-
3
-
-
0028464911
-
-
451-463.
-
Liao, T.W., Coates, E.R., Aghazadeh, F., Mann, L. and Guha, N. (1994) Modification of capp systems for capp/scheduling integration. Computers and Industrial Engineering, 26(3), 451-463.
-
Coates, E.R., Aghazadeh, F., Mann, L. and Guha, N. (1994) Modification of Capp Systems for Capp/scheduling Integration. Computers and Industrial Engineering, 26(3)
-
-
Liao, T.W.1
-
8
-
-
33749922215
-
-
pp. 272-279.
-
Maturana, S., Balasubramanian, S. and Norrie, D.H. (1996) A multi-agent approach to integrated planning and scheduling, in Proceedings of the International Conference on Concurrent Engineering: Research and Applications, pp. 272-279.
-
Balasubramanian, S. and Norrie, D.H. (1996) a Multi-agent Approach to Integrated Planning and Scheduling, in Proceedings of the International Conference on Concurrent Engineering: Research and Applications
-
-
Maturana, S.1
-
10
-
-
0032179235
-
-
1442-1446.
-
Hodgson, T.J., Cormier, D., Weintraub, A.J. and Zozom, A. (1998) Satisfying due-dates in large job shops. Management Science, 44(10), 1442-1446.
-
Cormier, D., Weintraub, A.J. and Zozom, A. (1998) Satisfying Due-dates in Large Job Shops. Management Science, 44(10)
-
-
Hodgson, T.J.1
-
15
-
-
0020013653
-
-
27-45.
-
Blackstone, J.H., Phillips, D.T. and Hogg, G.L. (1982) A state-ofthe-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20(1), 27-45.
-
Phillips, D.T. and Hogg, G.L. (1982) a State-ofthe-art Survey of Dispatching Rules for Manufacturing Job Shop Operations. International Journal of Production Research, 20(1)
-
-
Blackstone, J.H.1
-
18
-
-
33749917397
-
-
IN.
-
Demirkol, E., Mehta, S. and Uzsoy, R. (1996) Benchmarks for shop scheduling problems. Research Memorandum 96-4, School of Industrial Engineering, Purdue University, West Lafayette, IN.
-
Mehta, S. and Uzsoy, R. (1996) Benchmarks for Shop Scheduling Problems. Research Memorandum 96-4, School of Industrial Engineering, Purdue University, West Lafayette
-
-
Demirkol, E.1
-
20
-
-
0030418937
-
-
pp. 144-152.
-
Glover, F., Kelley, J.P. and Laguna, M. (1996) New advances and applications of combining simulation and optimization. Proceedings of the Winter Simulation Conference, in Charnes, J.M., Morrice, D.J., Brunner, D.T. and Swain, J.J. (eds), pp. 144-152.
-
Kelley, J.P. and Laguna, M. (1996) New Advances and Applications of Combining Simulation and Optimization. Proceedings of the Winter Simulation Conference, in Charnes, J.M., Morrice, D.J., Brunner, D.T. and Swain, J.J. (Eds)
-
-
Glover, F.1
-
24
-
-
33749930792
-
-
pp. 257-271.
-
Tonshoff, H.K., Bechendorf, U. and Schaele, M. (1987) Some approaches to represent the interdependence of process planning and process control, in Proceedings of the C.I.R.P. International Seminar on Manaiifactitring Systems, pp. 257-271.
-
Bechendorf, U. and Schaele, M. (1987) some Approaches to Represent the Interdependence of Process Planning and Process Control, in Proceedings of the C.I.R.P. International Seminar on Manaiifactitring Systems
-
-
Tonshoff, H.K.1
-
25
-
-
0031121631
-
-
1171-1191.
-
Lee, C.-Y., Piramuthu, S. and Tsai, Y.K. (1997) Job shop scheduling with a genetic algorithm and machine learning. International Journal of Production Research, 35(4), 1171-1191.
-
Piramuthu, S. and Tsai, Y.K. (1997) Job Shop Scheduling with a Genetic Algorithm and Machine Learning. International Journal of Production Research, 35(4)
-
-
Lee, C.-Y.1
|