메뉴 건너뛰기




Volumn 47, Issue 10, 2009, Pages 2805-2821

A methodology for planning and controlling workload in a job-shop: A four-way decision-making problem

Author keywords

Decision making; Input output control; Job shop; Order release

Indexed keywords

CONTROL OPERATIONS; DECISION MECHANISM; DECISION RULES; DECISION-MAKING PROBLEM; DECISION-MAKING SYSTEMS; DUE-DATE SETTING; GLOBAL SYSTEMS; INPUT-OUTPUT; INPUT-OUTPUT CONTROL; JOB-SHOP; LEADTIME; MANUFACTURING OPERATIONS; MEASURE OF PERFORMANCE; OPERATIONAL PERFORMANCE; ORDER ACCEPTANCE; ORDER RELEASE; PERFORMANCE MEASURE; SHOP FLOOR; WORK-IN-PROCESS;

EID: 70449565741     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701725083     Document Type: Article
Times cited : (37)

References (50)
  • 1
    • 84985810576 scopus 로고
    • Due date assignment, job order release and sequencing interaction in job shop scheduling
    • Ahmed, I. and Fisher, W., 1992. Due date assignment, job order release and sequencing interaction in job shop scheduling. Decision Sciences, 23 (3), 633-647.
    • (1992) Decision Sciences , vol.23 , Issue.3 , pp. 633-647
    • Ahmed, I.1    Fisher, W.2
  • 2
    • 0020087807 scopus 로고
    • On Poisson approximations for superposition arrival processes in queues
    • Albin, S., 1982. On Poisson approximations for superposition arrival processes in queues. Management Science, 28 (2), 126-137.
    • (1982) Management Science , vol.28 , Issue.2 , pp. 126-137
    • Albin, S.1
  • 3
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job-shop
    • Baker, K., 1984. Sequencing rules and due-date assignments in a job-shop. Management Science, 30 (9), 1093-1104.
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.1
  • 5
    • 0020783525 scopus 로고
    • The effects of workload dependent due-date on job shop performance
    • Bertrand, J., 1983a. The effects of workload dependent due-date on job shop performance. Management Science, 29 (7), 799-816.
    • (1983) Management Science , vol.29 , Issue.7 , pp. 799-816
    • Bertrand, J.1
  • 6
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J., 1983b. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3 (2), 79-92.
    • (1983) Journal of Operations Management , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.1
  • 7
    • 0036819519 scopus 로고    scopus 로고
    • An investigation of order release and flow time allowance policies for assembly job shops
    • Bertrand, J. and Van de Wakker, A., 2002. An investigation of order release and flow time allowance policies for assembly job shops. Production Planning & Control, 13 (7), 639-648.
    • (2002) Production Planning & Control , vol.13 , Issue.7 , pp. 639-648
    • Bertrand, J.1    Van De Wakker, A.2
  • 9
    • 3343016943 scopus 로고
    • Load forecasting, priority sequencing, and simulation in a job shop system
    • Bulkin, M., Colley, J. and Steinhoff, H., 1966. Load forecasting, priority sequencing, and simulation in a job shop system. Management Science, 13 (2), B29-B51.
    • (1966) Management Science , vol.13 , Issue.2
    • Bulkin, M.1    Colley, J.2    Steinhoff, H.3
  • 10
    • 0032205531 scopus 로고    scopus 로고
    • Comparison of order review and release techniques in a dynamic and uncertain job shop environment
    • Cigolini, R., Perona, M. and Portioli, A., 1998. Comparison of order review and release techniques in a dynamic and uncertain job shop environment. International Journal of Production Research, 36 (11), 2931-2951.
    • (1998) International Journal of Production Research , vol.36 , Issue.11 , pp. 2931-2951
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 11
    • 0001173515 scopus 로고
    • Priority dispatching and work-in-process inventory in a job shop
    • Conway, R., 1965. Priority dispatching and work-in-process inventory in a job shop. Industrial Engineering, 16 (2), 123-130.
    • (1965) Industrial Engineering , vol.16 , Issue.2 , pp. 123-130
    • Conway, R.1
  • 12
    • 15244355696 scopus 로고    scopus 로고
    • Workload based order acceptance in job shop environments
    • Ebben, M., Hans, E. and Olde Weghuis, F., 2005. Workload based order acceptance in job shop environments. OR Spectrum, 27 (1), 107-122.
    • (2005) OR Spectrum , vol.27 , Issue.1 , pp. 107-122
    • Ebben, M.1    Hans, E.2    Olde Weghuis, F.3
  • 13
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, S., 1981. A review of production scheduling. Operations Research, 29 (4), 646-675.
    • (1981) Operations Research , vol.29 , Issue.4 , pp. 646-675
    • Graves, S.1
  • 15
    • 2642522040 scopus 로고    scopus 로고
    • Performance analysis of make-to-order manufacturing systems under different workload control regimes
    • Haskose, A., Kingsman, B.G. and Worthington, D., 2004. Performance analysis of make-to-order manufacturing systems under different workload control regimes. International Journal of Production Economics, 90 (2), 169-186.
    • (2004) International Journal of Production Economics , vol.90 , Issue.2 , pp. 169-186
    • Haskose, A.1    Kingsman, B.G.2    Worthington, D.3
  • 16
    • 0024961857 scopus 로고
    • Production planning systems and their applicability to make-to-order companies
    • Hendry, L.C. and Kingsman, B.G., 1989. Production planning systems and their applicability to make-to-order companies. European Journal of Operational Research, 40 (1), 1-15.
    • (1989) European Journal of Operational Research , vol.40 , Issue.1 , pp. 1-15
    • Hendry, L.C.1    Kingsman, B.G.2
  • 17
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • Hendry, L.C. and Wong, S.K., 1994. Alternative order release mechanisms: a comparison by simulation. International Journal of Production Research, 32 (12), 2827-2842.
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2827-2842
    • Hendry, L.C.1    Wong, S.K.2
  • 20
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman, B.G., 2000. Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics, 68 (1), 73-93.
    • (2000) International Journal of Production Economics , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.G.1
  • 21
    • 33748746131 scopus 로고    scopus 로고
    • Parameters and sensitivity in workload control
    • Land, M., 2006. Parameters and sensitivity in workload control. International Journal of Production Economics, 104 (2), 625-638.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 625-638
    • Land, M.1
  • 22
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops: A critical assessment
    • Land, M. and Gaalman, G., 1996. Workload control concepts in job shops: a critical assessment. International Journal of Production Economics, 46-47 (3), 535-548.
    • (1996) International Journal of Production Economics , vol.46-47 , Issue.3 , pp. 535-548
    • Land, M.1    Gaalman, G.2
  • 23
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • Land, M. and Gaalman, G., 1998. The performance of workload control concepts in job shops: improving the release method. International Journal of Production Economics, 56-57 (3), 347-364.
    • (1998) International Journal of Production Economics , vol.56-57 , Issue.3 , pp. 347-364
    • Land, M.1    Gaalman, G.2
  • 25
    • 0024700372 scopus 로고
    • Order review/release: Research issues and perspectives
    • Melnyk, S. and Ragatz, G., 1989. Order review/release: research issues and perspectives. International Journal of Production Research, 27 (7), 1081-1096.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1081-1096
    • Melnyk, S.1    Ragatz, G.2
  • 26
    • 0000006895 scopus 로고    scopus 로고
    • Demand management: The evaluation of price and due date negotiation strategies using simulation
    • Moodie, D., 1999. Demand management: the evaluation of price and due date negotiation strategies using simulation. Production and Operations Management, 8 (2), 151-162.
    • (1999) Production and Operations Management , vol.8 , Issue.2 , pp. 151-162
    • Moodie, D.1
  • 27
    • 0033096959 scopus 로고    scopus 로고
    • Due date demand management: Negotiating the trade-off between price and delivery
    • Moodie, D. and Bobrowski, P., 1999. Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37 (5), 997-1021.
    • (1999) International Journal of Production Research , vol.37 , Issue.5 , pp. 997-1021
    • Moodie, D.1    Bobrowski, P.2
  • 28
    • 1842794508 scopus 로고
    • Experiments with priority dispatching rules in a parallel processor shop
    • Moodie, C. and Roberts, S., 1968. Experiments with priority dispatching rules in a parallel processor shop. International Journal of Production Research, 6 (4), 303-312.
    • (1968) International Journal of Production Research , vol.6 , Issue.4 , pp. 303-312
    • Moodie, C.1    Roberts, S.2
  • 29
    • 70449588929 scopus 로고    scopus 로고
    • A new input-output control order release mechanism: How workload control improves manufacturing operations in a job shop
    • Moreira, M. and Alves, R., 2005. A new input-output control order release mechanism: how workload control improves manufacturing operations in a job shop. In: 2005 European Simulation and Modelling Conference, 101-107.
    • (2005) 2005 European Simulation and Modelling Conference , pp. 101-107
    • Moreira, M.1    Alves, R.2
  • 32
    • 1642559579 scopus 로고    scopus 로고
    • Behaviour of an order release mechanism in a make-to-order manufacturing system with selected order acceptance
    • Nandi, A. and Rogers, P., 2003. Behaviour of an order release mechanism in a make-to-order manufacturing system with selected order acceptance. In: 2003 winter simulation conference, 1251-1259.
    • (2003) 2003 Winter Simulation Conference , pp. 1251-1259
    • Nandi, A.1    Rogers, P.2
  • 34
    • 0003054955 scopus 로고
    • A survey of scheduling rules
    • Panwalkar, S. and Iskander, W., 1977. A survey of scheduling rules. Operations Research, 25 (1), 45-61.
    • (1977) Operations Research , vol.25 , Issue.1 , pp. 45-61
    • Panwalkar, S.1    Iskander, W.2
  • 35
    • 0020103079 scopus 로고
    • Common due date assignment to minimise total penalty for the one machine scheduling problem
    • Panwalkar, S., Smith, M. and Seidmann, A., 1982. Common due date assignment to minimise total penalty for the one machine scheduling problem. Operations Research, 30 (2), 391-399.
    • (1982) Operations Research , vol.30 , Issue.2 , pp. 391-399
    • Panwalkar, S.1    Smith, M.2    Seidmann, A.3
  • 36
    • 0026953379 scopus 로고
    • Capacity-based order review/release strategies to improve manufacturing performance
    • Philipoom, P. and Fry, T., 1992. Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research, 30 (11), 2559-2572.
    • (1992) International Journal of Production Research , vol.30 , Issue.11 , pp. 2559-2572
    • Philipoom, P.1    Fry, T.2
  • 37
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragatz, G. and Mabert, V., 1984. A simulation analysis of due date assignment rules. Journal of Operations Management, 5 (1), 27-39.
    • (1984) Journal of Operations Management , vol.5 , Issue.1 , pp. 27-39
    • Ragatz, G.1    Mabert, V.2
  • 38
    • 29444438437 scopus 로고
    • Dynamic job-shop scheduling: A survey of simulation research
    • Ramasesh, R., 1990. Dynamic job-shop scheduling: a survey of simulation research. Omega- International Journal of Management Science, 18 (1), 43-57.
    • (1990) Omega- International Journal of Management Science , vol.18 , Issue.1 , pp. 43-57
    • Ramasesh, R.1
  • 40
    • 0034371598 scopus 로고    scopus 로고
    • A load-based and due-date-oriented approach to order review/release in job shops
    • Sabuncuoglu, I. and Karapinar, H.Y., 2000. A load-based and due-date-oriented approach to order review/release in job shops. Decision Sciences, 31 (2), 413-447.
    • (2000) Decision Sciences , vol.31 , Issue.2 , pp. 413-447
    • Sabuncuoglu, I.1    Karapinar, H.Y.2
  • 41
    • 0019560165 scopus 로고
    • Due date assignment for production systems
    • Seidmann, A. and Smith, M., 1981. Due date assignment for production systems. Management Science, 27 (5), 571-581.
    • (1981) Management Science , vol.27 , Issue.5 , pp. 571-581
    • Seidmann, A.1    Smith, M.2
  • 43
    • 30844447199 scopus 로고    scopus 로고
    • Refining a workload control (WLC) concept: A case study
    • Stevenson, M., 2006. Refining a workload control (WLC) concept: a case study. International Journal of Production Research, 44 (4), 767-790.
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 767-790
    • Stevenson, M.1
  • 44
    • 33748750890 scopus 로고    scopus 로고
    • Aggregate load-oriented workload control: A review and re-classification of a key approach
    • Stevenson, M. and Hendry, L., 2006. Aggregate load-oriented workload control: a review and re-classification of a key approach. International Journal of Production Economics, 104 (2), 676-693.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 676-693
    • Stevenson, M.1    Hendry, L.2
  • 46
    • 0031332607 scopus 로고    scopus 로고
    • Integrating order release control with due-date assignment rules
    • Tsai, C., Chang, G. and Li, R., 1997. Integrating order release control with due-date assignment rules. International Journal of Production Research, 35 (12), 3379-3392.
    • (1997) International Journal of Production Research , vol.35 , Issue.12 , pp. 3379-3392
    • Tsai, C.1    Chang, G.2    Li, R.3
  • 48
    • 0026880663 scopus 로고
    • Order acceptance strategies in a production-to-order environment with setup times and due-dates
    • Wester, F., Wijngaard, J. and Zijm, W., 1992. Order acceptance strategies in a production-to-order environment with setup times and due-dates. International Journal of Production Research, 30 (6), 1313-1326.
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1313-1326
    • Wester, F.1    Wijngaard, J.2    Zijm, W.3
  • 49
    • 0002274219 scopus 로고
    • Input/output control: A real handle on lead time
    • Wight, O., 1970. Input/output control: a real handle on lead time. Production and Inventory Management Journal, 11 (3), 9-30.
    • (1970) Production and Inventory Management Journal , vol.11 , Issue.3 , pp. 9-30
    • Wight, O.1
  • 50
    • 0030834962 scopus 로고    scopus 로고
    • Relevant cost information for order acceptance decisions
    • Wouters, M., 1997. Relevant cost information for order acceptance decisions. Production Planning & Control, 8 (1), 2-9.
    • (1997) Production Planning & Control , vol.8 , Issue.1 , pp. 2-9
    • Wouters, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.