메뉴 건너뛰기




Volumn 205, Issue 1, 2010, Pages 31-41

A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem

Author keywords

Bi objective approach; Clustering; Evolutionary algorithms; Multiple modes; Project scheduling; Resource constrained

Indexed keywords

APRIORI; CLUSTERING HEURISTICS; CLUSTERING TECHNIQUES; COMPUTATION TIME; EVOLUTIONARY OPERATORS; FEASIBLE SOLUTION; FITNESS FUNCTIONS; FITNESS VALUES; MAKESPAN; MULTI OBJECTIVE EVOLUTIONARY ALGORITHMS; MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; MULTI-OBJECTIVE GENETIC ALGORITHM; MULTIPLE MODES; NON-RENEWABLE RESOURCE; NP-HARD; OBJECTIVE SPACE; PREMATURE CONVERGENCE; PROJECT SCHEDULING; RESOURCE REQUIREMENTS; SINGLE OBJECTIVE; SOLUTION SET;

EID: 75849116037     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2009.12.014     Document Type: Article
Times cited : (86)

References (41)
  • 1
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • Alcaraz J., Maroto C., and Ruiz R. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of Operation Research Society 54 (2003) 614-626
    • (2003) Journal of Operation Research Society , vol.54 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 4
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor F.F. Heuristics for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research 31 (1993) 2547-2558
    • (1993) International Journal of Production Research , vol.31 , pp. 2547-2558
    • Boctor, F.F.1
  • 5
    • 0030124780 scopus 로고    scopus 로고
    • A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
    • Boctor F.F. A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. European Journal of Operational Research 90 (1996) 349-361
    • (1996) European Journal of Operational Research , vol.90 , pp. 349-361
    • Boctor, F.F.1
  • 6
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • Boctor F.F. Resource-constrained project scheduling by simulated annealing. International Journal of Production Research 34 (1996) 2335-2351
    • (1996) International Journal of Production Research , vol.34 , pp. 2335-2351
    • Boctor, F.F.1
  • 7
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149 (2003) 268-281
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 9
    • 60349124753 scopus 로고    scopus 로고
    • Differential evolution for solving multi-mode resource-constrained project scheduling problems
    • Damak N., Jarboui B., Siarry P., and Loukil T. Differential evolution for solving multi-mode resource-constrained project scheduling problems. Computers and Operations Research 36 (2009) 2653-2659
    • (2009) Computers and Operations Research , vol.36 , pp. 2653-2659
    • Damak, N.1    Jarboui, B.2    Siarry, P.3    Loukil, T.4
  • 11
    • 0033311742 scopus 로고    scopus 로고
    • The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    • De Reyck B., and Herroelen W. The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research 119 (1999) 538-556
    • (1999) European Journal of Operational Research , vol.119 , pp. 538-556
    • De Reyck, B.1    Herroelen, W.2
  • 12
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • Drexl A., and Grüenewald J. Nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 25 (1993) 74-81
    • (1993) IIE Transactions , vol.25 , pp. 74-81
    • Drexl, A.1    Grüenewald, J.2
  • 13
    • 75849156709 scopus 로고    scopus 로고
    • Elloumi, S., Loukil, T., Teghem, J., 2006. Ordonnancement de projets multi-mode sous contraintes de ressources: Un algorithme évolutionnaire basé sur l'information de l'efficacité. ValenSciences, 5. Presses Universitaires de Valenciennes, pp. 237-252.
    • Elloumi, S., Loukil, T., Teghem, J., 2006. Ordonnancement de projets multi-mode sous contraintes de ressources: Un algorithme évolutionnaire basé sur l'information de l'efficacité. ValenSciences, vol. 5. Presses Universitaires de Valenciennes, pp. 237-252.
  • 15
    • 0001953837 scopus 로고
    • Genetic algorithms for multi-objective optimization: Formulation, discussion and generalization
    • Forrest, S, Ed, Morgan Kaufmann, San Mateo, CA, July
    • Fonseca, C.M., Fleming, P.J., 1993. Genetic algorithms for multi-objective optimization: formulation, discussion and generalization. In: Forrest, S. (Ed.), Genetic Algorithms: Proceedings of the Fifth International Conference. Morgan Kaufmann, San Mateo, CA, July.
    • (1993) Genetic Algorithms: Proceedings of the Fifth International Conference
    • Fonseca, C.M.1    Fleming, P.J.2
  • 17
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: a genetic algorithm
    • Hartmann S. Project scheduling with multiple modes: a genetic algorithm. Annals of Operations Research 102 (2001) 111-135
    • (2001) Annals of Operations Research , vol.102 , pp. 111-135
    • Hartmann, S.1
  • 18
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • Hartmann S. A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics 49 (2002) 433-448
    • (2002) Naval Research Logistics , vol.49 , pp. 433-448
    • Hartmann, S.1
  • 19
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: a comparison of exact algorithms
    • Hartmann S., and Drexl A. Project scheduling with multiple modes: a comparison of exact algorithms. Networks 32 (1998) 283-297
    • (1998) Networks , vol.32 , pp. 283-297
    • Hartmann, S.1    Drexl, A.2
  • 20
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • Jarboui B., Damak N., Siarry P., and Rebai A. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation 195 (2008) 299-308
    • (2008) Applied Mathematics and Computation , vol.195 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 23
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. European Journal of Operational Research 90 (1996) 320-333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 24
    • 0031276875 scopus 로고    scopus 로고
    • Local search for nonpreemptive multi-mode resource-constrained project scheduling
    • Kolisch R., and Drexl A. Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 29 (1997) 987-999
    • (1997) IIE Transactions , vol.29 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 26
    • 0042863389 scopus 로고    scopus 로고
    • Rank-density-based multiobjective genetic algorithm and benchmark test function study
    • Lu H., and Yen G.G. Rank-density-based multiobjective genetic algorithm and benchmark test function study. IEEE Transactions on Evolutionary Computation 7 (2003) 325-343
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , pp. 325-343
    • Lu, H.1    Yen, G.G.2
  • 29
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problems
    • Słowiński R., and Wȩglarz J. (Eds), Elsevier
    • Patterson J.H., Słowiński R., Talbot F.B., and Wȩglarz J. An algorithm for a general class of precedence and resource constrained scheduling problems. In: Słowiński R., and Wȩglarz J. (Eds). Advances in Project Scheduling (1989), Elsevier 3-28
    • (1989) Advances in Project Scheduling , pp. 3-28
    • Patterson, J.H.1    Słowiński, R.2    Talbot, F.B.3    Wȩglarz, J.4
  • 30
    • 75849153316 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
    • Patterson J.H., Słowiński R., Talbot F.B., and Wȩglarz J. Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems. European Journal of Operational Research 79 (1990) 49-68
    • (1990) European Journal of Operational Research , vol.79 , pp. 49-68
    • Patterson, J.H.1    Słowiński, R.2    Talbot, F.B.3    Wȩglarz, J.4
  • 31
    • 52049097838 scopus 로고    scopus 로고
    • A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
    • Ranjbar M., De Reyck B., and Kianfar F. A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling. European Journal of Operational Research 193 (2009) 35-48
    • (2009) European Journal of Operational Research , vol.193 , pp. 35-48
    • Ranjbar, M.1    De Reyck, B.2    Kianfar, F.3
  • 32
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
    • Słowiński R. Multiobjective network scheduling with efficient use of renewable and nonrenewable resources. European Journal of Operational Research 7 (1981) 265-273
    • (1981) European Journal of Operational Research , vol.7 , pp. 265-273
    • Słowiński, R.1
  • 33
    • 0043156425 scopus 로고
    • Solving the general project scheduling problem with multiple constrained resources by mathematical programming
    • Słowiński R., and Wȩglarz J. Solving the general project scheduling problem with multiple constrained resources by mathematical programming. Lecture Notes in Control and Information System 7 (1978) 278-289
    • (1978) Lecture Notes in Control and Information System , vol.7 , pp. 278-289
    • Słowiński, R.1    Wȩglarz, J.2
  • 35
    • 21344485821 scopus 로고
    • Resource-Constrained Project Scheduling: Exact Methods for the Multi-mode Case
    • Springer, Berlin
    • Sprecher, A., 1994. Resource-Constrained Project Scheduling: Exact Methods for the Multi-mode Case. Lecture Notes in Economics and Mathematical Systems, vol. 409. Springer, Berlin.
    • (1994) Lecture Notes in Economics and Mathematical Systems , vol.409
    • Sprecher, A.1
  • 36
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a simple general and powerful sequencing algorithm
    • Sprecher A., and Drexl A. Multi-mode resource-constrained project scheduling by a simple general and powerful sequencing algorithm. European Journal of Operational Research 107 (1998) 431-450
    • (1998) European Journal of Operational Research , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 37
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • Sprecher A., Hartmann S., and Drexl A. An exact algorithm for project scheduling with multiple modes. OR Spektrum 19 (1997) 195-203
    • (1997) OR Spektrum , vol.19 , pp. 195-203
    • Sprecher, A.1    Hartmann, S.2    Drexl, A.3
  • 38
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case
    • Talbot F.B. Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case. Management Science 28 (1982) 1197-1210
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 39
    • 33745766181 scopus 로고    scopus 로고
    • A Hybrid Genetic Algorithm for the RCPSP
    • Technical Report, Department of Statistics and Operations Research, University of Valencia
    • Valls, V., Ballestin, F., Quintanilla, M.S., 2003. A Hybrid Genetic Algorithm for the RCPSP. Technical Report, Department of Statistics and Operations Research, University of Valencia.
    • (2003)
    • Valls, V.1    Ballestin, F.2    Quintanilla, M.S.3
  • 41
    • 0019049127 scopus 로고
    • Multiprocessor scheduling with memory allocation: a deterministic approach
    • Wȩglarz J. Multiprocessor scheduling with memory allocation: a deterministic approach. IEEE Transactions on Computers 29 (1980) 703-709
    • (1980) IEEE Transactions on Computers , vol.29 , pp. 703-709
    • Wȩglarz, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.