|
Volumn 39, Issue 1-2, 2001, Pages 109-124
|
Prototype of a feature-based multiple-alternative process planning system with scheduling verification
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ALGORITHMS;
PROCESS ENGINEERING;
RESOURCE ALLOCATION;
SCHEDULING;
STRATEGIC PLANNING;
FEATURE-BASED MULTIPLE-ALTERNATIVE PROCESS PLANNING SYSTEMS;
MANUFACTURING INFORMATION INTEGRATION;
PRODUCTION CONTROL;
|
EID: 0035247355
PISSN: 03608352
EISSN: None
Source Type: Journal
DOI: 10.1016/S0360-8352(00)00071-1 Document Type: Article |
Times cited : (30)
|
References (16)
|