public Roads, 31(1), 27-30.
    • (1981) Public Roads , vol.31 , Issue.1 , pp. 27-30
    • Mirack, F.1
  • 17
    • 0027664047 scopus 로고
    • DBID: Analogy-based DSS for bidding in construction
    • Moselhi, O., Hegazy, T., and Fazio, P. (1993). "DBID: Analogy-based DSS for bidding in construction." J. Constr. Eng. Manage., 119(3), 466-479.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.3 , pp. 466-479
    • Moselhi, O.1    Hegazy, T.2    Fazio, P.3
  • 18
    • 23044433913 scopus 로고
    • Construction cost trends
    • Texas Transportation Institute, Texas A&M Univ., College Station, Tex
    • Olson, R. M., and Epps, J. A. (1981). "Construction cost trends." Research Rep. No. 214-29, Texas Transportation Institute, Texas A&M Univ., College Station, Tex., 1-7.
    • (1981) Research Rep. No. 214-29 , vol.214 , Issue.29 , pp. 1-7
    • Olson, R.M.1    Epps, J.A.2
  • 19
    • 13944262248 scopus 로고
    • Cost estimating and forecasting for highway work in Kentucky
    • Kentucky Transportation Center, Lexington, Ky
    • Stevens, J. D. (1995). "Cost estimating and forecasting for highway work in Kentucky." Research Rep. No. KTC 95-12, Kentucky Transportation Center, Lexington, Ky., 1-29.
    • (1995) Research Rep. No. KTC 95-12 , vol.KTC 95-12 , pp. 1-29
    • Stevens, J.D.1
  • 21
    • 0028457079 scopus 로고
    • Predicting changes in construction cost indexes using neural networks
    • Williams, T. P. (1994). "Predicting changes in construction cost indexes using neural networks." J. Constr. Eng. Manage., 120(2), 306-320.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.2 , pp. 306-320
    • Williams, T.P.1
  • 22
    • 13844303116 scopus 로고    scopus 로고
    • Estimating future highway construction costs
    • Wilmot, C. G., and Cheng, G. (2003). "Estimating future highway construction costs." J. Constr. Eng. Manage. 129(3), 272-279.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 272-279
    • Wilmot, C.G.1    Cheng, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.