-
2
-
-
0038112235
-
Production planning and order acceptance in business to business electronic commerce
-
Calosso, T., Cantamessa, M., Vu, D. and Villa, A., Production planning and order acceptance in business to business electronic commerce. Int. J. Prod. Econ., 2003, 85, 233-249.
-
(2003)
Int. J. Prod. Econ.
, vol.85
, pp. 233-249
-
-
Calosso, T.1
Cantamessa, M.2
Vu, D.3
Villa, A.4
-
3
-
-
0034694440
-
Multi-agent hybrid shop floor control system
-
Choi, K.H., Kim, S.C. and Yook, S.H., Multi-agent hybrid shop floor control system. Int. J. Prod. Res., 2000, 38, 4193-4203.
-
(2000)
Int. J. Prod. Res.
, vol.38
, pp. 4193-4203
-
-
Choi, K.H.1
Kim, S.C.2
Yook, S.H.3
-
4
-
-
0028590749
-
Real-time distributed scheduling of heterarchical manufacturing systems
-
Duffie, N.A. and Prabhu, V.V., Real-time distributed scheduling of heterarchical manufacturing systems. J. Manuf. Syst., 1994, 13, 94-107.
-
(1994)
J. Manuf. Syst.
, vol.13
, pp. 94-107
-
-
Duffie, N.A.1
Prabhu, V.V.2
-
6
-
-
0032630439
-
Manufacturing responsiveness through integrated process planning and scheduling
-
Gindy, N.N., Saad, S.M. and Yue, Y., Manufacturing responsiveness through integrated process planning and scheduling. Int. J. Prod. Res., 1999, 37, 2399-2418.
-
(1999)
Int. J. Prod. Res.
, vol.37
, pp. 2399-2418
-
-
Gindy, N.N.1
Saad, S.M.2
Yue, Y.3
-
7
-
-
0031121228
-
Bidding-based process planning and scheduling in a multi-agent system
-
Gu, P., Balasubramanian, S. and Norrie, D.H., Bidding-based process planning and scheduling in a multi-agent system. Comp. & Indust. Eng., 1997, 32, 477-496.
-
(1997)
Comp. & Indust. Eng.
, vol.32
, pp. 477-496
-
-
Gu, P.1
Balasubramanian, S.2
Norrie, D.H.3
-
8
-
-
0030270466
-
Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities
-
Ho, Y.C. and Moodie, C.L., Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. Int. J. Prod. Res., 1996, 34, 2901-2923.
-
(1996)
Int. J. Prod. Res.
, vol.34
, pp. 2901-2923
-
-
Ho, Y.C.1
Moodie, C.L.2
-
9
-
-
79251627866
-
A progressive approach for the integration of process planning and scheduling
-
Huang, S.H., Zhang, H.C. and Smith, M.L., A progressive approach for the integration of process planning and scheduling. IIE Trans., 1995, 1, 456-464.
-
(1995)
IIE Trans.
, vol.1
, pp. 456-464
-
-
Huang, S.H.1
Zhang, H.C.2
Smith, M.L.3
-
10
-
-
0028401319
-
Flexible process plans: Their value in flexible automation systems
-
Hutchinson, G.K. and Pflughoeft, K.A., Flexible process plans: their value in flexible automation systems. Int. J. Prod. Res., 1994, 32, 707-719.
-
(1994)
Int. J. Prod. Res.
, vol.32
, pp. 707-719
-
-
Hutchinson, G.K.1
Pflughoeft, K.A.2
-
11
-
-
0026155862
-
Scheduling approaches for random job shop flexible manufacturing systems
-
Hutchison, J., Leong, K., Snyder, D. and Ward, P., Scheduling approaches for random job shop flexible manufacturing systems. Int. J. Prod. Res., 1991, 29, 1053-1067.
-
(1991)
Int. J. Prod. Res.
, vol.29
, pp. 1053-1067
-
-
Hutchison, J.1
Leong, K.2
Snyder, D.3
Ward, P.4
-
13
-
-
33746031638
-
Integration of process planning and scheduling functions
-
Khoshnevis, B. and Chen, Q., Integration of process planning and scheduling functions. J. Intell. Manuf., 1990, 1, 165-176.
-
(1990)
J. Intell. Manuf.
, vol.1
, pp. 165-176
-
-
Khoshnevis, B.1
Chen, Q.2
-
14
-
-
0032044924
-
A mathematical model for job shop scheduling with multiple process plan consideration per job
-
Kim, K.H. and Egbelu, P., A mathematical model for job shop scheduling with multiple process plan consideration per job. Prod. Plan. & Com., 1998, 9, 250-259.
-
(1998)
Prod. Plan. & Com.
, vol.9
, pp. 250-259
-
-
Kim, K.H.1
Egbelu, P.2
-
15
-
-
0032690982
-
Scheduling in a production environment with multiple process plans per job
-
Kim, K.H. and Egbelu, P.J., Scheduling in a production environment with multiple process plans per job. Int. J. Prod. Res., 1999, 37, 2725-2753.
-
(1999)
Int. J. Prod. Res.
, vol.37
, pp. 2725-2753
-
-
Kim, K.H.1
Egbelu, P.J.2
-
17
-
-
0037410965
-
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
-
Kim, Y.K., Park, K. and Ko, J., A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comp. & Op. Res., 2003, 30, 1151-1171.
-
(2003)
Comp. & Op. Res.
, vol.30
, pp. 1151-1171
-
-
Kim, Y.K.1
Park, K.2
Ko, J.3
-
18
-
-
0042021869
-
Job-shop scheduling with processing alternatives
-
Kis, T., Job-shop scheduling with processing alternatives. Euro. J. Op. Res., 2003, 151, 307-332.
-
(2003)
Euro. J. Op. Res.
, vol.151
, pp. 307-332
-
-
Kis, T.1
-
19
-
-
0033132543
-
Design of negotiation protocols for multi-agent manufacturing systems
-
Krothapalli, N. and Deshmukh, A., Design of negotiation protocols for multi-agent manufacturing systems. Int. J. Prod. Res., 1999, 37, 1601-1624.
-
(1999)
Int. J. Prod. Res.
, vol.37
, pp. 1601-1624
-
-
Krothapalli, N.1
Deshmukh, A.2
-
20
-
-
84950937653
-
Integrated shop floor control using autonomous agents
-
Lin, G.Y.J. and Solberg, J.J., Integrated shop floor control using autonomous agents. IIE Trans., 1992, 24, 57-71.
-
(1992)
IIE Trans.
, vol.24
, pp. 57-71
-
-
Lin, G.Y.J.1
Solberg, J.J.2
-
21
-
-
0036574007
-
A negotiation scheme for autonomous agents in job shop scheduling
-
Macchiaroli, R. and Riemma, S., A negotiation scheme for autonomous agents in job shop scheduling. Int. J. Comp. Integ. Manuf., 2002, 15, 222-232.
-
(2002)
Int. J. Comp. Integ. Manuf.
, vol.15
, pp. 222-232
-
-
Macchiaroli, R.1
Riemma, S.2
-
22
-
-
0032663605
-
MetaMorph: An adaptive agent-based architecture for intelligent manufacturing
-
Maturana, F., Shen, W. and Norrie, D.H., MetaMorph: an adaptive agent-based architecture for intelligent manufacturing. Int. J. Prod. Res., 1999, 37, 2159-2173.
-
(1999)
Int. J. Prod. Res.
, vol.37
, pp. 2159-2173
-
-
Maturana, F.1
Shen, W.2
Norrie, D.H.3
-
23
-
-
0025482435
-
Job shop scheduling with alternative machines
-
Nasr, N. and Elsayed, E.A., Job shop scheduling with alternative machines. Int. J. Prod. Res., 1990, 28, 1595-1609.
-
(1990)
Int. J. Prod. Res.
, vol.28
, pp. 1595-1609
-
-
Nasr, N.1
Elsayed, E.A.2
-
24
-
-
0001538571
-
Manufacturing experience with the contract net
-
edited by M.N. Huhns, Pitman: London.
-
Parunak, V.D., Manufacturing experience with the contract net. In Distributed Artificial. Intelligence, edited by M.N. Huhns, pp. 285-310, 1987 (Pitman: London).
-
(1987)
Distributed Artificial. Intelligence
, pp. 285-310
-
-
Parunak, V.D.1
-
25
-
-
0342855202
-
The AARIA agent architecture: From manufacturing requirements to agent-based system design
-
Parunak, V.D., Baker, A.D. and Clark, S.J., The AARIA agent architecture: From manufacturing requirements to agent-based system design. Integ. Comp.-Aided Eng., 2001, 8, 45-58.
-
(2001)
Integ. Comp.-Aided Eng.
, vol.8
, pp. 45-58
-
-
Parunak, V.D.1
Baker, A.D.2
Clark, S.J.3
-
26
-
-
0020871016
-
Production system design: A directed graph approach
-
Passler, E., Hutchinson, G.K. and Rudolph, K., Production system design: a directed graph approach. J. Manuf. Syst., 1983, 2, 107-116.
-
(1983)
J. Manuf. Syst.
, vol.2
, pp. 107-116
-
-
Passler, E.1
Hutchinson, G.K.2
Rudolph, K.3
-
27
-
-
0023419094
-
A distributed scheduling method for computer integrated manufacturing: The use of local area networks in cellular systems
-
Shaw, M.J., A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems. Int. J. Prod. Res., 1987, 25, 1285-1303.
-
(1987)
Int. J. Prod. Res.
, vol.25
, pp. 1285-1303
-
-
Shaw, M.J.1
-
28
-
-
0034205722
-
MetaMorph II: An agent-based architecture for distributed intelligent design and manufacturing
-
Shen, W., Maturana, F. and Norrie, D.H., MetaMorph II: An agent-based architecture for distributed intelligent design and manufacturing. J. Intel. Manuf., 2000, 11, 237-252.
-
(2000)
J. Intel. Manuf.
, vol.11
, pp. 237-252
-
-
Shen, W.1
Maturana, F.2
Norrie, D.H.3
-
29
-
-
0019180974
-
The contract net protocol: High-level communication and control in a distributed problem solver
-
Smith, R.G., The contract net protocol: high-level communication and control in a distributed problem solver. IEEE Trans. on Comp., 1980, 29, 1104-1113.
-
(1980)
IEEE Trans. on Comp.
, vol.29
, pp. 1104-1113
-
-
Smith, R.G.1
-
30
-
-
0033885605
-
Integration of process planning and scheduling - A review
-
Tan, W. and Khoshnevis, B., Integration of process planning and scheduling - a review. J. Intel. Manuf., 2000, 11, 51-63.
-
(2000)
J. Intel. Manuf.
, vol.11
, pp. 51-63
-
-
Tan, W.1
Khoshnevis, B.2
-
31
-
-
0141885118
-
Negotiation-based routing in job shops via collaborative agents
-
Usher, J.M., Negotiation-based routing in job shops via collaborative agents. J. Intel. Manuf., 2003, 14, 485-499.
-
(2003)
J. Intel. Manuf.
, vol.14
, pp. 485-499
-
-
Usher, J.M.1
-
32
-
-
0030212624
-
Dynamic process planning - The static phase
-
Usher, J.M. and Fernandes, K.J., Dynamic process planning - the static phase. J. Mat. Proc. Tech., 1996, 61, 53-58.
-
(1996)
J. Mat. Proc. Tech.
, vol.61
, pp. 53-58
-
-
Usher, J.M.1
Fernandes, K.J.2
-
33
-
-
0033341387
-
Scheduling with alternatives: A link between process planning and scheduling
-
Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J. and Zozom, A., Scheduling with alternatives: a link between process planning and scheduling. IIE Trans., 1999, 31, 1093-1102.
-
(1999)
IIE Trans.
, vol.31
, pp. 1093-1102
-
-
Weintraub, A.1
Cormier, D.2
Hodgson, T.3
King, R.4
Wilson, J.5
Zozom, A.6
-
34
-
-
0242269797
-
Integration of process planning and scheduling by exploring the flexibility of process planning
-
Zhang, Y.F., Saravanan, A.N. and Fuh, J.Y.H., Integration of process planning and scheduling by exploring the flexibility of process planning. Int. J. Prod. Res., 2003, 41, 611-628.
-
(2003)
Int. J. Prod. Res.
, vol.41
, pp. 611-628
-
-
Zhang, Y.F.1
Saravanan, A.N.2
Fuh, J.Y.H.3
|