메뉴 건너뛰기




Volumn 46-47, Issue , 1996, Pages 1-12

Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems

Author keywords

Capacity load smoothing; Load based work order release; Material coordination

Indexed keywords

COST ACCOUNTING; FORECASTING; INDUSTRIAL ECONOMICS; INVENTORY CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 0030412014     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/0925-5273(95)00184-0     Document Type: Article
Times cited : (8)

References (27)
  • 1
    • 0012427517 scopus 로고
    • The effect of workload control on order flow times
    • Bertrand, J.W.M., 1981. The effect of workload control on order flow times. Oper. Res, '81, 779-789.
    • (1981) Oper. Res, '81 , pp. 779-789
    • Bertrand, J.W.M.1
  • 2
    • 0020783525 scopus 로고
    • The effect of workload dependent due dates on job shop performance
    • Bertrand, J.W.M.. 1983. The effect of workload dependent due dates on job shop performance. Mgmt. Sci., 29: 799-816.
    • (1983) Mgmt. Sci. , vol.29 , pp. 799-816
    • Bertrand, J.W.M.1
  • 3
    • 0002098611 scopus 로고
    • The use of work load information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J.W.M., 1983. The use of work load information to control job lateness in controlled and uncontrolled release production systems. J. Oper. Mgmt., 3: 79-92.
    • (1983) J. Oper. Mgmt. , vol.3 , pp. 79-92
    • Bertrand, J.W.M.1
  • 4
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker, K.R., 1984. The effects of input control in a simple scheduling model. J. Oper. Mgmt., 4: 99-112.
    • (1984) J. Oper. Mgmt. , vol.4 , pp. 99-112
    • Baker, K.R.1
  • 5
    • 38249027443 scopus 로고
    • Load limited order release in job shop scheduling systems
    • Kanet, J.J., 1988. Load limited order release in job shop scheduling systems. J. Oper. Mgmt., 7: 44-58.
    • (1988) J. Oper. Mgmt. , vol.7 , pp. 44-58
    • Kanet, J.J.1
  • 6
    • 0020250106 scopus 로고
    • Controlling manufacturing leadtime and work-in-process inventory by means of a load oriented order release
    • Bechte, W., 1982. Controlling manufacturing leadtime and work-in-process inventory by means of a load oriented order release. APICS Conf. Proc.
    • (1982) APICS Conf. Proc.
    • Bechte, W.1
  • 7
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar, U.S., 1987, Lot sizes, lead times and in-process inventories. Mgmt. Sci., 33: 409-418.
    • (1987) Mgmt. Sci. , vol.33 , pp. 409-418
    • Karmarkar, U.S.1
  • 8
    • 0026884810 scopus 로고
    • A broader view of the job shop scheduling problem
    • Wein, L.M., and Chevalier, P.B., 1992. A broader view of the job shop scheduling problem. Mgmt. Sci., 38: 1018-1033.
    • (1992) Mgmt. Sci. , vol.38 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2
  • 9
    • 0016929914 scopus 로고
    • Due dates in job shop scheduling
    • Eilon, S. and Chowdhurry, I.G., 1976. Due dates in job shop scheduling. Int. J. Prod. Res., 14: 223-237.
    • (1976) Int. J. Prod. Res. , vol.14 , pp. 223-237
    • Eilon, S.1    Chowdhurry, I.G.2
  • 10
    • 0003067640 scopus 로고
    • An investigation of due date assignment rules with constrained tightness
    • Baker, K.R. and Bertrand, J.W.M., 1981. An investigation of due date assignment rules with constrained tightness. J. Oper. Mgm., 1: 1981.
    • (1981) J. Oper. Mgm. , vol.1 , pp. 1981
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 15
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in job shop environment
    • Ragatz, G.L. and Mabert, V.A., 1988. An evaluation of order release mechanisms in job shop environment. Dec. Sci., 19: 167-189.
    • (1988) Dec. Sci. , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 16
    • 0023831761 scopus 로고
    • Order review/release and its impact on the shop floor
    • Melnyk, S.A. and Ragatz, G. L., 1988. Order review/release and its impact on the shop floor. Prod. Inv. Mgmt., 29:13-17.
    • (1988) Prod. Inv. Mgmt. , vol.29 , pp. 13-17
    • Melnyk, S.A.1    Ragatz, G.L.2
  • 18
    • 38249025236 scopus 로고
    • Work release strategies in a dual resource constrained job shop
    • Bobrowski, P.M. and Park, P.S., 1989. Work release strategies in a dual resource constrained job shop. Omega, 17: 177-188.
    • (1989) Omega , vol.17 , pp. 177-188
    • Bobrowski, P.M.1    Park, P.S.2
  • 20
    • 0019581187 scopus 로고
    • Capacity planning with a stochastic workflow model
    • Solberg, J.J., 1981. Capacity planning with a stochastic workflow model. AIIE Trans., 13: 116-122.
    • (1981) AIIE Trans. , vol.13 , pp. 116-122
    • Solberg, J.J.1
  • 21
    • 0022076034 scopus 로고
    • Multiproduct optimal batch sizes with in-process inventories and multi work centres
    • Bertrand, J.W.M., 1985. Multiproduct optimal batch sizes with in-process inventories and multi work centres. IIE Trans., 17: 157-163.
    • (1985) IIE Trans. , vol.17 , pp. 157-163
    • Bertrand, J.W.M.1
  • 22
    • 30244564732 scopus 로고
    • Working paper No. 83-25, William E. Simon Graduate School of Business Administration, University of Rochester, Rochester, New York
    • Karmarkar, U.S., Kekre, S. and Kekre, S., 1984. Multi item batching and minimization of queueing delays. Working paper No. 83-25, William E. Simon Graduate School of Business Administration, University of Rochester, Rochester, New York.
    • (1984) Multi Item Batching and Minimization of Queueing Delays
    • Karmarkar, U.S.1    Kekre, S.2    Kekre, S.3
  • 23
    • 0004371274 scopus 로고
    • The superposition of several strictly periodic sequences of events
    • Cox, D.R. and Smith, W.L., 1953. The superposition of several strictly periodic sequences of events. Biometrika, 40: 1-10.
    • (1953) Biometrika , vol.40 , pp. 1-10
    • Cox, D.R.1    Smith, W.L.2
  • 25
    • 0021529403 scopus 로고
    • Open and closed models for networks of queues
    • Whitt, W., 1984. Open and closed models for networks of queues, AT&T Bell Laboratories Tech. J., 63: 1911-1979.
    • (1984) AT&T Bell Laboratories Tech. J. , vol.63 , pp. 1911-1979
    • Whitt, W.1
  • 26
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark, C.D. and Williams, J.G.W., 1976. Material Requirements Planning under uncertainty, Dec. Sci., 7: 595-606.
    • (1976) Dec. Sci. , vol.7 , pp. 595-606
    • Whybark, C.D.1    Williams, J.G.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.