메뉴 건너뛰기




Volumn 139, Issue 1-3 SPEC, 2003, Pages 267-272

A holonic architecture of the concurrent integrated process planning system

Author keywords

CAD; CORBA; Holon; Integration; Process planning; Production scheduling

Indexed keywords

PROCESS ENGINEERING; PRODUCTION ENGINEERING; SCHEDULING;

EID: 0038787545     PISSN: 09240136     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0924-0136(03)00233-4     Document Type: Article
Times cited : (40)

References (9)
  • 1
    • 0031121228 scopus 로고    scopus 로고
    • Bidding-based process planning and scheduling in a multi-agent system
    • Gu P., Balasubramnian S., Norrie D.H. Bidding-based process planning and scheduling in a multi-agent system. Comp. Ind. Eng. 32(2):1997;477-496.
    • (1997) Comp. Ind. Eng. , vol.32 , Issue.2 , pp. 477-496
    • Gu, P.1    Balasubramnian, S.2    Norrie, D.H.3
  • 2
    • 0028464911 scopus 로고
    • Modification of CAPP systems for CAPP/scheduling integration
    • Liao T.W., Coates E.R., Aghazadeh F.et al. Modification of CAPP systems for CAPP/scheduling integration. Comp. Ind. Eng. 26(3):1994;451-463.
    • (1994) Comp. Ind. Eng. , vol.26 , Issue.3 , pp. 451-463
    • Liao, T.W.1    Coates, E.R.2    Aghazadeh, F.3
  • 3
    • 0027151172 scopus 로고
    • IPPM - A prototype to integrate process planning and job shop scheduling functions
    • Zhang H.-C. IPPM - a prototype to integrate process planning and job shop scheduling functions. Ann. CIRP. 42(1):1993;513-518.
    • (1993) Ann. CIRP , vol.42 , Issue.1 , pp. 513-518
    • Zhang, H.-C.1
  • 4
    • 0028454972 scopus 로고
    • A fuzzy approach to process plan selection
    • Zhang H.-C., Huang S.H. A fuzzy approach to process plan selection. Int. J. Prod. Res. 32(6):1994;1265-1279.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.6 , pp. 1265-1279
    • Zhang, H.-C.1    Huang, S.H.2
  • 5
    • 0000944468 scopus 로고
    • An integrated model of process planning and production scheduling
    • Zhang H.-C., Mallur S. An integrated model of process planning and production scheduling. Int. J. Comp. Integr. Manuf. 7(6):1994;356-364.
    • (1994) Int. J. Comp. Integr. Manuf. , vol.7 , Issue.6 , pp. 356-364
    • Zhang, H.-C.1    Mallur, S.2
  • 6
    • 0026940359 scopus 로고
    • Note on concurrent engineering
    • Yeh R.T. Note on concurrent engineering. IEEE Trans. Know. Data Eng. 4(5):1992;407-414.
    • (1992) IEEE Trans. Know. Data Eng. , vol.4 , Issue.5 , pp. 407-414
    • Yeh, R.T.1
  • 7
    • 0030571366 scopus 로고    scopus 로고
    • SPAW: A design tool for planning a manufacturing process in a concurrent engineering environment
    • Yetukuri B.N., Yetukuri N.V., Fischer G.W. SPAW: a design tool for planning a manufacturing process in a concurrent engineering environment. Comp. Ind. 32(1):1996;79-93.
    • (1996) Comp. Ind. , vol.32 , Issue.1 , pp. 79-93
    • Yetukuri, B.N.1    Yetukuri, N.V.2    Fischer, G.W.3
  • 8
    • 0032045595 scopus 로고    scopus 로고
    • A dynamic scheduling holon for manufacturing orders
    • Sousa P., Ramos C. A dynamic scheduling holon for manufacturing orders. J. Intell. Manuf. 9(2):1998;107-112.
    • (1998) J. Intell. Manuf. , vol.9 , Issue.2 , pp. 107-112
    • Sousa, P.1    Ramos, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.