-
1
-
-
0012427517
-
The effect of workload control on order flow times
-
Bertrand, J.W.M., 1981. The effect of workload control on order flow times. Oper. Res, '81, 779-789.
-
(1981)
Oper. Res, '81
, pp. 779-789
-
-
Bertrand, J.W.M.1
-
2
-
-
0020783525
-
The effect of workload dependent due dates on job shop performance
-
Bertrand, J.W.M.. 1983. The effect of workload dependent due dates on job shop performance. Mgmt. Sci., 29: 799-816.
-
(1983)
Mgmt. Sci.
, vol.29
, pp. 799-816
-
-
Bertrand, J.W.M.1
-
3
-
-
0002098611
-
The use of work load information to control job lateness in controlled and uncontrolled release production systems
-
Bertrand, J.W.M., 1983. The use of work load information to control job lateness in controlled and uncontrolled release production systems. J. Oper. Mgmt., 3: 79-92.
-
(1983)
J. Oper. Mgmt.
, vol.3
, pp. 79-92
-
-
Bertrand, J.W.M.1
-
4
-
-
0012245221
-
The effects of input control in a simple scheduling model
-
Baker, K.R., 1984. The effects of input control in a simple scheduling model. J. Oper. Mgmt., 4: 99-112.
-
(1984)
J. Oper. Mgmt.
, vol.4
, pp. 99-112
-
-
Baker, K.R.1
-
5
-
-
38249027443
-
Load limited order release in job shop scheduling systems
-
Kanet, J.J., 1988. Load limited order release in job shop scheduling systems. J. Oper. Mgmt., 7: 44-58.
-
(1988)
J. Oper. Mgmt.
, vol.7
, pp. 44-58
-
-
Kanet, J.J.1
-
6
-
-
0020250106
-
Controlling manufacturing leadtime and work-in-process inventory by means of a load oriented order release
-
Bechte, W., 1982. Controlling manufacturing leadtime and work-in-process inventory by means of a load oriented order release. APICS Conf. Proc.
-
(1982)
APICS Conf. Proc.
-
-
Bechte, W.1
-
7
-
-
0023310940
-
Lot sizes, lead times and in-process inventories
-
Karmarkar, U.S., 1987, Lot sizes, lead times and in-process inventories. Mgmt. Sci., 33: 409-418.
-
(1987)
Mgmt. Sci.
, vol.33
, pp. 409-418
-
-
Karmarkar, U.S.1
-
8
-
-
0026884810
-
A broader view of the job shop scheduling problem
-
Wein, L.M., and Chevalier, P.B., 1992. A broader view of the job shop scheduling problem. Mgmt. Sci., 38: 1018-1033.
-
(1992)
Mgmt. Sci.
, vol.38
, pp. 1018-1033
-
-
Wein, L.M.1
Chevalier, P.B.2
-
9
-
-
0016929914
-
Due dates in job shop scheduling
-
Eilon, S. and Chowdhurry, I.G., 1976. Due dates in job shop scheduling. Int. J. Prod. Res., 14: 223-237.
-
(1976)
Int. J. Prod. Res.
, vol.14
, pp. 223-237
-
-
Eilon, S.1
Chowdhurry, I.G.2
-
10
-
-
0003067640
-
An investigation of due date assignment rules with constrained tightness
-
Baker, K.R. and Bertrand, J.W.M., 1981. An investigation of due date assignment rules with constrained tightness. J. Oper. Mgm., 1: 1981.
-
(1981)
J. Oper. Mgm.
, vol.1
, pp. 1981
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
15
-
-
84985757538
-
An evaluation of order release mechanisms in job shop environment
-
Ragatz, G.L. and Mabert, V.A., 1988. An evaluation of order release mechanisms in job shop environment. Dec. Sci., 19: 167-189.
-
(1988)
Dec. Sci.
, vol.19
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
16
-
-
0023831761
-
Order review/release and its impact on the shop floor
-
Melnyk, S.A. and Ragatz, G. L., 1988. Order review/release and its impact on the shop floor. Prod. Inv. Mgmt., 29:13-17.
-
(1988)
Prod. Inv. Mgmt.
, vol.29
, pp. 13-17
-
-
Melnyk, S.A.1
Ragatz, G.L.2
-
18
-
-
38249025236
-
Work release strategies in a dual resource constrained job shop
-
Bobrowski, P.M. and Park, P.S., 1989. Work release strategies in a dual resource constrained job shop. Omega, 17: 177-188.
-
(1989)
Omega
, vol.17
, pp. 177-188
-
-
Bobrowski, P.M.1
Park, P.S.2
-
20
-
-
0019581187
-
Capacity planning with a stochastic workflow model
-
Solberg, J.J., 1981. Capacity planning with a stochastic workflow model. AIIE Trans., 13: 116-122.
-
(1981)
AIIE Trans.
, vol.13
, pp. 116-122
-
-
Solberg, J.J.1
-
21
-
-
0022076034
-
Multiproduct optimal batch sizes with in-process inventories and multi work centres
-
Bertrand, J.W.M., 1985. Multiproduct optimal batch sizes with in-process inventories and multi work centres. IIE Trans., 17: 157-163.
-
(1985)
IIE Trans.
, vol.17
, pp. 157-163
-
-
Bertrand, J.W.M.1
-
22
-
-
30244564732
-
-
Working paper No. 83-25, William E. Simon Graduate School of Business Administration, University of Rochester, Rochester, New York
-
Karmarkar, U.S., Kekre, S. and Kekre, S., 1984. Multi item batching and minimization of queueing delays. Working paper No. 83-25, William E. Simon Graduate School of Business Administration, University of Rochester, Rochester, New York.
-
(1984)
Multi Item Batching and Minimization of Queueing Delays
-
-
Karmarkar, U.S.1
Kekre, S.2
Kekre, S.3
-
23
-
-
0004371274
-
The superposition of several strictly periodic sequences of events
-
Cox, D.R. and Smith, W.L., 1953. The superposition of several strictly periodic sequences of events. Biometrika, 40: 1-10.
-
(1953)
Biometrika
, vol.40
, pp. 1-10
-
-
Cox, D.R.1
Smith, W.L.2
-
24
-
-
0004113622
-
-
Addison Wesley, Reading, MA
-
Conway, R.W., Maxwell, W.L. and Miller, L.W., 1967. Theory of Scheduling. Addison Wesley, Reading, MA.
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
25
-
-
0021529403
-
Open and closed models for networks of queues
-
Whitt, W., 1984. Open and closed models for networks of queues, AT&T Bell Laboratories Tech. J., 63: 1911-1979.
-
(1984)
AT&T Bell Laboratories Tech. J.
, vol.63
, pp. 1911-1979
-
-
Whitt, W.1
-
26
-
-
84989412809
-
Material requirements planning under uncertainty
-
Whybark, C.D. and Williams, J.G.W., 1976. Material Requirements Planning under uncertainty, Dec. Sci., 7: 595-606.
-
(1976)
Dec. Sci.
, vol.7
, pp. 595-606
-
-
Whybark, C.D.1
Williams, J.G.W.2
|