-
1
-
-
0003942683
-
Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung
-
Thesis, TU Hannover
-
Bechte, W., 1980, Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung. Thesis, TU Hannover.
-
(1980)
-
-
Bechte, W.1
-
2
-
-
0031078124
-
Order review and release strategies in a job shop environment: A review and a classification
-
Bergamaschi, D., Cigolini, R., Perona, M., and Portoli, A., 1997, Order review and release strategies in a job shop environment: a review and a classification. International Journal of Production Research, 35, 399.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 399
-
-
Bergamaschi, D.1
Cigolini, R.2
Perona, M.3
Portoli, A.4
-
3
-
-
0012427517
-
The effect of workload control on order flow times
-
In J. P. Brans (ed); (North-Holland Publishing Company, Amsterdam)
-
Bertrand,J. M. M., 1981, The effect of workload control on order flow times. In J. P. Brans (ed) Operational Research '81 (North-Holland Publishing Company, Amsterdam), pp. 779-789.
-
(1981)
Operational Research '81
, pp. 779-789
-
-
Bertrand, J.M.M.1
-
4
-
-
0022076034
-
Multiproduct optimal batch sizes with in-process inventories and multiwork centres
-
Bertrand, J. W. M., 1985, Multiproduct optimal batch sizes with in-process inventories and multiwork centres. IIE-Transactions, 17, 157-163.
-
(1985)
IIE-Transactions
, vol.17
, pp. 157-163
-
-
Bertrand, J.W.M.1
-
5
-
-
0004085136
-
-
(Amsterdam, Oxford, New York: Elsevier)
-
Bertrand, J. W. M., and Wortmann, J. C., 1981, Production Control and Information Systems for Component-Manufacturing Shops (Amsterdam, Oxford, New York: Elsevier).
-
(1981)
Production Control and Information Systems for Component-Manufacturing Shops
-
-
Bertrand, J.W.M.1
Wortmann, J.C.2
-
6
-
-
0003714533
-
-
(Amsterdam, Oxford, New York: Elsevier)
-
Bertrand, J. W. M., Wortmann, J. C., and Wijngaard, J., 1990, Production Control: A Structural and Design Oriented Approach (Amsterdam, Oxford, New York: Elsevier).
-
(1990)
Production Control: A Structural and Design Oriented Approach
-
-
Bertrand, J.W.M.1
Wortmann, J.C.2
Wijngaard, J.3
-
7
-
-
0022775864
-
The influence of service-time variability in a closed network of queues
-
Bondi, A. B., and Whitt, W., 1986, The influence of service-time variability in a closed network of queues. Performance Evaluation, 6, 219-234.
-
(1986)
Performance Evaluation
, vol.6
, pp. 219-234
-
-
Bondi, A.B.1
Whitt, W.2
-
9
-
-
0025432133
-
An industrial study of the effects of batch sizes on the performance of the overall manufacturing system
-
Byrne, M. D., and O'Grady, P., 1990, An industrial study of the effects of batch sizes on the performance of the overall manufacturing system. Engineering Costs and Production Economics, 1(3), 139-147.
-
(1990)
Engineering Costs and Production Economics
, vol.1
, Issue.3
, pp. 139-147
-
-
Byrne, M.D.1
O'Grady, P.2
-
10
-
-
0001887653
-
Economic lot size determination in multi-stage assembly systems
-
Crowston, W. B., Wagner, M., and Williams, J. F., 1973, Economic lot size determination in multi-stage assembly systems. Management Science, 19(5), 517-527.
-
(1973)
Management Science
, vol.19
, Issue.5
, pp. 517-527
-
-
Crowston, W.B.1
Wagner, M.2
Williams, J.F.3
-
11
-
-
0002595739
-
A tactical planning model for manufacturing subcomponents of mainframe computers
-
Fine, C. H., and Graves, S. C., 1989, A tactical planning model for manufacturing subcomponents of mainframe computers. Journal of Manufacturing and Operations Management, 2, 4-34.
-
(1989)
Journal of Manufacturing and Operations Management
, vol.2
, pp. 4-34
-
-
Fine, C.H.1
Graves, S.C.2
-
12
-
-
0025699788
-
Multi-stage production-inventory systems
-
Goyal, S. K., and Gunasekaran, A., 1990, Multi-stage production-inventory systems. European Journal of Operational Research, 46, 1-20.
-
(1990)
European Journal of Operational Research
, vol.46
, pp. 1-20
-
-
Goyal, S.K.1
Gunasekaran, A.2
-
13
-
-
0001857828
-
Which lot sizing techniques are used in material requirements planning?
-
Haddock,J., and Hubicki, D. E., 1989, Which lot sizing techniques are used in material requirements planning? Production and Inventory Management Journal, 30(3), 53-56.
-
(1989)
Production and Inventory Management Journal
, vol.30
, Issue.3
, pp. 53-56
-
-
Haddock, J.1
Hubicki, D.E.2
-
14
-
-
0012393006
-
Die Bestimmung optimaler Losgröβen unter Berücksichtigung der betrieblichen Kapazität
-
Holm, U. C., and Nullmeier, E., 1974, Die Bestimmung optimaler Losgröβen unter Berücksichtigung der betrieblichen Kapazität. Zeitschrift für wirtschaftliche Fertigung, 69(4), 163-167.
-
(1974)
Zeitschrift Für Wirtschaftliche Fertigung
, vol.69
, Issue.4
, pp. 163-167
-
-
Holm, U.C.1
Nullmeier, E.2
-
15
-
-
0023310940
-
Lot sizes, lead times and in-process inventories
-
Karmarkar, U. S., 1987, Lot sizes, lead times and in-process inventories. Management Science, 33(3), 409-418.
-
(1987)
Management Science
, vol.33
, Issue.3
, pp. 409-418
-
-
Karmarkar, U.S.1
-
16
-
-
0022128589
-
Lotsizing in multi-machine job shops
-
Karmarkar, U. S., Kekre, S., and Kekre, S., 1985a, Lotsizing in multi-machine job shops. IIE Transactions, 13(3), 290-298.
-
(1985)
IIE Transactions
, vol.13
, Issue.3
, pp. 290-298
-
-
Karmarkar, U.S.1
Kekre, S.2
Kekre, S.3
-
17
-
-
0022034627
-
Lot-sizing and lead-time performance in a manufacturing cell
-
Karmakar, U. S., Kekre, S., Kekre, S., and Freeman, S., 1985b, Lot-sizing and lead-time performance in a manufacturing cell. Interfaces, 15(2), 1-9.
-
(1985)
Interfaces
, vol.15
, Issue.2
, pp. 1-9
-
-
Karmakar, U.S.1
Kekre, S.2
Kekre, S.3
Freeman, S.4
-
18
-
-
0023578221
-
Capacity analysis of a manufacturing cell
-
Karmarkar, U. S., Kekre, S., and Kekre, S., 1987, Capacity analysis of a manufacturing cell. Journal of Manufacturing Systems, 6, 165-175.
-
(1987)
Journal of Manufacturing Systems
, vol.6
, pp. 165-175
-
-
Karmarkar, U.S.1
Kekre, S.2
Kekre, S.3
-
19
-
-
0026853018
-
Multi-item batching heuristics for minimization of queueing delays
-
Karmarkar, U. S., Kekre, S., and Kekre, S., 1992, Multi-item batching heuristics for minimization of queueing delays. European Journal of Operational Research, 58, 99-111.
-
(1992)
European Journal of Operational Research
, vol.58
, pp. 99-111
-
-
Karmarkar, U.S.1
Kekre, S.2
Kekre, S.3
-
20
-
-
0012394474
-
The effect of number of items processed at a facility on manufacturing lead time
-
Working Paper Series No. QM 8418, University of Rochester
-
Kekre, S., 1984, The effect of number of items processed at a facility on manufacturing lead time. Working Paper Series No. QM 8418, University of Rochester.
-
(1984)
-
-
Kekre, S.1
-
21
-
-
0023417844
-
Performance of a manufacturing cell with increased product mix
-
Kekre, S., 1987, Performance of a manufacturing cell with increased product mix. IIE-Transactions, 19(3), 329-339.
-
(1987)
IIE-Transactions
, vol.19
, Issue.3
, pp. 329-339
-
-
Kekre, S.1
-
23
-
-
0034295811
-
Modelling input-output workload control for dynamic capacity planning in production planning systems
-
Kingsman, B. G., 2000, Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics, 68, 73-93.
-
(2000)
International Journal of Production Economics
, vol.68
, pp. 73-93
-
-
Kingsman, B.G.1
-
24
-
-
0024664777
-
A structural methodology for managing lead times in make-to-order companies
-
Kingsman, B. G., Tatsiopoulos, I. P., and Hendry, L. C., 1989, A structural methodology for managing lead times in make-to-order companies. European Journal of Operational Research, 40, 196-209.
-
(1989)
European Journal of Operational Research
, vol.40
, pp. 196-209
-
-
Kingsman, B.G.1
Tatsiopoulos, I.P.2
Hendry, L.C.3
-
25
-
-
0012435299
-
Lot sizing and queueing models: Some remarks on KARMARKAR'S model
-
In U. Leopold-Wildburger, G. Feichtinger and K.-P. Kistner (eds)
-
Kistner, K.-P., 1999, Lot sizing and queueing models: Some remarks on KARMARKAR'S model. In U. Leopold-Wildburger, G. Feichtinger and K.-P. Kistner (eds) Modelling and Decisions in Economics (Heidelberg: Physica), pp. 173-188.
-
(1999)
Modelling and Decisions in Economics (Heidelberg: Physica)
, pp. 173-188
-
-
Kistner, K.-P.1
-
26
-
-
0016081229
-
Application of the diffusion approximations to queueing networks II: Nonequilibrium distributions and applications to computer modeling
-
Kobayashi, H., 1974, Application of the diffusion approximations to queueing networks II: nonequilibrium distributions and applications to computer modeling. Journal of the Association for Computing Machinery, 21(3), 459-469.
-
Journal of the Association for Computing Machinery
, vol.21
, pp. 459-469
-
-
Kobayashi, H.1
-
27
-
-
0030288024
-
A general approximation for the single product lot sizing model with queueing delays
-
Lambrecht, M. R., and Vandaele, N. J., 1996, A general approximation for the single product lot sizing model with queueing delays. European Journal of Operational Research, 95, 73-88.
-
(1996)
European Journal of Operational Research
, vol.95
, pp. 73-88
-
-
Lambrecht, M.R.1
Vandaele, N.J.2
-
28
-
-
0030574815
-
A lot sizing model with queueing delays: The issue of safety time
-
Lambrecht, M. R., Chen S., and Vandaele, N., 1996, A lot sizing model with queueing delays: the issue of safety time. European Journal of Operational Research, 99, 269-276.
-
(1996)
European Journal of Operational Research
, vol.99
, pp. 269-276
-
-
Lambrecht, M.R.1
Chen, S.2
Vandaele, N.3
-
31
-
-
0012465749
-
Die Implikationen durchlauforientierter Losgröβenbildung für die Komplexität der Produktionsplanung und -steuerung
-
Missbauer, H., 1999, Die Implikationen durchlauforientierter Losgröβenbildung für die Komplexität der Produktionsplanung und -steuerung. Zeitschrift für Betriebswirtschaft (ZfB), 69(2), 245-265.
-
(1999)
Zeitschrift für Betriebswirtschaft (ZfB)
, vol.69
, Issue.2
, pp. 245-265
-
-
Missbauer, H.1
-
32
-
-
0037085145
-
Aggregate order release planning for time-varying demand
-
Missbauer, H., 2002, Aggregate order release planning for time-varying demand. International Journal of Production Research, 40, 699-718.
-
(2002)
International Journal of Production Research
, vol.40
, pp. 699-718
-
-
Missbauer, H.1
-
33
-
-
0012431576
-
Durchlauforientierte Losgrößenbestimmung
-
Nyhuis, P., 1988, Durchlauforientierte Losgrößenbestimmung. io Management Zeitschrift, 57(4), 200-205.
-
(1988)
io Management Zeitschrift
, vol.57
, Issue.4
, pp. 200-205
-
-
Nyhuis, P.1
-
34
-
-
0026953379
-
Capacity based order review/release strategies to improve manufacturing performance
-
Philipoom, R. R., and Fry, T. D., 1992, Capacity based order review/release strategies to improve manufacturing performance. International Journal of Production Research, 30, 2559-2572.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2559-2572
-
-
Philipoom, R.R.1
Fry, T.D.2
-
35
-
-
0028257336
-
The relaxation time heuristic for the initial transient problem in M/M/k queueing systems
-
Roth, E., 1994, The relaxation time heuristic for the initial transient problem in M/M/k queueing systems. European Journal of Operational Research, 72, 376-386.
-
(1994)
European Journal of Operational Research
, vol.72
, pp. 376-386
-
-
Roth, E.1
-
36
-
-
0020816023
-
Heuristic analysis of closed queueing networks
-
Shantikumar, J. G., and Gocmen, M., 1983, Heuristic analysis of closed queueing networks. International Journal of Production Research, 21 (5), 675-690.
-
(1983)
International Journal of Production Research
, vol.21
, Issue.5
, pp. 675-690
-
-
Shantikumar, J.G.1
Gocmen, M.2
-
38
-
-
0002232501
-
Hierarchically integrated lot size optimization
-
Söhner, V., and Schneeweiss, Ch., 1995, Hierarchically integrated lot size optimization. European Journal of Operational Research, 86, 73-90.
-
(1995)
European Journal of Operational Research
, vol.86
, pp. 73-90
-
-
Söhner, V.1
Schneeweiss, Ch.2
-
39
-
-
0022681029
-
A 50% increase in lot size and planned lead time with no increase in work-in-process inventory
-
South, J. B., and Stewart, R. J., 1986, A 50% increase in lot size and planned lead time with no increase in work-in-process inventory. Production and Inventory Management, 1/86, 19-27.
-
(1986)
Production and Inventory Management
, vol.1
, Issue.86
, pp. 19-27
-
-
South, J.B.1
Stewart, R.J.2
-
40
-
-
0020936101
-
Lead time management
-
Tatsiopoulos, I. P., and Kingsman, B. G., 1983, lead time management. European Journal of Operational Research, 14, 351-358.
-
(1983)
European Journal of Operational Research
, vol.14
, pp. 351-358
-
-
Tatsiopoulos, I.P.1
Kingsman, B.G.2
-
41
-
-
0030572956
-
An exploration of models that minimize leadtime through batching of arrived orders
-
Tielemans, P. F. J., and Kuik, R., 1996, An exploration of models that minimize leadtime through batching of arrived orders. European Journal of Operational Research, 95, 374-389.
-
(1996)
European Journal of Operational Research
, vol.95
, pp. 374-389
-
-
Tielemans, P.F.J.1
Kuik, R.2
-
43
-
-
0020848139
-
The queueing network analyzer
-
Whitt, W., 1983, The queueing network analyzer. Bell System Technical Journal, 62(9), 2779-2815.
-
(1983)
Bell System Technical Journal
, vol.62
, Issue.9
, pp. 2779-2815
-
-
Whitt, W.1
-
46
-
-
0028406902
-
Metamodels in manufacturing: A review
-
Yu, B., and Popplewell, K., 1994, Metamodels in manufacturing: a review. International Journal of Production Research, 32(4), 787-796.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.4
, pp. 787-796
-
-
Yu, B.1
Popplewell, K.2
-
47
-
-
0027625964
-
Production planning and control systems including load-oriented order release - Problems and research perspectives
-
Zäpfel, G., and Missbauer, H., 1993a, Production planning and control systems including load-oriented order release - problems and research perspectives. International Journal of Production Economics, 30-31, 107-122.
-
(1993)
International Journal of Production Economics
, vol.30-31
, pp. 107-122
-
-
Zäpfel, G.1
Missbauer, H.2
-
48
-
-
0027609191
-
New concepts for production planning and control
-
Zäpfel, G., and Missbauer, H., 1993b, New concepts for production planning and control. European Journal of Operational Research, 67, 297-320.
-
(1993)
European Journal of Operational Research
, vol.67
, pp. 297-320
-
-
Zäpfel, G.1
Missbauer, H.2
-
49
-
-
0001308069
-
PPS-Systeme mit belastungsorientierter Auftragsfreigabe - Operationscharakteristika und Möglichkeiten zur Weiterentwicklung
-
Zäpfel, G., Missbauer, H., and Kappel, W., 1990, PPS-Systeme mit belastungsorientierter Auftragsfreigabe - Operationscharakteristika und Möglichkeiten zur Weiterentwicklung. Zeitschrift für Betriebswirtschaft, 62(8), 897-919.
-
(1990)
Zeitschrift für Betriebswirtschaft
, vol.62
, Issue.8
, pp. 897-919
-
-
Zäpfel, G.1
Missbauer, H.2
Kappel, W.3
-
50
-
-
0012427187
-
Quantifizierung der Bestimmungsfaktoren von Durchlaufzeiten und Werkstattbeständen
-
Zimmermann, G., 1984, Quantifizierung der Bestimmungsfaktoren von Durchlaufzeiten und Werkstattbeständen, Zeitschrift für Betriebswirtschaft, 54 (10), 1016-1032.
-
(1984)
Zeitschrift für Betriebswirtschaft
, vol.54
, Issue.10
, pp. 1016-1032
-
-
Zimmermann, G.1
|