Lower bounds for resource-constrained project scheduling problems
-
0377-2217. 10.1016/S0377-2217(02)00762-2
-
Brucker, P., and Knust, S. (2003). " Lower bounds for resource-constrained project scheduling problems.." Eur. J. Oper. Res. 0377-2217, 149 (2), 302-313. 10.1016/S0377-2217(02)00762-2
-
(2003)
Eur. J. Oper. Res.
, vol.149
, Issue.2
, pp. 302-313
-
-
Brucker, P.1
Knust, S.2
-
3
-
-
0032096810
-
A branch and bound algorithm for the resource-constrained project scheduling problem
-
0377-2217. 10.1016/S0377-2217(97)00335-4
-
Brucker, P., Knust, S., Schoo, A., and Thiele, O. (1998). " A branch and bound algorithm for the resource-constrained project scheduling problem.." Eur. J. Oper. Res. 0377-2217, 107 (2), 272-288. 10.1016/S0377-2217(97)00335-4
-
(1998)
Eur. J. Oper. Res.
, vol.107
, Issue.2
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
4
-
-
0042613489
-
Advances in critical path methods
-
0030-364X. 10.1057/jors.1966.72
-
Carruthers, J. A., and Battersby, A. (1966). " Advances in critical path methods.." Oper. Res. 0030-364X, 17 (4), 359-380. 10.1057/jors.1966.72
-
(1966)
Oper. Res.
, vol.17
, Issue.4
, pp. 359-380
-
-
Carruthers, J.A.1
Battersby, A.2
-
5
-
-
73349103866
-
Using an enhanced ant colony system to solve resource-constrained project scheduling problem
-
Chen, R. M., and Lo, S. T. (2006). " Using an enhanced ant colony system to solve resource-constrained project scheduling problem.." Computer Science and Network Security, 6 (11), 75-84.
-
(2006)
Computer Science and Network Security
, vol.6
, Issue.11
, pp. 75-84
-
-
Chen, R.M.1
Lo, S.T.2
-
7
-
-
80053398528
-
Scheduling construction activities using ant colony optimization
-
Civil-ComPress, Rome, Italy
-
Christodoulou, S. (2005b). " Scheduling construction activities using ant colony optimization.." Proc., 8th Int. Conf. on the Application of Artificial Intelligence to Civil, Structural and Environmental Engineering, Civil-Comp Press, Rome, Italy.
-
(2005)
Proc., 8th Int. Conf. on the Application of Artificial Intelligence to Civil, Structural and Environmental Engineering
-
-
Christodoulou, S.1
-
8
-
-
58949095140
-
Resource-constrained scheduling using ant colony optimization
-
Civil-ComPress, St. Julians, Malta
-
Christodoulou, S. (2007). " Resource-constrained scheduling using ant colony optimization.." Proc., 9th Int. Conf. on the Application of Artificial Intelligence to Civil, Structural and Environmental Engineering (AICC07), Civil-Comp Press, St. Julians, Malta.
-
(2007)
Proc., 9th Int. Conf. on the Application of Artificial Intelligence to Civil, Structural and Environmental Engineering (AICC07)
-
-
Christodoulou, S.1
-
9
-
-
84955240346
-
Resource constrained project scheduling: A hybrid neural approach
-
J. Józefowska and J. Weglarz, eds., Springer, USA
-
Colak, S., Agarwal, A., and Erenguc, S. (2006). " Resource constrained project scheduling: A hybrid neural approach.." Perspectives in Modern Project Scheduling, J. Józefowska, and, J. Weglarz, eds., Springer, USA, 297-318.
-
(2006)
Perspectives in Modern Project Scheduling
, pp. 297-318
-
-
Colak, S.1
Agarwal, A.2
Erenguc, S.3
-
10
-
-
0003352726
-
An approach to resource constrained project scheduling
-
G. F. Luger, ed., AAAI Press, Albuquerque, N.M.
-
Crawford, J. (1996). " An approach to resource constrained project scheduling.." Proc., 1996 AI and Manufacturing Research Planning Workshop, G. F. Luger, ed., AAAI Press, Albuquerque, N.M.
-
(1996)
Proc., 1996 AI and Manufacturing Research Planning Workshop
-
-
Crawford, J.1
-
11
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
0025-1909. 10.1287/mnsc.38.12.1803
-
Demeulemeester, E., and Herroelen, W. (1992). " A branch-and-bound procedure for the multiple resource-constrained project scheduling problem.." Manage. Sci. 0025-1909, 38 (12), 1803-1818. 10.1287/mnsc.38.12. 1803
-
(1992)
Manage. Sci.
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
12
-
-
0031272722
-
New benchmark results for the resource-constrained project scheduling problem
-
0025-1909. 10.1287/mnsc.43.11.1485
-
Demeulemeester, E. L., and Herroelen, W. S. (1997). " New benchmark results for the resource-constrained project scheduling problem.." Manage. Sci. 0025-1909, 43 (11), 1485-1492. 10.1287/mnsc.43.11.1485
-
(1997)
Manage. Sci.
, vol.43
, Issue.11
, pp. 1485-1492
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
13
-
-
34147120474
-
A note on two problems in connection with graphs
-
0029-599X. 10.1007/BF01386390
-
Dijkstra, E. W. (1959). " A note on two problems in connection with graphs.." Numer. Math. 0029-599X, 1, 269-271. 10.1007/BF01386390
-
(1959)
Numer. Math.
, vol.1
, pp. 269-271
-
-
Dijkstra, E.W.1
-
14
-
-
27644543634
-
Ant colony optimization theory: A survey
-
DOI 10.1016/j.tcs.2005.05.020, PII S0304397505003798
-
Dorigo, M., and Blum, C. (2005). " Ant colony optimization theory: a survey.." Theor. Comput. Sci. 0304-3975, 344, 243-278. 10.1016/j.tcs.2005.05.020 (Pubitemid 41554100)
-
(2005)
Theoretical Computer Science
, vol.344
, Issue.2-3
, pp. 243-278
-
-
Dorigo, M.1
Blum, C.2
-
15
-
-
0030082551
-
Ant system: Optimization by a colony of cooperating agents.
-
10.1109/3477.484436
-
Dorigo, M., Maniezzo, V., and Colorni, A. (1996). " Ant system: Optimization by a colony of cooperating agents.. " IEEE Trans. Syst., Man, Cybern., Part B: Cybern, 26, 29-41. 10.1109/3477.484436
-
(1996)
IEEE Trans. Syst., Man, Cybern., Part B: Cybern
, vol.26
, pp. 29-41
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
16
-
-
33846295159
-
The ant colony optimization metaheuristic: Algorithms, applications and advances
-
F. Glover and G. A. Kochenberger, eds., Springer, New York
-
Dorigo, M., and Stutzle, T. (2002). " The ant colony optimization metaheuristic: Algorithms, applications and advances.." Handbook of Metaheuristics, F. Glover, and, G. A. Kochenberger, eds., Vol. 57, Springer, New York, 251-285.
-
(2002)
Handbook of Metaheuristics
, vol.57
, pp. 251-285
-
-
Dorigo, M.1
Stutzle, T.2
-
17
-
-
0001491336
-
Resource constrained scheduling as generalized bin packing
-
0097-3165. 10.1016/0097-3165(76)90001-7
-
Garey, M. R., Graham, R. L., Johnson, D. S., and Yao, A. C. C. (1976). " Resource constrained scheduling as generalized bin packing.." J. Comb. Theory, Ser. A 0097-3165, 21, 257-298. 10.1016/0097-3165(76)90001-7
-
(1976)
J. Comb. Theory, Ser. A
, vol.21
, pp. 257-298
-
-
Garey, M.R.1
Graham, R.L.2
Johnson, D.S.3
Yao, A.C.C.4
-
18
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
0733-9364. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
19
-
-
18744368219
-
Evaluation of the resource-constrained critical path method algorithms
-
0733-9364. 10.1061/(ASCE)0733-9364(2005)131:5(522)
-
Kim, K., and de la Garza, J. M. (2005). " Evaluation of the resource-constrained critical path method algorithms.." J. Constr. Eng. Manage. 0733-9364, 131 (5), 522-532. 10.1061/(ASCE)0733-9364(2005)131:5(522)
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.5
, pp. 522-532
-
-
Kim, K.1
De La Garza, J.M.2
-
20
-
-
0017924416
-
Complexity of scheduling under precedence constraints
-
0030-364X. 10.1287/opre.26.1.22
-
Lenstra, J. K., and Kan, A. (1978). " Complexity of scheduling under precedence constraints.." Oper. Res. 0030-364X, 26 (1), 22-35. 10.1287/opre.26.1.22
-
(1978)
Oper. Res.
, vol.26
, Issue.1
, pp. 22-35
-
-
Lenstra, J.K.1
Kan, A.2
-
21
-
-
28444479514
-
Optimization of resource allocation in construction using genetic algorithms
-
Liu, Y., Zhao, S., Du, X., and Li, S. (2005). " Optimization of resource allocation in construction using genetic algorithms.." Proc., 2005 Int. Conf. on Machine Learning and Cybernetics, Vol. 6, 3428-3432.
-
(2005)
Proc., 2005 Int. Conf. on Machine Learning and Cybernetics
, vol.6
, pp. 3428-3432
-
-
Liu, Y.1
Zhao, S.2
Du, X.3
Li, S.4
-
22
-
-
13444289001
-
-
G. C. Onwubolu and B. V. Babu, eds., Springer-Verlag, Berlin
-
Maniezzo, V., Gambardella, L., and Luigi, F. D. (2004). Ant colony optimization: New optimization techniques in engineering, G. C. Onwubolu, and, B. V. Babu, eds., Springer-Verlag, Berlin, 101-117.
-
(2004)
Ant Colony Optimization: New Optimization Techniques in Engineering
, pp. 101-117
-
-
Maniezzo, V.1
Gambardella, L.2
Luigi, F.D.3
-
23
-
-
0036672003
-
Ant colony optimization for resource-constrained project scheduling
-
DOI 10.1109/TEVC.2002.802450, PII 1011092002802450
-
Merkle, D., Middendorf, M., and Schmeck, H. (2002). " Ant colony optimization for resource-constrained project scheduling.." IEEE Trans. Evol. Comput. 1089-778X, 6 (4), 333-346. 10.1109/TEVC.2002.802450 (Pubitemid 35032735)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.4
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
24
-
-
73349097983
-
-
Microsoft project electronic manual v2000 edition. Microsoft Corporation, Redmond, Wash
-
Microsoft project electronic manual v2000 edition. (2000). Microsoft Corporation, Redmond, Wash.
-
(2000)
-
-
-
25
-
-
0032070635
-
An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
-
0025-1909. 10.1287/mnsc.44.5.714
-
Mingozzi, A., Maniezzo, V., Ricciardelli, S., and Bianco, L. (1998). " An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation.." Manage. Sci. 0025-1909, 44 (5), 714-729. 10.1287/mnsc.44.5.714
-
(1998)
Manage. Sci.
, vol.44
, Issue.5
, pp. 714-729
-
-
Mingozzi, A.1
Maniezzo, V.2
Ricciardelli, S.3
Bianco, L.4
-
26
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
-
0025-1909. 10.1287/mnsc.30.7.854
-
Patterson, J. H. (1984). " A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem.." Manage. Sci. 0025-1909, 30 (7), 854-867. 10.1287/mnsc.30.7.854
-
(1984)
Manage. Sci.
, vol.30
, Issue.7
, pp. 854-867
-
-
Patterson, J.H.1
-
27
-
-
73349124279
-
-
Primavera project planner electronic manual; v3.1 edition. Primavera Systems Inc., Bala Cynwyd, Pa.
-
Primavera project planner electronic manual; v3.1 edition. (2001). Primavera Systems Inc., Bala Cynwyd, Pa.
-
(2001)
-
-
-
28
-
-
7544238250
-
Project time-cost analysis under generalized precedence relations
-
0965-9978. 10.1016/j.advengsoft.2004.03.017
-
Sakellaropoulos, S., and Chassiakos, A. P. (2004). " Project time-cost analysis under generalized precedence relations.." Adv. Eng. Software 0965-9978, 35 (10), 715-724. 10.1016/j.advengsoft.2004.03.017
-
(2004)
Adv. Eng. Software
, vol.35
, Issue.10
, pp. 715-724
-
-
Sakellaropoulos, S.1
Chassiakos, A.P.2
-
29
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
-
Senouci, A. B., and Eldin, N. N. (2004). " Use of genetic algorithms in resource scheduling of construction projects.." J. Constr. Eng. Manage. 0733-9364, 130 (6), 869-877. 10.1061/(ASCE)0733-9364(2004)130:6(869) (Pubitemid 40265320)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
30
-
-
0003982378
-
-
4th Ed., Thomson-Brooks/Cole, Pacific Grove, Calif
-
Winston, W. L., and Venkataramanan, M. (2002). Introduction to mathematical programming, 4th Ed., Thomson-Brooks/Cole, Pacific Grove, Calif.
-
(2002)
Introduction to Mathematical Programming
-
-
Winston, W.L.1
Venkataramanan, M.2
-
31
-
-
32944459555
-
Permutation-based particle swarm optimization for resource-constrained project scheduling
-
DOI 10.1061/(ASCE)0887-3801(2006)20:2(141)
-
Zhang, H., Li, H., and Tam, C. (2006). " Permutation-based particle swarm optimization for resource-constrained project scheduling.." J. Comput. Civ. Eng. 0887-3801, 20 (2), 141-149. 10.1061/(ASCE)0887-3801(2006)20: 2(141) (Pubitemid 43260088)
-
(2006)
Journal of Computing in Civil Engineering
, vol.20
, Issue.2
, pp. 141-149
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
|