메뉴 건너뛰기




Volumn 37, Issue 2, 2010, Pages 1256-1264

An agent-based approach for integrated process planning and scheduling

Author keywords

Integrated process planning and scheduling; Multi agent system; Process planning; Scheduling

Indexed keywords

AGENT BASED; AGENT-BASED APPROACH; EXPERIMENTAL STUDIES; INTEGRATED PROCESS PLANNING AND SCHEDULING; MANUFACTURING SYSTEM; PROCESS PLAN;

EID: 71749109550     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2009.06.014     Document Type: Article
Times cited : (103)

References (42)
  • 5
    • 0021898372 scopus 로고
    • An integrated approach to process planning and scheduling
    • Chryssolouris G., and Chan S. An integrated approach to process planning and scheduling. Annals of the CIRP 34 1 (1985) 413-417
    • (1985) Annals of the CIRP , vol.34 , Issue.1 , pp. 413-417
    • Chryssolouris, G.1    Chan, S.2
  • 6
    • 0013278675 scopus 로고
    • Decision making on the factory floor: An integrated approach to process planning and scheduling
    • Chryssolouris G., Chan S., and Cobb W. Decision making on the factory floor: An integrated approach to process planning and scheduling. Robotics and Computer-Integrated Manufacturing 1 3-4 (1984) 315-319
    • (1984) Robotics and Computer-Integrated Manufacturing , vol.1 , Issue.3-4 , pp. 315-319
    • Chryssolouris, G.1    Chan, S.2    Cobb, W.3
  • 8
    • 0031121228 scopus 로고    scopus 로고
    • Bidding-based process planning and scheduling in a multi-agent system
    • Gu P., Balasubramanian S., and Norrie D. Bidding-based process planning and scheduling in a multi-agent system. Computers and Industrial Engineering 32 2 (1997) 477-496
    • (1997) Computers and Industrial Engineering , vol.32 , Issue.2 , pp. 477-496
    • Gu, P.1    Balasubramanian, S.2    Norrie, D.3
  • 9
    • 64149102872 scopus 로고    scopus 로고
    • Applications of particle swarm and optimization in integrated process planning and scheduling
    • Guo Y.W., Li W.D., Mileham A.R., and Owen G.W. Applications of particle swarm and optimization in integrated process planning and scheduling. Robotics and Computer-Integrated Manufacturing 25 (2009) 280-288
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , pp. 280-288
    • Guo, Y.W.1    Li, W.D.2    Mileham, A.R.3    Owen, G.W.4
  • 11
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • Kim Y.K., Park K., and Ko J. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research 30 (2003) 1151-1171
    • (2003) Computers and Operations Research , vol.30 , pp. 1151-1171
    • Kim, Y.K.1    Park, K.2    Ko, J.3
  • 12
    • 0038481224 scopus 로고    scopus 로고
    • Integration of scheduling with computer aided process planning
    • Kumar M., and Rajotia S. Integration of scheduling with computer aided process planning. Journal of Materials Processing Technology 138 (2003) 297-300
    • (2003) Journal of Materials Processing Technology , vol.138 , pp. 297-300
    • Kumar, M.1    Rajotia, S.2
  • 16
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using petri nets and heuristic search
    • Lee D.Y., and DiCesare F. Scheduling flexible manufacturing systems using petri nets and heuristic search. IEEE Transactions on Robotics and Automation 10 2 (1994) 123-132
    • (1994) IEEE Transactions on Robotics and Automation , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    DiCesare, F.2
  • 17
    • 0035175069 scopus 로고    scopus 로고
    • Integration of process planning and scheduling using simulation based genetic algorithms
    • Lee H., and Kim S.S. Integration of process planning and scheduling using simulation based genetic algorithms. International Journal of Advanced Manufacturing Technology 18 (2001) 586-590
    • (2001) International Journal of Advanced Manufacturing Technology , vol.18 , pp. 586-590
    • Lee, H.1    Kim, S.S.2
  • 18
    • 51049092106 scopus 로고    scopus 로고
    • Game theory-based cooperation of process planning and scheduling
    • Li, W. D., Gao, L., Li, X. Y., & Guo, Y. (2008a). Game theory-based cooperation of process planning and scheduling. In Proceeding of CSCWD (pp. 841-845).
    • (2008) Proceeding of CSCWD , pp. 841-845
    • Li, W.D.1    Gao, L.2    Li, X.Y.3    Guo, Y.4
  • 19
    • 33751504128 scopus 로고    scopus 로고
    • A simulated annealing-based optimization approach for integrated process planning and scheduling
    • Li W.D., and McMahon C.A. A simulated annealing-based optimization approach for integrated process planning and scheduling. International Journal of Computer Integrated Manufacturing. 20 1 (2007) 80-95
    • (2007) International Journal of Computer Integrated Manufacturing. , vol.20 , Issue.1 , pp. 80-95
    • Li, W.D.1    McMahon, C.A.2
  • 20
    • 0038449844 scopus 로고    scopus 로고
    • A multi-agent based manufacturing control strategy for responsive manufacturing
    • Lim M.K., and Zhang Z. A multi-agent based manufacturing control strategy for responsive manufacturing. Journal of Materials Processing Technology 139 (2003) 379-384
    • (2003) Journal of Materials Processing Technology , vol.139 , pp. 379-384
    • Lim, M.K.1    Zhang, Z.2
  • 21
    • 2042478705 scopus 로고    scopus 로고
    • An integrated agent-based approach for responsive control of manufacturing resources
    • Lim M.K., and Zhang D.Z. An integrated agent-based approach for responsive control of manufacturing resources. Computers and Industrial Engineering 46 (2004) 221-232
    • (2004) Computers and Industrial Engineering , vol.46 , pp. 221-232
    • Lim, M.K.1    Zhang, D.Z.2
  • 24
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • Morad N., and Zalzala A. Genetic algorithms in integrated process planning and scheduling. Journal of Intelligent Manufacturing 10 (1999) 169-179
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 169-179
    • Morad, N.1    Zalzala, A.2
  • 26
    • 0000481860 scopus 로고    scopus 로고
    • A simulated annealing approach to integrated production scheduling
    • Palmer G.J. A simulated annealing approach to integrated production scheduling. Journal of Intelligent Manufacturing 7 3 (1996) 163-176
    • (1996) Journal of Intelligent Manufacturing , vol.7 , Issue.3 , pp. 163-176
    • Palmer, G.J.1
  • 28
    • 56549112491 scopus 로고    scopus 로고
    • Integration of process planning and scheduling-a modified genetic algorithm-based approach
    • Shao X.Y., Li X.Y., Gao L., and Zhang C.Y. Integration of process planning and scheduling-a modified genetic algorithm-based approach. Computers and Operations Research 36 (2009) 2082-2096
    • (2009) Computers and Operations Research , vol.36 , pp. 2082-2096
    • Shao, X.Y.1    Li, X.Y.2    Gao, L.3    Zhang, C.Y.4
  • 30
    • 46749150544 scopus 로고    scopus 로고
    • Bidding-based multi-agent system for integrated process planning and scheduling: A data-mining and hybrid Tabu-SA algorithm-oriented approach
    • Shukla S.K., Tiwari M.K., and Son Y.J. Bidding-based multi-agent system for integrated process planning and scheduling: A data-mining and hybrid Tabu-SA algorithm-oriented approach. International Journal of Advanced Manufacturing Technology 38 (2008) 163-175
    • (2008) International Journal of Advanced Manufacturing Technology , vol.38 , pp. 163-175
    • Shukla, S.K.1    Tiwari, M.K.2    Son, Y.J.3
  • 31
    • 0344272408 scopus 로고    scopus 로고
    • Generation of alternative process plans in integrated manufacturing systems
    • Sormaz D., and Khoshnevis B. Generation of alternative process plans in integrated manufacturing systems. Journal of Intelligent Manufacturing 14 (2003) 509-526
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 509-526
    • Sormaz, D.1    Khoshnevis, B.2
  • 34
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and scheduling - A review
    • Tan W., and Khoshnevis B. Integration of process planning and scheduling - A review. Journal of Intelligent Manufacturing 11 (2000) 51-63
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 51-63
    • Tan, W.1    Khoshnevis, B.2
  • 36
    • 0141988713 scopus 로고    scopus 로고
    • DPP: An agent-based approach for distributed process planning
    • Wang L.H., and Shen W.M. DPP: An agent-based approach for distributed process planning. Journal of Intelligent Manufacturing 14 (2003) 429-439
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 429-439
    • Wang, L.H.1    Shen, W.M.2
  • 38
    • 33746794581 scopus 로고    scopus 로고
    • Integrated process planning and scheduling/rescheduling - An agent-based approach
    • Wong T.N., Leung C.W., Mak K.L., and Fung R.Y.K. Integrated process planning and scheduling/rescheduling - An agent-based approach. International Journal of Production Research 44 18-19 (2006) 3627-3655
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3627-3655
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 40
    • 0036165350 scopus 로고    scopus 로고
    • Concurrent process planning and scheduling in distributed virtual manufacturing
    • Wu S.H., Fuh J.Y.H., and Nee A.Y.C. Concurrent process planning and scheduling in distributed virtual manufacturing. IIE Transactions 34 (2002) 77-89
    • (2002) IIE Transactions , vol.34 , pp. 77-89
    • Wu, S.H.1    Fuh, J.Y.H.2    Nee, A.Y.C.3
  • 41
    • 0027151172 scopus 로고
    • IPPM-A prototype to integrated process planning and job shop scheduling functions
    • Zhang H.C. IPPM-A prototype to integrated process planning and job shop scheduling functions. Annals of the CIRP 42 1 (1993) 513-517
    • (1993) Annals of the CIRP , vol.42 , Issue.1 , pp. 513-517
    • Zhang, H.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.