메뉴 건너뛰기




Volumn 24, Issue 1, 2010, Pages 45-55

Scheduling resource-constrained projects with ant colony optimization artificial agents

Author keywords

Ant colony; Artificial intelligence; Computerized scheduling; Optimization; Resource management

Indexed keywords

ANT COLONIES; ANT COLONY; ANT-COLONY OPTIMIZATION; ARTIFICIAL AGENTS; COLLECTIVE BEHAVIOR; COMPUTERIZED SCHEDULING; CONSTRUCTION PROJECTS; CRITICAL PATH CALCULATIONS; FOOD SOURCES; NETWORK TOPOLOGY; PROJECT COMPLETION; RESOURCE AVAILABILITY CONSTRAINTS; RESOURCE MANAGEMENT; RESOURCE-CONSTRAINED; RESOURCE-CONSTRAINED NETWORK; SCHEDULING RESOURCES;

EID: 73349109790     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3801(2010)24:1(45)     Document Type: Article
Times cited : (51)

References (31)
  • 2
    • 0038183863 scopus 로고    scopus 로고
    • Lower bounds for resource-constrained project scheduling problems
    • 0377-2217. 10.1016/S0377-2217(02)00762-2
    • Brucker, P., and Knust, S. (2003). " Lower bounds for resource-constrained project scheduling problems.." Eur. J. Oper. Res. 0377-2217, 149 (2), 302-313. 10.1016/S0377-2217(02)00762-2
    • (2003) Eur. J. Oper. Res. , vol.149 , Issue.2 , pp. 302-313
    • Brucker, P.1    Knust, S.2
  • 3
    • 0032096810 scopus 로고    scopus 로고
    • A branch and bound algorithm for the resource-constrained project scheduling problem
    • 0377-2217. 10.1016/S0377-2217(97)00335-4
    • Brucker, P., Knust, S., Schoo, A., and Thiele, O. (1998). " A branch and bound algorithm for the resource-constrained project scheduling problem.." Eur. J. Oper. Res. 0377-2217, 107 (2), 272-288. 10.1016/S0377-2217(97)00335-4
    • (1998) Eur. J. Oper. Res. , vol.107 , Issue.2 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 4
    • 0042613489 scopus 로고
    • Advances in critical path methods
    • 0030-364X. 10.1057/jors.1966.72
    • Carruthers, J. A., and Battersby, A. (1966). " Advances in critical path methods.." Oper. Res. 0030-364X, 17 (4), 359-380. 10.1057/jors.1966.72
    • (1966) Oper. Res. , vol.17 , Issue.4 , pp. 359-380
    • Carruthers, J.A.1    Battersby, A.2
  • 5
    • 73349103866 scopus 로고    scopus 로고
    • Using an enhanced ant colony system to solve resource-constrained project scheduling problem
    • Chen, R. M., and Lo, S. T. (2006). " Using an enhanced ant colony system to solve resource-constrained project scheduling problem.." Computer Science and Network Security, 6 (11), 75-84.
    • (2006) Computer Science and Network Security , vol.6 , Issue.11 , pp. 75-84
    • Chen, R.M.1    Lo, S.T.2
  • 9
    • 84955240346 scopus 로고    scopus 로고
    • Resource constrained project scheduling: A hybrid neural approach
    • J. Józefowska and J. Weglarz, eds., Springer, USA
    • Colak, S., Agarwal, A., and Erenguc, S. (2006). " Resource constrained project scheduling: A hybrid neural approach.." Perspectives in Modern Project Scheduling, J. Józefowska, and, J. Weglarz, eds., Springer, USA, 297-318.
    • (2006) Perspectives in Modern Project Scheduling , pp. 297-318
    • Colak, S.1    Agarwal, A.2    Erenguc, S.3
  • 10
    • 0003352726 scopus 로고    scopus 로고
    • An approach to resource constrained project scheduling
    • G. F. Luger, ed., AAAI Press, Albuquerque, N.M.
    • Crawford, J. (1996). " An approach to resource constrained project scheduling.." Proc., 1996 AI and Manufacturing Research Planning Workshop, G. F. Luger, ed., AAAI Press, Albuquerque, N.M.
    • (1996) Proc., 1996 AI and Manufacturing Research Planning Workshop
    • Crawford, J.1
  • 11
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • 0025-1909. 10.1287/mnsc.38.12.1803
    • Demeulemeester, E., and Herroelen, W. (1992). " A branch-and-bound procedure for the multiple resource-constrained project scheduling problem.." Manage. Sci. 0025-1909, 38 (12), 1803-1818. 10.1287/mnsc.38.12. 1803
    • (1992) Manage. Sci. , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 12
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • 0025-1909. 10.1287/mnsc.43.11.1485
    • Demeulemeester, E. L., and Herroelen, W. S. (1997). " New benchmark results for the resource-constrained project scheduling problem.." Manage. Sci. 0025-1909, 43 (11), 1485-1492. 10.1287/mnsc.43.11.1485
    • (1997) Manage. Sci. , vol.43 , Issue.11 , pp. 1485-1492
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 13
    • 34147120474 scopus 로고
    • A note on two problems in connection with graphs
    • 0029-599X. 10.1007/BF01386390
    • Dijkstra, E. W. (1959). " A note on two problems in connection with graphs.." Numer. Math. 0029-599X, 1, 269-271. 10.1007/BF01386390
    • (1959) Numer. Math. , vol.1 , pp. 269-271
    • Dijkstra, E.W.1
  • 14
    • 27644543634 scopus 로고    scopus 로고
    • Ant colony optimization theory: A survey
    • DOI 10.1016/j.tcs.2005.05.020, PII S0304397505003798
    • Dorigo, M., and Blum, C. (2005). " Ant colony optimization theory: a survey.." Theor. Comput. Sci. 0304-3975, 344, 243-278. 10.1016/j.tcs.2005.05.020 (Pubitemid 41554100)
    • (2005) Theoretical Computer Science , vol.344 , Issue.2-3 , pp. 243-278
    • Dorigo, M.1    Blum, C.2
  • 16
    • 33846295159 scopus 로고    scopus 로고
    • The ant colony optimization metaheuristic: Algorithms, applications and advances
    • F. Glover and G. A. Kochenberger, eds., Springer, New York
    • Dorigo, M., and Stutzle, T. (2002). " The ant colony optimization metaheuristic: Algorithms, applications and advances.." Handbook of Metaheuristics, F. Glover, and, G. A. Kochenberger, eds., Vol. 57, Springer, New York, 251-285.
    • (2002) Handbook of Metaheuristics , vol.57 , pp. 251-285
    • Dorigo, M.1    Stutzle, T.2
  • 17
    • 0001491336 scopus 로고
    • Resource constrained scheduling as generalized bin packing
    • 0097-3165. 10.1016/0097-3165(76)90001-7
    • Garey, M. R., Graham, R. L., Johnson, D. S., and Yao, A. C. C. (1976). " Resource constrained scheduling as generalized bin packing.." J. Comb. Theory, Ser. A 0097-3165, 21, 257-298. 10.1016/0097-3165(76)90001-7
    • (1976) J. Comb. Theory, Ser. A , vol.21 , pp. 257-298
    • Garey, M.R.1    Graham, R.L.2    Johnson, D.S.3    Yao, A.C.C.4
  • 18
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • 0733-9364. 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 19
    • 18744368219 scopus 로고    scopus 로고
    • Evaluation of the resource-constrained critical path method algorithms
    • 0733-9364. 10.1061/(ASCE)0733-9364(2005)131:5(522)
    • Kim, K., and de la Garza, J. M. (2005). " Evaluation of the resource-constrained critical path method algorithms.." J. Constr. Eng. Manage. 0733-9364, 131 (5), 522-532. 10.1061/(ASCE)0733-9364(2005)131:5(522)
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.5 , pp. 522-532
    • Kim, K.1    De La Garza, J.M.2
  • 20
    • 0017924416 scopus 로고
    • Complexity of scheduling under precedence constraints
    • 0030-364X. 10.1287/opre.26.1.22
    • Lenstra, J. K., and Kan, A. (1978). " Complexity of scheduling under precedence constraints.." Oper. Res. 0030-364X, 26 (1), 22-35. 10.1287/opre.26.1.22
    • (1978) Oper. Res. , vol.26 , Issue.1 , pp. 22-35
    • Lenstra, J.K.1    Kan, A.2
  • 23
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimization for resource-constrained project scheduling
    • DOI 10.1109/TEVC.2002.802450, PII 1011092002802450
    • Merkle, D., Middendorf, M., and Schmeck, H. (2002). " Ant colony optimization for resource-constrained project scheduling.." IEEE Trans. Evol. Comput. 1089-778X, 6 (4), 333-346. 10.1109/TEVC.2002.802450 (Pubitemid 35032735)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.4 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 24
    • 73349097983 scopus 로고    scopus 로고
    • Microsoft project electronic manual v2000 edition. Microsoft Corporation, Redmond, Wash
    • Microsoft project electronic manual v2000 edition. (2000). Microsoft Corporation, Redmond, Wash.
    • (2000)
  • 25
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
    • 0025-1909. 10.1287/mnsc.44.5.714
    • Mingozzi, A., Maniezzo, V., Ricciardelli, S., and Bianco, L. (1998). " An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation.." Manage. Sci. 0025-1909, 44 (5), 714-729. 10.1287/mnsc.44.5.714
    • (1998) Manage. Sci. , vol.44 , Issue.5 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 26
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • 0025-1909. 10.1287/mnsc.30.7.854
    • Patterson, J. H. (1984). " A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem.." Manage. Sci. 0025-1909, 30 (7), 854-867. 10.1287/mnsc.30.7.854
    • (1984) Manage. Sci. , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 27
    • 73349124279 scopus 로고    scopus 로고
    • Primavera project planner electronic manual; v3.1 edition. Primavera Systems Inc., Bala Cynwyd, Pa.
    • Primavera project planner electronic manual; v3.1 edition. (2001). Primavera Systems Inc., Bala Cynwyd, Pa.
    • (2001)
  • 28
    • 7544238250 scopus 로고    scopus 로고
    • Project time-cost analysis under generalized precedence relations
    • 0965-9978. 10.1016/j.advengsoft.2004.03.017
    • Sakellaropoulos, S., and Chassiakos, A. P. (2004). " Project time-cost analysis under generalized precedence relations.." Adv. Eng. Software 0965-9978, 35 (10), 715-724. 10.1016/j.advengsoft.2004.03.017
    • (2004) Adv. Eng. Software , vol.35 , Issue.10 , pp. 715-724
    • Sakellaropoulos, S.1    Chassiakos, A.P.2
  • 29
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
    • Senouci, A. B., and Eldin, N. N. (2004). " Use of genetic algorithms in resource scheduling of construction projects.." J. Constr. Eng. Manage. 0733-9364, 130 (6), 869-877. 10.1061/(ASCE)0733-9364(2004)130:6(869) (Pubitemid 40265320)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 31
    • 32944459555 scopus 로고    scopus 로고
    • Permutation-based particle swarm optimization for resource-constrained project scheduling
    • DOI 10.1061/(ASCE)0887-3801(2006)20:2(141)
    • Zhang, H., Li, H., and Tam, C. (2006). " Permutation-based particle swarm optimization for resource-constrained project scheduling.." J. Comput. Civ. Eng. 0887-3801, 20 (2), 141-149. 10.1061/(ASCE)0887-3801(2006)20: 2(141) (Pubitemid 43260088)
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.2 , pp. 141-149
    • Zhang, H.1    Li, H.2    Tam, C.M.3