메뉴 건너뛰기




Volumn 139, Issue 1-3 SPEC, 2003, Pages 379-384

A multi-agent based manufacturing control strategy for responsive manufacturing

Author keywords

Agile manufacturing; Manufacturing resources optimisation; Manufacturing systems reconfiguration; Multi agent systems; Process planning and scheduling

Indexed keywords

COMPETITION; MARKETING; MULTI AGENT SYSTEMS; PLANNING; SCHEDULING;

EID: 0038449844     PISSN: 09240136     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0924-0136(03)00535-1     Document Type: Article
Times cited : (66)

References (14)
  • 1
    • 0030413664 scopus 로고    scopus 로고
    • Agile manufacturing: A strategy for the 21st century
    • P.T. Kidd, Agile manufacturing: a strategy for the 21st century, IEE Colloquium, Digest No. 74 (1996) 1/1-1/6.
    • (1996) IEE Colloquium, Digest No. 74 , vol.74 , pp. 11-16
    • Kidd, P.T.1
  • 3
    • 0028747692 scopus 로고
    • American Production and Inventory Control Society
    • A.M. Hormozi, Agile Manufacturing, American Production and Inventory Control Society, 1994, pp. 216-218.
    • (1994) Agile Manufacturing , pp. 216-218
    • Hormozi, A.M.1
  • 4
    • 33746031638 scopus 로고
    • Integration of process planning and scheduling functions
    • Khoshnevis B., Chan Q. Integration of process planning and scheduling functions. J. Int. Manuf. 1:1990;165-176.
    • (1990) J. Int. Manuf. , vol.1 , pp. 165-176
    • Khoshnevis, B.1    Chan, Q.2
  • 5
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • Morad N., Zalzala A. Genetic algorithms in integrated process planning and scheduling. J. Int. Scheduling. 10:1999;169-179.
    • (1999) J. Int. Scheduling , vol.10 , pp. 169-179
    • Morad, N.1    Zalzala, A.2
  • 7
    • 0027151172 scopus 로고
    • IPPM - A prototype to integrate process planning and job shop scheduling functions
    • Zhang H., Merchant E. IPPM - a prototype to integrate process planning and job shop scheduling functions. CIRP Ann. 42(1):1993;513-518.
    • (1993) CIRP Ann. , vol.42 , Issue.1 , pp. 513-518
    • Zhang, H.1    Merchant, E.2
  • 8
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • Huang H., Zhang H., Smith M. A progressive approach for the integration of process planning and scheduling. IIE Trans. 27:1995;456-464.
    • (1995) IIE Trans. , vol.27 , pp. 456-464
    • Huang, H.1    Zhang, H.2    Smith, M.3
  • 9
    • 0033132543 scopus 로고    scopus 로고
    • Design of negotiation protocols for multi-agent manufacturing systems
    • Krothapalli N.K., Deshmukh A.V. Design of negotiation protocols for multi-agent manufacturing systems. Int. J. Prod. Res. 37(7):1999;1601-1624.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.7 , pp. 1601-1624
    • Krothapalli, N.K.1    Deshmukh, A.V.2
  • 10
    • 0031631403 scopus 로고    scopus 로고
    • Multi-agent system for dynamic scheduling and control in manufacturing cells
    • Ouelhadj D., Hanachi C., Bouzouia B. Multi-agent system for dynamic scheduling and control in manufacturing cells. IEEE Int. Conf. Robotics Autom. 3:1998;2128-2133.
    • (1998) IEEE Int. Conf. Robotics Autom. , vol.3 , pp. 2128-2133
    • Ouelhadj, D.1    Hanachi, C.2    Bouzouia, B.3
  • 11
    • 0031625693 scopus 로고    scopus 로고
    • Multi-agent based dynamic scheduling for a flexible assembly system
    • Chen Y., Fu L., Chen Y. Multi-agent based dynamic scheduling for a flexible assembly system. IEEE Int. Conf. Robotics Autom. 3:1998;2122-2127.
    • (1998) IEEE Int. Conf. Robotics Autom. , vol.3 , pp. 2122-2127
    • Chen, Y.1    Fu, L.2    Chen, Y.3
  • 13
    • 0031074051 scopus 로고    scopus 로고
    • Agent-based software engineering
    • Wooldridge M. Agent-based software engineering. IEE Proceed. Software Eng. 144(1):1997;26-37.
    • (1997) IEE Proceed. Software Eng. , vol.144 , Issue.1 , pp. 26-37
    • Wooldridge, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.