메뉴 건너뛰기




Volumn 113, Issue 2, 2008, Pages 766-774

Integration of production sequencing and outbound logistics in the automotive industry

Author keywords

Integration; Logistics; Optimization; Production planning; Sequencing

Indexed keywords

DECISION MAKING; INTEGER PROGRAMMING; LOGISTICS; MATHEMATICAL MODELS; PLANNING; PRODUCTION;

EID: 43549084537     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.11.003     Document Type: Article
Times cited : (24)

References (24)
  • 3
    • 0031213490 scopus 로고    scopus 로고
    • Efficient methods for sequencing minimum job sets on mixed model assembly lines
    • Bolat A. Efficient methods for sequencing minimum job sets on mixed model assembly lines. Naval Research Logistics 44 5 (1997) 419-437
    • (1997) Naval Research Logistics , vol.44 , Issue.5 , pp. 419-437
    • Bolat, A.1
  • 6
    • 2542434900 scopus 로고    scopus 로고
    • Strategic capacity planning in supply chain design for a new market opportunity
    • Chauhan S.S., Nagi R., and Proth J. Strategic capacity planning in supply chain design for a new market opportunity. International Journal of Production Research 42 11 (2004) 2197-2206
    • (2004) International Journal of Production Research , vol.42 , Issue.11 , pp. 2197-2206
    • Chauhan, S.S.1    Nagi, R.2    Proth, J.3
  • 7
    • 0023984228 scopus 로고
    • Strategic analysis of integrated production-distribution systems: Models and methods
    • Cohen M.A., and Lee H. Strategic analysis of integrated production-distribution systems: Models and methods. Operations Research 36 2 (1988) 216-228
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 216-228
    • Cohen, M.A.1    Lee, H.2
  • 8
    • 0032628093 scopus 로고    scopus 로고
    • CONWIP-based production lines with multiple bottlenecks: Performance and design implications
    • Dar-El E.M., Herer Y.T., and Masin M. CONWIP-based production lines with multiple bottlenecks: Performance and design implications. IIE Transactions 31 2 (1999) 99-111
    • (1999) IIE Transactions , vol.31 , Issue.2 , pp. 99-111
    • Dar-El, E.M.1    Herer, Y.T.2    Masin, M.3
  • 9
    • 0033356980 scopus 로고    scopus 로고
    • A primal decomposition method for the integrated design of multi-period production-distribution systems
    • Dogan K., and Goetschalckx M. A primal decomposition method for the integrated design of multi-period production-distribution systems. IIE Transactions 31 11 (1999) 1027-1036
    • (1999) IIE Transactions , vol.31 , Issue.11 , pp. 1027-1036
    • Dogan, K.1    Goetschalckx, M.2
  • 10
  • 11
    • 0033339421 scopus 로고    scopus 로고
    • Synchronized development of production, inventory and distribution schedules
    • Fumero F., and Vercellis C. Synchronized development of production, inventory and distribution schedules. Transportation Science 33 3 (1999) 330-340
    • (1999) Transportation Science , vol.33 , Issue.3 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 12
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • Hall N., and Potts C. Supply chain scheduling: Batching and delivery. Operations Research 51 4 (2003) 566-584
    • (2003) Operations Research , vol.51 , Issue.4 , pp. 566-584
    • Hall, N.1    Potts, C.2
  • 13
    • 4644236596 scopus 로고    scopus 로고
    • Production and distribution lot sizing in a two stage supply chain
    • Kaminsky P., and Simchi-Levi D. Production and distribution lot sizing in a two stage supply chain. IIE Transactions 35 11 (2003) 1065-1075
    • (2003) IIE Transactions , vol.35 , Issue.11 , pp. 1065-1075
    • Kaminsky, P.1    Simchi-Levi, D.2
  • 14
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in just-in-time system: a survey
    • Kubiak W. Minimizing variation of production rates in just-in-time system: a survey. European Journal of Operational Research 66 3 (1993) 259-271
    • (1993) European Journal of Operational Research , vol.66 , Issue.3 , pp. 259-271
    • Kubiak, W.1
  • 15
    • 43549089695 scopus 로고    scopus 로고
    • Lei, L., Ruszczynski, A., Liu, S., Park, S., 2005. On the integrated production, inventory and distribution routing problem. Working Paper, Rutgers Business School, Newark.
    • Lei, L., Ruszczynski, A., Liu, S., Park, S., 2005. On the integrated production, inventory and distribution routing problem. Working Paper, Rutgers Business School, Newark.
  • 16
    • 0035130068 scopus 로고    scopus 로고
    • Balancing mixed-model assembly lines to reduce work overload
    • Matanachai S., and Yano C.A. Balancing mixed-model assembly lines to reduce work overload. IIE Transactions 33 1 (2001) 29-42
    • (2001) IIE Transactions , vol.33 , Issue.1 , pp. 29-42
    • Matanachai, S.1    Yano, C.A.2
  • 19
    • 22944440358 scopus 로고    scopus 로고
    • A multi-commodity supply chain design problem
    • Shen Z.M. A multi-commodity supply chain design problem. IIE Transactions 37 8 (2005) 753-762
    • (2005) IIE Transactions , vol.37 , Issue.8 , pp. 753-762
    • Shen, Z.M.1
  • 20
    • 0028508183 scopus 로고
    • Towards a deeper understanding of JIT: A comparison between APICS and logistics managers
    • Spencer M.S., Daugherty P.J., and Rogers D.S. Towards a deeper understanding of JIT: A comparison between APICS and logistics managers. Production and Inventory Management Journal 35 3 (1994) 23-28
    • (1994) Production and Inventory Management Journal , vol.35 , Issue.3 , pp. 23-28
    • Spencer, M.S.1    Daugherty, P.J.2    Rogers, D.S.3
  • 21
    • 0036507643 scopus 로고    scopus 로고
    • Sequencing mixed model assembly lines for a just-in-time production system
    • Ventura J., and Radhakrishnan S. Sequencing mixed model assembly lines for a just-in-time production system. Production Planning and Control 13 2 (2002) 199-210
    • (2002) Production Planning and Control , vol.13 , Issue.2 , pp. 199-210
    • Ventura, J.1    Radhakrishnan, S.2
  • 22
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho P.M., and Simaria A.S. A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations. International Journal of Production Research 40 6 (2002) 1405-1420
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 23
    • 0000298775 scopus 로고
    • Sequencing to minimize work overload in assembly lines with product options
    • Yano C.A., and Rachamadugu R. Sequencing to minimize work overload in assembly lines with product options. Management Science 37 5 (1991) 572-586
    • (1991) Management Science , vol.37 , Issue.5 , pp. 572-586
    • Yano, C.A.1    Rachamadugu, R.2
  • 24
    • 1842454666 scopus 로고    scopus 로고
    • A balancing problem for mixed model assembly lines with a paced moving conveyor
    • Zhao X., Ohno K., and Lau H. A balancing problem for mixed model assembly lines with a paced moving conveyor. Naval Research Logistics 51 3 (2004) 446-464
    • (2004) Naval Research Logistics , vol.51 , Issue.3 , pp. 446-464
    • Zhao, X.1    Ohno, K.2    Lau, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.