-
1
-
-
0032024157
-
Predicting the outcome of construction litigation using neural networks
-
Arditi, D., Oksay, F. E., and Tokdemir, O. B. (1998). “Predicting the outcome of construction litigation using neural networks.” CompAided Civ. And Infrastruct. Engrg., 13(2), 75–81.
-
(1998)
CompAided Civ. And Infrastruct. Engrg.
, vol.13
, Issue.2
, pp. 75-81
-
-
Arditi, D.1
Oksay, F.E.2
Tokdemir, O.B.3
-
2
-
-
0033156950
-
Comparison of case-based reasoning and artificial neural networks
-
Arditi, D., and Tokdemir B. (1999). “Comparison of case-based reasoning and artificial neural networks.” J. Comp.n Civ. Engrg., ASCE. 13(3), 162–169.
-
(1999)
J. Comp.n Civ. Engrg., ASCE.
, vol.13
, Issue.3
, pp. 162-169
-
-
Arditi, D.1
Tokdemir, B.2
-
3
-
-
13944265044
-
Predicting cost deviation in reconstruction project: Artificial neural networks versus regression
-
Attalla, M., and Hegazy, T. (2003). “Predicting cost deviation in reconstruction project: Artificial neural networks versus regression.” J. Constr. Engrg. and Mgmt., ASCE, 129(4), 405–411.
-
(2003)
J. Constr. Engrg. and Mgmt., ASCE
, vol.129
, Issue.4
, pp. 405-411
-
-
Attalla, M.1
Hegazy, T.2
-
4
-
-
0034655066
-
Neural networks for cost estimation: Simulations and pilot application
-
Bode, J. (2000). “Neural networks for cost estimation: Simulations and pilot application.” Int. J. Production Research, 38(6), 1231–1254.
-
(2000)
Int. J. Production Research
, vol.38
, Issue.6
, pp. 1231-1254
-
-
Bode, J.1
-
5
-
-
0001292966
-
The use of artificial neural networks in construction management: A review
-
Boussabaine, A. H. (1996). “The use of artificial neural networks in construction management: A review.” Constr Mgmt. and Economics, 14, 427–436.
-
(1996)
Constr Mgmt. and Economics
, vol.14
, pp. 427-436
-
-
Boussabaine, A.H.1
-
6
-
-
0002231440
-
Cost estimation of timber bridge using neural networks
-
Creece, R., and Li, L. (1995). “Cost estimation of timber bridge using neural networks.” Cost Engrg., AACE Int., 37(5), 17–22.
-
(1995)
Cost Engrg., AACE Int.
, vol.37
, Issue.5
, pp. 17-22
-
-
Creece, R.1
Li, L.2
-
7
-
-
85024739281
-
ESTEEM Software Documentation
-
Esteem software (1995), “ESTEEM Software Documentation.” Version 1.4 Cambridge City IN.
-
(1995)
Version 1.4 Cambridge City IN.
-
-
-
8
-
-
0029241605
-
Neural network versus parameter-based application
-
Garza, J., and Rouhana, K. (1995). “Neural network versus parameter-based application.” Cost Engrg., AACE Int., 37(2): 14–18.
-
(1995)
Cost Engrg., AACE Int.
, vol.37
, Issue.2
, pp. 14-18
-
-
Garza, J.1
Rouhana, K.2
-
9
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
Hegazy, T., and Ayed, A. (1998). “Neural network model for parametric cost estimation of highway projects.” J. Constr. Engrg. and Mgmt., ASCE, 124(3), 210–218.
-
(1998)
J. Constr. Engrg. and Mgmt., ASCE
, vol.124
, Issue.3
, pp. 210-218
-
-
Hegazy, T.1
Ayed, A.2
-
10
-
-
0028330587
-
Analogy-based solution to markup estimation problem
-
Hegazy, T., and Moselhi, O. (1994). “Analogy-based solution to markup estimation problem.” J. Comp.n Civ. Engrg., ASCE, 8(1), 72–87.
-
(1994)
J. Comp.n Civ. Engrg., ASCE
, vol.8
, Issue.1
, pp. 72-87
-
-
Hegazy, T.1
Moselhi, O.2
-
11
-
-
0028320021
-
Developing practical neural network applications using back-propagation
-
Hegazy, T., Moselhi, O., and Fazio, P. (1994). “Developing practical neural network applications using back-propagation.” Microcomputers in civ. Engrg., Blackwell Publisher, 9(2): 145–159.
-
(1994)
Microcomputers in civ. Engrg., Blackwell Publisher
, vol.9
, Issue.2
, pp. 145-159
-
-
Hegazy, T.1
Moselhi, O.2
Fazio, P.3
-
12
-
-
2642564315
-
Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning
-
Kim, G. H., An, S. H., and Kang, K. I. (2004), “Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning.” Building and Environment, 39(10): 1235–1242.
-
(2004)
Building and Environment
, vol.39
, Issue.10
, pp. 1235-1242
-
-
Kim, G.H.1
An, S.H.2
Kang, K.I.3
-
14
-
-
0012517636
-
Some analysis of the use of regression as an estimating tool
-
McCaffer, R. (1975). “Some analysis of the use of regression as an estimating tool.” Quantity surveyor, 32, 81–86.
-
(1975)
Quantity surveyor
, vol.32
, pp. 81-86
-
-
McCaffer, R.1
-
15
-
-
0027625827
-
Neural network application to cost engineering
-
McKim, R. (1993). “Neural network application to cost engineering.” Cost Engrg., AACE Int., 35(7), 31–35.
-
(1993)
Cost Engrg., AACE Int.
, vol.35
, Issue.7
, pp. 31-35
-
-
McKim, R.1
-
16
-
-
0026381932
-
Neural networks as tools in construction
-
Moselhi, O, and Hegazy, T. (1991). “Neural networks as tools in construction.” J. Constr. Engrg. and Mgmt., ASCE, 117(4), 606–625.
-
(1991)
J. Constr. Engrg. and Mgmt., ASCE
, vol.117
, Issue.4
, pp. 606-625
-
-
Moselhi, O.1
Hegazy, T.2
-
17
-
-
2642534679
-
The effect of project information on the accuracy of building price forecasts
-
London: E&FN Spon:
-
Skitmore M. (1987) “The effect of project information on the accuracy of building price forecasts.” In: Brandon PS, editor. Building cost modeling and computers. London: E&FN Spon:, 327–336.
-
(1987)
Brandon PS, editor. Building cost modeling and computers
, pp. 327-336
-
-
Skitmore, M.1
-
18
-
-
0031336193
-
Cost estimation modeling: Regression versus neural network
-
Smith, A. E., and Mason, A. K. (1997). “Cost estimation modeling: Regression versus neural network.” Engrg. Economist, 42(2), 137–161.
-
(1997)
Engrg. Economist
, vol.42
, Issue.2
, pp. 137-161
-
-
Smith, A.E.1
Mason, A.K.2
-
19
-
-
0032640764
-
Earthmoving productivity estimation using linear regression techniques
-
Smith, S. D. (1999). “Earthmoving productivity estimation using linear regression techniques ” J. Constr. Engrg. and Mgmt., ASCE, 125(3), 133–141.
-
(1999)
J. Constr. Engrg. and Mgmt., ASCE
, vol.125
, Issue.3
, pp. 133-141
-
-
Smith, S.D.1
-
20
-
-
2642579411
-
Predicting accuracy of early cost estimates using factor analysis and multivariate regression
-
Trost, S. M., and Oberlender, G. D. (2003). “Predicting accuracy of early cost estimates using factor analysis and multivariate regression.” J. Constr Engrg. And Mgmt., ASCE, 129(2), 198–204.
-
(2003)
J. Constr Engrg. And Mgmt., ASCE
, vol.129
, Issue.2
, pp. 198-204
-
-
Trost, S.M.1
Oberlender, G.D.2
-
21
-
-
0030147563
-
On the overtraining phenomenon of backpropagation neural networks
-
Tzafestas, S. G., Dalianis, P. J., and Anthopoulos, G. (1996). “On the overtraining phenomenon of backpropagation neural networks.” Math. and Comp. in Simulation, 40: 507–521.
-
(1996)
Math. and Comp. in Simulation
, vol.40
, pp. 507-521
-
-
Tzafestas, S.G.1
Dalianis, P.J.2
Anthopoulos, G.3
-
22
-
-
0034634798
-
Process cost modelling using neural networks
-
Wang, Q., Stockton, D. J., and Baguley, P. (2000). “Process cost modelling using neural networks.” Int. J. Prod. Res., 38(16), 3811–3821.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.16
, pp. 3811-3821
-
-
Wang, Q.1
Stockton, D.J.2
Baguley, P.3
-
24
-
-
0002675201
-
Neural-network learning and statistics
-
White, H. (1989). “Neural-network learning and statistics.” AI Expert(Dec.), 48–52.
-
(1989)
AI Expert(Dec.)
, pp. 48-52
-
-
White, H.1
-
25
-
-
0032073403
-
Applying case-based reasoning technique to retaining wall selection
-
Yau, N. J., and Yang, J. B. (1998). “Applying case-based reasoning technique to retaining wall selection.” Automation in Construction 7, 271–283.
-
(1998)
Automation in Construction
, vol.7
, pp. 271-283
-
-
Yau, N.J.1
Yang, J.B.2
-
26
-
-
0005061735
-
Quantity estimating of building with logarithmneuron networks
-
Yeh, I. C. (1998). “Quantity estimating of building with logarithmneuron networks.” J. Constr. Engrg. and Mgmt., ASCE, 124(5), 374–380.
-
(1998)
J. Constr. Engrg. and Mgmt., ASCE
, vol.124
, Issue.5
, pp. 374-380
-
-
Yeh, I.C.1
|