-
1
-
-
0012245221
-
The effects of input control in a simple scheduling model
-
Baker, K. R., 1984, The effects of input control in a simple scheduling model. Journal of Operations Management, 4(2), 99-112.
-
(1984)
Journal of Operations Management
, vol.4
, Issue.2
, pp. 99-112
-
-
Baker, K.R.1
-
2
-
-
0002563758
-
Job shop scheduling with modified due dates
-
Baker, K. R., Kanet, J. J., 1983, Job shop scheduling with modified due dates. Journal of Operations Management, 4(1), 11-22.
-
(1983)
Journal of Operations Management
, vol.4
, Issue.1
, pp. 11-22
-
-
Baker, K.R.1
Kanet, J.J.2
-
3
-
-
0020250106
-
Controlling manufacturing lead time and work-in-process inventory by means of load-oriented order release
-
Chicago, USA
-
Bechte, W., 1982, Controlling manufacturing lead time and work-in-process inventory by means of load-oriented order release. APICS 25th Annual International Conference Proceedings, Chicago, USA, pp. 67-80.
-
(1982)
APICS 25Th Annual International Conference Proceedings
, pp. 67-80
-
-
Bechte, W.1
-
4
-
-
0023979312
-
Theory and practice of load-oriented manufacturing control
-
Bechte, W., 1988, Theory and practice of load-oriented manufacturing control. International Journal of Production Research, 26(3), 375-395.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.3
, pp. 375-395
-
-
Bechte, W.1
-
5
-
-
0002098611
-
The use of workload information to control job lateness in controlled and uncontrolled release production systems
-
Bertrand, J. W. M., 1983, The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3(2), 79-92.
-
(1983)
Journal of Operations Management
, vol.3
, Issue.2
, pp. 79-92
-
-
Bertrand, J.W.M.1
-
6
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, J. H., Phillips, D. T. and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research. 20(1), 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.1
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
7
-
-
84985841594
-
Alternate Routeing Strategies in Batch Manufacturing: An Evaluation
-
Bobrowski, P. M. and Mabert, V. A., 1988, Alternate Routeing Strategies in Batch Manufacturing: An Evaluation. Decision Sciences, 19(4), 713-733.
-
(1988)
Decision Sciences
, vol.19
, Issue.4
, pp. 713-733
-
-
Bobrowski, P.M.1
Mabert, V.A.2
-
8
-
-
38249025236
-
Work Release Strategies in a Dual Resource Constrained Job Shop
-
Bobrowski, P. M., Park, P. S., 1989, Work Release Strategies in a Dual Resource Constrained Job Shop. OMEGA International Journal of Management Science, 17(2), 177-188.
-
(1989)
OMEGA International Journal of Management Science
, vol.17
, Issue.2
, pp. 177-188
-
-
Bobrowski, P.M.1
Park, P.S.2
-
10
-
-
0004113622
-
-
Reading, MA: Addison-Wesley)
-
Conway, R. W., Maxwell, W. L. and Miller, L. W., 1967, Theory of Scheduling (Reading, MA: Addison-Wesley).
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
11
-
-
0000487878
-
Operating policies in multiechelon dual-constraint job shops
-
Fryer, J. S., 1973, Operating policies in multiechelon dual-constraint job shops. Management Science, 19(9), 1001-1012.
-
(1973)
Management Science
, vol.19
, Issue.9
, pp. 1001-1012
-
-
Fryer, J.S.1
-
12
-
-
0000965956
-
Heuristics in Job Shop Scheduling
-
Gere, W. S. Jr., 1966, Heuristics in Job Shop Scheduling. Management Science, 13(2), 167-190.
-
(1966)
Management Science
, vol.13
, Issue.2
, pp. 167-190
-
-
Gere, W.S.1
-
13
-
-
0039210129
-
The labor assignment decision: An application of work flow structure information
-
Holstein, W. K. and Berry, W. L., 1972, The labor assignment decision: an application of work flow structure information. Management Science, 18(7), 390-400.
-
(1972)
Management Science
, vol.18
, Issue.7
, pp. 390-400
-
-
Holstein, W.K.1
Berry, W.L.2
-
14
-
-
38249027443
-
LOAD-limited ORDER RELEASE IN Job Shop Scheduling Systems
-
Kanet, J. J., 1988, LOAD-limited ORDER RELEASE IN Job Shop Scheduling Systems. Journal of Operations Management, 7(3), 44-58.
-
(1988)
Journal of Operations Management
, vol.7
, Issue.3
, pp. 44-58
-
-
Kanet, J.J.1
-
15
-
-
0021120911
-
Manufacturing systems with forbidden early order departure
-
Kanet, J. J. and Christy, D. P., 1984, Manufacturing systems with forbidden early order departure. International Journal of Production Research, 22(1), 41-50.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.1
, pp. 41-50
-
-
Kanet, J.J.1
Christy, D.P.2
-
18
-
-
0003947410
-
-
New York: Wiley)
-
Makridakis, S., Wheelwright, S. C. and McGee, V. E., 1983, Forecasting: Methods and Applications, (New York: Wiley).
-
(1983)
Forecasting: Methods and Applications
-
-
Makridakis, S.1
Wheelwright, S.C.2
Mc Gee, V.E.3
-
19
-
-
0002748923
-
Job-shop scheduling theory: What is relevant?
-
McKay, K. N., Safayeni, F. R., Buzacott, J. A., 1988, Job-shop scheduling theory: what is relevant?. Interfaces, 18(4), 84-90.
-
(1988)
Interfaces
, vol.18
, Issue.4
, pp. 84-90
-
-
Mc Kay, K.N.1
Safayeni, F.R.2
Buzacott, J.A.3
-
21
-
-
0024700372
-
Order review/release: Research issues and perspectives
-
Melnyk, S. A., Ragatz, G. L., 1989, Order review/release: research issues and perspectives. International Journal of Production Research, 27(7), 1081-1096.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.7
, pp. 1081-1096
-
-
Melnyk, S.A.1
Ragatz, G.L.2
-
23
-
-
0001311183
-
Dual-resource constrained series service systems
-
Nelson, R. T., 1968, Dual-resource constrained series service systems. Operations Research, 16(2), 324-341.
-
(1968)
Operations Research
, vol.16
, Issue.2
, pp. 324-341
-
-
Nelson, R.T.1
-
24
-
-
0003054955
-
A Survey of Scheduling Rules
-
Panwalker, S. S. and Iskander, W., 1977, A Survey of Scheduling Rules. Operations Research, 25(1), 45-61.
-
(1977)
Operations Research
, vol.25
, Issue.1
, pp. 45-61
-
-
Panwalker, S.S.1
Iskander, W.2
-
25
-
-
38249005828
-
Job release and labor flexibility in a dual resource constrained job shop
-
Park, S. and Bobrowski, P. M., 1989, Job release and labor flexibility in a dual resource constrained job shop. Journal of Operations Management, 8(3), 230-249.
-
(1989)
Journal of Operations Management
, vol.8
, Issue.3
, pp. 230-249
-
-
Park, S.1
Bobrowski, P.M.2
-
26
-
-
21344497794
-
An evaluation of capacity senstiive order review and release procedures in job shops
-
Phiupoom, P. R., Malhotra, M. K. and Jensen, J. B., 1993, An evaluation of capacity senstiive order review and release procedures in job shops. Decision Sciences, 24(6), 1109-1133.
-
(1993)
Decision Sciences
, vol.24
, Issue.6
, pp. 1109-1133
-
-
Phiupoom, P.R.1
Malhotra, M.K.2
Jensen, J.B.3
-
27
-
-
84985757538
-
An evaluation of order release mechanisms in a jobshop environment
-
Ragatz, G. L. and Mabert, V. A., 1988, An evaluation of order release mechanisms in a jobshop environment. Decision Sciences, 19(1), 167-189.
-
(1988)
Decision Sciences
, vol.19
, Issue.1
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
28
-
-
0021467239
-
Input scheduling and load balance control for a job shop
-
Siumovashiro, S., Isoda, K. and Awane, H., 1984, Input scheduling and load balance control for a job shop. International Journal of Production Research, 22(4), 597-605.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.4
, pp. 597-605
-
-
Siumovashiro, S.1
Isoda, K.2
Awane, H.3
-
29
-
-
0020848271
-
Optimal tests for initialization bias in simulation output
-
Schruben, L., Singh, H. and Tierney, L., 1983, Optimal tests for initialization bias in simulation output. Operations Research, 31(6), 1167-1178.
-
(1983)
Operations Research
, vol.31
, Issue.6
, pp. 1167-1178
-
-
Schruben, L.1
Singh, H.2
Tierney, L.3
-
30
-
-
0024731874
-
A review of the dual resource constrained system research
-
Treleven, M., 1989, A review of the dual resource constrained system research. HE Transactions, 21(3), 279-287.
-
(1989)
HE Transactions
, vol.21
, Issue.3
, pp. 279-287
-
-
Treleven, M.1
|