메뉴 건너뛰기




Volumn 15, Issue 5, 2004, Pages 593-605

A linearized polynomial mixed integer programming model for the integration of process planning and scheduling

Author keywords

Integration; Mixed integer programming; Planning window; Process planning; Scheduling

Indexed keywords

FUNCTIONS; INTEGER PROGRAMMING; INTEGRATION; POLYNOMIALS; PROBLEM SOLVING; SCHEDULING;

EID: 4344620927     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/B:JIMS.0000037710.80847.b6     Document Type: Article
Times cited : (47)

References (36)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E. and Zawack, D. (1988) The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391-401.
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0026126118 scopus 로고
    • A computational study of the job-shop problem
    • Applegate, D. and Cook, W. (1991) A computational study of the job-shop problem. ORSA Journal on Computing, 3, 149-156.
    • (1991) ORSA Journal on Computing , vol.3 , pp. 149-156
    • Applegate, D.1    Cook, W.2
  • 3
    • 0022781336 scopus 로고
    • Application of artificial intelligence in automated process planning
    • Berenji, H. and Khoshnevis, B. (1986) Application of artificial intelligence in automated process planning. Computers in Mechanical Engineering, 47-55.
    • (1986) Computers in Mechanical Engineering , pp. 47-55
    • Berenji, H.1    Khoshnevis, B.2
  • 5
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • Brandimarte, P. (1993) Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research, 41, 157-183.
    • (1993) Annals of Operations Research , vol.41 , pp. 157-183
    • Brandimarte, P.1
  • 6
    • 0000955243 scopus 로고
    • A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
    • Brandimarte, P. and Calderini, M. (1995) A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling. International Journal of Production Research, 33(1), 161-181.
    • (1995) International Journal of Production Research , vol.33 , Issue.1 , pp. 161-181
    • Brandimarte, P.1    Calderini, M.2
  • 9
    • 0013278675 scopus 로고
    • Decision making on the factory floor: An integrated approach to process planning and scheduling
    • Chryssolouris, G., Chan, S. and Cobb, W. (1984) Decision making on the factory floor: an integrated approach to process planning and scheduling. Robotics and Computer-Integrated Manufacturing, 1(3/4), 315-319.
    • (1984) Robotics and Computer-integrated Manufacturing , vol.1 , Issue.3-4 , pp. 315-319
    • Chryssolouris, G.1    Chan, S.2    Cobb, W.3
  • 10
    • 0342267508 scopus 로고
    • A heuristic to improve a job shop schedule
    • Department of Industrial and Systems Engineering, University of Southern California
    • Dessouky, M. and Tan, W. (1994) A heuristic to improve a job shop schedule. Working Paper, Department of Industrial and Systems Engineering, University of Southern California.
    • (1994) Working Paper
    • Dessouky, M.1    Tan, W.2
  • 13
    • 0001383406 scopus 로고
    • Further reduction of the zero-one polynomial programming problems to zero-one linear programs
    • Glover, F. and Woolsey, E. (1973) Further reduction of the zero-one polynomial programming problems to zero-one linear programs. Operational Research, 21, 156-161.
    • (1973) Operational Research , vol.21 , pp. 156-161
    • Glover, F.1    Woolsey, E.2
  • 14
    • 0001189913 scopus 로고
    • Converting the 0-1 polynomial programming problem to a 0-1 linear program
    • Glover, F. and Woolsey, E. (1974) Converting the 0-1 polynomial programming problem to a 0-1 linear program. Operational Research, 22, 180-182.
    • (1974) Operational Research , vol.22 , pp. 180-182
    • Glover, F.1    Woolsey, E.2
  • 15
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • Huang, S., Zhang, H. and Smith, M. L. (1995) A progressive approach for the integration of process planning and scheduling. IIE Transactions, 27, 456-464.
    • (1995) IIE Transactions , vol.27 , pp. 456-464
    • Huang, S.1    Zhang, H.2    Smith, M.L.3
  • 16
    • 33746031638 scopus 로고
    • Integration of process planning and scheduling functions
    • Khoshnevis, B. and Chen, Q. (1990) Integration of process planning and scheduling functions. Journal of Intelligent Manufacturing, 1, 165-176.
    • (1990) Journal of Intelligent Manufacturing , vol.1 , pp. 165-176
    • Khoshnevis, B.1    Chen, Q.2
  • 17
    • 0029323889 scopus 로고
    • Automated process planning for hole-making
    • Khoshnevis, B. and Tan, W. (1995) Automated process planning for hole-making. Manufacturing Review, 8(2).
    • (1995) Manufacturing Review , vol.8 , Issue.2
    • Khoshnevis, B.1    Tan, W.2
  • 18
    • 0007992513 scopus 로고
    • Recent developments in deterministic sequencing and scheduling: A survey
    • M. A. H. Dempster, J. K. Lenstra and A. H. G. Rinnooy Kan (eds.), Reidel, Dordrecht, The Netherlands
    • Lawler, E. L., Lenstra, J. K. and Rinnooy Kan, A. H. G. (1982) Recent developments in deterministic sequencing and scheduling: a survey, in Deterministic and Stochastic Scheduling, M. A. H. Dempster, J. K. Lenstra and A. H. G. Rinnooy Kan (eds.), Reidel, Dordrecht, The Netherlands, pp. 35-73.
    • (1982) Deterministic and Stochastic Scheduling , pp. 35-73
    • Lawler, E.L.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 19
    • 0024031525 scopus 로고
    • Concurrent routing, sequencing and setups for a two-machine flexible manufacturing cell
    • Lee, E. J. and Mirchandani, P. (1988) Concurrent routing, sequencing and setups for a two-machine flexible manufacturing cell. IEEE Journal of Robotics and Automation, 4(3).
    • (1988) IEEE Journal of Robotics and Automation , vol.4 , Issue.3
    • Lee, E.J.1    Mirchandani, P.2
  • 21
    • 0011745111 scopus 로고
    • A lineaization procedure for quadratic and cubic mixed-integer problems
    • Oral, M. and Kettani, O. (1992) A lineaization procedure for quadratic and cubic mixed-integer problems. Operational Research, 40(1), S109-S116.
    • (1992) Operational Research , vol.40 , Issue.1
    • Oral, M.1    Kettani, O.2
  • 23
    • 0013292090 scopus 로고    scopus 로고
    • Process sequencing and process clustering in process planning using state space search
    • Sormaz, D. and Khoshnevis, B. (1996) Process sequencing and process clustering in process planning using state space search. Journal of Intelligent Manufacturing, 7, 189-200.
    • (1996) Journal of Intelligent Manufacturing , vol.7 , pp. 189-200
    • Sormaz, D.1    Khoshnevis, B.2
  • 24
    • 0344272408 scopus 로고    scopus 로고
    • Generation of alternative process plans in the integrated manufacturing system
    • Sormaz, D. and Khoshnevis, B. (2003) Generation of alternative process plans in the integrated manufacturing system. Journal of Intelligent Manufacturing Systems, 14(6), 509-526.
    • (2003) Journal of Intelligent Manufacturing Systems , vol.14 , Issue.6 , pp. 509-526
    • Sormaz, D.1    Khoshnevis, B.2
  • 25
    • 0024175169 scopus 로고
    • Process planning and scheduling - A method of integration for productivity improvement
    • Sundaram R. M. and Fu, S. S. (1988) Process planning and scheduling - A method of integration for productivity improvement. Computers Ind. Engng, 15(1-4), 296-301.
    • (1988) Computers Ind. Engng , vol.15 , Issue.1-4 , pp. 296-301
    • Sundaram, R.M.1    Fu, S.S.2
  • 27
  • 28
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and scheduling: A review
    • Tan, W. and Khoshnevis, B. (2000) Integration of process planning and scheduling: a review. Journal of Intelligent Manufacturing, 11, 51-63.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 51-63
    • Tan, W.1    Khoshnevis, B.2
  • 30
    • 38249024789 scopus 로고
    • Scheduling and machining of jobs through parallel nonidentical machine cells
    • Watson, E. and Egbelu, P. (1988) Scheduling and machining of jobs through parallel nonidentical machine cells. Journal of Manufacturing Systems, 8(1).
    • (1988) Journal of Manufacturing Systems , vol.8 , Issue.1
    • Watson, E.1    Egbelu, P.2
  • 31
    • 0005638765 scopus 로고
    • Reduction of integer polynomial programming problems to zero-one linear programming problems
    • Watters, L. J. (1967) Reduction of integer polynomial programming problems to zero-one linear programming problems. Operational Research, 15, 1171-1174.
    • (1967) Operational Research , vol.15 , pp. 1171-1174
    • Watters, L.J.1
  • 32
    • 4344715402 scopus 로고    scopus 로고
    • Scheduling with alternatives: A link between process planning and scheduling
    • currently under review with IIE Transactions, Department of Industrial Engineering, North Carolina State University
    • Weintraub, A., Cormier, D. et al. (1998) Scheduling with alternatives: a link between process planning and scheduling. Technical Report No. 98-09, currently under review with IIE Transactions, Department of Industrial Engineering, North Carolina State University.
    • (1998) Technical Report No. 98-09 , vol.98 , Issue.9
    • Weintraub, A.1    Cormier, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.