메뉴 건너뛰기




Volumn 120, Issue 2, 2009, Pages 463-475

Constraint programming for project-driven manufacturing

Author keywords

Constraint satisfaction problems; Decision support system; Production modeling; Scheduling

Indexed keywords

BUILD-TO-ORDER; COMBINATORIAL PROBLEM; CONSTRAINT PROGRAMMING; CONSTRAINT SATISFACTION PROBLEMS; EFFICIENT DECOMPOSITION; MAKE TO ORDER; MODELING FRAMEWORKS; MULTI-PROJECT ENVIRONMENT; NEW PRODUCTION; NEW PROJECTS; PRODUCTION MODELING; RESOURCE MANAGEMENT; SEARCH TREES; SMALL AND MEDIUM-SIZE ENTERPRISE; TASK-SCHEDULING;

EID: 67651165059     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2008.12.016     Document Type: Article
Times cited : (30)

References (42)
  • 2
    • 84889485189 scopus 로고    scopus 로고
    • Alba, E, Ed, Wiley, New York
    • Alba, E. (Ed.), 2005. Parallel Metaheuristics. Wiley, New York.
    • (2005) Parallel Metaheuristics
  • 7
    • 33847273864 scopus 로고    scopus 로고
    • Banaszak, Z.A, Józefowska, J, Eds, WNT, Warsaw
    • Banaszak, Z.A., Józefowska, J. (Eds.), 2003. Project Driven Manufacturing. WNT, Warsaw.
    • (2003) Project Driven Manufacturing
  • 8
    • 33751515856 scopus 로고    scopus 로고
    • Project-driven planning and scheduling support for virtual manufacturing
    • Banaszak Z.A., and Zaremba M.B. Project-driven planning and scheduling support for virtual manufacturing. Journal of Intelligent Manufacturing 17 6 (2006) 641-651
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.6 , pp. 641-651
    • Banaszak, Z.A.1    Zaremba, M.B.2
  • 9
    • 84955306649 scopus 로고    scopus 로고
    • Banaszak, Z.A., 2006. CP-based decision support for project-driven manufacturing. In: Perspectives in Modern Project Scheduling. Springer, New York, pp. 409-437.
    • Banaszak, Z.A., 2006. CP-based decision support for project-driven manufacturing. In: Perspectives in Modern Project Scheduling. Springer, New York, pp. 409-437.
  • 13
    • 0035708796 scopus 로고    scopus 로고
    • Project contracts and payment schedules: the client's problem
    • Dayanand N., and Padman J.H. Project contracts and payment schedules: the client's problem. Management Science 47 12 (2001) 1654-1667
    • (2001) Management Science , vol.47 , Issue.12 , pp. 1654-1667
    • Dayanand, N.1    Padman, J.H.2
  • 16
    • 38749139204 scopus 로고    scopus 로고
    • A project scheduling problem with labor constraints and time-dependent activities requirements
    • Drezet L.-E., and Billaut J.-C. A project scheduling problem with labor constraints and time-dependent activities requirements. International Journal of Production Economics 112 (2008) 217-225
    • (2008) International Journal of Production Economics , vol.112 , pp. 217-225
    • Drezet, L.-E.1    Billaut, J.-C.2
  • 17
    • 0037448864 scopus 로고    scopus 로고
    • ERP: developments and directions for operations management research
    • Jacobs R., and Bendoly E. ERP: developments and directions for operations management research. European Journal of Operational Research (2003) 233-240
    • (2003) European Journal of Operational Research , pp. 233-240
    • Jacobs, R.1    Bendoly, E.2
  • 19
    • 67651199348 scopus 로고    scopus 로고
    • A project-oriented decision support system for production planning in make-to-order manufacturing
    • Kis T., Ërdos G., Markus A., and Vancza J. A project-oriented decision support system for production planning in make-to-order manufacturing. ERCIM News 58 (2004) 66
    • (2004) ERCIM News , vol.58 , pp. 66
    • Kis, T.1    Ërdos, G.2    Markus, A.3    Vancza, J.4
  • 21
    • 0034559445 scopus 로고    scopus 로고
    • A multi-criteria heuristic method to improve resource allocation in multi-project scheduling
    • Lova A., Maroto C., and Tormos P. A multi-criteria heuristic method to improve resource allocation in multi-project scheduling. European Journal of Operational Research 127 (2000) 408-424
    • (2000) European Journal of Operational Research , vol.127 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 23
    • 21344453725 scopus 로고    scopus 로고
    • Focused simulated annealing search: an application to job shop scheduling
    • Norman S., and Nakakuki Y. Focused simulated annealing search: an application to job shop scheduling. Annals of Operations Research 60 (1996) 77-103
    • (1996) Annals of Operations Research , vol.60 , pp. 77-103
    • Norman, S.1    Nakakuki, Y.2
  • 24
    • 67651193336 scopus 로고    scopus 로고
    • Application of fuzzy inference systems and genetic algorithms in integrated process planning and scheduling
    • Othman Z., Subari K., and Morad N. Application of fuzzy inference systems and genetic algorithms in integrated process planning and scheduling. International Journal of Computer, Internet and Management 10 2 (2002) 81-96
    • (2002) International Journal of Computer, Internet and Management , vol.10 , Issue.2 , pp. 81-96
    • Othman, Z.1    Subari, K.2    Morad, N.3
  • 26
    • 33947502562 scopus 로고    scopus 로고
    • Model-driven decision support systems: concepts and research directions
    • Powder D.J., and Sharda R. Model-driven decision support systems: concepts and research directions. Decision Support Systems 43 3 (2007) 1044-1061
    • (2007) Decision Support Systems , vol.43 , Issue.3 , pp. 1044-1061
    • Powder, D.J.1    Sharda, R.2
  • 28
    • 0034813379 scopus 로고    scopus 로고
    • Application of Petri nets and genetic algorithms to multi-mode multi-resource constrained project scheduling
    • Reddy J.P., Kumanan S., and Chetty O.V.K. Application of Petri nets and genetic algorithms to multi-mode multi-resource constrained project scheduling. International Journal of Advanced Manufacturing Technology 17 (2001) 305-314
    • (2001) International Journal of Advanced Manufacturing Technology , vol.17 , pp. 305-314
    • Reddy, J.P.1    Kumanan, S.2    Chetty, O.V.K.3
  • 30
    • 33748706709 scopus 로고    scopus 로고
    • Rossi, F, Van Beek, P, Walsh, T, Eds, Elsevier, Oxford
    • Rossi, F., Van Beek, P., Walsh, T. (Eds.), 2006. Handbook of Constraint Programming. Elsevier, Oxford.
    • (2006) Handbook of Constraint Programming
  • 31
    • 0030246423 scopus 로고    scopus 로고
    • Variable and value ordering heuristics for the job shop scheduling constraint satisfaction problem
    • Sadeh N.M., and Fox M.S. Variable and value ordering heuristics for the job shop scheduling constraint satisfaction problem. Artificial Intelligence 86 1 (1996) 1-41
    • (1996) Artificial Intelligence , vol.86 , Issue.1 , pp. 1-41
    • Sadeh, N.M.1    Fox, M.S.2
  • 34
    • 33947538715 scopus 로고    scopus 로고
    • Models for global constraint applications
    • Simonis H. Models for global constraint applications. Constraints 12 1 (2007) 63-92
    • (2007) Constraints , vol.12 , Issue.1 , pp. 63-92
    • Simonis, H.1
  • 36
    • 48249084195 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
    • Tseng C.T., and Liao C.J. A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks. International Journal of Production Research 46 17 (2008) 4655-4670
    • (2008) International Journal of Production Research , vol.46 , Issue.17 , pp. 4655-4670
    • Tseng, C.T.1    Liao, C.J.2
  • 37
    • 34250155324 scopus 로고    scopus 로고
    • An emergent synthesis approach to simultaneous process planning and scheduling
    • Ueda K., Fujii N., and Inoue R. An emergent synthesis approach to simultaneous process planning and scheduling. CIRP Annals-Manufacturing Technology 56 1 (2007) 463-466
    • (2007) CIRP Annals-Manufacturing Technology , vol.56 , Issue.1 , pp. 463-466
    • Ueda, K.1    Fujii, N.2    Inoue, R.3
  • 39
    • 57049118551 scopus 로고    scopus 로고
    • Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
    • Vinod V., and Sridharan R. Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times. International Journal of Production Research 47 6 (2009) 1425-1447
    • (2009) International Journal of Production Research , vol.47 , Issue.6 , pp. 1425-1447
    • Vinod, V.1    Sridharan, R.2
  • 42
    • 0000414908 scopus 로고
    • Applications of neural networks in manufacturing: a state-of-the-art survey
    • Zhang H.C., and Huang S.H. Applications of neural networks in manufacturing: a state-of-the-art survey. International Journal of Production Research 33 3 (1995) 705-728
    • (1995) International Journal of Production Research , vol.33 , Issue.3 , pp. 705-728
    • Zhang, H.C.1    Huang, S.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.