메뉴 건너뛰기




Volumn 58, Issue 5-8, 2012, Pages 727-740

An improved genetic algorithm for integrated process planning and scheduling

Author keywords

Improved genetic algorithm; Integrated process planning and scheduling; Process planning; Scheduling

Indexed keywords

EXPERIMENTAL STUDIES; GENETIC OPERATORS; GENETIC REPRESENTATIONS; IMPROVED GENETIC ALGORITHMS; INTEGRATED PROCESS PLANNING AND SCHEDULING; MAKESPAN; MANUFACTURING PROCESS; MANUFACTURING SYSTEM; MEAN FLOW TIME; MINIMIZING MAKESPAN; PERFORMANCE IMPROVEMENTS; PLANNING AND SCHEDULING; PROCESS PLAN; SELECTION METHODS;

EID: 84856002518     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3409-0     Document Type: Article
Times cited : (81)

References (39)
  • 2
    • 0013278675 scopus 로고
    • Decision making on the factory floor: An integrated approach to process planning and scheduling
    • 10.1016/0736-5845(84)90020-6
    • Chryssolouris G, Chan S, Cobb W (1984) Decision making on the factory floor: an integrated approach to process planning and scheduling. Robot Comput Integr Manuf 3/4:315-319
    • (1984) Robot Comput Integr Manuf , vol.34 , pp. 315-319
    • Chryssolouris, G.1    Chan, S.2    Cobb, W.3
  • 3
    • 79953758495 scopus 로고    scopus 로고
    • On-line integration of a process planning module with production scheduling
    • 10.1007/BF01179808
    • Mamalis AG, Malagardis I, Kambouris K (1996) On-line integration of a process planning module with production scheduling. Int J Adv Manuf Technol 12:330-338
    • (1996) Int J Adv Manuf Technol , vol.12 , pp. 330-338
    • Mamalis, A.G.1    Malagardis, I.2    Kambouris, K.3
  • 4
    • 0038787545 scopus 로고    scopus 로고
    • A holonic architecture of the concurrent integrated process planning system
    • 10.1016/S0924-0136(03)00233-4
    • Zhang J, Gao L, Chan F (2003) A holonic architecture of the concurrent integrated process planning system. J Mater Process Technol 139:267-272
    • (2003) J Mater Process Technol , vol.139 , pp. 267-272
    • Zhang, J.1    Gao, L.2    Chan, F.3
  • 5
    • 2142757359 scopus 로고    scopus 로고
    • Modeling integrated CAPP/PPS systems
    • 10.1016/j.cie.2003.12.003
    • Liu M, Bai L, Zhang SS (2004) Modeling integrated CAPP/PPS systems. Comput Ind Eng 46:275-283
    • (2004) Comput Ind Eng , vol.46 , pp. 275-283
    • Liu, M.1    Bai, L.2    Zhang, S.S.3
  • 6
    • 34248206715 scopus 로고    scopus 로고
    • A novel function block based integration approach to process planning and scheduling with execution control
    • Wang LH, Song YJ, Shen WM (2007) A novel function block based integration approach to process planning and scheduling with execution control. Int J Manuf Technol Manag 11(2):228-250
    • (2007) Int J Manuf Technol Manag , vol.11 , Issue.2 , pp. 228-250
    • Wang, L.H.1    Song, Y.J.2    Shen, W.M.3
  • 7
  • 8
    • 0035247355 scopus 로고    scopus 로고
    • Prototype of a feature-based multiple-alternative process planning system with scheduling verification
    • DOI 10.1016/S0360-8352(00)00071-1
    • Yang YN, Parsaei HR, Leep HR (2001) A prototype of a feature-based multiple-alternative process planning system with scheduling verification. Comput Ind Eng 39:109-124 (Pubitemid 32263384)
    • (2001) Computers and Industrial Engineering , vol.39 , Issue.1-2 , pp. 109-124
    • Yang, Y.-N.1    Parsaei, H.R.2    Leep, H.R.3
  • 9
    • 17844376511 scopus 로고    scopus 로고
    • Integration of the CAD/CAPP/PPC systems
    • DOI 10.1016/j.jmatprotec.2005.02.036, PII S0924013605000865, AMPT/ANMEOS Part 2
    • Grabowik C, Kalinowski K, Monica Z (2005) Integration of the CAD/CAPP/PPC systems. J Mater Process Technol 164-165:1358-1368 (Pubitemid 40584553)
    • (2005) Journal of Materials Processing Technology , vol.164-165 , pp. 1358-1368
    • Grabowik, C.1    Kalinowski, K.2    Monica, Z.3
  • 10
    • 56549112491 scopus 로고    scopus 로고
    • Integration of process planning and scheduling-a modified genetic algorithm-based approach
    • 1179.90153 10.1016/j.cor.2008.07.006
    • Shao XY, Li XY, Gao L, Zhang CY (2009) Integration of process planning and scheduling-a modified genetic algorithm-based approach. Comput Oper Res 36:2082-2096
    • (2009) Comput Oper Res , vol.36 , pp. 2082-2096
    • Shao, X.Y.1    Li, X.Y.2    Gao, L.3    Zhang, C.Y.4
  • 11
    • 0035175069 scopus 로고    scopus 로고
    • Integration of process planning and scheduling using simulation based genetic algorithms
    • DOI 10.1007/s001700170035
    • Lee H, Kim SS (2001) Integration of process planning and scheduling using simulation based genetic algorithms. Int J Adv Manuf Technol 18:586-590 (Pubitemid 33074064)
    • (2001) International Journal of Advanced Manufacturing Technology , vol.18 , Issue.8 , pp. 586-590
    • Lee, H.1    Kim, S.-S.2
  • 12
    • 0038449844 scopus 로고    scopus 로고
    • A multi-agent based manufacturing control strategy for responsive manufacturing
    • 10.1016/S0924-0136(03)00535-1
    • Lim MK, Zhang DZ (2003) A multi-agent based manufacturing control strategy for responsive manufacturing. J Mater Process Technol 139:379-384
    • (2003) J Mater Process Technol , vol.139 , pp. 379-384
    • Lim, M.K.1    Zhang, D.Z.2
  • 13
    • 2042478705 scopus 로고    scopus 로고
    • An integrated agent-based approach for responsive control of manufacturing resources
    • 10.1016/j.cie.2003.12.006
    • Lim MK, Zhang DZ (2004) An integrated agent-based approach for responsive control of manufacturing resources. Comput Ind Eng 46:221-232
    • (2004) Comput Ind Eng , vol.46 , pp. 221-232
    • Lim, M.K.1    Zhang, D.Z.2
  • 14
    • 32644476109 scopus 로고    scopus 로고
    • An agent-based negotiation approach to integrate process planning and scheduling
    • DOI 10.1080/00207540500409723, PII U775X356952466
    • Wong TN, Leung CW, Mak KL, Fung RYK (2006) An agent-based negotiation approach to integrate process planning and scheduling. Int J Prod Res 44(7):1331-1351 (Pubitemid 43245719)
    • (2006) International Journal of Production Research , vol.44 , Issue.7 , pp. 1331-1351
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 15
    • 33746794581 scopus 로고    scopus 로고
    • Integrated process planning and scheduling/rescheduling - An agent-based approach
    • DOI 10.1080/00207540600675801, PII U626203746486R74
    • Wong TN, Leung CW, Mak KL, Fung RYK (2006) Integrated process planning and scheduling/rescheduling-an agent-based approach. Int J Prod Res 44(18-19):3627-3655 (Pubitemid 44181115)
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3627-3655
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 16
    • 33744827670 scopus 로고    scopus 로고
    • Dynamic shopfloor scheduling in multi-agent manufacturing systems
    • DOI 10.1016/j.eswa.2005.09.073, PII S0957417405002629
    • Wong TN, Leung CW, Fung RYK (2006) Dynamic shop floor scheduling in multi-agent manufacturing system. Exp System App 31:486-494 (Pubitemid 43831628)
    • (2006) Expert Systems with Applications , vol.31 , Issue.3 , pp. 486-494
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 17
    • 77955268719 scopus 로고    scopus 로고
    • Integrated process planning and scheduling by an agent-based ant colony optimization
    • 10.1016/j.cie.2009.09.003
    • Leung CW, Wong TN, Mak KL, Fung RYK (2010) Integrated process planning and scheduling by an agent-based ant colony optimization. Comput Ind Eng 59:166-180
    • (2010) Comput Ind Eng , vol.59 , pp. 166-180
    • Leung, C.W.1    Wong, T.N.2    Mak, K.L.3    Fung, R.Y.K.4
  • 18
    • 46749150544 scopus 로고    scopus 로고
    • Bidding-based multi-agent system for integrated process planning and scheduling a data mining and hybrid tabu-SA algorithm-oriented approach
    • 10.1007/s00170-007-1087-8
    • Shukla SK, Tiwari MK, Son YJ (2008) Bidding-based multi-agent system for integrated process planning and scheduling a data mining and hybrid tabu-SA algorithm-oriented approach. Int J Adv Manuf Technol 38:163-175
    • (2008) Int J Adv Manuf Technol , vol.38 , pp. 163-175
    • Shukla, S.K.1    Tiwari, M.K.2    Son, Y.J.3
  • 19
    • 71749109550 scopus 로고    scopus 로고
    • An agent-based approach for integrated process planning and scheduling
    • 10.1016/j.eswa.2009.06.014
    • Li XY, Zhang CY, Gao L, Li WD, Shao XY (2010) An agent-based approach for integrated process planning and scheduling. Exp System App 37:1256-1264
    • (2010) Exp System App , vol.37 , pp. 1256-1264
    • Li, X.Y.1    Zhang, C.Y.2    Gao, L.3    Li, W.D.4    Shao, X.Y.5
  • 21
    • 4344620927 scopus 로고    scopus 로고
    • A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
    • 10.1023/B:JIMS.0000037710.80847.b6
    • Tan W, Khoshnevis B (2004) A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. J Intell Manuf 15:593-605
    • (2004) J Intell Manuf , vol.15 , pp. 593-605
    • Tan, W.1    Khoshnevis, B.2
  • 22
    • 33751504128 scopus 로고    scopus 로고
    • A simulated annealing-based optimization approach for integrated process planning and scheduling
    • DOI 10.1080/09511920600667366, PII K065652240N11240
    • Li WD, McMahon CA (2007) A simulated annealing-based optimization approach for integrated process planning and scheduling. Intl J Comput Integr Manuf 20(1):80-95 (Pubitemid 44838081)
    • (2007) International Journal of Computer Integrated Manufacturing , vol.20 , Issue.1 , pp. 80-95
    • Li, W.D.1    McMahon, C.A.2
  • 23
    • 77953685044 scopus 로고    scopus 로고
    • An effective hybrid algorithm for integrated process planning and scheduling
    • 10.1016/j.ijpe.2010.04.001
    • Li XY, Shao XY, Gao L, Qian WR (2010) An effective hybrid algorithm for integrated process planning and scheduling. Int J Prod Eco 126:289-298
    • (2010) Int J Prod Eco , vol.126 , pp. 289-298
    • Li, X.Y.1    Shao, X.Y.2    Gao, L.3    Qian, W.R.4
  • 24
    • 70350568684 scopus 로고    scopus 로고
    • Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling
    • 1175.90176 10.1016/j.cor.2009.06.008
    • Li XY, Shao XY, Zhang CY (2010) Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling. Comput Ope Res 37:656-667
    • (2010) Comput Ope Res , vol.37 , pp. 656-667
    • Li, X.Y.1    Shao, X.Y.2    Zhang, C.Y.3
  • 25
    • 0036642688 scopus 로고    scopus 로고
    • Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
    • DOI 10.1016/S0360-8352(02)00078-5, PII S0360835202000785
    • Moon C, Kim J, Hur S (2002) Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain. Comput Ind Eng 43:331-349 (Pubitemid 34551916)
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 331-349
    • Moon, C.1    Kim, J.2    Hur, S.3
  • 26
    • 14044262817 scopus 로고    scopus 로고
    • Evolutionary algorithm for advanced process planning and scheduling in a multi-plant
    • DOI 10.1016/j.cie.2005.01.016, PII S0360835205000173
    • Moon C, Seo Y (2005) Evolutionary algorithm for advanced process planning and scheduling in a multi-plant. Comput Integ Eng 48:311-325 (Pubitemid 40274927)
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.2 , pp. 311-325
    • Moon, C.1    Seo, Y.2
  • 27
    • 41449093762 scopus 로고    scopus 로고
    • Integrated process planning and scheduling in a supply chain
    • DOI 10.1016/j.cie.2007.06.018, PII S0360835207001088
    • Moon C, Lee YH, Jeong CS, Yun YS (2008) Integrated process planning and scheduling in a supply chain. Comput Ind Eng 54:1048-1061 (Pubitemid 351458373)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 1048-1061
    • Moon, C.1    Lee, Y.H.2    Jeong, C.S.3    Yun, Y.4
  • 28
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • DOI 10.1016/S0305-0548(02)00063-1, PII S0305054802000631
    • Kim YK, Park K, Ko J (2003) A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comput Ope Res 30:1151-1171 (Pubitemid 36346002)
    • (2003) Computers and Operations Research , vol.30 , Issue.8 , pp. 1151-1171
    • Kim, Y.K.1    Park, K.2    Ko, J.3
  • 29
    • 79958849983 scopus 로고    scopus 로고
    • Manufacturing process modeling using process specification language
    • 10.1007/s00170-010-3115-3 doi:
    • Qiao LH, Kao ST, Zhang YZ (2011) Manufacturing process modeling using process specification language. Int J Adv Manuf Technol. doi: 10.1007/s00170-010-3115-3
    • (2011) Int J Adv Manuf Technol
    • Qiao, L.H.1    Kao, S.T.2    Zhang, Y.Z.3
  • 30
    • 0028413979 scopus 로고
    • FMS scheduling using Petri nets and heuristic search
    • 10.1109/70.282537
    • Lee DY, Dicesare F (1994) FMS scheduling using Petri nets and heuristic search. IEEE Transa Robot Autom 10(2):123-132
    • (1994) IEEE Transa Robot Autom , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    Dicesare, F.2
  • 31
    • 0032121917 scopus 로고    scopus 로고
    • Improving the performances of part dispatching based on multiple process plans using graph theory
    • Yang Z, Qiao L, Jiang L (1998) Improving the performances of part dispatching based on multiple process plans using graph theory. Int J Prod Res 36(7):1987-2003 (Pubitemid 128553236)
    • (1998) International Journal of Production Research , vol.36 , Issue.7 , pp. 1987-2003
    • Yang, Z.1    Qiao, L.2    Jiang, L.3
  • 32
    • 0030270466 scopus 로고    scopus 로고
    • Solving cell formation problems in a manufacturing environment with flexible processing and routeing capabilities
    • Ho YC, Moodie CL (1996) Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. Int J Prod Res 34:2901-2923 (Pubitemid 126519746)
    • (1996) International Journal of Production Research , vol.34 , Issue.10 , pp. 2901-2923
    • Ho, Y.-C.1    Moodie, C.L.2
  • 33
    • 0033093715 scopus 로고    scopus 로고
    • Production scheduling and rescheduling with genetic algorithms
    • 10.1162/evco.1999.7.1.1
    • Bierwirth C, Mattfeld DC (1999) Production scheduling and rescheduling with genetic algorithms. Evol Comput 7:1-17
    • (1999) Evol Comput , vol.7 , pp. 1-17
    • Bierwirth, C.1    Mattfeld, D.C.2
  • 35
    • 0346077605 scopus 로고
    • A decision-making approach to the operation of flexible manufacturing systems
    • 10.1007/BF01324885
    • Chryssolouris G, Pierce JE, Dicke K (1992) A decision-making approach to the operation of flexible manufacturing systems. Int J Flex Manuf Sys 3(4):309-330
    • (1992) Int J Flex Manuf Sys , vol.3 , Issue.4 , pp. 309-330
    • Chryssolouris, G.1    Pierce, J.E.2    Dicke, K.3
  • 37
    • 0024175169 scopus 로고
    • Process planning and scheduling
    • 10.1016/0360-8352(88)90102-7
    • Sundaram RM, Fu SS (1988) Process planning and scheduling. Comput Ind Eng 15:296-307
    • (1988) Comput Ind Eng , vol.15 , pp. 296-307
    • Sundaram, R.M.1    Fu, S.S.2
  • 38
    • 0000481860 scopus 로고    scopus 로고
    • A simulated annealing approach to integrated production scheduling
    • 1441125 10.1007/BF00118077
    • Palmer GJ (1996) A simulated annealing approach to integrated production scheduling. J Intell Manuf 7:163-176
    • (1996) J Intell Manuf , vol.7 , pp. 163-176
    • Palmer, G.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.