메뉴 건너뛰기




Volumn 49, Issue 2, 1997, Pages 131-143

Order release and sequence-dependent setup times

Author keywords

Order release; Queues; Sequencing; Setup times; Workload control

Indexed keywords

CONTROL SYSTEMS; JOB ANALYSIS; MATHEMATICAL MODELS; OPTIMIZATION; PLANNING; PRODUCTION; QUEUEING THEORY; SCHEDULING;

EID: 0031121479     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(97)00008-X     Document Type: Article
Times cited : (31)

References (24)
  • 1
    • 0028462998 scopus 로고
    • Impact of sequence-dependent setup time on job shop scheduling performance
    • Kim, S.C. and Bobrowski, P.M., 1994. Impact of sequence-dependent setup time on job shop scheduling performance Int. J. Prod. Res., 32(7): 1503-1520.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.7 , pp. 1503-1520
    • Kim, S.C.1    Bobrowski, P.M.2
  • 3
    • 0027609191 scopus 로고
    • New concepts for production planning and control
    • Zäpfel, G. and Missbauer, H., 1993. New concepts for production planning and control, European J. Oper. Res., 67: 297-320.
    • (1993) European J. Oper. Res. , vol.67 , pp. 297-320
    • Zäpfel, G.1    Missbauer, H.2
  • 5
    • 0039334108 scopus 로고
    • The structuring of production control systems
    • Bertrand, J.W.M. and Wijngaard, J., 1986. The structuring of production control systems, Int. J. Oper. Prod. Mgmt., 6(2): 5-20.
    • (1986) Int. J. Oper. Prod. Mgmt. , vol.6 , Issue.2 , pp. 5-20
    • Bertrand, J.W.M.1    Wijngaard, J.2
  • 7
    • 0002595739 scopus 로고
    • A tactical planning model for manufacturing subcomponents of mainframe computers
    • Fine, C.H. and Graves, S.C., 1989. A tactical planning model for manufacturing subcomponents of mainframe computers, J. Manuf. Oper. Mgmt., 2: 4-34.
    • (1989) J. Manuf. Oper. Mgmt. , vol.2 , pp. 4-34
    • Fine, C.H.1    Graves, S.C.2
  • 8
    • 0028406902 scopus 로고
    • Metamodels in manufacuring: A review
    • Yu, B. and Popplewell, K., 1994. Metamodels in manufacuring: A review, Int. J. Prod. Res., 32(4): 787-796.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.4 , pp. 787-796
    • Yu, B.1    Popplewell, K.2
  • 10
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W., 1988. Theory and practice of load-oriented manufacturing control, Int. J. Prod. Res., 26(3): 375-395.
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 11
    • 0000170779 scopus 로고
    • A hierarchical control architecture for constant work-in-process (CONWIP) production systems
    • Spearman, M.L., Hopp, W.J. and Woodruff, D.L., 1989. A hierarchical control architecture for constant work-in-process (CONWIP) production systems, J. Manuf. Oper. Mgmt., 2(3): 147-171.
    • (1989) J. Manuf. Oper. Mgmt. , vol.2 , Issue.3 , pp. 147-171
    • Spearman, M.L.1    Hopp, W.J.2    Woodruff, D.L.3
  • 13
    • 0026953379 scopus 로고
    • Capacity based order review/release strategies to improve manufacturing performance
    • Philipoom, R.R. and Fry, T.D., 1992. Capacity based order review/release strategies to improve manufacturing performance, Int. J. Prod. Res., 30: 2559-2572.
    • (1992) Int. J. Prod. Res. , vol.30 , pp. 2559-2572
    • Philipoom, R.R.1    Fry, T.D.2
  • 14
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-in-progress (WIP) and leadtimes
    • Karmarkar, U.S., 1989. Capacity loading and release planning with work-in-progress (WIP) and leadtimes. J. Manuf. Oper. Mgmt, 2: 105-123.
    • (1989) J. Manuf. Oper. Mgmt , vol.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 15
    • 84986946649 scopus 로고
    • Evaluating order release mechanisms in a job shop with sequence-dependent setup times
    • Kim, S.C. and Bobrowski, P.M., 1995. Evaluating order release mechanisms in a job shop with sequence-dependent setup times, Prod. Oper. Mgmt., 4(2): 163-180.
    • (1995) Prod. Oper. Mgmt. , vol.4 , Issue.2 , pp. 163-180
    • Kim, S.C.1    Bobrowski, P.M.2
  • 17
    • 0023417844 scopus 로고
    • Performance of a manufacturing cell with increased product mix
    • Kekre, Sunder, 1987. Performance of a manufacturing cell with increased product mix, IIE-Trans., 19(3): 329-339.
    • (1987) IIE-Trans. , vol.19 , Issue.3 , pp. 329-339
    • Kekre, S.1
  • 18
    • 77957033398 scopus 로고
    • Performance evaluation of production networks
    • S.C. Graves, A.H.G. Rinnooy Kan and P.H. Zipkin (Eds.): North-Holland, Amsterdam
    • Suri, R., Sanders, J.L. and Kamath, M., 1993. Performance evaluation of production networks. In: S.C. Graves, A.H.G. Rinnooy Kan and P.H. Zipkin (Eds.): Logistics of Production and Inventory. North-Holland, Amsterdam, pp. 199-286.
    • (1993) Logistics of Production and Inventory , pp. 199-286
    • Suri, R.1    Sanders, J.L.2    Kamath, M.3
  • 19
    • 0345403299 scopus 로고
    • The influence of set-up time on job shop performance
    • Wilbrecht, J.K. and Prescott, W.B., 1969. The influence of set-up time on job shop performance. Mgmt. Sci., 16(4): B274-B280.
    • (1969) Mgmt. Sci. , vol.16 , Issue.4
    • Wilbrecht, J.K.1    Prescott, W.B.2
  • 24
    • 84985801774 scopus 로고
    • The repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing
    • Jacobs, F.R. and Bragg, D.J., 1988. The repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing. Decision Sci., 19: 281-294.
    • (1988) Decision Sci. , vol.19 , pp. 281-294
    • Jacobs, F.R.1    Bragg, D.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.