메뉴 건너뛰기




Volumn 21, Issue 7, 2008, Pages 1101-1112

A study of project scheduling optimization using Tabu Search algorithm

Author keywords

Heuristic methods; Multi resource project scheduling; Optimization; Project management; Tabu Search

Indexed keywords

ARTIFICIAL INTELLIGENCE; COMPUTER SOFTWARE; CYBERNETICS; HEURISTIC ALGORITHMS; HEURISTIC PROGRAMMING; LEARNING ALGORITHMS; PROJECT MANAGEMENT; SCHEDULING; SENSITIVITY ANALYSIS; SIMULATED ANNEALING; USER INTERFACES;

EID: 52949090841     PISSN: 09521976     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.engappai.2007.11.006     Document Type: Article
Times cited : (43)

References (24)
  • 1
    • 0035480298 scopus 로고    scopus 로고
    • Al-Turki, U., Fedjki, C., Andijani, A., 2001. Tabu Search method for a class of single-machine scheduling problems. Computers and Operations Research 28(12), 1223-1230.
    • Al-Turki, U., Fedjki, C., Andijani, A., 2001. Tabu Search method for a class of single-machine scheduling problems. Computers and Operations Research 28(12), 1223-1230.
  • 2
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor F.F. Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research 9 (1990) 9-13
    • (1990) European Journal of Operational Research , vol.9 , pp. 9-13
    • Boctor, F.F.1
  • 4
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints: historical review and categorization of procedures
    • Davis E.W. Project scheduling under resource constraints: historical review and categorization of procedures. AIIE Transactions 5 4 (1973) 297-312
    • (1973) AIIE Transactions , vol.5 , Issue.4 , pp. 297-312
    • Davis, E.W.1
  • 5
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis E.W., and Patterson J.H. A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Science 121 8 (1975) 944-955
    • (1975) Management Science , vol.121 , Issue.8 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 6
    • 0028368125 scopus 로고
    • Genetic Algorithm and Tabu Search method hybrids for optimization
    • Glover F., et al. Genetic Algorithm and Tabu Search method hybrids for optimization. Computers and Operations Research 22 1 (1995) 111-134
    • (1995) Computers and Operations Research , vol.22 , Issue.1 , pp. 111-134
    • Glover, F.1
  • 7
    • 0035370974 scopus 로고    scopus 로고
    • Gopalakrishnan, M., Mohan, S., He, Z., 2001. A Tabu Search method heuristic for preventive maintenance scheduling. Computers and Industrial Engineering 40(1-2), 149-160.
    • Gopalakrishnan, M., Mohan, S., He, Z., 2001. A Tabu Search method heuristic for preventive maintenance scheduling. Computers and Industrial Engineering 40(1-2), 149-160.
  • 8
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and Leveling/Smoothing using Genetic Algorithm
    • Hegazy T. Optimization of resource allocation and Leveling/Smoothing using Genetic Algorithm. Journal Construction Engineering and Management, ASCE 125 3 (1999) 167-175
    • (1999) Journal Construction Engineering and Management, ASCE , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 9
    • 84867375240 scopus 로고    scopus 로고
    • Hurink, J., Knust, S., 2002. A Tabu Search method algorithm for scheduling a single robot in a job-shop environment. Discrete Applied Mathematics 119(1-2), 181-203.
    • Hurink, J., Knust, S., 2002. A Tabu Search method algorithm for scheduling a single robot in a job-shop environment. Discrete Applied Mathematics 119(1-2), 181-203.
  • 11
    • 0001494926 scopus 로고    scopus 로고
    • A genetic-algorithm-based resource constrained construction scheduling system
    • Leu S.S., and Yang C.H. A genetic-algorithm-based resource constrained construction scheduling system. Construction Management and Economics 17 (1999) 767-776
    • (1999) Construction Management and Economics , vol.17 , pp. 767-776
    • Leu, S.S.1    Yang, C.H.2
  • 12
    • 52949104779 scopus 로고    scopus 로고
    • Lin, B.S.J., Wun, U., 1995. The dominance technique for the resource-constrained project scheduling problem. Management and System 2(2), 191-203.
    • Lin, B.S.J., Wun, U., 1995. The dominance technique for the resource-constrained project scheduling problem. Management and System 2(2), 191-203.
  • 13
    • 52949107591 scopus 로고    scopus 로고
    • Moder, J.J., 1983. Project Management with CPM, PERT and Precedence Diagramming, pp. 191-227.
    • Moder, J.J., 1983. Project Management with CPM, PERT and Precedence Diagramming, pp. 191-227.
  • 19
    • 0032117729 scopus 로고    scopus 로고
    • A Tabu Search approach for the resource constrained project scheduling problem
    • Thomas P.R., and Salhi S. A Tabu Search approach for the resource constrained project scheduling problem. Journal of Heuristics 4 (1998) 123-139
    • (1998) Journal of Heuristics , vol.4 , pp. 123-139
    • Thomas, P.R.1    Salhi, S.2
  • 20
    • 0032049169 scopus 로고    scopus 로고
    • Valls, V., Perez, M.A., Quintanilla, M.S., 1998. A Tabu Search method approach to machine scheduling. European Journal of Operational Research 106(2-3), 277-300.
    • Valls, V., Perez, M.A., Quintanilla, M.S., 1998. A Tabu Search method approach to machine scheduling. European Journal of Operational Research 106(2-3), 277-300.
  • 21
    • 0033102073 scopus 로고    scopus 로고
    • Vinicius, A.A., Debora, P.R., 1999. Tabu Search method for total tardiness minimization in flowshop scheduling problems. Computers and Operations Research (3), 219-235.
    • Vinicius, A.A., Debora, P.R., 1999. Tabu Search method for total tardiness minimization in flowshop scheduling problems. Computers and Operations Research (3), 219-235.
  • 22
    • 52949093909 scopus 로고    scopus 로고
    • Wiest, J.D., 1963. The scheduling of large project with limited resource. Unpublished Ph.D. Thesis, Carnegie Institute of Technology.
    • Wiest, J.D., 1963. The scheduling of large project with limited resource. Unpublished Ph.D. Thesis, Carnegie Institute of Technology.
  • 23
    • 52949135544 scopus 로고    scopus 로고
    • Yang, T.S., Ye, Y.C., 1996. Resource constraint scheduling in constraint programming. Thesis for the Degree of Master, Chung Hua University, Sin-Jhu, Taiwan.
    • Yang, T.S., Ye, Y.C., 1996. Resource constraint scheduling in constraint programming. Thesis for the Degree of Master, Chung Hua University, Sin-Jhu, Taiwan.
  • 24
    • 52949090412 scopus 로고    scopus 로고
    • Yang, B., Geunes, J., O'Brien, W., 2001. Resource constrained project scheduling; past work and new directions. Research Report 2001-6, Department of Industrial and Systems Engineering, University of Florida, 28pp.
    • Yang, B., Geunes, J., O'Brien, W., 2001. Resource constrained project scheduling; past work and new directions. Research Report 2001-6, Department of Industrial and Systems Engineering, University of Florida, 28pp.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.