메뉴 건너뛰기




Volumn 44, Issue 18-19, 2006, Pages 3627-3655

Integrated process planning and scheduling/rescheduling - An agent-based approach

Author keywords

Agents; Integrated process planning and scheduling; Negotiation; Rescheduling

Indexed keywords

INDUSTRIAL MANAGEMENT; INTELLIGENT AGENTS; PERFORMANCE; PRODUCTION CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 33746794581     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600675801     Document Type: Conference Paper
Times cited : (101)

References (26)
  • 1
    • 0031189107 scopus 로고    scopus 로고
    • Rescheduling job shops under random disruptions
    • Abumaizar, R.J. and Svestka, J.A., Rescheduling job shops under random disruptions. Int. J. Prod. Res., 1997, 35, 2065-2082.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 2065-2082
    • Abumaizar, R.J.1    Svestka, J.A.2
  • 2
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., Lawley, M.A., Mckay, K., Mohan, S. and Uzsoy, R., Executing production schedules in the face of uncertainties: a review and some future directions. Eur. J. Oper. Res., 2005, 161, 86-110.
    • (2005) Eur. J. Oper. Res. , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    Mckay, K.3    Mohan, S.4    Uzsoy, R.5
  • 4
    • 0242301593 scopus 로고    scopus 로고
    • Distributed intelligent control of exceptions in reconfigurable manufacturing systems
    • Bruccoleri, M., Amico, M. and Perrone, G., Distributed intelligent control of exceptions in reconfigurable manufacturing systems. Int. J. Prod. Res., 2003, 41, 1393-1412.
    • (2003) Int. J. Prod. Res. , vol.41 , pp. 1393-1412
    • Bruccoleri, M.1    Amico, M.2    Perrone, G.3
  • 5
    • 0034694440 scopus 로고    scopus 로고
    • Multi-agent hybrid shop floor control system
    • Choi, K.H., Kim, S.C. and Yook, S.H., Multi-agent hybrid shop floor control system. Int. J. Prod. Res., 2000, 38, 4193-4203.
    • (2000) Int. J. Prod. Res. , vol.38 , pp. 4193-4203
    • Choi, K.H.1    Kim, S.C.2    Yook, S.H.3
  • 6
    • 0346077605 scopus 로고
    • A decision-making approach to the operation of flexible manufacturing systems
    • Chryssolouris, G., Pierce, J.E. and Dicke, K., A decision-making approach to the operation of flexible manufacturing systems. Int. J. Flex. Manuf. Syst., 1992, 3, 309-330.
    • (1992) Int. J. Flex. Manuf. Syst. , vol.3 , pp. 309-330
    • Chryssolouris, G.1    Pierce, J.E.2    Dicke, K.3
  • 7
    • 0025555793 scopus 로고
    • Reacting to scheduling exceptions in FMS environments
    • Dutta, A., Reacting to scheduling exceptions in FMS environments. IIE Trans., 1990, 22, 300-314.
    • (1990) IIE Trans. , vol.22 , pp. 300-314
    • Dutta, A.1
  • 9
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • Jain, A.K. and Elmaraghy, H.A., Production scheduling/rescheduling in flexible manufacturing. Int. J. Prod. Res., 1997, 35, 281-309.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 281-309
    • Jain, A.K.1    Elmaraghy, H.A.2
  • 10
    • 0036643293 scopus 로고    scopus 로고
    • Intelligent agent modeling of an industrial warehousing problem
    • Kim, B.-I, Graves, R.J., Heragu, S.S. and Onge, A.S., Intelligent agent modeling of an industrial warehousing problem. IIE Trans., 2002, 34, 601-612.
    • (2002) IIE Trans. , vol.34 , pp. 601-612
    • Kim, B.-I.1    Graves, R.J.2    Heragu, S.S.3    Onge, A.S.4
  • 12
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • Kim, Y.K., Park, K. and Ko, J., A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comput. Oper. Res., 2003, 30, 1151-1171.
    • (2003) Comput. Oper. Res. , vol.30 , pp. 1151-1171
    • Kim, Y.K.1    Park, K.2    Ko, J.3
  • 13
    • 0027641665 scopus 로고
    • A heuristic rescheduling algorithm for computer-based production scheduling systems
    • Li, R.K., Shyu, Y.T. and Adiga, S., A heuristic rescheduling algorithm for computer-based production scheduling systems. Int. J. Prod. Res., 1993, 31, 1815-1826.
    • (1993) Int. J. Prod. Res. , vol.31 , pp. 1815-1826
    • Li, R.K.1    Shyu, Y.T.2    Adiga, S.3
  • 14
    • 1342308533 scopus 로고    scopus 로고
    • Rescheduling strategies for minimizing total weighted tardiness in complex job shops
    • Mason, S.J., Jin, S. and Wessels, C.M., Rescheduling strategies for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res., 2004, 42, 613-628.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 613-628
    • Mason, S.J.1    Jin, S.2    Wessels, C.M.3
  • 15
    • 15744370548 scopus 로고    scopus 로고
    • A hybrid multi-agent system architecture for enterprise integration using computer networks
    • Nahm, Y.E. and Ishikawa, H., A hybrid multi-agent system architecture for enterprise integration using computer networks. Robot. Comput. Integ. Manuf., 2005, 21, 217-234.
    • (2005) Robot. Comput. Integ. Manuf. , vol.21 , pp. 217-234
    • Nahm, Y.E.1    Ishikawa, H.2
  • 16
    • 2942528884 scopus 로고    scopus 로고
    • A coordination strategy for distributed multi-agent manufacturing systems
    • Naso, D. and Turcbiano, B., A coordination strategy for distributed multi-agent manufacturing systems. Int. J. Prod. Res., 2004, 42, 2497-2520.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 2497-2520
    • Naso, D.1    Turcbiano, B.2
  • 17
    • 0034628954 scopus 로고    scopus 로고
    • An adaptive production control system utilizing agent technology
    • Ottaway, T.A. and Burns, J.R., An adaptive production control system utilizing agent technology. Int. J. Prod. Res., 2000, 38, 721-737.
    • (2000) Int. J. Prod. Res. , vol.38 , pp. 721-737
    • Ottaway, T.A.1    Burns, J.R.2
  • 18
    • 0032094503 scopus 로고    scopus 로고
    • The development of a hybrid hierarchical/heterarchical shop floor control system applying bidding method in job dispatching
    • Ou-Yang, C. and Lin, J.S., The development of a hybrid hierarchical/heterarchical shop floor control system applying bidding method in job dispatching. Robot. Comput. Integ. Manuf., 1998, 14, 199-217.
    • (1998) Robot. Comput. Integ. Manuf. , vol.14 , pp. 199-217
    • Ou-Yang, C.1    Lin, J.S.2
  • 19
    • 0036300695 scopus 로고    scopus 로고
    • Reactive recovery of job shop schedules - A review
    • Raheja, A.S. and Subramaniam, V., Reactive recovery of job shop schedules - a review. Int. J. Adv. Manuf. Technol., 2002, 19, 756-763.
    • (2002) Int. J. Adv. Manuf. Technol. , vol.19 , pp. 756-763
    • Raheja, A.S.1    Subramaniam, V.2
  • 20
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • Smith, R.G., The contract net protocol: high-level communication and control in a distributed problem solver. IEEE Trans. Comput., 1980, 29, 1104-1113.
    • (1980) IEEE Trans. Comput. , vol.29 , pp. 1104-1113
    • Smith, R.G.1
  • 21
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • Vieira, G.E., Herrmann, J.W. and Lin, E., Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched., 2003, 6, 39-62.
    • (2003) J. Sched. , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 22
    • 0141741168 scopus 로고    scopus 로고
    • Machining process sequencing with fuzzy expert system and genetic algorithms
    • Wong, T.N., Chan, L.C.F. and Lau, H.C.W., Machining process sequencing with fuzzy expert system and genetic algorithms. Engng Comput., 2003, 19, 191-202.
    • (2003) Engng Comput. , vol.19 , pp. 191-202
    • Wong, T.N.1    Chan, L.C.F.2    Lau, H.C.W.3
  • 24
    • 32644476109 scopus 로고    scopus 로고
    • An agent-based negotiation approach to integrate process planning and scheduling
    • Wong, T.N., Leung, C.W., Mak, K.L. and Fung, R.Y.K., An agent-based negotiation approach to integrate process planning and scheduling. Int. J. Prod. Res., 2006a, 44, 1331-1351.
    • (2006) Int. J. Prod. Res. , vol.44 , pp. 1331-1351
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 25
    • 33744827670 scopus 로고    scopus 로고
    • Dynamic shopfloor scheduling in multi-agent manufacturing systems
    • accepted for publication
    • Wong, T.N., Leung, C.W., Mak, K.L. and Fung, R.Y.K., Dynamic shopfloor scheduling in multi-agent manufacturing systems. Expert Syst. Applic, 2006b, 31 (accepted for publication).
    • (2006) Expert Syst. Applic , pp. 31
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 26
    • 0242269797 scopus 로고    scopus 로고
    • Integration of process planning and scheduling by exploring the flexibility of process planning
    • Zhang, Y.F., Saravanan, A.N. and Fuh, J.Y.H., Integration of process planning and scheduling by exploring the flexibility of process planning. Int. J. Prod. Res., 2003, 41, 611-628.
    • (2003) Int. J. Prod. Res. , vol.41 , pp. 611-628
    • Zhang, Y.F.1    Saravanan, A.N.2    Fuh, J.Y.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.