-
1
-
-
0035480298
-
-
Al-Turki, U., Fedjki, C., Andijani, A., 2001. Tabu Search method for a class of single-machine scheduling problems. Computers and Operations Research 28(12), 1223-1230.
-
Al-Turki, U., Fedjki, C., Andijani, A., 2001. Tabu Search method for a class of single-machine scheduling problems. Computers and Operations Research 28(12), 1223-1230.
-
-
-
-
2
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Boctor F.F. Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research 9 (1990) 9-13
-
(1990)
European Journal of Operational Research
, vol.9
, pp. 9-13
-
-
Boctor, F.F.1
-
3
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan W.T., Chua D.K.H., and Kannan G. Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, ASCE 122 2 (1996) 125-132
-
(1996)
Journal of Construction Engineering and Management, ASCE
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
Kannan, G.3
-
4
-
-
0015725454
-
Project scheduling under resource constraints: historical review and categorization of procedures
-
Davis E.W. Project scheduling under resource constraints: historical review and categorization of procedures. AIIE Transactions 5 4 (1973) 297-312
-
(1973)
AIIE Transactions
, vol.5
, Issue.4
, pp. 297-312
-
-
Davis, E.W.1
-
5
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
Davis E.W., and Patterson J.H. A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Science 121 8 (1975) 944-955
-
(1975)
Management Science
, vol.121
, Issue.8
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
6
-
-
0028368125
-
Genetic Algorithm and Tabu Search method hybrids for optimization
-
Glover F., et al. Genetic Algorithm and Tabu Search method hybrids for optimization. Computers and Operations Research 22 1 (1995) 111-134
-
(1995)
Computers and Operations Research
, vol.22
, Issue.1
, pp. 111-134
-
-
Glover, F.1
-
7
-
-
0035370974
-
-
Gopalakrishnan, M., Mohan, S., He, Z., 2001. A Tabu Search method heuristic for preventive maintenance scheduling. Computers and Industrial Engineering 40(1-2), 149-160.
-
Gopalakrishnan, M., Mohan, S., He, Z., 2001. A Tabu Search method heuristic for preventive maintenance scheduling. Computers and Industrial Engineering 40(1-2), 149-160.
-
-
-
-
8
-
-
0032642926
-
Optimization of resource allocation and Leveling/Smoothing using Genetic Algorithm
-
Hegazy T. Optimization of resource allocation and Leveling/Smoothing using Genetic Algorithm. Journal Construction Engineering and Management, ASCE 125 3 (1999) 167-175
-
(1999)
Journal Construction Engineering and Management, ASCE
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
9
-
-
84867375240
-
-
Hurink, J., Knust, S., 2002. A Tabu Search method algorithm for scheduling a single robot in a job-shop environment. Discrete Applied Mathematics 119(1-2), 181-203.
-
Hurink, J., Knust, S., 2002. A Tabu Search method algorithm for scheduling a single robot in a job-shop environment. Discrete Applied Mathematics 119(1-2), 181-203.
-
-
-
-
11
-
-
0001494926
-
A genetic-algorithm-based resource constrained construction scheduling system
-
Leu S.S., and Yang C.H. A genetic-algorithm-based resource constrained construction scheduling system. Construction Management and Economics 17 (1999) 767-776
-
(1999)
Construction Management and Economics
, vol.17
, pp. 767-776
-
-
Leu, S.S.1
Yang, C.H.2
-
12
-
-
52949104779
-
-
Lin, B.S.J., Wun, U., 1995. The dominance technique for the resource-constrained project scheduling problem. Management and System 2(2), 191-203.
-
Lin, B.S.J., Wun, U., 1995. The dominance technique for the resource-constrained project scheduling problem. Management and System 2(2), 191-203.
-
-
-
-
13
-
-
52949107591
-
-
Moder, J.J., 1983. Project Management with CPM, PERT and Precedence Diagramming, pp. 191-227.
-
Moder, J.J., 1983. Project Management with CPM, PERT and Precedence Diagramming, pp. 191-227.
-
-
-
-
17
-
-
52949139438
-
Calculation weight matrix of neural networks for resource leveling
-
Savin D., Alkass S., and Fazio P. Calculation weight matrix of neural networks for resource leveling. Journal of Computing in Civil Engineering, ASCE 12 4 (1998) 917-925
-
(1998)
Journal of Computing in Civil Engineering, ASCE
, vol.12
, Issue.4
, pp. 917-925
-
-
Savin, D.1
Alkass, S.2
Fazio, P.3
-
19
-
-
0032117729
-
A Tabu Search approach for the resource constrained project scheduling problem
-
Thomas P.R., and Salhi S. A Tabu Search approach for the resource constrained project scheduling problem. Journal of Heuristics 4 (1998) 123-139
-
(1998)
Journal of Heuristics
, vol.4
, pp. 123-139
-
-
Thomas, P.R.1
Salhi, S.2
-
20
-
-
0032049169
-
-
Valls, V., Perez, M.A., Quintanilla, M.S., 1998. A Tabu Search method approach to machine scheduling. European Journal of Operational Research 106(2-3), 277-300.
-
Valls, V., Perez, M.A., Quintanilla, M.S., 1998. A Tabu Search method approach to machine scheduling. European Journal of Operational Research 106(2-3), 277-300.
-
-
-
-
21
-
-
0033102073
-
-
Vinicius, A.A., Debora, P.R., 1999. Tabu Search method for total tardiness minimization in flowshop scheduling problems. Computers and Operations Research (3), 219-235.
-
Vinicius, A.A., Debora, P.R., 1999. Tabu Search method for total tardiness minimization in flowshop scheduling problems. Computers and Operations Research (3), 219-235.
-
-
-
-
22
-
-
52949093909
-
-
Wiest, J.D., 1963. The scheduling of large project with limited resource. Unpublished Ph.D. Thesis, Carnegie Institute of Technology.
-
Wiest, J.D., 1963. The scheduling of large project with limited resource. Unpublished Ph.D. Thesis, Carnegie Institute of Technology.
-
-
-
-
23
-
-
52949135544
-
-
Yang, T.S., Ye, Y.C., 1996. Resource constraint scheduling in constraint programming. Thesis for the Degree of Master, Chung Hua University, Sin-Jhu, Taiwan.
-
Yang, T.S., Ye, Y.C., 1996. Resource constraint scheduling in constraint programming. Thesis for the Degree of Master, Chung Hua University, Sin-Jhu, Taiwan.
-
-
-
-
24
-
-
52949090412
-
-
Yang, B., Geunes, J., O'Brien, W., 2001. Resource constrained project scheduling; past work and new directions. Research Report 2001-6, Department of Industrial and Systems Engineering, University of Florida, 28pp.
-
Yang, B., Geunes, J., O'Brien, W., 2001. Resource constrained project scheduling; past work and new directions. Research Report 2001-6, Department of Industrial and Systems Engineering, University of Florida, 28pp.
-
-
-
|