A computer application for a bus body assembly line using Genetic Algorithms

Author keywords

Bus body assembly; Genetic Algorithm; RCMPSP

Indexed keywords

ASSEMBLY LINE; BUS BODY; COLOMBIA; MATERIALS REQUIREMENTS PLANNING; MULTI-PROJECT SCHEDULING; ON-TIME DELIVERY; ORGANIZATIONAL CLIMATE; PRODUCTION SYSTEM; RCMPSP; RESOURCE CONSTRAINT; SENIOR MANAGEMENT; SOLUTION METHODS; SOUTH AMERICA;

EID: 84865695092     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.06.026     Document Type: Article
Times cited : (17)

References (36)
  • 1
    • 78049444992 scopus 로고    scopus 로고
    • A neurogenetic approach for the resource-constrained project scheduling problem
    • A. Agarwal, S. Colak, and S. Erenguc A neurogenetic approach for the resource-constrained project scheduling problem Computers and Operations Research 38 1 2011 44 50
    • (2011) Computers and Operations Research , vol.38 , Issue.1 , pp. 44-50
    • Agarwal, A.1    Colak, S.2    Erenguc, S.3
  • 5
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • N. Boysen, M. Fliedner, and A. Scholl Sequencing mixed-model assembly lines: survey, classification and model critique European Journal of Operational Research 192 2 2009 349 373
    • (2009) European Journal of Operational Research , vol.192 , Issue.2 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 6
    • 77953684240 scopus 로고    scopus 로고
    • Resource-constrained multi-project scheduling: Priority rule performance revisited
    • T.R. Browning, and A. Yassine Resource-constrained multi-project scheduling: priority rule performance revisited International Journal of Production Economics 126 2 2010 212 228
    • (2010) International Journal of Production Economics , vol.126 , Issue.2 , pp. 212-228
    • Browning, T.R.1    Yassine, A.2
  • 8
    • 0032592184 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: Hybrid genetic search strategies
    • 10.1016/s0360-8352(99)00136-9
    • R. Cheng, M. Gen, and Y. Tsujimura A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: hybrid genetic search strategies Computers and Industrial Engineering 36 2 1999 343 364 10.1016/s0360-8352(99)00136-9
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.2 , pp. 343-364
    • Cheng, R.1    Gen, M.2    Tsujimura, Y.3
  • 10
    • 33644861570 scopus 로고    scopus 로고
    • Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
    • 10.1016/j.ijpe.2005.02.007
    • F.-Y. Ding, J. Zhu, and H. Sun Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives International Journal of Production Economics 102 1 2006 108 131 10.1016/j.ijpe.2005.02.007
    • (2006) International Journal of Production Economics , vol.102 , Issue.1 , pp. 108-131
    • Ding, F.-Y.1    Zhu, J.2    Sun, H.3
  • 11
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • A. Drexl, and J. Grünewald Nonpreemptive multi-mode resource-constrained project scheduling IIE Transactions 25 5 1993 74 81
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 74-81
    • Drexl, A.1    Grünewald, J.2
  • 12
    • 33646399781 scopus 로고    scopus 로고
    • Algorithms for the car sequencing and the level scheduling problem
    • A. Drexl, A. Kimms, and L. Matthie ßen Algorithms for the car sequencing and the level scheduling problem Journal of Scheduling 9 2 2006 153 176
    • (2006) Journal of Scheduling , vol.9 , Issue.2 , pp. 153-176
    • Drexl, A.1    Kimms, A.2    Matthie ßen, L.3
  • 13
    • 38749139204 scopus 로고    scopus 로고
    • A project scheduling problem with labour constraints and time-dependent activities requirements
    • 10.1016/j.ijpe.2006.08.021
    • L.E. Drezet, and J.C. Billaut A project scheduling problem with labour constraints and time-dependent activities requirements International Journal of Production Economics 112 1 2008 217 225 10.1016/j.ijpe.2006.08.021
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 217-225
    • Drezet, L.E.1    Billaut, J.C.2
  • 14
    • 75849116037 scopus 로고    scopus 로고
    • A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
    • S. Elloumi, and P. Fortemps A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem European Journal of Operational Research 205 1 2010 31 41
    • (2010) European Journal of Operational Research , vol.205 , Issue.1 , pp. 31-41
    • Elloumi, S.1    Fortemps, P.2
  • 15
    • 33746841392 scopus 로고    scopus 로고
    • Solving real car sequencing problems with ant colony optimization
    • C.M.G. Gagné, and W. Price Solving real car sequencing problems with ant colony optimization European Journal of Operational Research 174 2006 1427 1448
    • (2006) European Journal of Operational Research , vol.174 , pp. 1427-1448
    • Gagné, C.M.G.1    Price, W.2
  • 16
    • 74149092231 scopus 로고    scopus 로고
    • Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line
    • V. Giard, and J. Jeunet Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line International Journal of Production Economics 123 2 2010 290 300
    • (2010) International Journal of Production Economics , vol.123 , Issue.2 , pp. 290-300
    • Giard, V.1    Jeunet, J.2
  • 17
    • 40849142091 scopus 로고    scopus 로고
    • A genetic algorithm for the resource constrained multi-project scheduling problem
    • J.F. Gonçalves, J. Mendes, and M.G.C. Resende A genetic algorithm for the resource constrained multi-project scheduling problem European Journal of Operational Research 189 3 2008 1171 1190
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 1171-1190
    • Gonçalves, J.F.1    Mendes, J.2    Resende, M.G.C.3
  • 18
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • S. Hartmann, and D. Briskorn A survey of variants and extensions of the resource-constrained project scheduling problem European Journal of Operational Research 207 1 2010 1 14
    • (2010) European Journal of Operational Research , vol.207 , Issue.1 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 19
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • S. Hartmann, and R. Kolisch Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem European Journal of Operational Research 127 2000 394 407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 20
    • 0037448273 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
    • R. Heilmann A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags European Journal of Operational Research 144 2 2003 348 365
    • (2003) European Journal of Operational Research , vol.144 , Issue.2 , pp. 348-365
    • Heilmann, R.1
  • 21
    • 43549084537 scopus 로고    scopus 로고
    • Integration of production sequencing and outbound logistics in the automotive industry
    • 10.1016/j.ijpe.2007.11.003
    • M. Jin, Y. Luo, and S.D. Eksioglu Integration of production sequencing and outbound logistics in the automotive industry International Journal of Production Economics 113 2 2008 766 774 10.1016/j.ijpe.2007.11.003
    • (2008) International Journal of Production Economics , vol.113 , Issue.2 , pp. 766-774
    • Jin, M.1    Luo, Y.2    Eksioglu, S.D.3
  • 23
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • R. Kolisch Efficient priority rules for the resource-constrained project scheduling problem Journal of Operations Management 14 3 1996 179 192
    • (1996) Journal of Operations Management , vol.14 , Issue.3 , pp. 179-192
    • Kolisch, R.1
  • 24
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • R. Kolisch Serial and parallel resource-constrained project scheduling methods revisited: theory and computation European Journal of Operational Research 90 2 1996 320 323
    • (1996) European Journal of Operational Research , vol.90 , Issue.2 , pp. 320-323
    • Kolisch, R.1
  • 26
    • 37349059632 scopus 로고    scopus 로고
    • A tabu search procedure for developing robust predictive project schedules
    • 10.1016/j.ijpe.2007.02.003
    • O. Lambrechts, E. Demeulemeester, and W. Herroelen A tabu search procedure for developing robust predictive project schedules International Journal of Production Economics 111 2 2008 493 508 10.1016/j.ijpe.2007.02.003
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 493-508
    • Lambrechts, O.1    Demeulemeester, E.2    Herroelen, W.3
  • 28
    • 0035599853 scopus 로고    scopus 로고
    • Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
    • A. Lova, and P. Tormos Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling Annals of Operations Research 102 2001 263 286
    • (2001) Annals of Operations Research , vol.102 , pp. 263-286
    • Lova, A.1    Tormos, P.2
  • 29
    • 58949096631 scopus 로고    scopus 로고
    • An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
    • A. Lova, P. Tormos, M. Cervantes, and F. Barber An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes International Journal of Production Economics 117 2 2009 302 316
    • (2009) International Journal of Production Economics , vol.117 , Issue.2 , pp. 302-316
    • Lova, A.1    Tormos, P.2    Cervantes, M.3    Barber, F.4
  • 30
    • 0024749283 scopus 로고
    • Multiple projects - Multiple resources constrained scheduling: A multiobjective analysis
    • R.P. Mohanty, and M.K. Siddiq Multiple projects - multiple resources constrained scheduling: a multiobjective analysis Engineering Costs and Production Economics 18 1 1989 83 92
    • (1989) Engineering Costs and Production Economics , vol.18 , Issue.1 , pp. 83-92
    • Mohanty, R.P.1    Siddiq, M.K.2
  • 36
    • 37849188714 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application
    • S. Voß, and A. Witt Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: a real-world application International Journal of Production Economics 105 2 2007 445 458
    • (2007) International Journal of Production Economics , vol.105 , Issue.2 , pp. 445-458
    • Voß, S.1    Witt, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.