-
1
-
-
0031189107
-
Rescheduling job shops under random disruptions
-
Abumaizar, R.J. and Svestka, J.A., Rescheduling job shops under random disruptions. Int. J. Prod. Res., 1997, 35, 2065-2082.
-
(1997)
Int. J. Prod. Res.
, vol.35
, pp. 2065-2082
-
-
Abumaizar, R.J.1
Svestka, J.A.2
-
2
-
-
5144232431
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
Aytug, H., Lawley, M.A., Mckay, K., Mohan, S. and Uzsoy, R., Executing production schedules in the face of uncertainties: a review and some future directions. Eur. J. Oper. Res., 2005, 161, 86-110.
-
(2005)
Eur. J. Oper. Res.
, vol.161
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
Mckay, K.3
Mohan, S.4
Uzsoy, R.5
-
4
-
-
0242301593
-
Distributed intelligent control of exceptions in reconfigurable manufacturing systems
-
Bruccoleri, M., Amico, M. and Perrone, G., Distributed intelligent control of exceptions in reconfigurable manufacturing systems. Int. J. Prod. Res., 2003, 41, 1393-1412.
-
(2003)
Int. J. Prod. Res.
, vol.41
, pp. 1393-1412
-
-
Bruccoleri, M.1
Amico, M.2
Perrone, G.3
-
5
-
-
0034694440
-
Multi-agent hybrid shop floor control system
-
Choi, K.H., Kim, S.C. and Yook, S.H., Multi-agent hybrid shop floor control system. Int. J. Prod. Res., 2000, 38, 4193-4203.
-
(2000)
Int. J. Prod. Res.
, vol.38
, pp. 4193-4203
-
-
Choi, K.H.1
Kim, S.C.2
Yook, S.H.3
-
6
-
-
0346077605
-
A decision-making approach to the operation of flexible manufacturing systems
-
Chryssolouris, G., Pierce, J.E. and Dicke, K., A decision-making approach to the operation of flexible manufacturing systems. Int. J. Flex. Manuf. Syst., 1992, 3, 309-330.
-
(1992)
Int. J. Flex. Manuf. Syst.
, vol.3
, pp. 309-330
-
-
Chryssolouris, G.1
Pierce, J.E.2
Dicke, K.3
-
7
-
-
0025555793
-
Reacting to scheduling exceptions in FMS environments
-
Dutta, A., Reacting to scheduling exceptions in FMS environments. IIE Trans., 1990, 22, 300-314.
-
(1990)
IIE Trans.
, vol.22
, pp. 300-314
-
-
Dutta, A.1
-
9
-
-
0030786875
-
Production scheduling/rescheduling in flexible manufacturing
-
Jain, A.K. and Elmaraghy, H.A., Production scheduling/rescheduling in flexible manufacturing. Int. J. Prod. Res., 1997, 35, 281-309.
-
(1997)
Int. J. Prod. Res.
, vol.35
, pp. 281-309
-
-
Jain, A.K.1
Elmaraghy, H.A.2
-
10
-
-
0036643293
-
Intelligent agent modeling of an industrial warehousing problem
-
Kim, B.-I, Graves, R.J., Heragu, S.S. and Onge, A.S., Intelligent agent modeling of an industrial warehousing problem. IIE Trans., 2002, 34, 601-612.
-
(2002)
IIE Trans.
, vol.34
, pp. 601-612
-
-
Kim, B.-I.1
Graves, R.J.2
Heragu, S.S.3
Onge, A.S.4
-
12
-
-
0037410965
-
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
-
Kim, Y.K., Park, K. and Ko, J., A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comput. Oper. Res., 2003, 30, 1151-1171.
-
(2003)
Comput. Oper. Res.
, vol.30
, pp. 1151-1171
-
-
Kim, Y.K.1
Park, K.2
Ko, J.3
-
13
-
-
0027641665
-
A heuristic rescheduling algorithm for computer-based production scheduling systems
-
Li, R.K., Shyu, Y.T. and Adiga, S., A heuristic rescheduling algorithm for computer-based production scheduling systems. Int. J. Prod. Res., 1993, 31, 1815-1826.
-
(1993)
Int. J. Prod. Res.
, vol.31
, pp. 1815-1826
-
-
Li, R.K.1
Shyu, Y.T.2
Adiga, S.3
-
14
-
-
1342308533
-
Rescheduling strategies for minimizing total weighted tardiness in complex job shops
-
Mason, S.J., Jin, S. and Wessels, C.M., Rescheduling strategies for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res., 2004, 42, 613-628.
-
(2004)
Int. J. Prod. Res.
, vol.42
, pp. 613-628
-
-
Mason, S.J.1
Jin, S.2
Wessels, C.M.3
-
15
-
-
15744370548
-
A hybrid multi-agent system architecture for enterprise integration using computer networks
-
Nahm, Y.E. and Ishikawa, H., A hybrid multi-agent system architecture for enterprise integration using computer networks. Robot. Comput. Integ. Manuf., 2005, 21, 217-234.
-
(2005)
Robot. Comput. Integ. Manuf.
, vol.21
, pp. 217-234
-
-
Nahm, Y.E.1
Ishikawa, H.2
-
16
-
-
2942528884
-
A coordination strategy for distributed multi-agent manufacturing systems
-
Naso, D. and Turcbiano, B., A coordination strategy for distributed multi-agent manufacturing systems. Int. J. Prod. Res., 2004, 42, 2497-2520.
-
(2004)
Int. J. Prod. Res.
, vol.42
, pp. 2497-2520
-
-
Naso, D.1
Turcbiano, B.2
-
17
-
-
0034628954
-
An adaptive production control system utilizing agent technology
-
Ottaway, T.A. and Burns, J.R., An adaptive production control system utilizing agent technology. Int. J. Prod. Res., 2000, 38, 721-737.
-
(2000)
Int. J. Prod. Res.
, vol.38
, pp. 721-737
-
-
Ottaway, T.A.1
Burns, J.R.2
-
18
-
-
0032094503
-
The development of a hybrid hierarchical/heterarchical shop floor control system applying bidding method in job dispatching
-
Ou-Yang, C. and Lin, J.S., The development of a hybrid hierarchical/heterarchical shop floor control system applying bidding method in job dispatching. Robot. Comput. Integ. Manuf., 1998, 14, 199-217.
-
(1998)
Robot. Comput. Integ. Manuf.
, vol.14
, pp. 199-217
-
-
Ou-Yang, C.1
Lin, J.S.2
-
19
-
-
0036300695
-
Reactive recovery of job shop schedules - A review
-
Raheja, A.S. and Subramaniam, V., Reactive recovery of job shop schedules - a review. Int. J. Adv. Manuf. Technol., 2002, 19, 756-763.
-
(2002)
Int. J. Adv. Manuf. Technol.
, vol.19
, pp. 756-763
-
-
Raheja, A.S.1
Subramaniam, V.2
-
20
-
-
0019180974
-
The contract net protocol: High-level communication and control in a distributed problem solver
-
Smith, R.G., The contract net protocol: high-level communication and control in a distributed problem solver. IEEE Trans. Comput., 1980, 29, 1104-1113.
-
(1980)
IEEE Trans. Comput.
, vol.29
, pp. 1104-1113
-
-
Smith, R.G.1
-
21
-
-
0242703954
-
Rescheduling manufacturing systems: A framework of strategies, policies, and methods
-
Vieira, G.E., Herrmann, J.W. and Lin, E., Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched., 2003, 6, 39-62.
-
(2003)
J. Sched.
, vol.6
, pp. 39-62
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
22
-
-
0141741168
-
Machining process sequencing with fuzzy expert system and genetic algorithms
-
Wong, T.N., Chan, L.C.F. and Lau, H.C.W., Machining process sequencing with fuzzy expert system and genetic algorithms. Engng Comput., 2003, 19, 191-202.
-
(2003)
Engng Comput.
, vol.19
, pp. 191-202
-
-
Wong, T.N.1
Chan, L.C.F.2
Lau, H.C.W.3
-
23
-
-
33746794581
-
Integrated process planning and scheduling - An agent-based approach
-
31 July-4 August, Naples, Italy
-
Wong, T.N., Leung, C.W., Mak, K.L., & Fung, R.Y.K., Integrated process planning and scheduling - an agent-based approach, in Proceedings of the 18th International Conference of Production Research, 31 July-4 August 2005, Naples, Italy.
-
(2005)
Proceedings of the 18th International Conference of Production Research
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
24
-
-
32644476109
-
An agent-based negotiation approach to integrate process planning and scheduling
-
Wong, T.N., Leung, C.W., Mak, K.L. and Fung, R.Y.K., An agent-based negotiation approach to integrate process planning and scheduling. Int. J. Prod. Res., 2006a, 44, 1331-1351.
-
(2006)
Int. J. Prod. Res.
, vol.44
, pp. 1331-1351
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
25
-
-
33744827670
-
Dynamic shopfloor scheduling in multi-agent manufacturing systems
-
accepted for publication
-
Wong, T.N., Leung, C.W., Mak, K.L. and Fung, R.Y.K., Dynamic shopfloor scheduling in multi-agent manufacturing systems. Expert Syst. Applic, 2006b, 31 (accepted for publication).
-
(2006)
Expert Syst. Applic
, pp. 31
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
26
-
-
0242269797
-
Integration of process planning and scheduling by exploring the flexibility of process planning
-
Zhang, Y.F., Saravanan, A.N. and Fuh, J.Y.H., Integration of process planning and scheduling by exploring the flexibility of process planning. Int. J. Prod. Res., 2003, 41, 611-628.
-
(2003)
Int. J. Prod. Res.
, vol.41
, pp. 611-628
-
-
Zhang, Y.F.1
Saravanan, A.N.2
Fuh, J.Y.H.3
|