메뉴 건너뛰기




Volumn 50, Issue 1, 2004, Pages 83-98

Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers

Author keywords

Agile production; CONWIP; Cross training; Workforce

Indexed keywords

COMPUTER SIMULATION; COSTS; INDUSTRIAL MANAGEMENT; MAINTENANCE; PERFORMANCE; PUBLIC POLICY; REAL TIME SYSTEMS;

EID: 1242309349     PISSN: 00251909     EISSN: None     Source Type: Journal    
DOI: 10.1287/mnsc.1030.0166     Document Type: Article
Times cited : (244)

References (28)
  • 1
    • 0027660881 scopus 로고
    • A comparison of scheduling philosophies for manufacturing cells
    • Askin, R. G., A. Iyer. 1993. A comparison of scheduling philosophies for manufacturing cells. Eur. J. Oper. Res. 69 438-449.
    • (1993) Eur. J. Oper. Res. , vol.69 , pp. 438-449
    • Askin, R.G.1    Iyer, A.2
  • 2
    • 0002622989 scopus 로고    scopus 로고
    • A production line that balances itself
    • Bartholdi III, J. J., D. D. Eisenstein. 1996. A production line that balances itself. Oper. Res. 44(1) 21-34.
    • (1996) Oper. Res. , vol.44 , Issue.1 , pp. 21-34
    • Bartholdi III, J.J.1    Eisenstein, D.D.2
  • 3
    • 0032631927 scopus 로고    scopus 로고
    • Dynamics of 2- and 3-worker "bucket brigade" production lines
    • Bartholdi III, J. J., L. A. Bunimovich, D. D. Eisenstein. 1999. Dynamics of 2- and 3-worker "bucket brigade" production lines. Oper. Res. 47(3) 488-491.
    • (1999) Oper. Res. , vol.47 , Issue.3 , pp. 488-491
    • Bartholdi III, J.J.1    Bunimovich, L.A.2    Eisenstein, D.D.3
  • 5
    • 0031070705 scopus 로고    scopus 로고
    • Scheduling workforce and workflow in a high volume factory
    • Berman, O., R. Larson, E. Pinker. 1997. Scheduling workforce and workflow in a high volume factory. Management Sci. 43(2) 158-172.
    • (1997) Management Sci. , vol.43 , Issue.2 , pp. 158-172
    • Berman, O.1    Larson, R.2    Pinker, E.3
  • 6
    • 0030247852 scopus 로고    scopus 로고
    • Performance of a manufacturing module with moving workers
    • Bischak, D. P. 1996. Performance of a manufacturing module with moving workers. IIE Trans. 28 723-733.
    • (1996) IIE Trans. , vol.28 , pp. 723-733
    • Bischak, D.P.1
  • 7
    • 0032389620 scopus 로고    scopus 로고
    • Staffing a multiskilled work-force with varying levels of productivity: An analysis of cross-training policies
    • Brusco, M. J., T. R. Johns. 1998. Staffing a multiskilled work-force with varying levels of productivity: An analysis of cross-training policies. Decision Sci. 29(2) 499-515.
    • (1998) Decision Sci. , vol.29 , Issue.2 , pp. 499-515
    • Brusco, M.J.1    Johns, T.R.2
  • 8
    • 0032656506 scopus 로고    scopus 로고
    • Cross-utilization of workers whose capabilities differ
    • Campbell, G. M. 1999. Cross-utilization of workers whose capabilities differ. Management Sci. 45(5) 722-732.
    • (1999) Management Sci. , vol.45 , Issue.5 , pp. 722-732
    • Campbell, G.M.1
  • 9
    • 0023981046 scopus 로고
    • The role of work-in-process inventory in serial production lines
    • Conway, R., W. Maxwell, J. McClain, L. J. Thomas. 1988. The role of work-in-process inventory in serial production lines. Oper. Res. 36(2) 229-241.
    • (1988) Oper. Res. , vol.36 , Issue.2 , pp. 229-241
    • Conway, R.1    Maxwell, W.2    McClain, J.3    Thomas, L.J.4
  • 11
    • 0023978708 scopus 로고
    • A discrete time average cost flexible manufacturing and operator scheduling model solved by deconvexification over time
    • Eaves, B. C., U. G. Rothblum. 1988. A discrete time average cost flexible manufacturing and operator scheduling model solved by deconvexification over time. Oper. Res. 36(2) 242-257.
    • (1988) Oper. Res. , vol.36 , Issue.2 , pp. 242-257
    • Eaves, B.C.1    Rothblum, U.G.2
  • 13
    • 26844509871 scopus 로고    scopus 로고
    • Workforce agility in systems with hierarchical cross training
    • Arizona State University, Tempe, AZ
    • Gel, E. G. S., W. J. Hopp, M. P. Van Oyen. 2001. Workforce agility in systems with hierarchical cross training. Working paper, Arizona State University, Tempe, AZ.
    • (2001) Working Paper
    • Gel, E.G.S.1    Hopp, W.J.2    Van Oyen, M.P.3
  • 15
    • 0042266799 scopus 로고    scopus 로고
    • Process flexibility in supply chains
    • Graves, S. C., B. T. Tomlin. 2003. Process flexibility in supply chains. Management Sci. 49(7) 907-919.
    • (2003) Management Sci. , vol.49 , Issue.7 , pp. 907-919
    • Graves, S.C.1    Tomlin, B.T.2
  • 17
    • 1242350890 scopus 로고    scopus 로고
    • Agile workforce evaluation: A framework for cross-training and coordination
    • Forthcoming
    • Hopp, W. J., M. P. Van Oyen. 2002. Agile workforce evaluation: A framework for cross-training and coordination. IIE Trans. Forthcoming.
    • (2002) IIE Trans.
    • Hopp, W.J.1    Van Oyen, M.P.2
  • 18
    • 0029290411 scopus 로고
    • Principles on the benefits of manufacturing process flexibility
    • Jordan, W. J., S. C. Graves. 1995. Principles on the benefits of manufacturing process flexibility. Management Sci. 41(4) 577-594.
    • (1995) Management Sci. , vol.41 , Issue.4 , pp. 577-594
    • Jordan, W.J.1    Graves, S.C.2
  • 19
    • 0031193169 scopus 로고    scopus 로고
    • Workforce planning in mixed model assembly systems
    • Lee, C. Y., G. L. Vairaktarakis. 1997. Workforce planning in mixed model assembly systems. Oper. Res. 45(4) 553-567.
    • (1997) Oper. Res. , vol.45 , Issue.4 , pp. 553-567
    • Lee, C.Y.1    Vairaktarakis, G.L.2
  • 20
    • 0032119036 scopus 로고    scopus 로고
    • On pooling in queueing networks
    • Mandelbaum, R., A. Reiman. 1998. On pooling in queueing networks. Management Sci. 44(7) 971-981.
    • (1998) Management Sci. , vol.44 , Issue.7 , pp. 971-981
    • Mandelbaum, R.1    Reiman, A.2
  • 24
    • 0003094666 scopus 로고
    • The use of dynamic (state-dependent) assembly-line balancing to improve throughput
    • Ostolaza, J., J. McClain, J. Thomas. 1990. The use of dynamic (state-dependent) assembly-line balancing to improve throughput. J. Manufacturing Service Oper. Management 3 105-133.
    • (1990) J. Manufacturing Service Oper. Management , vol.3 , pp. 105-133
    • Ostolaza, J.1    McClain, J.2    Thomas, J.3
  • 26
    • 0024731874 scopus 로고
    • A review of the dual resource constrained system research
    • Treleven, M. 1989. A review of the dual resource constrained system research. IIE Trans. 21(3) 279-287.
    • (1989) IIE Trans. , vol.21 , Issue.3 , pp. 279-287
    • Treleven, M.1
  • 27
    • 0035452548 scopus 로고    scopus 로고
    • Performance opportunity of workforce agility in collaborative and noncollaborative work systems
    • Van Oyen, M. P., E. G. S. Gel, W. J. Hopp. 2001. Performance opportunity of workforce agility in collaborative and noncollaborative work systems. IIE Trans. 33 761-777.
    • (2001) IIE Trans. , vol.33 , pp. 761-777
    • Van Oyen, M.P.1    Gel, E.G.S.2    Hopp, W.J.3
  • 28
    • 0000906215 scopus 로고    scopus 로고
    • Self-buffering, self-balancing, self-flushing production lines
    • Zavadlav, E., J. O. McClain, L. J. Thomas. 1996. Self-buffering, self-balancing, self-flushing production lines. Management Sci. 42(8) 1151-1164.
    • (1996) Management Sci. , vol.42 , Issue.8 , pp. 1151-1164
    • Zavadlav, E.1    McClain, J.O.2    Thomas, L.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.