메뉴 건너뛰기




Volumn 9, Issue 2, 2006, Pages 153-176

Algorithms for the car sequencing and the level scheduling problem

Author keywords

Bounding; Branching; Car sequencing; Computational results; Level scheduling

Indexed keywords

ALGORITHMS; COMPUTATION THEORY; CONSTRAINT THEORY; GROUND VEHICLES; PROBLEM SOLVING; SCHEDULING;

EID: 33646399781     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-006-7186-9     Document Type: Article
Times cited : (49)

References (21)
  • 1
    • 0000363908 scopus 로고
    • Sequencing mixed-model assembly lines to level parts usage and minimize line length
    • Bard, J. F., A. Shtub, and S. B. Josh, "Sequencing mixed-model assembly lines to level parts usage and minimize line length," International Journal of Production Research, 32, 2431-2454 (1994).
    • (1994) International Journal of Production Research , vol.32 , pp. 2431-2454
    • Bard, J.F.1    Shtub, A.2    Josh, S.B.3
  • 2
    • 0031213490 scopus 로고    scopus 로고
    • Efficient methods for sequencing minimum job sets on mixed model assembly lines
    • Bolat, A., "Efficient methods for sequencing minimum job sets on mixed model assembly lines," Naval Research Logistics. 44, 419-137 (1997).
    • (1997) Naval Research Logistics , vol.44 , pp. 419-1137
    • Bolat, A.1
  • 4
    • 0008553293 scopus 로고
    • Materialflußorientierte produktionssteuerung bei variantenfließfertigung
    • Drexl, A. and C. Jordan, "Materialflußorientierte Produktionssteuerung bei Variantenfließfertigung," Zeitschtifi für betriebswirtschaftliche Forschung. 47, 1073-1087 (1995).
    • (1995) Zeitschtifi für Betriebswirtschaftliche Forschung , vol.47 , pp. 1073-1087
    • Drexl, A.1    Jordan, C.2
  • 5
    • 0035295083 scopus 로고    scopus 로고
    • Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
    • Drexl, A. and A. Kimms, "Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints," Management Science, 47, 489-491 (2001).
    • (2001) Management Science , vol.47 , pp. 489-491
    • Drexl, A.1    Kimms, A.2
  • 6
    • 0001602291 scopus 로고
    • Sequencing JIT mixed-model assembly lines
    • Inman, R. R. and R. L. Bulfin, "Sequencing JIT mixed-model assembly lines," Management Science, 37, 901-904 (1991).
    • (1991) Management Science , vol.37 , pp. 901-904
    • Inman, R.R.1    Bulfin, R.L.2
  • 7
    • 0030398997 scopus 로고    scopus 로고
    • Sequencing in mixed model assembly lines: A genetic algorithm approach
    • Kim, Y. K., C. J. Hyun, and Y. Kim, "Sequencing in mixed model assembly lines: A genetic algorithm approach," Computers & Operations Research, 23, 1131-1145 (1996).
    • (1996) Computers & Operations Research , vol.23 , pp. 1131-1145
    • Kim, Y.K.1    Hyun, C.J.2    Kim, Y.3
  • 8
    • 2042505081 scopus 로고    scopus 로고
    • On the complexity of the car sequencing problem
    • Kis, T., "On the complexity of the car sequencing problem," Operations Research Letters, 32, 331-335 (2004).
    • (2004) Operations Research Letters , vol.32 , pp. 331-335
    • Kis, T.1
  • 9
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in just-in-time systems: A survey
    • Kubiak, W., "Minimizing variation of production rates in just-in-time systems: a survey," European Journal of Operational Research, 66, 259-271 (1993).
    • (1993) European Journal of Operational Research , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 10
    • 0025868004 scopus 로고
    • A note on 'Level schedules for mixed-model assembly lines in just-in-time production systems'
    • Kubiak, W., S. Sethi, "A note on 'Level schedules for mixed-model assembly lines in just-in-time production systems'," Management Science, 37, 121-122 (1991).
    • (1991) Management Science , vol.37 , pp. 121-122
    • Kubiak, W.1    Sethi, S.2
  • 11
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • Miltenburg, G. J., "Level schedules for mixed-model assembly lines in just-in-time production systems," Management Science, 35, 192-207 (1989).
    • (1989) Management Science , vol.35 , pp. 192-207
    • Miltenburg, G.J.1
  • 13
    • 0008553295 scopus 로고
    • CAR WARS: The (almost) birth of an expert system
    • Parello, B. D. "CAR WARS: The (almost) birth of an expert system," AI Expert, 3, 60-64 (1988).
    • (1988) AI Expert , vol.3 , pp. 60-64
    • Parello, B.D.1
  • 14
    • 0022953553 scopus 로고
    • Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem
    • Parello, B. D., W. C. Kabat, and L. Wos, "Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem," Journal of Automated Reasoning. 2, 1-42 (1986).
    • (1986) Journal of Automated Reasoning , vol.2 , pp. 1-42
    • Parello, B.D.1    Kabat, W.C.2    Wos, L.3
  • 16
    • 0027614669 scopus 로고
    • Level schedules for mixed-model, just-in-time processes
    • Steiner, G.and J. S. Yeomans, "Level schedules for mixed-model, just-in-time processes," Management Science, 39, 728-735 (1993).
    • (1993) Management Science , vol.39 , pp. 728-735
    • Steiner, G.1    Yeomans, J.S.2
  • 17
    • 0030290584 scopus 로고    scopus 로고
    • Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication
    • Sumichrast, R. T. and E. R. Clayton, "Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication," International Journal of Production Research, 34, 3125-3143 (1996).
    • (1996) International Journal of Production Research , vol.34 , pp. 3125-3143
    • Sumichrast, R.T.1    Clayton, E.R.2
  • 18
    • 0029276137 scopus 로고
    • Mixed-model sequencing to minimize utility work and the risk of conveyor stopping
    • Tsai, L.-H. "Mixed-model sequencing to minimize utility work and the risk of conveyor stopping," Management Science, 41, 485-495 (1995).
    • (1995) Management Science , vol.41 , pp. 485-495
    • Tsai, L.-H.1
  • 19
    • 0000298775 scopus 로고
    • Sequencing to minimize work overload in assembly lines with product options
    • Yano, C. A. and R. M. V. Raehamadugu, "Sequencing to minimize work overload in assembly lines with product options," Management Science, 37, 572-586 (1991).
    • (1991) Management Science , vol.37 , pp. 572-586
    • Yano, C.A.1    Raehamadugu, R.M.V.2
  • 21
    • 0034135513 scopus 로고    scopus 로고
    • Mixed-model assembly line scheduling using the Lagrangian relaxation technique
    • Zhang, Y., P. B. Luh, K. Yoneda, T. Kano, and Y. Kyoya, "Mixed-model assembly line scheduling using the Lagrangian relaxation technique," IIE Transactions. 32, 125-134 (2000).
    • (2000) IIE Transactions , vol.32 , pp. 125-134
    • Zhang, Y.1    Luh, P.B.2    Yoneda, K.3    Kano, T.4    Kyoya, Y.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.