메뉴 건너뛰기




Volumn 28, Issue 1-2, 2006, Pages 109-116

Integration of process planning and scheduling in a job shop environment

Author keywords

Computer aided process planning; Decision support system; Job shop environment; Production scheduling; Scheduling factor

Indexed keywords

DECISION SUPPORT SYSTEMS; MACHINE TOOLS; PRODUCTION; SCHEDULING; SPECIFICATIONS;

EID: 33644699284     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-004-2317-y     Document Type: Article
Times cited : (52)

References (36)
  • 1
    • 0021898372 scopus 로고
    • An integrated approach to process planning and scheduling
    • Chryssolouris G, Chan S (1985) An integrated approach to process planning and scheduling. Ann CIRP 34(1):413-417
    • (1985) Ann CIRP , vol.34 , Issue.1 , pp. 413-417
    • Chryssolouris, G.1    Chan, S.2
  • 2
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • Morad N, Zalzala A (1999) Genetic algorithms in integrated process planning and scheduling. J Intell Manuf 10:169-179
    • (1999) J Intell Manuf , vol.10 , pp. 169-179
    • Morad, N.1    Zalzala, A.2
  • 4
    • 0020943397 scopus 로고
    • Development of on-line, real time, scheduling method for a computer aided manufacturing system
    • Toni T, Ohtsuki N, Suzuki M (1983) Development of on-line, real time, scheduling method for a computer aided manufacturing system. Ann CIRP 32(1):379-383
    • (1983) Ann CIRP , vol.32 , Issue.1 , pp. 379-383
    • Toni, T.1    Ohtsuki, N.2    Suzuki, M.3
  • 5
    • 0021615443 scopus 로고
    • On line scheduling for flexible manufacturing systems
    • Halevi G, Weill R (1984) On line scheduling for flexible manufacturing systems. Ann CIRP 33(1):331-333
    • (1984) Ann CIRP , vol.33 , Issue.1 , pp. 331-333
    • Halevi, G.1    Weill, R.2
  • 6
    • 0024175169 scopus 로고
    • Process planning and scheduling - A method of integration for productivity improvement
    • Sundaram RM, Fu SS (1988) Process planning and scheduling - A method of integration for productivity improvement. Comput Ind Eng 15(1-4):296-301
    • (1988) Comput Ind Eng , vol.15 , Issue.1-4 , pp. 296-301
    • Sundaram, R.M.1    Fu, S.S.2
  • 8
    • 33746031638 scopus 로고
    • Integration of process planning and scheduling functions
    • Khoshnevis B, Chen Q, (1990) Integration of process planning and scheduling functions. J Intell Manuf 1:165-176
    • (1990) J Intell Manuf , vol.1 , pp. 165-176
    • Khoshnevis, B.1    Chen, Q.2
  • 9
    • 0026943156 scopus 로고
    • A feature based dynamic process planning and scheduling
    • Dong J, Jo HH, Parsaei HR (1992) A feature based dynamic process planning and scheduling. Comput Ind Eng 23(1-4):141-144
    • (1992) Comput Ind Eng , vol.23 , Issue.1-4 , pp. 141-144
    • Dong, J.1    Jo, H.H.2    Parsaei, H.R.3
  • 11
    • 0027151172 scopus 로고
    • IPPM - A prototype to integrate process planning and job shop scheduling functions
    • Zhang HC (1993) IPPM - A prototype to integrate process planning and job shop scheduling functions. Ann CIRP 42(1):513-518
    • (1993) Ann CIRP , vol.42 , Issue.1 , pp. 513-518
    • Zhang, H.C.1
  • 12
    • 0027733474 scopus 로고
    • Methodology for integrated process-production planning
    • Villa A, Rossetto S (1993) Methodology for integrated process-production planning: IFIP Trans B: Comput Appl Technol, B-13, pp 267-273
    • (1993) IFIP Trans B: Comput Appl Technol , vol.B-13 , pp. 267-273
    • Villa, A.1    Rossetto, S.2
  • 13
    • 0038693447 scopus 로고
    • Modification of CAPP systems for CAPP/scheduling integration
    • Liao TW, Coates ER, Aghazadeh F, Mann L, Guha N (1993) Modification of CAPP systems for CAPP/scheduling integration. Comput Ind Eng 25 (1-4):203-206
    • (1993) Comput Ind Eng , vol.25 , Issue.1-4 , pp. 203-206
    • Liao, T.W.1    Coates, E.R.2    Aghazadeh, F.3    Mann, L.4    Guha, N.5
  • 14
    • 0000955243 scopus 로고
    • A hierarchical bicriterion approach to integrate process plan selection and job shop scheduling
    • Brandimarte P, Calderini M (1995) A hierarchical bicriterion approach to integrate process plan selection and job shop scheduling. Int J Prod Res 33(1):161-181
    • (1995) Int J Prod Res , vol.33 , Issue.1 , pp. 161-181
    • Brandimarte, P.1    Calderini, M.2
  • 15
    • 0029220198 scopus 로고
    • The integration of process planning and shop floor scheduling in small batch part manufacturing
    • Zijm WHM (1995) The integration of process planning and shop floor scheduling in small batch part manufacturing. Ann CIRP 44(1): 429-432
    • (1995) Ann CIRP , vol.44 , Issue.1 , pp. 429-432
    • Zijm, W.H.M.1
  • 16
    • 0029376103 scopus 로고
    • Process planning interface for a shop floor control architecture for computer integrated manufacturing
    • Lee S, Wysk RA, Smith JS (1995) Process planning interface for a shop floor control architecture for computer integrated manufacturing. Int J Prod Res 33(9):2415-2436
    • (1995) Int J Prod Res , vol.33 , Issue.9 , pp. 2415-2436
    • Lee, S.1    Wysk, R.A.2    Smith, J.S.3
  • 17
    • 79251627866 scopus 로고
    • A progressive approach for integration of process planning and scheduling
    • Huang SH, Zhang HC, Smith ML (1995) A progressive approach for integration of process planning and scheduling. IIE Trans 27:456-464
    • (1995) IIE Trans , vol.27 , pp. 456-464
    • Huang, S.H.1    Zhang, H.C.2    Smith, M.L.3
  • 18
    • 0000481860 scopus 로고    scopus 로고
    • A simulated annealing approach to integrated production scheduling
    • Palmer GJ (1996) A simulated annealing approach to integrated production scheduling. J Intell Manuf 7:163-176
    • (1996) J Intell Manuf , vol.7 , pp. 163-176
    • Palmer, G.J.1
  • 19
    • 0030270337 scopus 로고    scopus 로고
    • A two-phased approach to dynamic process planning
    • Usher JM, Fernandes KJ (1996) A two-phased approach to dynamic process planning. Comput Ind Eng 31(1-2):173-176
    • (1996) Comput Ind Eng , vol.31 , Issue.1-2 , pp. 173-176
    • Usher, J.M.1    Fernandes, K.J.2
  • 21
    • 0031121228 scopus 로고    scopus 로고
    • Bidding-based process planning & scheduling in a multi-agent system
    • Gu P, Balasubramanian S, Norrie DH (1997) Bidding-based process planning & scheduling in a multi-agent system. Comput lud Eng 32(2):477-496
    • (1997) Comput Lud Eng , vol.32 , Issue.2 , pp. 477-496
    • Gu, P.1    Balasubramanian, S.2    Norrie, D.H.3
  • 22
    • 0032121917 scopus 로고    scopus 로고
    • Improving the performance of part dispatching based on multiple process plans using graph theory
    • Yang Z, Qiao L, Jiang I (1998) Improving the performance of part dispatching based on multiple process plans using graph theory. Int J Prod Res 36(7): 1987-2003
    • (1998) Int J Prod Res , vol.36 , Issue.7 , pp. 1987-2003
    • Yang, Z.1    Qiao, L.2    Jiang, I.3
  • 23
    • 2542625299 scopus 로고    scopus 로고
    • An integrated intelligent process planning system (IIPPS) for machining
    • Wang K (1998) An integrated intelligent process planning system (IIPPS) for machining. J Intell Manuf 9:503-514
    • (1998) J Intell Manuf , vol.9 , pp. 503-514
    • Wang, K.1
  • 24
    • 0033341387 scopus 로고    scopus 로고
    • Scheduling with alternatives: A link between process planning and scheduling
    • Weintraub A, Cormier D, Hodgson T, King R, Wilson J, Zozom A (1999) Scheduling with alternatives: a link between process planning and scheduling. IIE Trans 31:1093-1102
    • (1999) IIE Trans , vol.31 , pp. 1093-1102
    • Weintraub, A.1    Cormier, D.2    Hodgson, T.3    King, R.4    Wilson, J.5    Zozom, A.6
  • 25
    • 33644671882 scopus 로고    scopus 로고
    • Relational CAPP (computer aided process planning) system
    • Halevi G (1999) Relational CAPP (computer aided process planning) system. Int J Manuf Sci Prod 2(4):171-187
    • (1999) Int J Manuf Sci Prod , vol.2 , Issue.4 , pp. 171-187
    • Halevi, G.1
  • 26
    • 0035175069 scopus 로고    scopus 로고
    • Integration of process planning and scheduling using simulation based genetic algorithms
    • Lee H, Kim SS (2001) Integration of process planning and scheduling using simulation based genetic algorithms. Int J Adv Manuf Technol 18:586-590
    • (2001) Int J Adv Manuf Technol , vol.18 , pp. 586-590
    • Lee, H.1    Kim, S.S.2
  • 27
    • 0036217284 scopus 로고    scopus 로고
    • A dynamic programming based process planning selection strategy considering utilization of machines
    • Chang HC, Chen FF (2002) A dynamic programming based process planning selection strategy considering utilization of machines. Int J Adv Manuf Technol 19:97-105
    • (2002) Int J Adv Manuf Technol , vol.19 , pp. 97-105
    • Chang, H.C.1    Chen, F.F.2
  • 28
    • 0036642688 scopus 로고    scopus 로고
    • Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
    • Moon C, Kim J, Hur S (2002) Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain. Comput Ind Eng 43:331-349
    • (2002) Comput Ind Eng , vol.43 , pp. 331-349
    • Moon, C.1    Kim, J.2    Hur, S.3
  • 29
    • 0242269797 scopus 로고    scopus 로고
    • Integration of process planning and scheduling by exploring the flexibility of process planning
    • Zhang YF, Saravanan AN, Fuh JYH (2003) Integration of process planning and scheduling by exploring the flexibility of process planning. Int J Prod Res 41(3):611-628
    • (2003) Int J Prod Res , vol.41 , Issue.3 , pp. 611-628
    • Zhang, Y.F.1    Saravanan, A.N.2    Fuh, J.Y.H.3
  • 31
    • 27944439983 scopus 로고    scopus 로고
    • Development of a generative CAPP system for axisymmetric components for a job shop environment
    • DOI: 10.1007/s00170-004-2135-2
    • Kumar M, Rajotia S (2005) Development of a generative CAPP system for axisymmetric components for a job shop environment. Int J Adv Manuf Technol, DOI: 10.1007/s00170-004-2135-2
    • (2005) Int J Adv Manuf Technol
    • Kumar, M.1    Rajotia, S.2
  • 34
    • 0008494615 scopus 로고
    • Automatic determination of work holding parameters for turned components
    • Hinduja S, Huang H (1989) Automatic determination of work holding parameters for turned components. Proc Inst Mech Eng 203(B2): 101-112
    • (1989) Proc Inst Mech Eng , vol.203 , Issue.B2 , pp. 101-112
    • Hinduja, S.1    Huang, H.2
  • 35
    • 0038481224 scopus 로고    scopus 로고
    • Integration of scheduling with computer aided process planning
    • Kumar M, Rajotia S (2003) Integration of scheduling with computer aided process planning. J Mater Process Technol 138:297-300
    • (2003) J Mater Process Technol , vol.138 , pp. 297-300
    • Kumar, M.1    Rajotia, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.