메뉴 건너뛰기




Volumn 34, Issue 10, 1996, Pages 2783-2802

Information and scheduling in a dual resource constrained job shop

Author keywords

[No Author keywords available]

Indexed keywords

AUTOMOBILE MANUFACTURE; COSTS; MACHINING CENTERS; PERSONNEL; PROCESS CONTROL; PRODUCTION CONTROL; SENSITIVITY ANALYSIS;

EID: 0030269708     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608905059     Document Type: Article
Times cited : (22)

References (30)
  • 1
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker, K. R., 1984, The effects of input control in a simple scheduling model. Journal of Operations Management, 4(2), 99-112.
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 99-112
    • Baker, K.R.1
  • 2
  • 3
    • 0020250106 scopus 로고
    • Controlling manufacturing lead time and work-in-process inventory by means of load-oriented order release
    • Chicago, USA
    • Bechte, W., 1982, Controlling manufacturing lead time and work-in-process inventory by means of load-oriented order release. APICS 25th Annual International Conference Proceedings, Chicago, USA, pp. 67-80.
    • (1982) APICS 25Th Annual International Conference Proceedings , pp. 67-80
    • Bechte, W.1
  • 4
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W., 1988, Theory and practice of load-oriented manufacturing control. International Journal of Production Research, 26(3), 375-395.
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 5
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J. W. M., 1983, The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3(2), 79-92.
    • (1983) Journal of Operations Management , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.W.M.1
  • 6
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J. H., Phillips, D. T. and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research. 20(1), 27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 7
    • 84985841594 scopus 로고
    • Alternate Routeing Strategies in Batch Manufacturing: An Evaluation
    • Bobrowski, P. M. and Mabert, V. A., 1988, Alternate Routeing Strategies in Batch Manufacturing: An Evaluation. Decision Sciences, 19(4), 713-733.
    • (1988) Decision Sciences , vol.19 , Issue.4 , pp. 713-733
    • Bobrowski, P.M.1    Mabert, V.A.2
  • 11
    • 0000487878 scopus 로고
    • Operating policies in multiechelon dual-constraint job shops
    • Fryer, J. S., 1973, Operating policies in multiechelon dual-constraint job shops. Management Science, 19(9), 1001-1012.
    • (1973) Management Science , vol.19 , Issue.9 , pp. 1001-1012
    • Fryer, J.S.1
  • 12
    • 0000965956 scopus 로고
    • Heuristics in Job Shop Scheduling
    • Gere, W. S. Jr., 1966, Heuristics in Job Shop Scheduling. Management Science, 13(2), 167-190.
    • (1966) Management Science , vol.13 , Issue.2 , pp. 167-190
    • Gere, W.S.1
  • 13
    • 0039210129 scopus 로고
    • The labor assignment decision: An application of work flow structure information
    • Holstein, W. K. and Berry, W. L., 1972, The labor assignment decision: an application of work flow structure information. Management Science, 18(7), 390-400.
    • (1972) Management Science , vol.18 , Issue.7 , pp. 390-400
    • Holstein, W.K.1    Berry, W.L.2
  • 14
    • 38249027443 scopus 로고
    • LOAD-limited ORDER RELEASE IN Job Shop Scheduling Systems
    • Kanet, J. J., 1988, LOAD-limited ORDER RELEASE IN Job Shop Scheduling Systems. Journal of Operations Management, 7(3), 44-58.
    • (1988) Journal of Operations Management , vol.7 , Issue.3 , pp. 44-58
    • Kanet, J.J.1
  • 19
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • McKay, K. N., Safayeni, F. R., Buzacott, J. A., 1988, Job-shop scheduling theory: what is relevant?. Interfaces, 18(4), 84-90.
    • (1988) Interfaces , vol.18 , Issue.4 , pp. 84-90
    • Mc Kay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 23
    • 0001311183 scopus 로고
    • Dual-resource constrained series service systems
    • Nelson, R. T., 1968, Dual-resource constrained series service systems. Operations Research, 16(2), 324-341.
    • (1968) Operations Research , vol.16 , Issue.2 , pp. 324-341
    • Nelson, R.T.1
  • 25
    • 38249005828 scopus 로고
    • Job release and labor flexibility in a dual resource constrained job shop
    • Park, S. and Bobrowski, P. M., 1989, Job release and labor flexibility in a dual resource constrained job shop. Journal of Operations Management, 8(3), 230-249.
    • (1989) Journal of Operations Management , vol.8 , Issue.3 , pp. 230-249
    • Park, S.1    Bobrowski, P.M.2
  • 26
    • 21344497794 scopus 로고
    • An evaluation of capacity senstiive order review and release procedures in job shops
    • Phiupoom, P. R., Malhotra, M. K. and Jensen, J. B., 1993, An evaluation of capacity senstiive order review and release procedures in job shops. Decision Sciences, 24(6), 1109-1133.
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1133
    • Phiupoom, P.R.1    Malhotra, M.K.2    Jensen, J.B.3
  • 27
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a jobshop environment
    • Ragatz, G. L. and Mabert, V. A., 1988, An evaluation of order release mechanisms in a jobshop environment. Decision Sciences, 19(1), 167-189.
    • (1988) Decision Sciences , vol.19 , Issue.1 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 29
    • 0020848271 scopus 로고
    • Optimal tests for initialization bias in simulation output
    • Schruben, L., Singh, H. and Tierney, L., 1983, Optimal tests for initialization bias in simulation output. Operations Research, 31(6), 1167-1178.
    • (1983) Operations Research , vol.31 , Issue.6 , pp. 1167-1178
    • Schruben, L.1    Singh, H.2    Tierney, L.3
  • 30
    • 0024731874 scopus 로고
    • A review of the dual resource constrained system research
    • Treleven, M., 1989, A review of the dual resource constrained system research. HE Transactions, 21(3), 279-287.
    • (1989) HE Transactions , vol.21 , Issue.3 , pp. 279-287
    • Treleven, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.