-
1
-
-
78049444992
-
A neurogenetic approach for the resource-constrained project scheduling problem
-
A. Agarwal, S. Colak, and S. Erenguc A neurogenetic approach for the resource-constrained project scheduling problem Computers and Operations Research 38 1 2011 44 50
-
(2011)
Computers and Operations Research
, vol.38
, Issue.1
, pp. 44-50
-
-
Agarwal, A.1
Colak, S.2
Erenguc, S.3
-
2
-
-
40849118104
-
GRASP and path relinking for project scheduling under partially renewable resources
-
R. Alvarez-Valdes, E. Crespo, J.M. Tamarit, and F. Villa GRASP and path relinking for project scheduling under partially renewable resources European Journal of Operational Research 189 3 2008 1153 1170
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.3
, pp. 1153-1170
-
-
Alvarez-Valdes, R.1
Crespo, E.2
Tamarit, J.M.3
Villa, F.4
-
5
-
-
51249121803
-
Sequencing mixed-model assembly lines: Survey, classification and model critique
-
N. Boysen, M. Fliedner, and A. Scholl Sequencing mixed-model assembly lines: survey, classification and model critique European Journal of Operational Research 192 2 2009 349 373
-
(2009)
European Journal of Operational Research
, vol.192
, Issue.2
, pp. 349-373
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
6
-
-
77953684240
-
Resource-constrained multi-project scheduling: Priority rule performance revisited
-
T.R. Browning, and A. Yassine Resource-constrained multi-project scheduling: priority rule performance revisited International Journal of Production Economics 126 2 2010 212 228
-
(2010)
International Journal of Production Economics
, vol.126
, Issue.2
, pp. 212-228
-
-
Browning, T.R.1
Yassine, A.2
-
8
-
-
0032592184
-
A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: Hybrid genetic search strategies
-
10.1016/s0360-8352(99)00136-9
-
R. Cheng, M. Gen, and Y. Tsujimura A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: hybrid genetic search strategies Computers and Industrial Engineering 36 2 1999 343 364 10.1016/s0360-8352(99)00136-9
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.2
, pp. 343-364
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
10
-
-
33644861570
-
Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
-
10.1016/j.ijpe.2005.02.007
-
F.-Y. Ding, J. Zhu, and H. Sun Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives International Journal of Production Economics 102 1 2006 108 131 10.1016/j.ijpe.2005.02.007
-
(2006)
International Journal of Production Economics
, vol.102
, Issue.1
, pp. 108-131
-
-
Ding, F.-Y.1
Zhu, J.2
Sun, H.3
-
11
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
A. Drexl, and J. Grünewald Nonpreemptive multi-mode resource-constrained project scheduling IIE Transactions 25 5 1993 74 81
-
(1993)
IIE Transactions
, vol.25
, Issue.5
, pp. 74-81
-
-
Drexl, A.1
Grünewald, J.2
-
12
-
-
33646399781
-
Algorithms for the car sequencing and the level scheduling problem
-
A. Drexl, A. Kimms, and L. Matthie ßen Algorithms for the car sequencing and the level scheduling problem Journal of Scheduling 9 2 2006 153 176
-
(2006)
Journal of Scheduling
, vol.9
, Issue.2
, pp. 153-176
-
-
Drexl, A.1
Kimms, A.2
Matthie ßen, L.3
-
13
-
-
38749139204
-
A project scheduling problem with labour constraints and time-dependent activities requirements
-
10.1016/j.ijpe.2006.08.021
-
L.E. Drezet, and J.C. Billaut A project scheduling problem with labour constraints and time-dependent activities requirements International Journal of Production Economics 112 1 2008 217 225 10.1016/j.ijpe.2006.08.021
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.1
, pp. 217-225
-
-
Drezet, L.E.1
Billaut, J.C.2
-
14
-
-
75849116037
-
A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
-
S. Elloumi, and P. Fortemps A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem European Journal of Operational Research 205 1 2010 31 41
-
(2010)
European Journal of Operational Research
, vol.205
, Issue.1
, pp. 31-41
-
-
Elloumi, S.1
Fortemps, P.2
-
15
-
-
33746841392
-
Solving real car sequencing problems with ant colony optimization
-
C.M.G. Gagné, and W. Price Solving real car sequencing problems with ant colony optimization European Journal of Operational Research 174 2006 1427 1448
-
(2006)
European Journal of Operational Research
, vol.174
, pp. 1427-1448
-
-
Gagné, C.M.G.1
Price, W.2
-
16
-
-
74149092231
-
Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line
-
V. Giard, and J. Jeunet Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line International Journal of Production Economics 123 2 2010 290 300
-
(2010)
International Journal of Production Economics
, vol.123
, Issue.2
, pp. 290-300
-
-
Giard, V.1
Jeunet, J.2
-
18
-
-
77953872383
-
A survey of variants and extensions of the resource-constrained project scheduling problem
-
S. Hartmann, and D. Briskorn A survey of variants and extensions of the resource-constrained project scheduling problem European Journal of Operational Research 207 1 2010 1 14
-
(2010)
European Journal of Operational Research
, vol.207
, Issue.1
, pp. 1-14
-
-
Hartmann, S.1
Briskorn, D.2
-
19
-
-
0034559432
-
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
-
S. Hartmann, and R. Kolisch Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem European Journal of Operational Research 127 2000 394 407
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 394-407
-
-
Hartmann, S.1
Kolisch, R.2
-
20
-
-
0037448273
-
A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
-
R. Heilmann A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags European Journal of Operational Research 144 2 2003 348 365
-
(2003)
European Journal of Operational Research
, vol.144
, Issue.2
, pp. 348-365
-
-
Heilmann, R.1
-
21
-
-
43549084537
-
Integration of production sequencing and outbound logistics in the automotive industry
-
10.1016/j.ijpe.2007.11.003
-
M. Jin, Y. Luo, and S.D. Eksioglu Integration of production sequencing and outbound logistics in the automotive industry International Journal of Production Economics 113 2 2008 766 774 10.1016/j.ijpe.2007.11.003
-
(2008)
International Journal of Production Economics
, vol.113
, Issue.2
, pp. 766-774
-
-
Jin, M.1
Luo, Y.2
Eksioglu, S.D.3
-
22
-
-
0035612931
-
Simulated annealing for multi-mode resource-constrained project scheduling
-
J. Józefowska, M. Mika, R.G.W. Rózycki, and J. Weglarz Simulated annealing for multi-mode resource-constrained project scheduling Annals of Operations Research 102 1-4 2001 137 155
-
(2001)
Annals of Operations Research
, vol.102
, Issue.14
, pp. 137-155
-
-
Józefowska, J.1
Mika, M.2
Rózycki, R.G.W.3
Weglarz, J.4
-
23
-
-
0030231487
-
Efficient priority rules for the resource-constrained project scheduling problem
-
R. Kolisch Efficient priority rules for the resource-constrained project scheduling problem Journal of Operations Management 14 3 1996 179 192
-
(1996)
Journal of Operations Management
, vol.14
, Issue.3
, pp. 179-192
-
-
Kolisch, R.1
-
24
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
R. Kolisch Serial and parallel resource-constrained project scheduling methods revisited: theory and computation European Journal of Operational Research 90 2 1996 320 323
-
(1996)
European Journal of Operational Research
, vol.90
, Issue.2
, pp. 320-323
-
-
Kolisch, R.1
-
26
-
-
37349059632
-
A tabu search procedure for developing robust predictive project schedules
-
10.1016/j.ijpe.2007.02.003
-
O. Lambrechts, E. Demeulemeester, and W. Herroelen A tabu search procedure for developing robust predictive project schedules International Journal of Production Economics 111 2 2008 493 508 10.1016/j.ijpe.2007.02.003
-
(2008)
International Journal of Production Economics
, vol.111
, Issue.2
, pp. 493-508
-
-
Lambrechts, O.1
Demeulemeester, E.2
Herroelen, W.3
-
27
-
-
78650181236
-
Definition of spacing constraints for the car sequencing problem
-
S. Leserta, G. Alpana, Y. Freina, and S. Noireacuteb Definition of spacing constraints for the car sequencing problem International Journal of Production Research 49 4 2011 963 994
-
(2011)
International Journal of Production Research
, vol.49
, Issue.4
, pp. 963-994
-
-
Leserta, S.1
Alpana, G.2
Freina, Y.3
Noireacuteb, S.4
-
28
-
-
0035599853
-
Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
-
A. Lova, and P. Tormos Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling Annals of Operations Research 102 2001 263 286
-
(2001)
Annals of Operations Research
, vol.102
, pp. 263-286
-
-
Lova, A.1
Tormos, P.2
-
29
-
-
58949096631
-
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
-
A. Lova, P. Tormos, M. Cervantes, and F. Barber An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes International Journal of Production Economics 117 2 2009 302 316
-
(2009)
International Journal of Production Economics
, vol.117
, Issue.2
, pp. 302-316
-
-
Lova, A.1
Tormos, P.2
Cervantes, M.3
Barber, F.4
-
30
-
-
0024749283
-
Multiple projects - Multiple resources constrained scheduling: A multiobjective analysis
-
R.P. Mohanty, and M.K. Siddiq Multiple projects - multiple resources constrained scheduling: a multiobjective analysis Engineering Costs and Production Economics 18 1 1989 83 92
-
(1989)
Engineering Costs and Production Economics
, vol.18
, Issue.1
, pp. 83-92
-
-
Mohanty, R.P.1
Siddiq, M.K.2
-
36
-
-
37849188714
-
Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application
-
S. Voß, and A. Witt Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: a real-world application International Journal of Production Economics 105 2 2007 445 458
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.2
, pp. 445-458
-
-
Voß, S.1
Witt, A.2
|