|
Volumn 139, Issue 1-3 SPEC, 2003, Pages 267-272
|
A holonic architecture of the concurrent integrated process planning system
|
Author keywords
CAD; CORBA; Holon; Integration; Process planning; Production scheduling
|
Indexed keywords
PROCESS ENGINEERING;
PRODUCTION ENGINEERING;
SCHEDULING;
PROCESS PLANNING (PP);
CONCURRENT ENGINEERING;
|
EID: 0038787545
PISSN: 09240136
EISSN: None
Source Type: Journal
DOI: 10.1016/S0924-0136(03)00233-4 Document Type: Article |
Times cited : (40)
|
References (9)
|