메뉴 건너뛰기




Volumn 13, Issue 7, 2002, Pages 614-624

The effectiveness of input control based on aggreǵate versus bottleneck work loads

Author keywords

Bottleneck scheduling; Input control; Order release; Work load control

Indexed keywords

COMPUTER SIMULATION; INVENTORY CONTROL; POISSON DISTRIBUTION; PROCESS CONTROL; PRODUCTION; SCHEDULING; STRATEGIC PLANNING;

EID: 0036820210     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/0953728021000026258     Document Type: Article
Times cited : (42)

References (21)
  • 1
    • 0004286084 scopus 로고
    • (Sewickley, PA: Systems Modeling Corp.)
    • ARENA 3. User's Guide, 1994, (Sewickley, PA: Systems Modeling Corp.)
    • (1994) ARENA 3. User's Guide
  • 2
    • 0023979312 scopus 로고
    • Theory and practise of load-oriented manufacturing control
    • Bechte, W., 1988, Theory and practise of load-oriented manufacturing control. International Journal of Production Research, 26(3), 375-395.
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 3
    • 0016870485 scopus 로고
    • Integrating capacity planning and capacity control
    • First Quarter
    • Belt, B., 1976, Integrating capacity planning and capacity control. Production and Inventory Management, First Quarter, 9-25.
    • (1976) Production and Inventory Management , pp. 9-25
    • Belt, B.1
  • 5
    • 0032205531 scopus 로고    scopus 로고
    • Comparion of order review and release techniques in a dynamic and uncertain job shop environment
    • Cigolini, R., Perona, M., and Portioli, A., 1998, Comparion of order review and release techniques in a dynamic and uncertain job shop environment. International Journal of Production Research, 36(11), 2931-2951.
    • (1998) International Journal of Production Research , vol.36 , Issue.11 , pp. 2931-2951
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 6
    • 0033888502 scopus 로고    scopus 로고
    • Evaluating shop floor input control using rapid modeling
    • Enns, S. T., 2000, Evaluating shop floor input control using rapid modeling. International Journal of Production Economics, 63, 229-241.
    • (2000) International Journal of Production Economics , vol.63 , pp. 229-241
    • Enns, S.T.1
  • 9
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • Hendry, L., and Wong, S., 1994, Alternative order release mechanisms: a comparison by simulation. International Journal of Production Research, 32(12), 2827-2842.
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2827-2842
    • Hendry, L.1    Wong, S.2
  • 10
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload concepts in job shops: Improving the release method
    • Land, M., and Gaalman, G., 1998, The performance of workload concepts in job shops: improving the release method. International Journal of Production Economics, 56, 347-364.
    • (1998) International Journal of Production Economics , vol.56 , pp. 347-364
    • Land, M.1    Gaalman, G.2
  • 12
    • 0000861722 scopus 로고
    • A proof of the queuing formula: L = λW
    • Little, J. D. C., 1961, A proof of the queuing formula: L = λW. Operations Research, 9, 383-387.
    • (1961) Operations Research , vol.9 , pp. 383-387
    • Little, J.D.C.1
  • 14
    • 0012237785 scopus 로고    scopus 로고
    • The influence of shop characteristics on workload control
    • Faculty of Management and Organisation Working Paper 98A28, University of Groningen
    • Oosterman, B., Land, M., and Gaalman, G., 1998, The influence of shop characteristics on workload control. Faculty of Management and Organisation Working Paper 98A28, University of Groningen.
    • (1998)
    • Oosterman, B.1    Land, M.2    Gaalman, G.3
  • 15
    • 0029732560 scopus 로고    scopus 로고
    • An enhanced loading model for the probabilistic workload control under workload imbalance
    • Perona, M., and Portioli, A., 1996, An enhanced loading model for the probabilistic workload control under workload imbalance. Production Planning and Control, 7(1), 68-78.
    • (1996) Production Planning and Control , vol.7 , Issue.1 , pp. 68-78
    • Perona, M.1    Portioli, A.2
  • 16
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job-shop environment
    • Ragatz, G. L., and Mabert, V. A., 1988, An evaluation of order release mechanisms in a job-shop environment. Decision Sciences, 19, 167-189.
    • (1988) Decision Sciences , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 21
    • 0002274219 scopus 로고
    • Input/output control: A real handle on lead time
    • Third Quarter
    • Wight, O., 1970, Input/output control: a real handle on lead time. Production and Inventory Management, Third Quarter, 9-31.
    • (1970) Production and Inventory Management , pp. 9-31
    • Wight, O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.