메뉴 건너뛰기




Volumn 44, Issue 7, 2006, Pages 1331-1351

An agent-based negotiation approach to integrate process planning and scheduling

Author keywords

Agents; Currency function; Integrated process planning and scheduling; Negotiation

Indexed keywords

INDUSTRIAL PLANTS; PLANNING; PROCESS ENGINEERING; SCHEDULING;

EID: 32644476109     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540500409723     Document Type: Article
Times cited : (82)

References (34)
  • 2
    • 0038112235 scopus 로고    scopus 로고
    • Production planning and order acceptance in business to business electronic commerce
    • Calosso, T., Cantamessa, M., Vu, D. and Villa, A., Production planning and order acceptance in business to business electronic commerce. Int. J. Prod. Econ., 2003, 85, 233-249.
    • (2003) Int. J. Prod. Econ. , vol.85 , pp. 233-249
    • Calosso, T.1    Cantamessa, M.2    Vu, D.3    Villa, A.4
  • 3
    • 0034694440 scopus 로고    scopus 로고
    • Multi-agent hybrid shop floor control system
    • Choi, K.H., Kim, S.C. and Yook, S.H., Multi-agent hybrid shop floor control system. Int. J. Prod. Res., 2000, 38, 4193-4203.
    • (2000) Int. J. Prod. Res. , vol.38 , pp. 4193-4203
    • Choi, K.H.1    Kim, S.C.2    Yook, S.H.3
  • 4
    • 0028590749 scopus 로고
    • Real-time distributed scheduling of heterarchical manufacturing systems
    • Duffie, N.A. and Prabhu, V.V., Real-time distributed scheduling of heterarchical manufacturing systems. J. Manuf. Syst., 1994, 13, 94-107.
    • (1994) J. Manuf. Syst. , vol.13 , pp. 94-107
    • Duffie, N.A.1    Prabhu, V.V.2
  • 6
    • 0032630439 scopus 로고    scopus 로고
    • Manufacturing responsiveness through integrated process planning and scheduling
    • Gindy, N.N., Saad, S.M. and Yue, Y., Manufacturing responsiveness through integrated process planning and scheduling. Int. J. Prod. Res., 1999, 37, 2399-2418.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 2399-2418
    • Gindy, N.N.1    Saad, S.M.2    Yue, Y.3
  • 7
    • 0031121228 scopus 로고    scopus 로고
    • Bidding-based process planning and scheduling in a multi-agent system
    • Gu, P., Balasubramanian, S. and Norrie, D.H., Bidding-based process planning and scheduling in a multi-agent system. Comp. & Indust. Eng., 1997, 32, 477-496.
    • (1997) Comp. & Indust. Eng. , vol.32 , pp. 477-496
    • Gu, P.1    Balasubramanian, S.2    Norrie, D.H.3
  • 8
    • 0030270466 scopus 로고    scopus 로고
    • Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities
    • Ho, Y.C. and Moodie, C.L., Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. Int. J. Prod. Res., 1996, 34, 2901-2923.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 2901-2923
    • Ho, Y.C.1    Moodie, C.L.2
  • 9
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • Huang, S.H., Zhang, H.C. and Smith, M.L., A progressive approach for the integration of process planning and scheduling. IIE Trans., 1995, 1, 456-464.
    • (1995) IIE Trans. , vol.1 , pp. 456-464
    • Huang, S.H.1    Zhang, H.C.2    Smith, M.L.3
  • 10
    • 0028401319 scopus 로고
    • Flexible process plans: Their value in flexible automation systems
    • Hutchinson, G.K. and Pflughoeft, K.A., Flexible process plans: their value in flexible automation systems. Int. J. Prod. Res., 1994, 32, 707-719.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 707-719
    • Hutchinson, G.K.1    Pflughoeft, K.A.2
  • 11
    • 0026155862 scopus 로고
    • Scheduling approaches for random job shop flexible manufacturing systems
    • Hutchison, J., Leong, K., Snyder, D. and Ward, P., Scheduling approaches for random job shop flexible manufacturing systems. Int. J. Prod. Res., 1991, 29, 1053-1067.
    • (1991) Int. J. Prod. Res. , vol.29 , pp. 1053-1067
    • Hutchison, J.1    Leong, K.2    Snyder, D.3    Ward, P.4
  • 13
    • 33746031638 scopus 로고
    • Integration of process planning and scheduling functions
    • Khoshnevis, B. and Chen, Q., Integration of process planning and scheduling functions. J. Intell. Manuf., 1990, 1, 165-176.
    • (1990) J. Intell. Manuf. , vol.1 , pp. 165-176
    • Khoshnevis, B.1    Chen, Q.2
  • 14
    • 0032044924 scopus 로고    scopus 로고
    • A mathematical model for job shop scheduling with multiple process plan consideration per job
    • Kim, K.H. and Egbelu, P., A mathematical model for job shop scheduling with multiple process plan consideration per job. Prod. Plan. & Com., 1998, 9, 250-259.
    • (1998) Prod. Plan. & Com. , vol.9 , pp. 250-259
    • Kim, K.H.1    Egbelu, P.2
  • 15
    • 0032690982 scopus 로고    scopus 로고
    • Scheduling in a production environment with multiple process plans per job
    • Kim, K.H. and Egbelu, P.J., Scheduling in a production environment with multiple process plans per job. Int. J. Prod. Res., 1999, 37, 2725-2753.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 2725-2753
    • Kim, K.H.1    Egbelu, P.J.2
  • 17
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • Kim, Y.K., Park, K. and Ko, J., A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comp. & Op. Res., 2003, 30, 1151-1171.
    • (2003) Comp. & Op. Res. , vol.30 , pp. 1151-1171
    • Kim, Y.K.1    Park, K.2    Ko, J.3
  • 18
    • 0042021869 scopus 로고    scopus 로고
    • Job-shop scheduling with processing alternatives
    • Kis, T., Job-shop scheduling with processing alternatives. Euro. J. Op. Res., 2003, 151, 307-332.
    • (2003) Euro. J. Op. Res. , vol.151 , pp. 307-332
    • Kis, T.1
  • 19
    • 0033132543 scopus 로고    scopus 로고
    • Design of negotiation protocols for multi-agent manufacturing systems
    • Krothapalli, N. and Deshmukh, A., Design of negotiation protocols for multi-agent manufacturing systems. Int. J. Prod. Res., 1999, 37, 1601-1624.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 1601-1624
    • Krothapalli, N.1    Deshmukh, A.2
  • 20
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • Lin, G.Y.J. and Solberg, J.J., Integrated shop floor control using autonomous agents. IIE Trans., 1992, 24, 57-71.
    • (1992) IIE Trans. , vol.24 , pp. 57-71
    • Lin, G.Y.J.1    Solberg, J.J.2
  • 21
    • 0036574007 scopus 로고    scopus 로고
    • A negotiation scheme for autonomous agents in job shop scheduling
    • Macchiaroli, R. and Riemma, S., A negotiation scheme for autonomous agents in job shop scheduling. Int. J. Comp. Integ. Manuf., 2002, 15, 222-232.
    • (2002) Int. J. Comp. Integ. Manuf. , vol.15 , pp. 222-232
    • Macchiaroli, R.1    Riemma, S.2
  • 22
    • 0032663605 scopus 로고    scopus 로고
    • MetaMorph: An adaptive agent-based architecture for intelligent manufacturing
    • Maturana, F., Shen, W. and Norrie, D.H., MetaMorph: an adaptive agent-based architecture for intelligent manufacturing. Int. J. Prod. Res., 1999, 37, 2159-2173.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 2159-2173
    • Maturana, F.1    Shen, W.2    Norrie, D.H.3
  • 23
    • 0025482435 scopus 로고
    • Job shop scheduling with alternative machines
    • Nasr, N. and Elsayed, E.A., Job shop scheduling with alternative machines. Int. J. Prod. Res., 1990, 28, 1595-1609.
    • (1990) Int. J. Prod. Res. , vol.28 , pp. 1595-1609
    • Nasr, N.1    Elsayed, E.A.2
  • 24
    • 0001538571 scopus 로고
    • Manufacturing experience with the contract net
    • edited by M.N. Huhns, Pitman: London.
    • Parunak, V.D., Manufacturing experience with the contract net. In Distributed Artificial. Intelligence, edited by M.N. Huhns, pp. 285-310, 1987 (Pitman: London).
    • (1987) Distributed Artificial. Intelligence , pp. 285-310
    • Parunak, V.D.1
  • 25
    • 0342855202 scopus 로고    scopus 로고
    • The AARIA agent architecture: From manufacturing requirements to agent-based system design
    • Parunak, V.D., Baker, A.D. and Clark, S.J., The AARIA agent architecture: From manufacturing requirements to agent-based system design. Integ. Comp.-Aided Eng., 2001, 8, 45-58.
    • (2001) Integ. Comp.-Aided Eng. , vol.8 , pp. 45-58
    • Parunak, V.D.1    Baker, A.D.2    Clark, S.J.3
  • 26
    • 0020871016 scopus 로고
    • Production system design: A directed graph approach
    • Passler, E., Hutchinson, G.K. and Rudolph, K., Production system design: a directed graph approach. J. Manuf. Syst., 1983, 2, 107-116.
    • (1983) J. Manuf. Syst. , vol.2 , pp. 107-116
    • Passler, E.1    Hutchinson, G.K.2    Rudolph, K.3
  • 27
    • 0023419094 scopus 로고
    • A distributed scheduling method for computer integrated manufacturing: The use of local area networks in cellular systems
    • Shaw, M.J., A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems. Int. J. Prod. Res., 1987, 25, 1285-1303.
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 1285-1303
    • Shaw, M.J.1
  • 28
    • 0034205722 scopus 로고    scopus 로고
    • MetaMorph II: An agent-based architecture for distributed intelligent design and manufacturing
    • Shen, W., Maturana, F. and Norrie, D.H., MetaMorph II: An agent-based architecture for distributed intelligent design and manufacturing. J. Intel. Manuf., 2000, 11, 237-252.
    • (2000) J. Intel. Manuf. , vol.11 , pp. 237-252
    • Shen, W.1    Maturana, F.2    Norrie, D.H.3
  • 29
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • Smith, R.G., The contract net protocol: high-level communication and control in a distributed problem solver. IEEE Trans. on Comp., 1980, 29, 1104-1113.
    • (1980) IEEE Trans. on Comp. , vol.29 , pp. 1104-1113
    • Smith, R.G.1
  • 30
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and scheduling - A review
    • Tan, W. and Khoshnevis, B., Integration of process planning and scheduling - a review. J. Intel. Manuf., 2000, 11, 51-63.
    • (2000) J. Intel. Manuf. , vol.11 , pp. 51-63
    • Tan, W.1    Khoshnevis, B.2
  • 31
    • 0141885118 scopus 로고    scopus 로고
    • Negotiation-based routing in job shops via collaborative agents
    • Usher, J.M., Negotiation-based routing in job shops via collaborative agents. J. Intel. Manuf., 2003, 14, 485-499.
    • (2003) J. Intel. Manuf. , vol.14 , pp. 485-499
    • Usher, J.M.1
  • 32
    • 0030212624 scopus 로고    scopus 로고
    • Dynamic process planning - The static phase
    • Usher, J.M. and Fernandes, K.J., Dynamic process planning - the static phase. J. Mat. Proc. Tech., 1996, 61, 53-58.
    • (1996) J. Mat. Proc. Tech. , vol.61 , pp. 53-58
    • Usher, J.M.1    Fernandes, K.J.2
  • 33
    • 0033341387 scopus 로고    scopus 로고
    • Scheduling with alternatives: A link between process planning and scheduling
    • Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J. and Zozom, A., Scheduling with alternatives: a link between process planning and scheduling. IIE Trans., 1999, 31, 1093-1102.
    • (1999) IIE Trans. , vol.31 , pp. 1093-1102
    • Weintraub, A.1    Cormier, D.2    Hodgson, T.3    King, R.4    Wilson, J.5    Zozom, A.6
  • 34
    • 0242269797 scopus 로고    scopus 로고
    • Integration of process planning and scheduling by exploring the flexibility of process planning
    • Zhang, Y.F., Saravanan, A.N. and Fuh, J.Y.H., Integration of process planning and scheduling by exploring the flexibility of process planning. Int. J. Prod. Res., 2003, 41, 611-628.
    • (2003) Int. J. Prod. Res. , vol.41 , pp. 611-628
    • Zhang, Y.F.1    Saravanan, A.N.2    Fuh, J.Y.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.