메뉴 건너뛰기




Volumn 136, Issue 8, 2010, Pages 844-853

Data preprocessing-based parametric cost model for building projects: Case studies of Korean construction projects

Author keywords

Construction management; Cost; Cost estimate; Cost model; Costs; Data analysis; Data preprocessing; Korea South

Indexed keywords

ABNORMAL VALUES; BUILDING PROJECTS; CONSTRUCTION MANAGEMENT; CONSTRUCTION PROJECTS; COST DATA; COST ESTIMATE; COST ESTIMATIONS; COST ESTIMATORS; COST MODELS; COST VARIANCE; DATA ANALYSIS; DATA PREPROCESSING; DE-NOISING; ESTIMATION STRATEGIES; GOVERNING PARAMETERS; HIGHLY SENSITIVE; HISTORICAL DATA; INITIAL ESTIMATE; INITIAL PHASIS; MULTIPLE REGRESSION EQUATIONS; PARAMETRIC COST ESTIMATION; PRE-PROCESSED DATA; PROJECT SCOPE; SCHEMATIC DESIGN;

EID: 77955338136     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000197     Document Type: Article
Times cited : (27)

References (26)
  • 1
    • 2242459831 scopus 로고    scopus 로고
    • Analysis of factor influencing project cost estimating practice
    • CMECF3 0144-6193, 10.1080/014461900370979
    • Akintoye, A. (2000). " Analysis of factor influencing project cost estimating practice.." Constr. Manage. Econom. CMECF3 0144-6193, 18, 77-89. 10.1080/014461900370979
    • (2000) Constr. Manage. Econom. , vol.18 , pp. 77-89
    • Akintoye, A.1
  • 2
    • 27144490625 scopus 로고
    • Cost models-Their history development and appraisal
    • CIOB, London
    • Ashworth, A. (1986). " Cost models-Their history development and appraisal.." Technical information service no. 64, CIOB, London.
    • (1986) Technical Information Service No. 64
    • Ashworth, A.1
  • 3
    • 0036353696 scopus 로고    scopus 로고
    • Parametric estimating for design costs
    • 0002-7820
    • Bajaj, A., (2002). " Parametric estimating for design costs.." AACE International Transactions, 2002, EST.08.1-EST.08.6. 0002-7820
    • (2002) AACE International Transactions , vol.2002
    • Bajaj, A.1
  • 4
    • 25844464963 scopus 로고    scopus 로고
    • Organizational learning: Conceptual challenges from a project perspective
    • DOI 10.1080/01446190500127021
    • Chan, L. S., and Park, M. (2005). " Project cost estimation using principle component regression.." Constr. Manage. Econom. CMECF3 0144-6193, 23, 295-304. 10.1080/01446190500127021 (Pubitemid 41388512)
    • (2005) Construction Management and Economics , vol.23 , Issue.7 , pp. 747-756
    • Chan, P.1    Cooper, R.2    Tzortzopoulos, P.3
  • 5
    • 57649199673 scopus 로고    scopus 로고
    • Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model
    • AUCOES 0926-5805
    • Cheng, M. Y., (2008). " Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model.." Autom. Constr. AUCOES 0926-5805, 18 (2), 164-172.
    • (2008) Autom. Constr. , vol.18 , Issue.2 , pp. 164-172
    • Cheng, M.Y.1
  • 6
    • 0002231440 scopus 로고
    • Cost estimation of timber bridge using neural networks
    • CSTEDM 0274-9696
    • Cresse, R., and Li, L. (1995). " Cost estimation of timber bridge using neural networks.." Cost Eng. CSTEDM 0274-9696, 37 (5), 17-22.
    • (1995) Cost Eng. , vol.37 , Issue.5 , pp. 17-22
    • Cresse, R.1    Li, L.2
  • 7
    • 0242411449 scopus 로고    scopus 로고
    • Developing a parametric model for estimating process control costs
    • CSTEDM 0274-9696
    • Dysert, L. R. (2001). " Developing a parametric model for estimating process control costs.." Cost Eng. CSTEDM 0274-9696, 43 (2), 31-34.
    • (2001) Cost Eng. , vol.43 , Issue.2 , pp. 31-34
    • Dysert, L.R.1
  • 8
    • 0032083467 scopus 로고    scopus 로고
    • Cost-to-capacity analysis for estimating waste-to-energy facility costs
    • CSTEDM 0274-9696
    • Ellsworth, R. K. (1998). " Cost-to-capacity analysis for estimating waste-to-energy facility costs.." Cost Eng. CSTEDM 0274-9696, 40 (6), 27-30.
    • (1998) Cost Eng. , vol.40 , Issue.6 , pp. 27-30
    • Ellsworth, R.K.1
  • 9
    • 33748967308 scopus 로고
    • Neural network versus parameter based application
    • CSTEDM 0274-9696
    • Graza, J., and Rouhana, K. (1995). " Neural network versus parameter based application.." Cost Eng. CSTEDM 0274-9696, 37 (2), 14-18.
    • (1995) Cost Eng. , vol.37 , Issue.2 , pp. 14-18
    • Graza, J.1    Rouhana, K.2
  • 11
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimating of highway projects
    • CMECF3 0144-6193
    • Hegazy, T., and Ayed, A. (1998). " Neural network model for parametric cost estimating of highway projects.." Constr. Manage. Econom. CMECF3 0144-6193, 124 (3), 210-218.
    • (1998) Constr. Manage. Econom. , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 12
    • 0003921398 scopus 로고    scopus 로고
    • 2nd Ed., Carnegie Mellon Univ., Pittsburgh, (February 2008)
    • Hendrickson, C. (2000). Project management for construction 2, 2nd Ed., Carnegie Mellon Univ., Pittsburgh, 〈 http://pmbook.ce.cmu.edu/05-Cost- Estimation.html 〉 (February 2008).
    • (2000) Project Management for Construction 2
    • Hendrickson, C.1
  • 13
    • 36248954911 scopus 로고    scopus 로고
    • Computer-integrated system for estimating the costs of building project
    • JCEMD4 0733-9364
    • Jarde, A., and Alkass, S. (2007). " Computer-integrated system for estimating the costs of building project.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 13 (4), 205-223.
    • (2007) J. Constr. Eng. Manage. , vol.13 , Issue.4 , pp. 205-223
    • Jarde, A.1    Alkass, S.2
  • 14
    • 27644500165 scopus 로고    scopus 로고
    • Cost estimating in the age of 3D CAD software and object database
    • ASCE, Reston, Va
    • Karshenas, S. (2005). " Cost estimating in the age of 3D CAD software and object database.." Proc., Construction Research Congress 2005, ASCE, Reston, Va.
    • (2005) Proc., Construction Research Congress 2005
    • Karshenas, S.1
  • 19
    • 0035335579 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates based on estimate quality
    • DOI 10.1061/(ASCE)0733-9364(2001)127:3(173), Reportnr 22225
    • Oberlender, G. D., and Trost, S. M. (2001). " Predicting accuracy of early cost estimates based on estimate quality.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (3), 173-182. 10.1061/(ASCE)0733-9364(2001)127:3(173) (Pubitemid 32508535)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 173-182
    • Oberlender, G.D.1    Trost, S.M.2
  • 20
    • 28844458223 scopus 로고    scopus 로고
    • SPSS Academy Publishing, Seoul
    • Park, S., (2004). SPSS ver. 12k, SPSS Academy Publishing, Seoul, 225.
    • (2004) SPSS Ver. 12k , pp. 225
    • Park, S.1
  • 24
    • 27144471702 scopus 로고    scopus 로고
    • Procost-Towards a powerful early stage cost estimating tool
    • Computing in Civil Engineering
    • Soutos, M., and Lowe, D. J. (2005). " Procost-Towards a powerful early stage cost estimating tool.." Proc., Int. Conf. on Computing in Civil Engineering, Computing in Civil Engineering.
    • (2005) Proc., Int. Conf. on Computing in Civil Engineering
    • Soutos, M.1    Lowe, D.J.2
  • 25
    • 0027675776 scopus 로고
    • Forecasting final cost and budget of construction projects
    • JCCEE5 0887-3801, 10.1061/(ASCE)0887-3801(1993)7:4(511)
    • Teicholz, P. (1993). " Forecasting final cost and budget of construction projects.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 7 (4), 511-529. 10.1061/(ASCE)0887-3801(1993)7:4(511)
    • (1993) J. Comput. Civ. Eng. , vol.7 , Issue.4 , pp. 511-529
    • Teicholz, P.1
  • 26
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • DOI 10.1061/(ASCE)0733-9364(2003)129:2(198)
    • Trost, S. M., and Oberlender, G. D. (2003). " Predicting accuracy of early cost estimates using factor analysis and multivariate regression.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (2), 198-204. 10.1061/(ASCE)0733- 9364(2003)129:2(198) (Pubitemid 40265489)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.2 , pp. 198-204
    • Trost, S.M.1    Oberlender, G.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.