-
1
-
-
26844503523
-
Cross-training decisions in field services with three job types and server-job mismatch
-
doi:10.1111/j.00117315.2004.02642.x
-
Agnihothri, S. R. and Mishra, A. K. 2004. Cross-training decisions in field services with three job types and server-job mismatch. Decision Sciences, 35: 239-256. (doi:10.1111/j.00117315.2004.02642.x)
-
(2004)
Decision Sciences
, vol.35
, pp. 239-256
-
-
Agnihothri, S.R.1
Mishra, A.K.2
-
2
-
-
0038060722
-
Workforce cross-training decisions in field service systems with two job types
-
doi:10.1057/palgrave.jors.2601535
-
Agnihothri, S. R., Mishra, A. K. and Simmons, D. E. 2003. Workforce cross-training decisions in field service systems with two job types. Journal of the Operational Research Society, 54: 410-418. (doi:10.1057/palgrave.jors.2601535)
-
(2003)
Journal of the Operational Research Society
, vol.54
, pp. 410-418
-
-
Agnihothri, S.R.1
Mishra, A.K.2
Simmons, D.E.3
-
3
-
-
66249105689
-
Towards an operations strategy for product-centric servitization
-
doi:10.1108/01443570910953603
-
Baines, T., Lightfoot, H., Peppard, J., Johnson, M., Tiwari, A., Shehab, E. and Swink, M. 2008. Towards an operations strategy for product-centric servitization. International Journal of Operations & Production Management, 29: 494-519. (doi:10.1108/01443570910953603)
-
(2008)
International Journal of Operations & Production Management
, vol.29
, pp. 494-519
-
-
Baines, T.1
Lightfoot, H.2
Peppard, J.3
Johnson, M.4
Tiwari, A.5
Shehab, E.6
Swink, M.7
-
4
-
-
38149134544
-
State-of-the-art in product service systems
-
doi:10.1243/09544054JEM858
-
Baines, T. S., Lightfoot, H. W., Evans, S., Neely, A., Greenough, R., Peppard, J. and Wilson, H. 2007. State-of-the-art in product service systems. Proceedings of the Institution of Mechanical Engineers Part B-Journal of Engineering Manufacture, 221: 1543-1552. (doi:10.1243/09544054JEM858)
-
(2007)
Proceedings of the Institution of Mechanical Engineers Part B - Journal of Engineering Manufacture
, vol.221
, pp. 1543-1552
-
-
Baines, T.S.1
Lightfoot, H.W.2
Evans, S.3
Neely, A.4
Greenough, R.5
Peppard, J.6
Wilson, H.7
-
5
-
-
52149114233
-
Modeling and optimizing sequential imperfect preventive maintenance
-
doi:10.1016/j.ress.2008.03.002
-
Bartholomew-Biggs, M., Zuo, M. J. and Li, X. H. 2009. Modeling and optimizing sequential imperfect preventive maintenance. Reliability Engineering & System Safety, 94: 53-62. (doi:10.1016/j.ress.2008.03.002)
-
(2009)
Reliability Engineering & System Safety
, vol.94
, pp. 53-62
-
-
Bartholomew-Biggs, M.1
Zuo, M.J.2
Li, X.H.3
-
6
-
-
0037251574
-
Optimizing periodic maintenance operations for Schindler elevator corporation
-
doi:10.1287/inte.33.1.67.12722
-
Blakeley, F., Bozkaya, B., Cao, B. Y., Hall, W. and Knolmajer, J. 2003. Optimizing periodic maintenance operations for Schindler elevator corporation. Interfaces, 33: 67-79. (doi:10.1287/inte.33.1.67.12722)
-
(2003)
Interfaces
, vol.33
, pp. 67-79
-
-
Blakeley, F.1
Bozkaya, B.2
Cao, B.Y.3
Hall, W.4
Knolmajer, J.5
-
7
-
-
0028311122
-
Strategies for improveing field service operations productivity and quality
-
Blumberg, D.F. (1994). Strategies for improveing field service operations productivity and quality. The Service Industries Journal, 14, 262-277.
-
(1994)
The Service Industries Journal
, vol.14
, pp. 262-277
-
-
Blumberg, D.F.1
-
8
-
-
66249123625
-
Developing integrated solution offerings for remote diagnostics: A comparative case study of two manufacturers
-
doi:10.1108/01443570910953621
-
Brax, S. and Jonsson, K. 2009. Developing integrated solution offerings for remote diagnostics: A comparative case study of two manufacturers. International Journal of Operations & Production Management, 29: 539-560. (doi:10.1108/01443570910953621)
-
(2009)
International Journal of Operations & Production Management
, vol.29
, pp. 539-560
-
-
Brax, S.1
Jonsson, K.2
-
9
-
-
0032389620
-
Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies
-
doi:10.1111/j.1540-5915.1998.tb01586.x
-
Brusco, M. J. and Johns, T. R. 1998. Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies. Decision Sciences, 29: 499-515. (doi:10.1111/j.1540-5915.1998.tb01586.x)
-
(1998)
Decision Sciences
, vol.29
, pp. 499-515
-
-
Brusco, M.J.1
Johns, T.R.2
-
10
-
-
33747190367
-
Scheduling preventive railway maintenance activities
-
doi:10.1057/palgrave.jors.2602085
-
Budai, G., Huisman, D. and Dekker, R. 2006. Scheduling preventive railway maintenance activities. Journal of the Operational Research Society, 57: 1035-1044. (doi:10.1057/palgrave.jors.2602085)
-
(2006)
Journal of the Operational Research Society
, vol.57
, pp. 1035-1044
-
-
Budai, G.1
Huisman, D.2
Dekker, R.3
-
12
-
-
34247540981
-
Optimizing service parts inventory in a multiechelon, multi-item supply chain with time-based customer service-level agreements
-
doi:10.1287/opre.1060.0345
-
Caggiano, K. E., Jackson, P. L., Muckstadt, J. A. and Rappold, J. A. 2007. Optimizing service parts inventory in a multiechelon, multi-item supply chain with time-based customer service-level agreements. Operations Research, 55: 303-318. (doi:10.1287/opre.1060.0345)
-
(2007)
Operations Research
, vol.55
, pp. 303-318
-
-
Caggiano, K.E.1
Jackson, P.L.2
Muckstadt, J.A.3
Rappold, J.A.4
-
13
-
-
26844452548
-
Optimal workforce mix in service systems with two types of customers
-
doi:10.1111/j.1937-5956.2005.tb00020.x
-
Chakravarthy, S. R. and Agnihothri, S. R. 2005. Optimal workforce mix in service systems with two types of customers. Production and Operations Management, 14: 218-231. (doi:10.1111/j.1937-5956.2005.tb00020.x)
-
(2005)
Production and Operations Management
, vol.14
, pp. 218-231
-
-
Chakravarthy, S.R.1
Agnihothri, S.R.2
-
15
-
-
33646748953
-
Winning in the aftermarket
-
Cohen, M. A., Agrawal, N. and Agrawal, V. 2006. Winning in the aftermarket. Harvard Business Review, 84(5): 129-138.
-
(2006)
Harvard Business Review
, vol.84
, Issue.5
, pp. 129-138
-
-
Cohen, M.A.1
Agrawal, N.2
Agrawal, V.3
-
16
-
-
0011155527
-
Saturn's supply-chain innovation: High value in after-sales service
-
Cohen, M. A., Cull, C., Lee, H. L. and Willen, D. 2000. Saturn's supply-chain innovation: High value in after-sales service. Sloan Management Review, 41(4): 93-102.
-
(2000)
Sloan Management Review
, vol.41
, Issue.4
, pp. 93-102
-
-
Cohen, M.A.1
Cull, C.2
Lee, H.L.3
Willen, D.4
-
17
-
-
0031109002
-
Competing in product and service: A product life-cycle model
-
doi:10.1287/mnsc.43.4.535
-
Cohen, M. A. and Whang, S. J. 1997. Competing in product and service: A product life-cycle model. Management Science, 43: 535-545. (doi:10.1287/mnsc.43.4.535)
-
(1997)
Management Science
, vol.43
, pp. 535-545
-
-
Cohen, M.A.1
Whang, S.J.2
-
19
-
-
45749100468
-
Risk-based model for valuation of performance-specified pavement maintenance contracts
-
doi:10.1061/(ASCE)0733-9364(2008)134:7(492)
-
Damnjanovic, I. and Zhang, Z. 2008. Risk-based model for valuation of performance-specified pavement maintenance contracts. Journal of Construction Engineering and Management, 134: 492-500. (doi:10.1061/(ASCE)0733-9364(2008)134:7(492))
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, pp. 492-500
-
-
Damnjanovic, I.1
Zhang, Z.2
-
20
-
-
1642601903
-
Classes of imperfect repair models based on reduction of failure intensity or virtual age
-
doi:10.1016/S0951-8320(03)00173-X
-
Doyen, L. and Gaudoin, O. 2004. Classes of imperfect repair models based on reduction of failure intensity or virtual age. Reliability Engineering & System Safety, 84: 45-56. (doi:10.1016/S0951-8320(03)00173-X)
-
(2004)
Reliability Engineering & System Safety
, vol.84
, pp. 45-56
-
-
Doyen, L.1
Gaudoin, O.2
-
21
-
-
78149254843
-
Exploitation or exploration in service business development?
-
doi:10.1108/09564231011079066
-
Fischer, T., Gebauer, H., Gregory, M., Guangjie, R. and Fleisch, E. 2010. Exploitation or exploration in service business development?. Journal of Service Management, 21: 591-624. (doi:10.1108/09564231011079066)
-
(2010)
Journal of Service Management
, vol.21
, pp. 591-624
-
-
Fischer, T.1
Gebauer, H.2
Gregory, M.3
Guangjie, R.4
Fleisch, E.5
-
22
-
-
37349051693
-
Mass customization: A method for market segmentation and choice menu design
-
doi:10.1016/j.ijpe.2007.02.034
-
Fogliatto, F. S. and da Silveira, G. J.C. 2008. Mass customization: A method for market segmentation and choice menu design. International Journal of Production Economics, 111: 606-622. (doi:10.1016/j.ijpe.2007.02.034)
-
(2008)
International Journal of Production Economics
, vol.111
, pp. 606-622
-
-
Fogliatto, F.S.1
da Silveira, G.J.C.2
-
23
-
-
27944444610
-
Agent-based model for managing composite product information
-
doi:10.1016/j.compind.2005.04.004
-
Främling, K., Ala-Risku, T., Karkainen, M. and Holmstorm, J. 2006. Agent-based model for managing composite product information. Computers in Industry, 57: 72-81. (doi:10.1016/j.compind.2005.04.004)
-
(2006)
Computers in Industry
, vol.57
, pp. 72-81
-
-
Främling, K.1
Ala-Risku, T.2
Karkainen, M.3
Holmstorm, J.4
-
24
-
-
77952492822
-
Match or mismatch: Strategy-structure configurations in the service business of manufacturing companies
-
doi:10.1177/1094670509353933
-
Gebauer, H., Edvardsson, B., Gustafsson, A. and Witell, L. 2010. Match or mismatch: Strategy-structure configurations in the service business of manufacturing companies. Journal of Service Research, 13: 198-215. (doi:10.1177/1094670509353933)
-
(2010)
Journal of Service Research
, vol.13
, pp. 198-215
-
-
Gebauer, H.1
Edvardsson, B.2
Gustafsson, A.3
Witell, L.4
-
25
-
-
33947160035
-
An investigation of the relationship between behavioural processes, motivation, investments in the service business and service revenue
-
doi:10.1016/j.indmarman.2005.09.005
-
Gebauer, H. and Fleisch, E. 2007. An investigation of the relationship between behavioural processes, motivation, investments in the service business and service revenue. Industrial Marketing Management, 36: 337-348. (doi:10.1016/j.indmarman.2005.09.005)
-
(2007)
Industrial Marketing Management
, vol.36
, pp. 337-348
-
-
Gebauer, H.1
Fleisch, E.2
-
26
-
-
13844276921
-
Overcoming the service paradox in manufacturing companies
-
doi:10.1016/j.emj.2004.12.006
-
Gebauer, H., Fleisch, E. and Friedli, T. 2005. Overcoming the service paradox in manufacturing companies. European Management Journal, 23: 14-26. (doi:10.1016/j.emj.2004.12.006)
-
(2005)
European Management Journal
, vol.23
, pp. 14-26
-
-
Gebauer, H.1
Fleisch, E.2
Friedli, T.3
-
27
-
-
0035606120
-
Customer support and new product development - An exploratory study
-
doi:10.1108/01443570110364605
-
Goffin, K. and New, C. 2001. Customer support and new product development-An exploratory study. International Journal of Operations & Production Management, 21: 275-301. (doi:10.1108/01443570110364605)
-
(2001)
International Journal of Operations & Production Management
, vol.21
, pp. 275-301
-
-
Goffin, K.1
New, C.2
-
28
-
-
33749410679
-
A major appliance manufacturer rethinks its inventory policies for service vehicles
-
doi:10.1287/inte.1060.0232
-
Gorman, M. F. and Ahire, S. 2006. A major appliance manufacturer rethinks its inventory policies for service vehicles. Interfaces, 36: 407-419. (doi:10.1287/inte.1060.0232)
-
(2006)
Interfaces
, vol.36
, pp. 407-419
-
-
Gorman, M.F.1
Ahire, S.2
-
29
-
-
77952528114
-
-
Manuscript submitted for publication
-
Guajardo, J. A., Cohen, M. A., Netessine, S. and Kim, S. H. 2010. Impact of performance-based contracting on product reliability: An empirical analysis Manuscript submitted for publication
-
(2010)
Impact of performance-based contracting on product reliability: An empirical analysis
-
-
Guajardo, J.A.1
Cohen, M.A.2
Netessine, S.3
Kim, S.H.4
-
30
-
-
63449110232
-
Designing and pricing menus of extended warranty contracts
-
doi:10.1002/nav.20333
-
Hartman, J. C. and Laksana, K. 2009. Designing and pricing menus of extended warranty contracts. Naval Research Logistics, 56: 199-214. (doi:10.1002/nav.20333)
-
(2009)
Naval Research Logistics
, vol.56
, pp. 199-214
-
-
Hartman, J.C.1
Laksana, K.2
-
31
-
-
43149112343
-
Forecasting service parts demand for a discontinued product
-
doi:10.1080/07408170701745337
-
Hong, J. S., Koo, H. Y., Lee, C. S. and Ahn, J. 2008. Forecasting service parts demand for a discontinued product. IIE Transactions, 40: 640-649. (doi:10.1080/07408170701745337)
-
(2008)
IIE Transactions
, vol.40
, pp. 640-649
-
-
Hong, J.S.1
Koo, H.Y.2
Lee, C.S.3
Ahn, J.4
-
32
-
-
0004253213
-
-
New York, NY, New York, NY,: Irwin/McGraw-Hill
-
Hopp, W. and Spearman, M. 2000. Factory physics, New York, NY: Irwin/McGraw-Hill.
-
(2000)
Factory physics
-
-
Hopp, W.1
Spearman, M.2
-
33
-
-
1242309349
-
Benefits of skill chaining in production lines with cross-trained workers
-
doi:10.1287/mnsc.1030.0166
-
Hopp, W. J., Tekin, E. and Van Oyen, M. P. 2004. Benefits of skill chaining in production lines with cross-trained workers. Management Science, 50: 83-98. (doi:10.1287/mnsc.1030.0166)
-
(2004)
Management Science
, vol.50
, pp. 83-98
-
-
Hopp, W.J.1
Tekin, E.2
Van Oyen, M.P.3
-
34
-
-
34249929736
-
Optimal reliability, warranty and price for new products
-
doi:10.1080/07408170601091907
-
Huang, H., Liu, Z. and Murthy, D. N.P. 2007. Optimal reliability, warranty and price for new products. IIE Transactions, 39: 819-827. (doi:10.1080/07408170601091907)
-
(2007)
IIE Transactions
, vol.39
, pp. 819-827
-
-
Huang, H.1
Liu, Z.2
Murthy, D.N.P.3
-
35
-
-
0344303619
-
Warranty and optimal reliability improvement through product development
-
doi:10.1016/S0895-7177(03)90122-1
-
Hussain, A. and Murthy, D. N.P. 2003. Warranty and optimal reliability improvement through product development. Mathematical and Computer Modelling, 38: 1211-1217. (doi:10.1016/S0895-7177(03)90122-1)
-
(2003)
Mathematical and Computer Modelling
, vol.38
, pp. 1211-1217
-
-
Hussain, A.1
Murthy, D.N.P.2
-
36
-
-
34547328706
-
Modelling R&M in performance based contracts - when does risk equals reward?
-
New York, NY, New York, NY,: IEEE
-
Jacopino, A. Modelling R&M in performance based contracts-when does risk equals reward?. Proceedings of the Annual Reliability and Maintainability Symposium. pp.142-146. New York, NY: IEEE.
-
Proceedings of the Annual Reliability and Maintainability Symposium
, pp. 142-146
-
-
Jacopino, A.1
-
37
-
-
79951596516
-
Spare parts logistics and installed base information
-
doi:10.1057/jors.2010.38
-
Jalil, M. N., Zuidwijk, R. A., Fleischmann, M. and van Nunen, J. A.E.E. 2011. Spare parts logistics and installed base information. Journal of the Operational Research Society, 62: 442-457. (doi:10.1057/jors.2010.38)
-
(2011)
Journal of the Operational Research Society
, vol.62
, pp. 442-457
-
-
Jalil, M.N.1
Zuidwijk, R.A.2
Fleischmann, M.3
van Nunen, J.A.E.E.4
-
38
-
-
33847041127
-
Integrated decision-support system for diagnosis, maintenance planning, and scheduling of manufacturing systems
-
doi:10.1080/00207540600678896
-
Jeong, I. J., Leon, V. J. and Villalobos, J. R. 2007. Integrated decision-support system for diagnosis, maintenance planning, and scheduling of manufacturing systems. International Journal of Production Research, 45: 267-285. (doi:10.1080/00207540600678896)
-
(2007)
International Journal of Production Research
, vol.45
, pp. 267-285
-
-
Jeong, I.J.1
Leon, V.J.2
Villalobos, J.R.3
-
39
-
-
45049084123
-
Supply chain management for servitized products: A multi-industry case study
-
doi:10.1016/j.ijpe.2007.09.011
-
Johnson, M. and Mena, C. 2008. Supply chain management for servitized products: A multi-industry case study. International Journal of Production Economics, 114: 27-39. (doi:10.1016/j.ijpe.2007.09.011)
-
(2008)
International Journal of Production Economics
, vol.114
, pp. 27-39
-
-
Johnson, M.1
Mena, C.2
-
40
-
-
52349114741
-
In search of 'product-service': Evidence from aerospace, construction, and engineering
-
doi:10.1080/02642060801990429
-
Johnstone, S., Dainty, A. and Wilkinson, A. 2008. In search of 'product-service': Evidence from aerospace, construction, and engineering. The Service Industries Journal, 28: 861-875. (doi:10.1080/02642060801990429)
-
(2008)
The Service Industries Journal
, vol.28
, pp. 861-875
-
-
Johnstone, S.1
Dainty, A.2
Wilkinson, A.3
-
41
-
-
66249125034
-
Integrating products and services through life: An aerospace experience
-
doi:10.1108/01443570910953612
-
Johnstone, S., Dainty, A. and Wilkinson, A. 2009. Integrating products and services through life: An aerospace experience. International Journal of Operations & Production Management, 29: 520-538. (doi:10.1108/01443570910953612)
-
(2009)
International Journal of Operations & Production Management
, vol.29
, pp. 520-538
-
-
Johnstone, S.1
Dainty, A.2
Wilkinson, A.3
-
42
-
-
38549086460
-
Performance contracting in after-sales service supply chains
-
doi:10.1287/mnsc.1070.0741
-
Kim, S. H., Cohen, M. A. and Netessine, S. 2007. Performance contracting in after-sales service supply chains. Management Science, 53: 1843-1858. (doi:10.1287/mnsc.1070.0741)
-
(2007)
Management Science
, vol.53
, pp. 1843-1858
-
-
Kim, S.H.1
Cohen, M.A.2
Netessine, S.3
-
43
-
-
34249950719
-
Effect of commonality on spare parts provisioning costs for capital goods
-
doi:10.1016/j.ijpe.2006.12.025
-
Kranenburg, A. A. and van Houtum, G. J. 2007. Effect of commonality on spare parts provisioning costs for capital goods. International Journal of Production Economics, 108: 221-227. (doi:10.1016/j.ijpe.2006.12.025)
-
(2007)
International Journal of Production Economics
, vol.108
, pp. 221-227
-
-
Kranenburg, A.A.1
van Houtum, G.J.2
-
44
-
-
67349094522
-
A new partial pooling structure for spare parts networks
-
doi:10.1016/j.ejor.2009.01.057
-
Kranenburg, A. A. and van Houtum, G. J. 2009. A new partial pooling structure for spare parts networks. European Journal of Operational Research, 199: 908-921. (doi:10.1016/j.ejor.2009.01.057)
-
(2009)
European Journal of Operational Research
, vol.199
, pp. 908-921
-
-
Kranenburg, A.A.1
van Houtum, G.J.2
-
45
-
-
84876273853
-
Optimization of a stochastic reverse logistics network with refurbishment and exchange options
-
Lieckens, K. T., Colen, P. J. and Lambrecht, M. R. Optimization of a stochastic reverse logistics network with refurbishment and exchange options. Paper presented at the Manufacturing and Service Operations Management Conference, Ann Arbor, MI
-
Paper presented at the Manufacturing and Service Operations Management Conference, Ann Arbor, MI
-
-
Lieckens, K.T.1
Colen, P.J.2
Lambrecht, M.R.3
-
46
-
-
0035599831
-
Service strategies within the manufacturing sector: Benefits, costs and partnerships
-
doi:10.1108/EUM0000000006093
-
Mathieu, V. 2001. Service strategies within the manufacturing sector: Benefits, costs and partnerships. International Journal of Service Industry Management, 12: 451-475. (doi:10.1108/EUM0000000006093)
-
(2001)
International Journal of Service Industry Management
, vol.12
, pp. 451-475
-
-
Mathieu, V.1
-
47
-
-
70350345486
-
Exploring the financial consequences of the servitization of manufacturing
-
doi:10.1007/s12063-009-0015-5
-
Neely, A. 2008. Exploring the financial consequences of the servitization of manufacturing. Operations Management Research, 1: 103-118. (doi:10.1007/s12063-009-0015-5)
-
(2008)
Operations Management Research
, vol.1
, pp. 103-118
-
-
Neely, A.1
-
48
-
-
23944443256
-
Forming successful business-to-business services in goods-dominant firms
-
doi:10.1177/1094670505276619
-
Neu, W. A. and Brown, S. W. 2005. Forming successful business-to-business services in goods-dominant firms. Journal of Service Research, 8: 3-17. (doi:10.1177/1094670505276619)
-
(2005)
Journal of Service Research
, vol.8
, pp. 3-17
-
-
Neu, W.A.1
Brown, S.W.2
-
49
-
-
0038245167
-
Managing the transition from products to services
-
doi:10.1108/09564230310474138
-
Oliva, R. and Kallenberg, R. 2003. Managing the transition from products to services. International Journal of Service Industry Management, 14: 160-172. (doi:10.1108/09564230310474138)
-
(2003)
International Journal of Service Industry Management
, vol.14
, pp. 160-172
-
-
Oliva, R.1
Kallenberg, R.2
-
50
-
-
66249085213
-
The pso triangle: Designing product, service and organisation to create value
-
doi:10.1108/01443570910953595
-
Pawar, K. S., Beltagui, A. and Riedel, J. 2009. The pso triangle: Designing product, service and organisation to create value. International Journal of Operations & Production Management, 29: 468-493. (doi:10.1108/01443570910953595)
-
(2009)
International Journal of Operations & Production Management
, vol.29
, pp. 468-493
-
-
Pawar, K.S.1
Beltagui, A.2
Riedel, J.3
-
51
-
-
0345010120
-
Managing product variety: An integrative review and research directions
-
doi:10.1111/j.1937-5956.2003.tb00199.x
-
Ramdas, K. 2003. Managing product variety: An integrative review and research directions. Production and Operations Management, 12: 79-101. (doi:10.1111/j.1937-5956.2003.tb00199.x)
-
(2003)
Production and Operations Management
, vol.12
, pp. 79-101
-
-
Ramdas, K.1
-
52
-
-
67349199931
-
Designing multi-echelon service parts networks with finite repair capacity
-
doi:10.1016/j.ejor.2008.08.006
-
Rappold, J. A. and Van Roo, B. D. 2009. Designing multi-echelon service parts networks with finite repair capacity. European Journal of Operational Research, 199: 781-792. (doi:10.1016/j.ejor.2008.08.006)
-
(2009)
European Journal of Operational Research
, vol.199
, pp. 781-792
-
-
Rappold, J.A.1
Van Roo, B.D.2
-
53
-
-
77952481779
-
Contracting for collaborative services
-
doi:10.1287/mnsc.1100.1146
-
Roels, G., Karmarkar, U. and Carr, S. 2010. Contracting for collaborative services. Management Science, 56: 849-863. (doi:10.1287/mnsc.1100.1146)
-
(2010)
Management Science
, vol.56
, pp. 849-863
-
-
Roels, G.1
Karmarkar, U.2
Carr, S.3
-
54
-
-
66249140256
-
Service, services and products: Rethinking operations strategy
-
doi:10.1108/01443570910953586
-
Spring, M. and Araujo, L. 2009. Service, services and products: Rethinking operations strategy. International Journal of Operations & Production Management, 29: 444-467. (doi:10.1108/01443570910953586)
-
(2009)
International Journal of Operations & Production Management
, vol.29
, pp. 444-467
-
-
Spring, M.1
Araujo, L.2
-
55
-
-
60749104806
-
Forecasting intermittent demand: A comparative study
-
doi:10.1057/palgrave.jors.2602569
-
Teunter, R. H. and Duncan, L. 2009. Forecasting intermittent demand: A comparative study. Journal of the Operational Research Society, 60: 321-329. (doi:10.1057/palgrave.jors.2602569)
-
(2009)
Journal of the Operational Research Society
, vol.60
, pp. 321-329
-
-
Teunter, R.H.1
Duncan, L.2
-
56
-
-
34547327241
-
A periodic inventory model for stocking modular components
-
doi:10.1111/j.1937-5956.2007.tb00263.x
-
Thomas, D. J. and Warsing, D. P. 2007. A periodic inventory model for stocking modular components. Production and Operations Management, 16: 343-359. (doi:10.1111/j.1937-5956.2007.tb00263.x)
-
(2007)
Production and Operations Management
, vol.16
, pp. 343-359
-
-
Thomas, D.J.1
Warsing, D.P.2
-
58
-
-
0032222131
-
A simulation metamodel for response-time planning
-
doi:10.1111/j.1540-5915.1998.tb01350.x
-
Watson, E. F., Chawda, P. P., McCarthy, B., Drevna, M. J. and Sadowski, R. P. 1998. A simulation metamodel for response-time planning. Decision Sciences, 29: 217-241. (doi:10.1111/j.1540-5915.1998.tb01350.x)
-
(1998)
Decision Sciences
, vol.29
, pp. 217-241
-
-
Watson, E.F.1
Chawda, P.P.2
McCarthy, B.3
Drevna, M.J.4
Sadowski, R.P.5
-
59
-
-
0001571885
-
Go downstream: The new profit imperative in manufacturing
-
Wise, R. and Baumgartner, P. 1999. Go downstream: The new profit imperative in manufacturing. Harvard Business Review, 77(1): 133-142.
-
(1999)
Harvard Business Review
, vol.77
, Issue.1
, pp. 133-142
-
-
Wise, R.1
Baumgartner, P.2
-
60
-
-
31144476950
-
Multi-item spare parts systems with lateral transshipments and waiting time constraints
-
doi:10.1016/j.ejor.2005.01.018
-
Wong, H., van Houtum, G. J., Cattrysse, D. and Van Oudheusden, D. 2006. Multi-item spare parts systems with lateral transshipments and waiting time constraints. European Journal of Operational Research, 171: 1071-1093. (doi:10.1016/j.ejor.2005.01.018)
-
(2006)
European Journal of Operational Research
, vol.171
, pp. 1071-1093
-
-
Wong, H.1
van Houtum, G.J.2
Cattrysse, D.3
Van Oudheusden, D.4
|