메뉴 건너뛰기




Volumn 4, Issue 1, 2005, Pages 113-120

Comparing Cost Prediction Methods for Apartment Housing Projects: CBR versus ANN

Author keywords

Apartment house; Artificial neural networks; Case based reasoning; Cost estimation

Indexed keywords


EID: 84994360479     PISSN: 13467581     EISSN: 13472852     Source Type: Journal    
DOI: 10.3130/jaabe.4.113     Document Type: Article
Times cited : (21)

References (26)
  • 1
    • 0032024157 scopus 로고    scopus 로고
    • Predicting the outcome of construction litigation using neural networks
    • Arditi, D., Oksay, F. E., and Tokdemir, O. B. (1998). “Predicting the outcome of construction litigation using neural networks.” CompAided Civ. And Infrastruct. Engrg., 13(2), 75–81.
    • (1998) CompAided Civ. And Infrastruct. Engrg. , vol.13 , Issue.2 , pp. 75-81
    • Arditi, D.1    Oksay, F.E.2    Tokdemir, O.B.3
  • 2
    • 0033156950 scopus 로고    scopus 로고
    • Comparison of case-based reasoning and artificial neural networks
    • Arditi, D., and Tokdemir B. (1999). “Comparison of case-based reasoning and artificial neural networks.” J. Comp.n Civ. Engrg., ASCE. 13(3), 162–169.
    • (1999) J. Comp.n Civ. Engrg., ASCE. , vol.13 , Issue.3 , pp. 162-169
    • Arditi, D.1    Tokdemir, B.2
  • 3
    • 13944265044 scopus 로고    scopus 로고
    • Predicting cost deviation in reconstruction project: Artificial neural networks versus regression
    • Attalla, M., and Hegazy, T. (2003). “Predicting cost deviation in reconstruction project: Artificial neural networks versus regression.” J. Constr. Engrg. and Mgmt., ASCE, 129(4), 405–411.
    • (2003) J. Constr. Engrg. and Mgmt., ASCE , vol.129 , Issue.4 , pp. 405-411
    • Attalla, M.1    Hegazy, T.2
  • 4
    • 0034655066 scopus 로고    scopus 로고
    • Neural networks for cost estimation: Simulations and pilot application
    • Bode, J. (2000). “Neural networks for cost estimation: Simulations and pilot application.” Int. J. Production Research, 38(6), 1231–1254.
    • (2000) Int. J. Production Research , vol.38 , Issue.6 , pp. 1231-1254
    • Bode, J.1
  • 5
    • 0001292966 scopus 로고    scopus 로고
    • The use of artificial neural networks in construction management: A review
    • Boussabaine, A. H. (1996). “The use of artificial neural networks in construction management: A review.” Constr Mgmt. and Economics, 14, 427–436.
    • (1996) Constr Mgmt. and Economics , vol.14 , pp. 427-436
    • Boussabaine, A.H.1
  • 6
    • 0002231440 scopus 로고
    • Cost estimation of timber bridge using neural networks
    • Creece, R., and Li, L. (1995). “Cost estimation of timber bridge using neural networks.” Cost Engrg., AACE Int., 37(5), 17–22.
    • (1995) Cost Engrg., AACE Int. , vol.37 , Issue.5 , pp. 17-22
    • Creece, R.1    Li, L.2
  • 7
    • 85024739281 scopus 로고
    • ESTEEM Software Documentation
    • Esteem software (1995), “ESTEEM Software Documentation.” Version 1.4 Cambridge City IN.
    • (1995) Version 1.4 Cambridge City IN.
  • 8
    • 0029241605 scopus 로고
    • Neural network versus parameter-based application
    • Garza, J., and Rouhana, K. (1995). “Neural network versus parameter-based application.” Cost Engrg., AACE Int., 37(2): 14–18.
    • (1995) Cost Engrg., AACE Int. , vol.37 , Issue.2 , pp. 14-18
    • Garza, J.1    Rouhana, K.2
  • 9
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • Hegazy, T., and Ayed, A. (1998). “Neural network model for parametric cost estimation of highway projects.” J. Constr. Engrg. and Mgmt., ASCE, 124(3), 210–218.
    • (1998) J. Constr. Engrg. and Mgmt., ASCE , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 10
    • 0028330587 scopus 로고
    • Analogy-based solution to markup estimation problem
    • Hegazy, T., and Moselhi, O. (1994). “Analogy-based solution to markup estimation problem.” J. Comp.n Civ. Engrg., ASCE, 8(1), 72–87.
    • (1994) J. Comp.n Civ. Engrg., ASCE , vol.8 , Issue.1 , pp. 72-87
    • Hegazy, T.1    Moselhi, O.2
  • 12
    • 2642564315 scopus 로고    scopus 로고
    • Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning
    • Kim, G. H., An, S. H., and Kang, K. I. (2004), “Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning.” Building and Environment, 39(10): 1235–1242.
    • (2004) Building and Environment , vol.39 , Issue.10 , pp. 1235-1242
    • Kim, G.H.1    An, S.H.2    Kang, K.I.3
  • 14
    • 0012517636 scopus 로고
    • Some analysis of the use of regression as an estimating tool
    • McCaffer, R. (1975). “Some analysis of the use of regression as an estimating tool.” Quantity surveyor, 32, 81–86.
    • (1975) Quantity surveyor , vol.32 , pp. 81-86
    • McCaffer, R.1
  • 15
    • 0027625827 scopus 로고
    • Neural network application to cost engineering
    • McKim, R. (1993). “Neural network application to cost engineering.” Cost Engrg., AACE Int., 35(7), 31–35.
    • (1993) Cost Engrg., AACE Int. , vol.35 , Issue.7 , pp. 31-35
    • McKim, R.1
  • 16
    • 0026381932 scopus 로고
    • Neural networks as tools in construction
    • Moselhi, O, and Hegazy, T. (1991). “Neural networks as tools in construction.” J. Constr. Engrg. and Mgmt., ASCE, 117(4), 606–625.
    • (1991) J. Constr. Engrg. and Mgmt., ASCE , vol.117 , Issue.4 , pp. 606-625
    • Moselhi, O.1    Hegazy, T.2
  • 17
    • 2642534679 scopus 로고
    • The effect of project information on the accuracy of building price forecasts
    • London: E&FN Spon:
    • Skitmore M. (1987) “The effect of project information on the accuracy of building price forecasts.” In: Brandon PS, editor. Building cost modeling and computers. London: E&FN Spon:, 327–336.
    • (1987) Brandon PS, editor. Building cost modeling and computers , pp. 327-336
    • Skitmore, M.1
  • 18
    • 0031336193 scopus 로고    scopus 로고
    • Cost estimation modeling: Regression versus neural network
    • Smith, A. E., and Mason, A. K. (1997). “Cost estimation modeling: Regression versus neural network.” Engrg. Economist, 42(2), 137–161.
    • (1997) Engrg. Economist , vol.42 , Issue.2 , pp. 137-161
    • Smith, A.E.1    Mason, A.K.2
  • 19
    • 0032640764 scopus 로고    scopus 로고
    • Earthmoving productivity estimation using linear regression techniques
    • Smith, S. D. (1999). “Earthmoving productivity estimation using linear regression techniques ” J. Constr. Engrg. and Mgmt., ASCE, 125(3), 133–141.
    • (1999) J. Constr. Engrg. and Mgmt., ASCE , vol.125 , Issue.3 , pp. 133-141
    • Smith, S.D.1
  • 20
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • Trost, S. M., and Oberlender, G. D. (2003). “Predicting accuracy of early cost estimates using factor analysis and multivariate regression.” J. Constr Engrg. And Mgmt., ASCE, 129(2), 198–204.
    • (2003) J. Constr Engrg. And Mgmt., ASCE , vol.129 , Issue.2 , pp. 198-204
    • Trost, S.M.1    Oberlender, G.D.2
  • 22
    • 0034634798 scopus 로고    scopus 로고
    • Process cost modelling using neural networks
    • Wang, Q., Stockton, D. J., and Baguley, P. (2000). “Process cost modelling using neural networks.” Int. J. Prod. Res., 38(16), 3811–3821.
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.16 , pp. 3811-3821
    • Wang, Q.1    Stockton, D.J.2    Baguley, P.3
  • 24
    • 0002675201 scopus 로고
    • Neural-network learning and statistics
    • White, H. (1989). “Neural-network learning and statistics.” AI Expert(Dec.), 48–52.
    • (1989) AI Expert(Dec.) , pp. 48-52
    • White, H.1
  • 25
    • 0032073403 scopus 로고    scopus 로고
    • Applying case-based reasoning technique to retaining wall selection
    • Yau, N. J., and Yang, J. B. (1998). “Applying case-based reasoning technique to retaining wall selection.” Automation in Construction 7, 271–283.
    • (1998) Automation in Construction , vol.7 , pp. 271-283
    • Yau, N.J.1    Yang, J.B.2
  • 26
    • 0005061735 scopus 로고    scopus 로고
    • Quantity estimating of building with logarithmneuron networks
    • Yeh, I. C. (1998). “Quantity estimating of building with logarithmneuron networks.” J. Constr. Engrg. and Mgmt., ASCE, 124(5), 374–380.
    • (1998) J. Constr. Engrg. and Mgmt., ASCE , vol.124 , Issue.5 , pp. 374-380
    • Yeh, I.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.