-
1
-
-
0021898372
-
An integrated approach to process planning and scheduling
-
Chryssolouris G, Chan S (1985) An integrated approach to process planning and scheduling. Ann CIRP 34(1):413-417
-
(1985)
Ann CIRP
, vol.34
, Issue.1
, pp. 413-417
-
-
Chryssolouris, G.1
Chan, S.2
-
2
-
-
0032642660
-
Genetic algorithms in integrated process planning and scheduling
-
Morad N, Zalzala A (1999) Genetic algorithms in integrated process planning and scheduling. J Intell Manuf 10:169-179
-
(1999)
J Intell Manuf
, vol.10
, pp. 169-179
-
-
Morad, N.1
Zalzala, A.2
-
4
-
-
0020943397
-
Development of on-line, real time, scheduling method for a computer aided manufacturing system
-
Toni T, Ohtsuki N, Suzuki M (1983) Development of on-line, real time, scheduling method for a computer aided manufacturing system. Ann CIRP 32(1):379-383
-
(1983)
Ann CIRP
, vol.32
, Issue.1
, pp. 379-383
-
-
Toni, T.1
Ohtsuki, N.2
Suzuki, M.3
-
5
-
-
0021615443
-
On line scheduling for flexible manufacturing systems
-
Halevi G, Weill R (1984) On line scheduling for flexible manufacturing systems. Ann CIRP 33(1):331-333
-
(1984)
Ann CIRP
, vol.33
, Issue.1
, pp. 331-333
-
-
Halevi, G.1
Weill, R.2
-
6
-
-
0024175169
-
Process planning and scheduling - A method of integration for productivity improvement
-
Sundaram RM, Fu SS (1988) Process planning and scheduling - A method of integration for productivity improvement. Comput Ind Eng 15(1-4):296-301
-
(1988)
Comput Ind Eng
, vol.15
, Issue.1-4
, pp. 296-301
-
-
Sundaram, R.M.1
Fu, S.S.2
-
8
-
-
33746031638
-
Integration of process planning and scheduling functions
-
Khoshnevis B, Chen Q, (1990) Integration of process planning and scheduling functions. J Intell Manuf 1:165-176
-
(1990)
J Intell Manuf
, vol.1
, pp. 165-176
-
-
Khoshnevis, B.1
Chen, Q.2
-
9
-
-
0026943156
-
A feature based dynamic process planning and scheduling
-
Dong J, Jo HH, Parsaei HR (1992) A feature based dynamic process planning and scheduling. Comput Ind Eng 23(1-4):141-144
-
(1992)
Comput Ind Eng
, vol.23
, Issue.1-4
, pp. 141-144
-
-
Dong, J.1
Jo, H.H.2
Parsaei, H.R.3
-
10
-
-
0027005630
-
Dynamic process planning and scheduling algorithm
-
San Francisco, CA, USA
-
Choobineh F, Shivani M (1992) Dynamic process planning and scheduling algorithm. Proc 1992 Japan-USA Symposium on Flexible Automation, Part 1(of 2), San Francisco, CA, USA, pp 13-15
-
(1992)
Proc 1992 Japan-USA Symposium on Flexible Automation, Part 1(of 2)
, pp. 13-15
-
-
Choobineh, F.1
Shivani, M.2
-
11
-
-
0027151172
-
IPPM - A prototype to integrate process planning and job shop scheduling functions
-
Zhang HC (1993) IPPM - A prototype to integrate process planning and job shop scheduling functions. Ann CIRP 42(1):513-518
-
(1993)
Ann CIRP
, vol.42
, Issue.1
, pp. 513-518
-
-
Zhang, H.C.1
-
12
-
-
0027733474
-
Methodology for integrated process-production planning
-
Villa A, Rossetto S (1993) Methodology for integrated process-production planning: IFIP Trans B: Comput Appl Technol, B-13, pp 267-273
-
(1993)
IFIP Trans B: Comput Appl Technol
, vol.B-13
, pp. 267-273
-
-
Villa, A.1
Rossetto, S.2
-
13
-
-
0038693447
-
Modification of CAPP systems for CAPP/scheduling integration
-
Liao TW, Coates ER, Aghazadeh F, Mann L, Guha N (1993) Modification of CAPP systems for CAPP/scheduling integration. Comput Ind Eng 25 (1-4):203-206
-
(1993)
Comput Ind Eng
, vol.25
, Issue.1-4
, pp. 203-206
-
-
Liao, T.W.1
Coates, E.R.2
Aghazadeh, F.3
Mann, L.4
Guha, N.5
-
14
-
-
0000955243
-
A hierarchical bicriterion approach to integrate process plan selection and job shop scheduling
-
Brandimarte P, Calderini M (1995) A hierarchical bicriterion approach to integrate process plan selection and job shop scheduling. Int J Prod Res 33(1):161-181
-
(1995)
Int J Prod Res
, vol.33
, Issue.1
, pp. 161-181
-
-
Brandimarte, P.1
Calderini, M.2
-
15
-
-
0029220198
-
The integration of process planning and shop floor scheduling in small batch part manufacturing
-
Zijm WHM (1995) The integration of process planning and shop floor scheduling in small batch part manufacturing. Ann CIRP 44(1): 429-432
-
(1995)
Ann CIRP
, vol.44
, Issue.1
, pp. 429-432
-
-
Zijm, W.H.M.1
-
16
-
-
0029376103
-
Process planning interface for a shop floor control architecture for computer integrated manufacturing
-
Lee S, Wysk RA, Smith JS (1995) Process planning interface for a shop floor control architecture for computer integrated manufacturing. Int J Prod Res 33(9):2415-2436
-
(1995)
Int J Prod Res
, vol.33
, Issue.9
, pp. 2415-2436
-
-
Lee, S.1
Wysk, R.A.2
Smith, J.S.3
-
17
-
-
79251627866
-
A progressive approach for integration of process planning and scheduling
-
Huang SH, Zhang HC, Smith ML (1995) A progressive approach for integration of process planning and scheduling. IIE Trans 27:456-464
-
(1995)
IIE Trans
, vol.27
, pp. 456-464
-
-
Huang, S.H.1
Zhang, H.C.2
Smith, M.L.3
-
18
-
-
0000481860
-
A simulated annealing approach to integrated production scheduling
-
Palmer GJ (1996) A simulated annealing approach to integrated production scheduling. J Intell Manuf 7:163-176
-
(1996)
J Intell Manuf
, vol.7
, pp. 163-176
-
-
Palmer, G.J.1
-
19
-
-
0030270337
-
A two-phased approach to dynamic process planning
-
Usher JM, Fernandes KJ (1996) A two-phased approach to dynamic process planning. Comput Ind Eng 31(1-2):173-176
-
(1996)
Comput Ind Eng
, vol.31
, Issue.1-2
, pp. 173-176
-
-
Usher, J.M.1
Fernandes, K.J.2
-
21
-
-
0031121228
-
Bidding-based process planning & scheduling in a multi-agent system
-
Gu P, Balasubramanian S, Norrie DH (1997) Bidding-based process planning & scheduling in a multi-agent system. Comput lud Eng 32(2):477-496
-
(1997)
Comput Lud Eng
, vol.32
, Issue.2
, pp. 477-496
-
-
Gu, P.1
Balasubramanian, S.2
Norrie, D.H.3
-
22
-
-
0032121917
-
Improving the performance of part dispatching based on multiple process plans using graph theory
-
Yang Z, Qiao L, Jiang I (1998) Improving the performance of part dispatching based on multiple process plans using graph theory. Int J Prod Res 36(7): 1987-2003
-
(1998)
Int J Prod Res
, vol.36
, Issue.7
, pp. 1987-2003
-
-
Yang, Z.1
Qiao, L.2
Jiang, I.3
-
23
-
-
2542625299
-
An integrated intelligent process planning system (IIPPS) for machining
-
Wang K (1998) An integrated intelligent process planning system (IIPPS) for machining. J Intell Manuf 9:503-514
-
(1998)
J Intell Manuf
, vol.9
, pp. 503-514
-
-
Wang, K.1
-
24
-
-
0033341387
-
Scheduling with alternatives: A link between process planning and scheduling
-
Weintraub A, Cormier D, Hodgson T, King R, Wilson J, Zozom A (1999) Scheduling with alternatives: a link between process planning and scheduling. IIE Trans 31:1093-1102
-
(1999)
IIE Trans
, vol.31
, pp. 1093-1102
-
-
Weintraub, A.1
Cormier, D.2
Hodgson, T.3
King, R.4
Wilson, J.5
Zozom, A.6
-
25
-
-
33644671882
-
Relational CAPP (computer aided process planning) system
-
Halevi G (1999) Relational CAPP (computer aided process planning) system. Int J Manuf Sci Prod 2(4):171-187
-
(1999)
Int J Manuf Sci Prod
, vol.2
, Issue.4
, pp. 171-187
-
-
Halevi, G.1
-
26
-
-
0035175069
-
Integration of process planning and scheduling using simulation based genetic algorithms
-
Lee H, Kim SS (2001) Integration of process planning and scheduling using simulation based genetic algorithms. Int J Adv Manuf Technol 18:586-590
-
(2001)
Int J Adv Manuf Technol
, vol.18
, pp. 586-590
-
-
Lee, H.1
Kim, S.S.2
-
27
-
-
0036217284
-
A dynamic programming based process planning selection strategy considering utilization of machines
-
Chang HC, Chen FF (2002) A dynamic programming based process planning selection strategy considering utilization of machines. Int J Adv Manuf Technol 19:97-105
-
(2002)
Int J Adv Manuf Technol
, vol.19
, pp. 97-105
-
-
Chang, H.C.1
Chen, F.F.2
-
28
-
-
0036642688
-
Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
-
Moon C, Kim J, Hur S (2002) Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain. Comput Ind Eng 43:331-349
-
(2002)
Comput Ind Eng
, vol.43
, pp. 331-349
-
-
Moon, C.1
Kim, J.2
Hur, S.3
-
29
-
-
0242269797
-
Integration of process planning and scheduling by exploring the flexibility of process planning
-
Zhang YF, Saravanan AN, Fuh JYH (2003) Integration of process planning and scheduling by exploring the flexibility of process planning. Int J Prod Res 41(3):611-628
-
(2003)
Int J Prod Res
, vol.41
, Issue.3
, pp. 611-628
-
-
Zhang, Y.F.1
Saravanan, A.N.2
Fuh, J.Y.H.3
-
31
-
-
27944439983
-
Development of a generative CAPP system for axisymmetric components for a job shop environment
-
DOI: 10.1007/s00170-004-2135-2
-
Kumar M, Rajotia S (2005) Development of a generative CAPP system for axisymmetric components for a job shop environment. Int J Adv Manuf Technol, DOI: 10.1007/s00170-004-2135-2
-
(2005)
Int J Adv Manuf Technol
-
-
Kumar, M.1
Rajotia, S.2
-
34
-
-
0008494615
-
Automatic determination of work holding parameters for turned components
-
Hinduja S, Huang H (1989) Automatic determination of work holding parameters for turned components. Proc Inst Mech Eng 203(B2): 101-112
-
(1989)
Proc Inst Mech Eng
, vol.203
, Issue.B2
, pp. 101-112
-
-
Hinduja, S.1
Huang, H.2
-
35
-
-
0038481224
-
Integration of scheduling with computer aided process planning
-
Kumar M, Rajotia S (2003) Integration of scheduling with computer aided process planning. J Mater Process Technol 138:297-300
-
(2003)
J Mater Process Technol
, vol.138
, pp. 297-300
-
-
Kumar, M.1
Rajotia, S.2
|