메뉴 건너뛰기




Volumn 49, Issue 23, 2011, Pages 6905-6935

Three decades of workload control research: A systematic review of the literature

Author keywords

Order review and release (ORR); Production planning and control (PPC); Systematic literature review; Workload control (WLC)

Indexed keywords

ACTION RESEARCH; CUSTOMER ENQUIRIES; EMPIRICAL FINDINGS; EXPERIMENTAL TESTING; INPUT AND OUTPUTS; JOB SHOP; LITERATURE REVIEWS; ORDER REVIEW AND RELEASE (ORR); PLANNING STAGES; PRODUCTION PLANNING AND CONTROL (PPC); SIMULATION-BASED; SYSTEMATIC LITERATURE REVIEW; SYSTEMATIC REVIEW; THEORETICAL DEVELOPMENT; WORKLOAD CONTROL;

EID: 84855789582     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.519000     Document Type: Review
Times cited : (88)

References (107)
  • 1
    • 84985810576 scopus 로고
    • Due date assignment, job order release and sequencing interaction in job shop scheduling
    • Ahmed, I. and Fisher, W.W., 1992. Due date assignment, job order release and sequencing interaction in job shop scheduling. Decision Sciences, 23 (3), 633-647.
    • (1992) Decision Sciences , vol.23 , Issue.3 , pp. 633-647
    • Ahmed, I.1    Fisher, W.W.2
  • 2
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker, K.R., 1984. The effects of input control in a simple scheduling model. Journal of Operations Management, 4 (2), 99-112.
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 99-112
    • Baker, K.R.1
  • 4
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W., 1988. Theory and practise of load-oriented manufacturing control. International Journal of Production Research, 26 (3), 375-395. (Pubitemid 18604815)
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte Wolfgang1
  • 5
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control just-in-time production for job shops
    • Bechte, W., 1994. Load-oriented manufacturing control just-in-time production for job shops. Production Planning and Control, 5 (3), 292-307.
    • (1994) Production Planning and Control , vol.5 , Issue.3 , pp. 292-307
    • Bechte, W.1
  • 7
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J.W.M., 1983a. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3 (2), 79-92.
    • (1983) Journal of Operations Management , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.W.M.1
  • 8
    • 0030412014 scopus 로고    scopus 로고
    • Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems
    • DOI 10.1016/0925-5273(95)00184-0
    • Bertrand, J.W.M. and Van Ooijen, H.P.G., 1996. Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems. International Journal of Production Economics, 46-47 (1), 1-12. (Pubitemid 126366405)
    • (1996) International Journal of Production Economics , vol.46-47 , pp. 1-12
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 9
    • 0036820319 scopus 로고    scopus 로고
    • Workload based order release and productivity: A missing link
    • Bertrand, J.W.M. and Van Ooijen, H.P.G., 2002. Workload based order release and productivity: a missing link. Production Planning and Control, 13 (7), 665-678.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 665-678
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 10
    • 0024769152 scopus 로고
    • Implementing a loading heuristic in a discrete release job shop
    • Bobrowski, P.M., 1989. Implementing a loading heuristic in a discrete release job shop. International Journal of Production Research, 27 (11), 1935-1948.
    • (1989) International Journal of Production Research , vol.27 , Issue.11 , pp. 1935-1948
    • Bobrowski, P.M.1
  • 11
    • 38249025236 scopus 로고
    • Work release strategies in a dual resource constrained job shop
    • Bobrowski, P.M. and Park, P.S., 1989. Work release strategies in a dual resource constrained job shop. Omega, 17 (2), 177-188.
    • (1989) Omega , vol.17 , Issue.2 , pp. 177-188
    • Bobrowski, P.M.1    Park, P.S.2
  • 12
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of load oriented order release
    • Breithaupt, J.W., Land, M.J., and Nyhuis, P., 2002. The workload control concept: theory and practical extensions of load oriented order release. Production Planning and Control, 13 (7), 625-638.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 625-638
    • Breithaupt, J.W.1    Land, M.J.2    Nyhuis, P.3
  • 13
    • 0032205531 scopus 로고    scopus 로고
    • Comparison of order review and release techniques in a dynamic and uncertain job shop environment
    • Cigolini, R., Perona, M., and Portioli, A., 1998. Comparison of order review and release techniques in a dynamic and uncertain job shop environment. International Journal of Production Research, 36 (11), 2931-2951. (Pubitemid 128568668)
    • (1998) International Journal of Production Research , vol.36 , Issue.11 , pp. 2931-2951
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 14
    • 0036819537 scopus 로고    scopus 로고
    • An experimental investigation on workload limiting methods with ORR policies in a job shop environment
    • Cigolini, R. and Portioli-Staudacher, A., 2002. An experimental investigation on workload limiting methods with ORR policies in a job shop environment. Production Planning and Control, 13 (7), 602-613.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 602-613
    • Cigolini, R.1    Portioli-Staudacher, A.2
  • 15
    • 33748757057 scopus 로고    scopus 로고
    • A capacity-driven approach to establish reliable due dates in a MTO environment
    • DOI 10.1016/j.ijpe.2005.03.003, PII S092552730500068X
    • Corti, D., Pozzetti, A., and Zorzini, M., 2006. A capacity-driven approach to establish reliable due dates in a MTO environment. International Journal of Production Economics, 104 (2), 536-554. (Pubitemid 44403070)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 536-554
    • Corti, D.1    Pozzetti, A.2    Zorzini, M.3
  • 16
    • 0010353627 scopus 로고
    • An integrated system for controlling shop loading and work flows
    • Enns, S.T., 1995. An integrated system for controlling shop loading and work flows. International Journal of Production Research, 33 (10), 2801-2820.
    • (1995) International Journal of Production Research , vol.33 , Issue.10 , pp. 2801-2820
    • Enns, S.T.1
  • 17
    • 0033888502 scopus 로고    scopus 로고
    • Evaluating shop floor input control using rapid modeling
    • DOI 10.1016/S0925-5273(99)00024-9
    • Enns, S.T., 2000. Evaluating shop floor input control using rapid modelling. International Journal of Production Economics, 63 (3), 229-241. (Pubitemid 30519304)
    • (2000) International Journal of Production Economics , vol.63 , Issue.3 , pp. 229-241
    • Enns, S.T.1
  • 18
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck workloads
    • Enns, S.T. and Prongue Costa, M., 2002. The effectiveness of input control based on aggregate versus bottleneck workloads. Production Planning and Control, 13 (7), 614-624.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 614-624
    • Enns, S.T.1    Prongue Costa, M.2
  • 21
    • 0029323273 scopus 로고
    • Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop
    • Fredendall, L. and Melnyk, S.A., 1995. Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop. International Journal of Production Research, 33 (6), 1521-1534.
    • (1995) International Journal of Production Research , vol.33 , Issue.6 , pp. 1521-1534
    • Fredendall, L.1    Melnyk, S.A.2
  • 22
    • 0030269708 scopus 로고    scopus 로고
    • Information and scheduling in a dual resource constrained job shop
    • Fredendall, L.D., Melnyk, S.A., and Ragatz, G., 1996. Information and scheduling in a dual resource constrained job shop. International Journal of Production Research, 34 (10), 2783-2802. (Pubitemid 126519740)
    • (1996) International Journal of Production Research , vol.34 , Issue.10 , pp. 2783-2802
    • Fredendall, L.D.1    Melnyk, S.A.2    Ragatz, G.3
  • 23
    • 0023544082 scopus 로고
    • A procedure for implementing input/output control: A case study
    • Fry, T.D. and Smith, A.E., 1987. A procedure for implementing input/output control: a case study. Production and Inventory Management Journal, 28 (4), 50-52.
    • (1987) Production and Inventory Management Journal , vol.28 , Issue.4 , pp. 50-52
    • Fry, T.D.1    Smith, A.E.2
  • 24
    • 0036820339 scopus 로고    scopus 로고
    • Editorial workload control in job shops: An introduction to the special issue
    • Gaalman, G. and Perona, M., 2002. Editorial workload control in job shops: an introduction to the special issue. Production Planning and Control, 13 (7), 565-567.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 565-567
    • Gaalman, G.1    Perona, M.2
  • 26
    • 0023964289 scopus 로고
    • Closed-loop job release control for VLSI circuit manufacturing
    • DOI 10.1109/66.4371
    • Glassey, C.R. and Resende, M.G., 1988. Closed-loop job release control for VLSI circuit manufacturing. IEEE Transactions on Semiconductor Manufacturing, 1 (1), 36-46. (Pubitemid 18612167)
    • (1988) IEEE Trans Semicond Manuf , vol.1 , Issue.1 , pp. 36-46
    • Glassey, C.R.1    Resende, M.G.2
  • 27
    • 0037063278 scopus 로고    scopus 로고
    • Modelling flow and jobbing shops as a queueing network for workload control
    • DOI 10.1016/S0925-5273(01)00117-7, PII S0925527301001177
    • Haskose, A., Kingsman, B.G., and Worthington, D., 2002. Modelling flow and jobbing shops as a queuing network for workload control. International Journal of Production Economics, 78 (3), 271-285. (Pubitemid 34545032)
    • (2002) International Journal of Production Economics , vol.78 , Issue.3 , pp. 271-285
    • Haskose, A.1    Kingsman, B.G.2    Worthington, D.3
  • 28
    • 2642522040 scopus 로고    scopus 로고
    • Performance analysis of make-to-order manufacturing systems under different workload control regimes
    • Haskose, A., Kingsman, B.G., and Worthington, D., 2004. Performance analysis of make-to-order manufacturing systems under different workload control regimes. International Journal of Production Economics, 90 (2), 169-186.
    • (2004) International Journal of Production Economics , vol.90 , Issue.2 , pp. 169-186
    • Haskose, A.1    Kingsman, B.G.2    Worthington, D.3
  • 29
    • 0027911614 scopus 로고
    • Production planning for an artists studio - A case study
    • DOI 10.1016/0377-2217(93)90004-7
    • Hendry, L.C., Elings, P., and Pegg, D., 1993. Production planning for an artists studio : a case study. European Journal of Operational Research, 64 (1), 12-20. (Pubitemid 23599268)
    • (1993) European Journal of Operational Research , vol.64 , Issue.1 , pp. 12-20
    • Hendry, L.C.1    Elings, P.2    Pegg, D.3
  • 30
    • 0024961857 scopus 로고
    • Production planning systems and their applicability to make-to-order companies
    • Hendry, L.C. and Kingsman, B.G., 1989. Production planning systems and their applicability to make-to-order companies. European Journal of Operational Research, 40 (1), 1-15.
    • (1989) European Journal of Operational Research , vol.40 , Issue.1 , pp. 1-15
    • Hendry, L.C.1    Kingsman, B.G.2
  • 32
    • 0026239339 scopus 로고
    • Job release. Part of a hierarchical system to manage manufacturing lead times in make-to-order companies
    • Hendry, L.C. and Kingsman, B.G., 1991b. Job release: part of a hierarchical system to manage manufacturing lead times in make-to-order companies. Journal of the Operational Research Society, 42 (10), 871-883. (Pubitemid 21720308)
    • (1991) Journal of the Operational Research Society , vol.42 , Issue.10 , pp. 871-883
    • Hendry, L.C.1    Kingsman, B.G.2
  • 33
    • 0027147723 scopus 로고
    • Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies
    • Hendry, L.C. and Kingsman, B.G., 1993. Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies. Journal of the Operational Research Society, 44 (1), 61-70. (Pubitemid 23640104)
    • (1993) Journal of the Operational Research Society , vol.44 , Issue.1 , pp. 61-70
    • Hendry, L.C.1    Kingsman, B.G.2
  • 34
    • 0031632563 scopus 로고    scopus 로고
    • The effect of workload control (WLC) on performance in make-to-order companies
    • PII S0272696397000119
    • Hendry, L.C., Kingsman, B.G., and Cheung, P., 1998. The effect of workload control (WLC) on performance in make-to-order companies. Journal of Operations Management, 16 (1), 63-75. (Pubitemid 128393970)
    • (1998) Journal of Operations Management , vol.16 , Issue.1 , pp. 63-75
    • Hendry, L.C.1    Kingsman, B.G.2    Cheung, P.3
  • 35
    • 38749152402 scopus 로고    scopus 로고
    • Investigating implementation issues for workload control (WLC): A comparative case study analysis
    • Hendry, L.C., et al., 2008. Investigating implementation issues for workload control (WLC): a comparative case study analysis. International Journal of Production Economics, 112 (1), 452-469.
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 452-469
    • Hendry, L.C.1
  • 36
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • Hendry, L.C. and Wong, S.K., 1994. Alternative order release mechanisms: a comparison by simulation. International Journal of Production Research, 32 (12), 2827-2842.
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2827-2842
    • Hendry, L.C.1    Wong, S.K.2
  • 38
    • 10444232001 scopus 로고    scopus 로고
    • Reducing feedback requirements of workload control
    • Henrich, P., et al., 2004b. Reducing feedback requirements of workload control. International Journal of Production Research, 42 (24), 5235-5252.
    • (2004) International Journal of Production Research , vol.42 , Issue.24 , pp. 5235-5252
    • Henrich, P.1
  • 39
    • 33747110239 scopus 로고    scopus 로고
    • Grouping machines for effective workload control
    • DOI 10.1016/j.ijpe.2004.11.006, PII S0925527304004335, Strategic Issues and Innovation in Production Economics
    • Henrich, P., Land, M.J., and Gaalman, G., 2006. Grouping machines for effective workload control. International Journal of Production Economics, 104 (1), 125-142. (Pubitemid 44223992)
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 125-142
    • Henrich, P.1    Land, M.2    Gaalman, G.3
  • 40
    • 33847247900 scopus 로고    scopus 로고
    • Semi-interchangeable machines: Implications for workload control
    • DOI 10.1080/09537280600909445, PII 771247156
    • Henrich, P., Land, M.J., and Gaalman, G., 2007. Semi-interchangeable machines: implications for workload control. Production Planning and Control, 18 (2), 91-104. (Pubitemid 46326996)
    • (2007) Production Planning and Control , vol.18 , Issue.2 , pp. 91-104
    • Henrich, P.1    Land, M.J.2    Gaalman, G.J.C.3
  • 42
    • 38249027443 scopus 로고
    • Load-limited order release in job shop scheduling systems
    • Kanet, J.J., 1988. Load-limited order release in job shop scheduling systems. Journal of Operations Management, 7 (3), 44-58.
    • (1988) Journal of Operations Management , vol.7 , Issue.3 , pp. 44-58
    • Kanet, J.J.1
  • 43
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-in-progress (WIP) and lead times
    • Karmarkar, U.S., 1989. Capacity loading and release planning with work-in-progress (WIP) and lead times. Journal of Manufacturing and Operations Management, 2, 105-123.
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 44
    • 84855782719 scopus 로고
    • Capacity requirements planning: Optimal work station capacities
    • Karni, R., 1981. Capacity requirements planning: optimal work station capacities. International Journal of Production Research, 19 (5), 595-611.
    • (1981) International Journal of Production Research , vol.19 , Issue.5 , pp. 595-611
    • Karni, R.1
  • 45
    • 0020203269 scopus 로고
    • Capacity requirements planning: A systematization
    • Karni, R., 1982. Capacity requirements planning: a systematization. International Journal of Production Research, 20 (6), 715-739.
    • (1982) International Journal of Production Research , vol.20 , Issue.6 , pp. 715-739
    • Karni, R.1
  • 46
    • 84986946649 scopus 로고
    • Evaluating order release mechanisms in a job shop with sequence-dependent set-up times
    • Kim, S.J. and Bobrowski, P.M., 1995. Evaluating order release mechanisms in a job shop with sequence-dependent set-up times. Production and Operations Management, 4 (2), 163-180.
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 163-180
    • Kim, S.J.1    Bobrowski, P.M.2
  • 47
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman, B.G., 2000. Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics, 68 (1), 73-93.
    • (2000) International Journal of Production Economics , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.G.1
  • 48
    • 0036819875 scopus 로고    scopus 로고
    • The relative contributions of input and output controls on the performance of a workload control system in make-to-order companies
    • Kingsman, B.G. and Hendry, L.C., 2002. The relative contributions of input and output controls on the performance of a workload control system in make-to-order companies. Production Planning and Control, 13 (7), 579-590.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 579-590
    • Kingsman, B.G.1    Hendry, L.C.2
  • 49
    • 0030410144 scopus 로고    scopus 로고
    • Responding to customer enquiries in make-to-order companies: Problems and solutions
    • Kingsman, B.G., et al., 1996. Responding to customer enquiries in make-to-order companies: problems and solutions. International Journal of Production Economics, 46-47, 219-231.
    • (1996) International Journal of Production Economics , vol.46-47 , pp. 219-231
    • Kingsman, B.G.1
  • 50
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • Kingsman, B.G., Tatsiopoulos, I.P., and Hendry, L.C., 1989. A structural methodology for managing manufacturing lead times in make-to-order companies. European Journal of Operational Research, 40 (2), 196-209.
    • (1989) European Journal of Operational Research , vol.40 , Issue.2 , pp. 196-209
    • Kingsman, B.G.1    Tatsiopoulos, I.P.2    Hendry, L.C.3
  • 51
    • 0027628217 scopus 로고
    • Integrating marketing and production planning in make-to-order companies
    • Kingsman, B.G., et al., 1993. Integrating marketing and production planning in make-to-order companies. International Journal of Production Economics, 30-31, 53-66.
    • (1993) International Journal of Production Economics , vol.30-31 , pp. 53-66
    • Kingsman, B.G.1
  • 52
    • 33748746131 scopus 로고    scopus 로고
    • Parameters and sensitivity in workload control
    • Land, M.J., 2006. Parameters and sensitivity in workload control. International Journal of Production Economics, 104 (2), 625-638.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 625-638
    • Land, M.J.1
  • 54
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • PII S0925527398000528
    • Land, M.J. and Gaalman, G.J.C., 1998. The performance of workload control concepts in job shops: improving the release method. International Journal of Production Economics, 56-57, 347-364. (Pubitemid 128400955)
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 55
    • 70349649481 scopus 로고    scopus 로고
    • Production planning and control in SMEs: Time for change
    • Land, M.J. and Gaalman, G.J.C., 2009. Production planning and control in SMEs: time for change. Production Planning and Control, 20 (7), 548-558.
    • (2009) Production Planning and Control , vol.20 , Issue.7 , pp. 548-558
    • Land, M.J.1    Gaalman, G.J.C.2
  • 58
    • 84990609932 scopus 로고
    • Management of vital customer priorities in job shop manufacturing environments
    • Malhotra, M.K., Jensen, J.B., and Philipoom, P.R., 1994. Management of vital customer priorities in job shop manufacturing environments. Decision Sciences, 25 (5-6), 711-733.
    • (1994) Decision Sciences , vol.25 , Issue.5-6 , pp. 711-733
    • Malhotra, M.K.1    Jensen, J.B.2    Philipoom, P.R.3
  • 60
    • 84987013915 scopus 로고
    • An experimental model for investigating the sensitivity of job shop performance to job release time distribution parameters
    • Melnyk, S.A., et al., 1994a. An experimental model for investigating the sensitivity of job shop performance to job release time distribution parameters. Production and Operations Management, 3 (1), 64-74.
    • (1994) Production and Operations Management , vol.3 , Issue.1 , pp. 64-74
    • Melnyk, S.A.1
  • 63
    • 0000809619 scopus 로고
    • Load smoothing by the planning and order review/release systems: A simulation experiment
    • Melnyk, S.A., Ragatz, G.L., and Fredendall, L., 1991. Load smoothing by the planning and order review/release systems: a simulation experiment. Journal of Operations Management, 10 (4), 512-523.
    • (1991) Journal of Operations Management , vol.10 , Issue.4 , pp. 512-523
    • Melnyk, S.A.1    Ragatz, G.L.2    Fredendall, L.3
  • 64
    • 0028436792 scopus 로고
    • Evaluating variance control, order review/release and dispatching: A regression analysis
    • Melnyk, S.A., et al., 1994b. Evaluating variance control, order review/release and dispatching: a regression analysis. International Journal of Production Research, 32 (5), 1045-1061.
    • (1994) International Journal of Production Research , vol.32 , Issue.5 , pp. 1045-1061
    • Melnyk, S.A.1
  • 65
    • 0031121479 scopus 로고    scopus 로고
    • Order release and sequence-dependent setup times
    • PII S092552739700008X
    • Missbauer, H., 1997. Order release and sequence-dependent set-up times. International Journal of Production Economics, 49 (2), 131-143. (Pubitemid 127382398)
    • (1997) International Journal of Production Economics , vol.49 , Issue.2 , pp. 131-143
    • Missbauer, H.1
  • 66
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time-varying demand
    • DOI 10.1080/00207540110090939
    • Missbauer, H., 2002a. Aggregate order release planning for time-varying demand. International Journal of Production Research, 40 (3), 699-718. (Pubitemid 34593822)
    • (2002) International Journal of Production Research , vol.40 , Issue.3 , pp. 699-718
    • Missbauer, H.1
  • 67
    • 0036820605 scopus 로고    scopus 로고
    • Lot sizing in workload control systems
    • Missbauer, H., 2002b. Lot sizing in workload control systems. Production Planning and Control, 13 (7), 649-664.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 649-664
    • Missbauer, H.1
  • 68
    • 63149103431 scopus 로고    scopus 로고
    • Models of the transient behaviour of production units to optimize the aggregate material flow
    • doi:10.1016/j.ijpe.(2008).11.014
    • Missbauer, H., (2009). Models of the transient behaviour of production units to optimize the aggregate material flow. International Journal of Production Economics. doi:10.1016/j.ijpe.(2008).11.014.
    • (2009) International Journal of Production Economics
    • Missbauer, H.1
  • 69
    • 70449565741 scopus 로고    scopus 로고
    • A methodology for planning and controlling workload in a job-shop: A four-way decision-making problem
    • Moreira, M.R.A. and Alves, R.A.F.S., 2009. A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem. International Journal of Production Research, 47 (10), 2805-2821.
    • (2009) International Journal of Production Research , vol.47 , Issue.10 , pp. 2805-2821
    • Moreira, M.R.A.1    Alves, R.A.F.S.2
  • 70
    • 38149143666 scopus 로고
    • An adaptive approach to shop loading
    • O'Grady, P.J. and Azoza, M.A., 1987. An adaptive approach to shop loading. Omega, 15 (2), 121-128.
    • (1987) Omega , vol.15 , Issue.2 , pp. 121-128
    • O'Grady, P.J.1    Azoza, M.A.2
  • 73
    • 38249005828 scopus 로고
    • Job release and labour flexibility in a dual resource constraint job shop
    • Park, P.S. and Bobrowski, P.M., 1989. Job release and labour flexibility in a dual resource constraint job shop. Journal of Operations Management, 8, (3), 230-249.
    • (1989) Journal of Operations Management , vol.8 , Issue.3 , pp. 230-249
    • Park, P.S.1    Bobrowski, P.M.2
  • 75
    • 0032635740 scopus 로고    scopus 로고
    • Delivery date decision support system for the large scale make to order manufacturing companies: A Korean electric motor company case
    • Park, C., et al., 1999. Delivery date decision support system for the large scale make to order manufacturing companies: a Korean electric motor company case. Production Planning and Control, 10 (6), 585-597.
    • (1999) Production Planning and Control , vol.10 , Issue.6 , pp. 585-597
    • Park, C.1
  • 76
    • 0029732560 scopus 로고    scopus 로고
    • An enhanced loading model for the probabilistic workload control under workload imbalance
    • Perona, M. and Portioli, A., 1996. An enhanced loading model for the probabilistic workload control under workload imbalance. Production Planning and Control, 7 (1), 68-78. (Pubitemid 126643640)
    • (1996) Production Planning and Control , vol.7 , Issue.1 , pp. 68-78
    • Perona, M.1    Portioli, A.2
  • 77
    • 0032118511 scopus 로고    scopus 로고
    • The impact of parameters setting in load oriented manufacturing control
    • PII S0925527398000500
    • Perona, M. and Portioli, A., 1998. The impact of parameter setting in load oriented manufacturing control. International Journal of Production Economics, 55 (2), 133-142. (Pubitemid 128401604)
    • (1998) International Journal of Production Economics , vol.55 , Issue.2 , pp. 133-142
    • Perona, M.1    Portioli, A.2
  • 78
    • 0026953379 scopus 로고
    • Capacity-based order review/release strategies to improve manufacturing performance
    • Philipoom, P.R. and Fry, T.D., 1992. Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research, 30 (11), 2559-2572. (Pubitemid 23574550)
    • (1992) International Journal of Production Research , vol.30 , Issue.11 , pp. 2559-2572
    • Philipoom, P.R.1    Fry, T.D.2
  • 79
    • 0033101604 scopus 로고    scopus 로고
    • Order review/release in the absence of adherence to formal scheduling policies
    • Philipoom, P.R. and Fry, T.D., 1999. Order review/release in the absence of adherence to formal scheduling policies. Journal of Operations Management, 17 (3), 327-342.
    • (1999) Journal of Operations Management , vol.17 , Issue.3 , pp. 327-342
    • Philipoom, P.R.1    Fry, T.D.2
  • 80
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • Philipoom, P.R., Malhotra, M.K., and Jensen, J.B., 1993. An evaluation of capacity sensitive order review and release procedures in job shops. Decision Sciences, 24 (6), 1109-1133.
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1133
    • Philipoom, P.R.1    Malhotra, M.K.2    Jensen, J.B.3
  • 81
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job shop environment
    • Ragatz, G.L. and Mabert, V.A., 1988. An evaluation of order release mechanisms in a job shop environment. Decision Sciences, 19 (1), 167-189.
    • (1988) Decision Sciences , vol.19 , Issue.1 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 85
    • 0034371598 scopus 로고    scopus 로고
    • A load-based and due-date-oriented approach to order review/release in job shops
    • Sabuncuoglu, I. and Karapinar, H.Y., 2000. A load-based and due-date-oriented approach to order review/release in job shops. Decision Sciences, 31 (2), 413-447.
    • (2000) Decision Sciences , vol.31 , Issue.2 , pp. 413-447
    • Sabuncuoglu, I.1    Karapinar, H.Y.2
  • 86
    • 0030386130 scopus 로고    scopus 로고
    • Integrating the planning and scheduling systems in a job shop
    • Salegna, G., 1996. Integrating the planning and scheduling systems in a job shop. Production and Inventory Management Journal, 37 (4), 1-6. (Pubitemid 126437275)
    • (1996) Production and Inventory Management Journal , vol.37 , Issue.4 , pp. 1-6
    • Salegna, G.1
  • 89
    • 33749578069 scopus 로고    scopus 로고
    • MAPP - A web-based decision support system for the mould industry
    • DOI 10.1016/j.dss.2005.08.001, PII S0167923605001119
    • Silva, C., Roque, L., and Almeida, A., 2006. MAPP : a web-based decision support system for the mould industry. Decision Support Systems, 42 (2), 999-1014. (Pubitemid 44537479)
    • (2006) Decision Support Systems , vol.42 , Issue.2 , pp. 999-1014
    • Silva, C.1    Roque, L.2    Almeida, A.3
  • 90
    • 38749134078 scopus 로고    scopus 로고
    • The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companies
    • DOI 10.1016/j.ijpe.2007.06.001, PII S0925527307002344
    • Soepenberg, G.D., Land, M., and Gaalman, G., 2008. The order progress diagram: a supportive tool for diagnosing delivery reliability performance in make-to-order companies. International Journal of Production Economics, 112 (1), 495-503. (Pubitemid 351179619)
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 495-503
    • Soepenberg, G.D.1    Land, M.2    Gaalman, G.3
  • 91
    • 30844447199 scopus 로고    scopus 로고
    • Refining a Workload Control (WLC) concept: A case study
    • DOI 10.1080/00207540500338070, PII L0214177X06052
    • Stevenson, M., 2006. Refining a workload control (WLC) concept: a case study. International Journal of Production Research, 44 (4), 767-790. (Pubitemid 43102617)
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 767-790
    • Stevenson, M.1
  • 92
    • 33748750890 scopus 로고    scopus 로고
    • Aggregate load-oriented workload control: A review and a re-classification of a key approach
    • DOI 10.1016/j.ijpe.2005.05.022, PII S092552730500215X
    • Stevenson, M. and Hendry, L.C., 2006. Aggregate load oriented workload control: a review and a reclassification of a key approach. International Journal of Production Economics, 104 (2), 676-693. (Pubitemid 44403076)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 676-693
    • Stevenson, M.1    Hendry, L.C.2
  • 93
    • 84855802698 scopus 로고    scopus 로고
    • Flexibility and lean manufacturing in customised b2B supply chains
    • Stevenson, M. and Hendry, L.C., 2007a. Flexibility and lean manufacturing in customised b2B supply chains. Control, 33 (1), 16-20.
    • (2007) Control , vol.33 , Issue.1 , pp. 16-20
    • Stevenson, M.1    Hendry, L.C.2
  • 94
    • 33847258721 scopus 로고    scopus 로고
    • Improving supply chain integration using a workload control concept and web-functionality
    • DOI 10.1080/09537280600965785, PII 771246854
    • Stevenson, M. and Hendry, L.C., 2007b. Improving supply chain integration using a workload control concept and web-functionality. Production Planning and Control, 18 (2), 142-155. (Pubitemid 46327000)
    • (2007) Production Planning and Control , vol.18 , Issue.2 , pp. 142-155
    • Stevenson, M.1    Hendry, L.C.2
  • 95
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make-to-order industry
    • DOI 10.1080/0020754042000298520
    • Stevenson, M., Hendry, L.C., and Kingsman, B.G., 2005. A review of production planning and control: the applicability of key concepts to the make to order industry. International Journal of Production Research, 43 (5), 869-898. (Pubitemid 41633078)
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 96
    • 70349636294 scopus 로고    scopus 로고
    • The development and application of an interactive end-user training tool: Part of an implementation strategy for workload control
    • Stevenson, M., Huang, Y., and Hendry, L.C., 2009. The development and application of an interactive end-user training tool: part of an implementation strategy for workload control. Production Planning and Control, 20 (7), 622-635.
    • (2009) Production Planning and Control , vol.20 , Issue.7 , pp. 622-635
    • Stevenson, M.1    Huang, Y.2    Hendry, L.C.3
  • 97
    • 41849149287 scopus 로고    scopus 로고
    • Theoretical development of a workload control methodology: Evidence from two case studies
    • DOI 10.1080/00207540601039791, PII 771200955
    • Stevenson, M. and Silva, C., 2008. Theoretical development of a workload control methodology: evidence from two case studies. International Journal of Production Research, 46 (11), 3107-3131. (Pubitemid 351499535)
    • (2008) International Journal of Production Research , vol.46 , Issue.11 , pp. 3107-3131
    • Stevenson, M.1    Silva, C.2
  • 98
    • 0002154577 scopus 로고
    • Simplified production management software for the small manufacturing firm
    • Tatsiopoulos, I.P., 1993. Simplified production management software for the small manufacturing firm. Production Planning and Control, 4 (1), 17-26.
    • (1993) Production Planning and Control , vol.4 , Issue.1 , pp. 17-26
    • Tatsiopoulos, I.P.1
  • 100
    • 77951100029 scopus 로고    scopus 로고
    • Workload control release mechanisms: From practice back to theory building
    • Thürer, M., Silva, C., and Stevenson, M., 2009. Workload control release mechanisms: from practice back to theory building. International Journal of Production Research, 48 (12), 3593-3617.
    • (2009) International Journal of Production Research , vol.48 , Issue.12 , pp. 3593-3617
    • Thürer, M.1    Silva, C.2    Stevenson, M.3
  • 101
    • 39449089365 scopus 로고    scopus 로고
    • Multi-agent-based workload control for make-to-order manufacturing
    • DOI 10.1080/00207540600969758, PII 790718858
    • Weng, M.X., 2008. Multi-agent-based workload control for make-to-order manufacturing. International Journal of Production Research, 46 (8), 2197-2213. (Pubitemid 351272737)
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2197-2213
    • Weng, M.X.1    Wu, Z.2    Qi, G.3    Zheng, L.4
  • 103
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • Wein, L.M. and Chevalier, P.B., 1992. A broader view of the job-shop scheduling problem. Management Science, 38 (7), 1018-1032.
    • (1992) Management Science , vol.38 , Issue.7 , pp. 1018-1032
    • Wein, L.M.1    Chevalier, P.B.2
  • 104
  • 106
    • 0027625964 scopus 로고
    • Production planning and control (PPC) systems including load-oriented order release - problems and research perspectives
    • DOI 10.1016/0925-5273(93)90085-Y
    • Zäpfel, G. and Missbauer, H., 1993a. Production planning and control systems including loadoriented order release : problems and research perspectives. International Journal of Production Economics, 30-31, 107-122. (Pubitemid 23715802)
    • (1993) International Journal of Production Economics , vol.30-31 , pp. 107-122
    • Zapfel, G.1    Missbauer, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.