메뉴 건너뛰기




Volumn 30, Issue 11-12, 2006, Pages 1111-1118

An integrated scheme for process planning and scheduling in FMS

Author keywords

FMS; Integration; Process planning; Scheduling

Indexed keywords

PROCESS PLAN SELECTION MODULES; PROCESS PLANNING; SHOP FLOOR ACTIVITIES;

EID: 33750028809     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-005-0142-6     Document Type: Article
Times cited : (73)

References (24)
  • 1
    • 0026910349 scopus 로고
    • Dynamic planning enriches concurrent process and production planning
    • Larsen NE, Alting L (1992) Dynamic planning enriches concurrent process and production planning. Int J Prod Res 30(8):
    • (1992) Int J Prod Res , vol.30 , Issue.8
    • Larsen, N.E.1    Alting, L.2
  • 2
    • 33746031638 scopus 로고
    • Integration of process planning and scheduling functions
    • Khoshnevis B, Chen Q (1990) Integration of process planning and scheduling functions. J Intell Manuf 1:165-176
    • (1990) J Intell Manuf , vol.1 , pp. 165-176
    • Khoshnevis, B.1    Chen, Q.2
  • 3
  • 4
    • 84946302845 scopus 로고
    • Short interval scheduling for discrete parts manufacturing
    • Chryssolouris G, Dick K, Lee M (1991) Short interval scheduling for discrete parts manufacturing. Int J Comput Integr Manuf 4:157-168
    • (1991) Int J Comput Integr Manuf , vol.4 , pp. 157-168
    • Chryssolouris, G.1    Dick, K.2    Lee, M.3
  • 5
    • 0038693449 scopus 로고
    • FLEXPLAN: A concept for intelligent process planning and scheduling
    • Hannover, Germany, September
    • Tonshoff HK, Beckendorff U, Andres N (1989) FLEXPLAN: A concept for intelligent process planning and scheduling. CIRP International Workshop, Hannover, Germany, September, pp. 21-22
    • (1989) CIRP International Workshop , pp. 21-22
    • Tonshoff, H.K.1    Beckendorff, U.2    Andres, N.3
  • 6
    • 0030146089 scopus 로고    scopus 로고
    • Modeling, measurement and evaluation of sequencing flexibility in manufacturing systems
    • Benjaafar S, Ramakrishnan R (1996) Modeling, measurement and evaluation of sequencing flexibility in manufacturing systems. Int J Prod Res 4(5):1195-1220
    • (1996) Int J Prod Res , vol.4 , Issue.5 , pp. 1195-1220
    • Benjaafar, S.1    Ramakrishnan, R.2
  • 8
    • 0032690982 scopus 로고    scopus 로고
    • Scheduling in a production environment with multiple process plans per job
    • Kim KH, Egbelu PJ (1999) Scheduling in a production environment with multiple process plans per job. Int J Prod Res 37 (12):2725-2753
    • (1999) Int J Prod Res , vol.37 , Issue.12 , pp. 2725-2753
    • Kim, K.H.1    Egbelu, P.J.2
  • 10
    • 33749992847 scopus 로고
    • Scheduling with flexible process plans
    • Chen Q, Khoshnevis B (1992) Scheduling with flexible process plans. Prod Plan Control 3:1-11
    • (1992) Prod Plan Control , vol.3 , pp. 1-11
    • Chen, Q.1    Khoshnevis, B.2
  • 11
    • 0035840762 scopus 로고    scopus 로고
    • Adaptive and dynamic process planning using neural networks
    • Joo J, Park S, Cho H (2001) Adaptive and dynamic process planning using neural networks. Int J Prod Res 39(13):2923-2946
    • (2001) Int J Prod Res , vol.39 , Issue.13 , pp. 2923-2946
    • Joo, J.1    Park, S.2    Cho, H.3
  • 12
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • Huang SS, Zhang HC, Smith ML (1995) A progressive approach for the integration of process planning and scheduling. IIE Trans 27:456-464
    • (1995) IIE Trans , vol.27 , pp. 456-464
    • Huang, S.S.1    Zhang, H.C.2    Smith, M.L.3
  • 13
    • 0000944468 scopus 로고
    • An integrated model of process planning and production scheduling
    • Zhang HC, Mullar S (1994) An integrated model of process planning and production scheduling. Int J Comput Integr Manuf 7:356-364
    • (1994) Int J Comput Integr Manuf , vol.7 , pp. 356-364
    • Zhang, H.C.1    Mullar, S.2
  • 14
    • 0027151172 scopus 로고
    • IPPM - A prototype to integrate process planning and job shop scheduling functions
    • Zhang HC, Merchant ME (1993) IPPM - A prototype to integrate process planning and job shop scheduling functions. Ann CIRP 42(1):513-518
    • (1993) Ann CIRP , vol.42 , Issue.1 , pp. 513-518
    • Zhang, H.C.1    Merchant, M.E.2
  • 15
  • 16
    • 0002605876 scopus 로고    scopus 로고
    • A multi-agent architecture for concurrent design, process planning, routing and scheduling
    • Balasubramanian S, Noorie DH (1996) A multi-agent architecture for concurrent design, process planning, routing and scheduling. Concurr Eng: Res Appl 4(1):7-16
    • (1996) Concurr Eng: Res Appl , vol.4 , Issue.1 , pp. 7-16
    • Balasubramanian, S.1    Noorie, D.H.2
  • 17
    • 0008795069 scopus 로고
    • Simulations engineering within process and production planning
    • Australia, 17-21 December 1990
    • Larsen NE, Alting L (1990) Simulations engineering within process and production planning. 1990 Pacific Conference on Manufacturing, Australia, 17-21 December 1990
    • (1990) 1990 Pacific Conference on Manufacturing
    • Larsen, N.E.1    Alting, L.2
  • 18
    • 0021898372 scopus 로고
    • An integrated approach to process planning and scheduling
    • Chryssolouris G, Chen S (1985) An integrated approach to process planning and scheduling. Ann CIRP 34(1):413-417
    • (1985) Ann CIRP , vol.34 , Issue.1 , pp. 413-417
    • Chryssolouris, G.1    Chen, S.2
  • 19
    • 0029220198 scopus 로고
    • The integration of process planning and shop floor scheduling in small batch part manufacturing
    • Zijm WHM, Kals HJJ (1995) The integration of process planning and shop floor scheduling in small batch part manufacturing. Ann CIRP 44(1):429-432
    • (1995) Ann CIRP , vol.44 , Issue.1 , pp. 429-432
    • Zijm, W.H.M.1    Kals, H.J.J.2
  • 20
    • 0035247355 scopus 로고    scopus 로고
    • A prototype of a feature -based multiple-alternative process planning system with scheduling verification
    • Yang YN, Parsaei HR, Leep HR (2001) A prototype of a feature -based multiple-alternative process planning system with scheduling verification. Comput Ind Eng 39:109-124
    • (2001) Comput Ind Eng , vol.39 , pp. 109-124
    • Yang, Y.N.1    Parsaei, H.R.2    Leep, H.R.3
  • 22
    • 0032121917 scopus 로고    scopus 로고
    • Improving the performances of part dispatching based on multiple process plans using graph theory
    • Yang Z, Qiao L, Jiang L (1998) Improving the performances of part dispatching based on multiple process plans using graph theory. Int J Prod Res 36(7):1987-2003
    • (1998) Int J Prod Res , vol.36 , Issue.7 , pp. 1987-2003
    • Yang, Z.1    Qiao, L.2    Jiang, L.3
  • 23
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing system
    • Saygin C, Kilic SE (1999) Integrating flexible process plans with scheduling in flexible manufacturing system. Int J Adv Manuf Technol 15:269-280
    • (1999) Int J Adv Manuf Technol , vol.15 , pp. 269-280
    • Saygin, C.1    Kilic, S.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.