Volumn 28, Issue 3, 2014, Pages

Bayesian Markov chain Monte Carlo model for determining optimum tender price in multifamily housing projects

Author keywords

Bayesian Markov Chain Monte Carlo; Multifamily housing; Regression analysis; Tender price

Indexed keywords

HOUSING; REGRESSION ANALYSIS;

EID: 84898933169     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000297     Document Type: Article
Times cited : (8)

References (40)
  • 4
    • 0035426615 scopus 로고    scopus 로고
    • Multi-criteria assessment of the probability of winning in the competitive bidding process
    • IPMAEL 10.1016/S0263-7863(00)00020-X
    • Cagno, E., Caron, F., and, Perego, A. (2001). " Multi-criteria assessment of the probability of winning in the competitive bidding process." Int. J. Proj. Manage., 19 (6), 313-324. IPMAEL 10.1016/S0263-7863(00)00020-X
    • (2001) Int. J. Proj. Manage. , vol.19 , Issue.6 , pp. 313-324
    • Cagno, E.1    Caron, F.2    Perego, A.3
  • 7
    • 0026789909 scopus 로고
    • Bayesian inference for feedback control. I: Theory
    • 10.1061/(ASCE)0733-9437(1992)118:3(397), JIDEDH 0733-9437
    • Clemmens, A. J., and, Keats, J. B. (1992). " Bayesian inference for feedback control. I: Theory." J. Irrig. Drain. Eng., 10.1061/(ASCE)0733- 9437(1992)118:3(397), 397-415. JIDEDH 0733-9437
    • (1992) J. Irrig. Drain. Eng. , pp. 397-415
    • Clemmens, A.J.1    Keats, J.B.2
  • 8
    • 0001748017 scopus 로고
    • A competitive-bidding strategy
    • OPREAI 0030-364X 10.1287/opre.4.1.104
    • Friedman, L. (1956). " A competitive-bidding strategy." Oper. Res., 4 (1), 104-112. OPREAI 0030-364X 10.1287/opre.4.1.104
    • (1956) Oper. Res. , vol.4 , Issue.1 , pp. 104-112
    • Friedman, L.1
  • 9
    • 33846799194 scopus 로고    scopus 로고
    • A probabilistic framework for Bayesian adaptive forecasting of project progress
    • CCIEFR 1093-9687 10.1111/mice.2007.22.issue-3
    • Gardoni, P., Reinschmidt, K. F., and, Kumar, R. (2007). " A probabilistic framework for Bayesian adaptive forecasting of project progress." Comput. Aided Civ. Infrastruct. Eng., 22 (3), 182-196. CCIEFR 1093-9687 10.1111/mice.2007.22.issue-3
    • (2007) Comput. Aided Civ. Infrastruct. Eng. , vol.22 , Issue.3 , pp. 182-196
    • Gardoni, P.1    Reinschmidt, K.F.2    Kumar, R.3
  • 10
    • 0442309436 scopus 로고    scopus 로고
    • The variable selection problem
    • JSTNAL 0162-1459 10.1080/01621459.2000.10474336
    • George, E. I. (2000). " The variable selection problem." J. Am. Stat. Assoc., 95 (452), 1304-1308. JSTNAL 0162-1459 10.1080/01621459.2000. 10474336
    • (2000) J. Am. Stat. Assoc. , vol.95 , Issue.452 , pp. 1304-1308
    • George, E.I.1
  • 11
    • 0007789970 scopus 로고
    • An empirical comparison of three inference methods
    • Chapter 4, R. Shacher, T. Levitt, L. Kanal, and J. Lemmer, eds. North-Holland, New York
    • Heckerman, D. (1988). " An empirical comparison of three inference methods." Chapter 4, Uncertainty in artificial intelligence, R. Shacher, T. Levitt, L. Kanal, and J. Lemmer., eds., North-Holland, New York, 283-302.
    • (1988) Uncertainty in Artificial Intelligence , pp. 283-302
    • Heckerman, D.1
  • 12
    • 4344578226 scopus 로고    scopus 로고
    • Bayesian networks for data mining
    • Heckerman, D. (1997). " Bayesian networks for data mining." Data Min. Knowl. Discov., 1 (1), 79-119.
    • (1997) Data Min. Knowl. Discov. , vol.1 , Issue.1 , pp. 79-119
    • Heckerman, D.1
  • 15
    • 33749423592 scopus 로고    scopus 로고
    • A dynamic competition model for construction contractors
    • 0144-6193 10.1080/01446190600799729
    • Kim, H. J., and, Reinschmidt, K. F. (2006). " A dynamic competition model for construction contractors." Constr. Manage. Econ., 24 (9), 955-965. 0144-6193 10.1080/01446190600799729
    • (2006) Constr. Manage. Econ. , vol.24 , Issue.9 , pp. 955-965
    • Kim, H.J.1    Reinschmidt, K.F.2
  • 16
    • 79955389359 scopus 로고    scopus 로고
    • Effects of contractors' risk attitude on competition in construction
    • 10.1061/(ASCE)CO.1943-7862.0000284, JCEMD4 0733-9364
    • Kim, H. J., and, Reinschmdit, K. F. (2011). " Effects of contractors' risk attitude on competition in construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000284, 275-283. JCEMD4 0733-9364
    • (2011) J. Constr. Eng. Manage. , pp. 275-283
    • Kim, H.J.1    Reinschmdit, K.F.2
  • 17
    • 84872939930 scopus 로고    scopus 로고
    • Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation
    • 1392-1525 10.3846/13923730.2012.737829
    • Kim, S. (2013). " Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation." J. Civ. Eng. Manage., 19 (1), 86-96. 1392-1525 10.3846/13923730.2012.737829
    • (2013) J. Civ. Eng. Manage. , vol.19 , Issue.1 , pp. 86-96
    • Kim, S.1
  • 18
    • 84947928349 scopus 로고    scopus 로고
    • 7th Pacific Rim Int. Conf. on Artificial Intelligence, Tokyo, Japan, August 2002. Proceedings/Lecture Notes in Artificial Intelligence 2417, Springer, Tokyo
    • Kim, S. B., Rim, H. C., Yook, D. S., Lim, H. S., and, An, S. D. (2002). " Effective methods for improving naïve Bayes text classifiers." 7th Pacific Rim Int. Conf. on Artificial Intelligence, Tokyo, Japan, August 2002. Proceedings/Lecture Notes in Artificial Intelligence 2417, Springer, Tokyo, 414-423.
    • (2002) Effective Methods for Improving Naïve Bayes Text Classifiers , pp. 414-423
    • Kim, S.B.1    Rim, H.C.2    Yook, D.S.3    Lim, H.S.4    An, S.D.5
  • 19
    • 15944390626 scopus 로고    scopus 로고
    • Modeling a contractor's markup estimation
    • 10.1061/(ASCE)0733-9364(2005)131:4(391), JCEMD4 0733-9364
    • Liu, M., and, Ling, Y. Y. (2005). " Modeling a contractor's markup estimation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131: 4(391), 391-399. JCEMD4 0733-9364
    • (2005) J. Constr. Eng. Manage. , pp. 391-399
    • Liu, M.1    Ling, Y.Y.2
  • 20
    • 33745325166 scopus 로고    scopus 로고
    • Predicting construction cost using multiple regression techniques
    • 10.1061/(ASCE)0733-9364(2006)132:7(750), JCEMD4 0733-9364
    • Lowe, D. J., Emsley, M. W., and, Harding, A. (2006). " Predicting construction cost using multiple regression techniques." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:7(750), 750-758. JCEMD4 0733-9364
    • (2006) J. Constr. Eng. Manage. , pp. 750-758
    • Lowe, D.J.1    Emsley, M.W.2    Harding, A.3
  • 23
    • 0021428493 scopus 로고
    • Predicting the tender price of buildings in the early design stage: Method and validation
    • McCaffer, R., McCaffrey, M. J., and, Thorpe, A. (1984). " Predicting the tender price of buildings in the early design stage: Method and validation." Int. J. Oper. Res. Soc., 35 (5), 415-424.
    • (1984) Int. J. Oper. Res. Soc. , vol.35 , Issue.5 , pp. 415-424
    • McCaffer, R.1    McCaffrey, M.J.2    Thorpe, A.3
  • 25
    • 0035400065 scopus 로고    scopus 로고
    • Pricing strategy in the US construction industry
    • 0144-6193 10.1080/01446190010020372
    • Mochtar, K., and, Arditi, D. (2001). " Pricing strategy in the US construction industry." Constr. Manage. Econ., 19 (4), 405-415. 0144-6193 10.1080/01446190010020372
    • (2001) Constr. Manage. Econ. , vol.19 , Issue.4 , pp. 405-415
    • Mochtar, K.1    Arditi, D.2
  • 26
    • 0027664047 scopus 로고
    • Analogy-based DSS for bidding in construction
    • 10.1061/(ASCE)0733-9364(1993)119:3(466), JCEMD4 0733-9364
    • Moselhi, O., Hegazy, T., and, Fazio, P. (1993). " Analogy-based DSS for bidding in construction." J. Constr. Eng. Manage., 10.1061/(ASCE)0733- 9364(1993)119:3(466), 466-479. JCEMD4 0733-9364
    • (1993) J. Constr. Eng. Manage. , pp. 466-479
    • Moselhi, O.1    Hegazy, T.2    Fazio, P.3
  • 30
    • 84898935018 scopus 로고    scopus 로고
    • A strategy Bayesian model to predict profit of construction projects
    • Park, S., and, Kim, S. (2011). " A strategy Bayesian model to predict profit of construction projects." Archit. Inst. Korea, 13 (3), 49-56.
    • (2011) Archit. Inst. Korea , vol.13 , Issue.3 , pp. 49-56
    • Park, S.1    Kim, S.2
  • 32
    • 0344515203 scopus 로고
    • Competitive bidding system
    • CSTEDM 0274-9696
    • Shash, A. A. (1995). " Competitive bidding system." Cost Eng., 37 (2), 19-20. CSTEDM 0274-9696
    • (1995) Cost Eng. , vol.37 , Issue.2 , pp. 19-20
    • Shash, A.A.1
  • 33
    • 84898979364 scopus 로고    scopus 로고
    • How to be a Bayesian in SAS: Model selection uncertainty in Proc Logistic and Proc Genmod, Northeast SAS Users Group, Philadelphia
    • Shtatland, E. S., Moore, S., Dashevsky, I., Miroshnik, I., Cain, E., and, Barton, M. B. (2000). How to be a Bayesian in SAS: Model selection uncertainty in Proc Logistic and Proc Genmod, Northeast SAS Users Group, Philadelphia, 724-732.
    • (2000) , pp. 724-732
    • Shtatland, E.S.1    Moore, S.2    Dashevsky, I.3    Miroshnik, I.4    Cain, E.5    Barton, M.B.6
  • 34
    • 0038604047 scopus 로고    scopus 로고
    • Forecast models for actual construction time and cost
    • BUSCBC 0360-1323 10.1016/S0360-1323(03)00067-2
    • Skitmore, R. M., and, Ng, S. T. (2003). " Forecast models for actual construction time and cost." Build. Environ., 38 (8), 1075-1083. BUSCBC 0360-1323 10.1016/S0360-1323(03)00067-2
    • (2003) Build. Environ. , vol.38 , Issue.8 , pp. 1075-1083
    • Skitmore, R.M.1    Ng, S.T.2
  • 35
    • 84860438313 scopus 로고
    • Developments in contract price forecasting and bidding techniques.", BSP Professional Books, Oxford, U.K
    • Skitmore, R. M., and, Patchell, B. R. T. (1990). " Developments in contract price forecasting and bidding techniques." Quantity surveying techniques new directions, BSP Professional Books, Oxford, U.K.
    • (1990) Quantity Surveying Techniques New Directions
    • Skitmore, R.M.1    Patchell, B.R.T.2
  • 37
    • 0024683940 scopus 로고
    • Bid markup assistant
    • CSTEDM 0274-9696
    • Tavakoli, A., and, Utomo, J. L. (1989). " Bid markup assistant." Cost Eng., 31 (6), 28-33. CSTEDM 0274-9696
    • (1989) Cost Eng. , vol.31 , Issue.6 , pp. 28-33
    • Tavakoli, A.1    Utomo, J.L.2
  • 38
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • 10.1061/(ASCE)0733-9364(2003)129:2(198), JCEMD4 0733-9364
    • Trost, S. M., and, Oberlender, G. D. (2003). " Predicting accuracy of early cost estimates using factor analysis and multivariate regression." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2003)129:2(198), 198-204. JCEMD4 0733-9364
    • (2003) J. Constr. Eng. Manage. , pp. 198-204
    • Trost, S.M.1    Oberlender, G.D.2
  • 39
    • 0001268563 scopus 로고
    • What constitutes a theoretical contribution
    • 0363-7425
    • Whetten, D. A. (1989). " What constitutes a theoretical contribution." Acad. Manage. Rev., 14 (4), 490-495. 0363-7425
    • (1989) Acad. Manage. Rev. , vol.14 , Issue.4 , pp. 490-495
    • Whetten, D.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.