-
3
-
-
0003532687
-
-
1st Ed. Addison-Wesley, Reading, MA
-
Box, G. E. P., and, Tiao, G. C. (1992). Bayesian inference in statistical analysis, 1st Ed., Addison-Wesley, Reading, MA.
-
(1992)
Bayesian Inference in Statistical Analysis
-
-
Box, G.E.P.1
Tiao, G.C.2
-
4
-
-
0035426615
-
Multi-criteria assessment of the probability of winning in the competitive bidding process
-
IPMAEL 10.1016/S0263-7863(00)00020-X
-
Cagno, E., Caron, F., and, Perego, A. (2001). " Multi-criteria assessment of the probability of winning in the competitive bidding process." Int. J. Proj. Manage., 19 (6), 313-324. IPMAEL 10.1016/S0263-7863(00)00020-X
-
(2001)
Int. J. Proj. Manage.
, vol.19
, Issue.6
, pp. 313-324
-
-
Cagno, E.1
Caron, F.2
Perego, A.3
-
5
-
-
0003924731
-
-
Springer, Berlin
-
Chen, M. H., Hao, Q. M., and, Ibrahim, J. G. (2000). Monte Carlo methods in Bayesian computation, Springer, Berlin.
-
(2000)
Monte Carlo Methods in Bayesian Computation
-
-
Chen, M.H.1
Hao, Q.M.2
Ibrahim, J.G.3
-
7
-
-
0026789909
-
Bayesian inference for feedback control. I: Theory
-
10.1061/(ASCE)0733-9437(1992)118:3(397), JIDEDH 0733-9437
-
Clemmens, A. J., and, Keats, J. B. (1992). " Bayesian inference for feedback control. I: Theory." J. Irrig. Drain. Eng., 10.1061/(ASCE)0733- 9437(1992)118:3(397), 397-415. JIDEDH 0733-9437
-
(1992)
J. Irrig. Drain. Eng.
, pp. 397-415
-
-
Clemmens, A.J.1
Keats, J.B.2
-
8
-
-
0001748017
-
A competitive-bidding strategy
-
OPREAI 0030-364X 10.1287/opre.4.1.104
-
Friedman, L. (1956). " A competitive-bidding strategy." Oper. Res., 4 (1), 104-112. OPREAI 0030-364X 10.1287/opre.4.1.104
-
(1956)
Oper. Res.
, vol.4
, Issue.1
, pp. 104-112
-
-
Friedman, L.1
-
9
-
-
33846799194
-
A probabilistic framework for Bayesian adaptive forecasting of project progress
-
CCIEFR 1093-9687 10.1111/mice.2007.22.issue-3
-
Gardoni, P., Reinschmidt, K. F., and, Kumar, R. (2007). " A probabilistic framework for Bayesian adaptive forecasting of project progress." Comput. Aided Civ. Infrastruct. Eng., 22 (3), 182-196. CCIEFR 1093-9687 10.1111/mice.2007.22.issue-3
-
(2007)
Comput. Aided Civ. Infrastruct. Eng.
, vol.22
, Issue.3
, pp. 182-196
-
-
Gardoni, P.1
Reinschmidt, K.F.2
Kumar, R.3
-
10
-
-
0442309436
-
The variable selection problem
-
JSTNAL 0162-1459 10.1080/01621459.2000.10474336
-
George, E. I. (2000). " The variable selection problem." J. Am. Stat. Assoc., 95 (452), 1304-1308. JSTNAL 0162-1459 10.1080/01621459.2000. 10474336
-
(2000)
J. Am. Stat. Assoc.
, vol.95
, Issue.452
, pp. 1304-1308
-
-
George, E.I.1
-
11
-
-
0007789970
-
An empirical comparison of three inference methods
-
Chapter 4, R. Shacher, T. Levitt, L. Kanal, and J. Lemmer, eds. North-Holland, New York
-
Heckerman, D. (1988). " An empirical comparison of three inference methods." Chapter 4, Uncertainty in artificial intelligence, R. Shacher, T. Levitt, L. Kanal, and J. Lemmer., eds., North-Holland, New York, 283-302.
-
(1988)
Uncertainty in Artificial Intelligence
, pp. 283-302
-
-
Heckerman, D.1
-
12
-
-
4344578226
-
Bayesian networks for data mining
-
Heckerman, D. (1997). " Bayesian networks for data mining." Data Min. Knowl. Discov., 1 (1), 79-119.
-
(1997)
Data Min. Knowl. Discov.
, vol.1
, Issue.1
, pp. 79-119
-
-
Heckerman, D.1
-
13
-
-
14544278231
-
-
1st Ed. Blackwell Science
-
Jaggar, D., Ross, A., Smith, J., and, Love, P. (2002). Building design cost management, 1st Ed., Blackwell Science.
-
(2002)
Building Design Cost Management
-
-
Jaggar, D.1
Ross, A.2
Smith, J.3
Love, P.4
-
15
-
-
33749423592
-
A dynamic competition model for construction contractors
-
0144-6193 10.1080/01446190600799729
-
Kim, H. J., and, Reinschmidt, K. F. (2006). " A dynamic competition model for construction contractors." Constr. Manage. Econ., 24 (9), 955-965. 0144-6193 10.1080/01446190600799729
-
(2006)
Constr. Manage. Econ.
, vol.24
, Issue.9
, pp. 955-965
-
-
Kim, H.J.1
Reinschmidt, K.F.2
-
16
-
-
79955389359
-
Effects of contractors' risk attitude on competition in construction
-
10.1061/(ASCE)CO.1943-7862.0000284, JCEMD4 0733-9364
-
Kim, H. J., and, Reinschmdit, K. F. (2011). " Effects of contractors' risk attitude on competition in construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000284, 275-283. JCEMD4 0733-9364
-
(2011)
J. Constr. Eng. Manage.
, pp. 275-283
-
-
Kim, H.J.1
Reinschmdit, K.F.2
-
17
-
-
84872939930
-
Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation
-
1392-1525 10.3846/13923730.2012.737829
-
Kim, S. (2013). " Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation." J. Civ. Eng. Manage., 19 (1), 86-96. 1392-1525 10.3846/13923730.2012.737829
-
(2013)
J. Civ. Eng. Manage.
, vol.19
, Issue.1
, pp. 86-96
-
-
Kim, S.1
-
18
-
-
84947928349
-
-
7th Pacific Rim Int. Conf. on Artificial Intelligence, Tokyo, Japan, August 2002. Proceedings/Lecture Notes in Artificial Intelligence 2417, Springer, Tokyo
-
Kim, S. B., Rim, H. C., Yook, D. S., Lim, H. S., and, An, S. D. (2002). " Effective methods for improving naïve Bayes text classifiers." 7th Pacific Rim Int. Conf. on Artificial Intelligence, Tokyo, Japan, August 2002. Proceedings/Lecture Notes in Artificial Intelligence 2417, Springer, Tokyo, 414-423.
-
(2002)
Effective Methods for Improving Naïve Bayes Text Classifiers
, pp. 414-423
-
-
Kim, S.B.1
Rim, H.C.2
Yook, D.S.3
Lim, H.S.4
An, S.D.5
-
19
-
-
15944390626
-
Modeling a contractor's markup estimation
-
10.1061/(ASCE)0733-9364(2005)131:4(391), JCEMD4 0733-9364
-
Liu, M., and, Ling, Y. Y. (2005). " Modeling a contractor's markup estimation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131: 4(391), 391-399. JCEMD4 0733-9364
-
(2005)
J. Constr. Eng. Manage.
, pp. 391-399
-
-
Liu, M.1
Ling, Y.Y.2
-
20
-
-
33745325166
-
Predicting construction cost using multiple regression techniques
-
10.1061/(ASCE)0733-9364(2006)132:7(750), JCEMD4 0733-9364
-
Lowe, D. J., Emsley, M. W., and, Harding, A. (2006). " Predicting construction cost using multiple regression techniques." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:7(750), 750-758. JCEMD4 0733-9364
-
(2006)
J. Constr. Eng. Manage.
, pp. 750-758
-
-
Lowe, D.J.1
Emsley, M.W.2
Harding, A.3
-
23
-
-
0021428493
-
Predicting the tender price of buildings in the early design stage: Method and validation
-
McCaffer, R., McCaffrey, M. J., and, Thorpe, A. (1984). " Predicting the tender price of buildings in the early design stage: Method and validation." Int. J. Oper. Res. Soc., 35 (5), 415-424.
-
(1984)
Int. J. Oper. Res. Soc.
, vol.35
, Issue.5
, pp. 415-424
-
-
McCaffer, R.1
McCaffrey, M.J.2
Thorpe, A.3
-
25
-
-
0035400065
-
Pricing strategy in the US construction industry
-
0144-6193 10.1080/01446190010020372
-
Mochtar, K., and, Arditi, D. (2001). " Pricing strategy in the US construction industry." Constr. Manage. Econ., 19 (4), 405-415. 0144-6193 10.1080/01446190010020372
-
(2001)
Constr. Manage. Econ.
, vol.19
, Issue.4
, pp. 405-415
-
-
Mochtar, K.1
Arditi, D.2
-
26
-
-
0027664047
-
Analogy-based DSS for bidding in construction
-
10.1061/(ASCE)0733-9364(1993)119:3(466), JCEMD4 0733-9364
-
Moselhi, O., Hegazy, T., and, Fazio, P. (1993). " Analogy-based DSS for bidding in construction." J. Constr. Eng. Manage., 10.1061/(ASCE)0733- 9364(1993)119:3(466), 466-479. JCEMD4 0733-9364
-
(1993)
J. Constr. Eng. Manage.
, pp. 466-479
-
-
Moselhi, O.1
Hegazy, T.2
Fazio, P.3
-
30
-
-
84898935018
-
A strategy Bayesian model to predict profit of construction projects
-
Park, S., and, Kim, S. (2011). " A strategy Bayesian model to predict profit of construction projects." Archit. Inst. Korea, 13 (3), 49-56.
-
(2011)
Archit. Inst. Korea
, vol.13
, Issue.3
, pp. 49-56
-
-
Park, S.1
Kim, S.2
-
31
-
-
77954116981
-
-
Pearson Education. Upper Saddle River, NJ
-
Russell, S., and, Norvig, P. (2010). Artificial intelligence a modern approach, Pearson Education., Upper Saddle River, NJ.
-
(2010)
Artificial Intelligence A Modern Approach
-
-
Russell, S.1
Norvig, P.2
-
32
-
-
0344515203
-
Competitive bidding system
-
CSTEDM 0274-9696
-
Shash, A. A. (1995). " Competitive bidding system." Cost Eng., 37 (2), 19-20. CSTEDM 0274-9696
-
(1995)
Cost Eng.
, vol.37
, Issue.2
, pp. 19-20
-
-
Shash, A.A.1
-
33
-
-
84898979364
-
-
How to be a Bayesian in SAS: Model selection uncertainty in Proc Logistic and Proc Genmod, Northeast SAS Users Group, Philadelphia
-
Shtatland, E. S., Moore, S., Dashevsky, I., Miroshnik, I., Cain, E., and, Barton, M. B. (2000). How to be a Bayesian in SAS: Model selection uncertainty in Proc Logistic and Proc Genmod, Northeast SAS Users Group, Philadelphia, 724-732.
-
(2000)
, pp. 724-732
-
-
Shtatland, E.S.1
Moore, S.2
Dashevsky, I.3
Miroshnik, I.4
Cain, E.5
Barton, M.B.6
-
34
-
-
0038604047
-
Forecast models for actual construction time and cost
-
BUSCBC 0360-1323 10.1016/S0360-1323(03)00067-2
-
Skitmore, R. M., and, Ng, S. T. (2003). " Forecast models for actual construction time and cost." Build. Environ., 38 (8), 1075-1083. BUSCBC 0360-1323 10.1016/S0360-1323(03)00067-2
-
(2003)
Build. Environ.
, vol.38
, Issue.8
, pp. 1075-1083
-
-
Skitmore, R.M.1
Ng, S.T.2
-
35
-
-
84860438313
-
-
Developments in contract price forecasting and bidding techniques.", BSP Professional Books, Oxford, U.K
-
Skitmore, R. M., and, Patchell, B. R. T. (1990). " Developments in contract price forecasting and bidding techniques." Quantity surveying techniques new directions, BSP Professional Books, Oxford, U.K.
-
(1990)
Quantity Surveying Techniques New Directions
-
-
Skitmore, R.M.1
Patchell, B.R.T.2
-
36
-
-
0003541633
-
-
MRC Biostatistics Unit, Cambridge, U.K
-
Spiegelhalteral, D., Thomas, A., Best, N., and, Lunn, D. (2002). Winbugsuser manual version 1.4., MRC Biostatistics Unit, Cambridge, U.K.
-
(2002)
Winbugsuser Manual Version 1.4.
-
-
Spiegelhalteral, D.1
Thomas, A.2
Best, N.3
Lunn, D.4
-
37
-
-
0024683940
-
Bid markup assistant
-
CSTEDM 0274-9696
-
Tavakoli, A., and, Utomo, J. L. (1989). " Bid markup assistant." Cost Eng., 31 (6), 28-33. CSTEDM 0274-9696
-
(1989)
Cost Eng.
, vol.31
, Issue.6
, pp. 28-33
-
-
Tavakoli, A.1
Utomo, J.L.2
-
38
-
-
2642579411
-
Predicting accuracy of early cost estimates using factor analysis and multivariate regression
-
10.1061/(ASCE)0733-9364(2003)129:2(198), JCEMD4 0733-9364
-
Trost, S. M., and, Oberlender, G. D. (2003). " Predicting accuracy of early cost estimates using factor analysis and multivariate regression." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2003)129:2(198), 198-204. JCEMD4 0733-9364
-
(2003)
J. Constr. Eng. Manage.
, pp. 198-204
-
-
Trost, S.M.1
Oberlender, G.D.2
-
39
-
-
0001268563
-
What constitutes a theoretical contribution
-
0363-7425
-
Whetten, D. A. (1989). " What constitutes a theoretical contribution." Acad. Manage. Rev., 14 (4), 490-495. 0363-7425
-
(1989)
Acad. Manage. Rev.
, vol.14
, Issue.4
, pp. 490-495
-
-
Whetten, D.A.1
|