메뉴 건너뛰기




Volumn 13, Issue 7, 2002, Pages 665-678

Workload based order release and productivity: A missing link

Author keywords

Productivity; Throughput time; Workload control

Indexed keywords

COMPUTER SIMULATION; INDUSTRIAL MANAGEMENT; MATHEMATICAL MODELS; PERSONNEL; PRODUCTION; PRODUCTIVITY; SCHEDULING;

EID: 0036820319     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/0953728021000026276     Document Type: Article
Times cited : (83)

References (33)
  • 1
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker, K. R., 1984, The effects of input control in a simple scheduling model. Journal of Operations Management, 4(2), 99-112.
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 99-112
    • Baker, K.R.1
  • 2
    • 0020250106 scopus 로고
    • Controlling manufacturing lead time and work-in-process inventory by means of load-oriented order release
    • Bechte, W., 1982, Controlling manufacturing lead time and work-in-process inventory by means of load-oriented order release. APICS 1982 Conference Proceedings, pp. 67-71.
    • (1982) APICS 1982 Conference Proceedings , pp. 67-71
    • Bechte, W.1
  • 3
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W., 1988, Theory and practice of load-oriented manufacturing control. International Journal of Production Research, 26(3), 375-395.
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 4
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J. W. M., 1983, The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3(2), 79-92.
    • (1983) Journal of Operations Management , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.W.M.1
  • 6
    • 0032205531 scopus 로고    scopus 로고
    • Comparison of order review and release techniques in a dynamic and uncertain job shop environment
    • Cigolini, R., Perona, M., and Portioli, A., 1998, Comparison of order review and release techniques in a dynamic and uncertain job shop environment. International Journal of Production Research, 36(11), 2931-2952.
    • (1998) International Journal of Production Research , vol.36 , Issue.11 , pp. 2931-2952
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 7
    • 0023544082 scopus 로고
    • A procedure for implementing input/output control: A case study
    • Fourth Quarter 1987
    • Fry, T. D., and Smith, A. E., 1987, A procedure for implementing input/output control: a case study. Production and Inventory Management Journal, Fourth Quarter 1987, 1987, pp. 50-52.
    • (1987) Production and Inventory Management Journal , pp. 50-52
    • Fry, T.D.1    Smith, A.E.2
  • 10
    • 0012328119 scopus 로고
    • Measuring delivery performance: Case study from the semiconductor industry
    • colloquium, Harvard Business School, January 1989
    • Harrison, J. M, Holloway, C. A., and Patell, J. M., 1989, Measuring delivery performance: case study from the semiconductor industry, paper presented at the 'Measuring Manufacturing Performance' colloquium, Harvard Business School, January 1989.
    • (1989) Measuring Manufacturing Performance
    • Harrison, J.M.1    Holloway, C.A.2    Patell, J.M.3
  • 11
    • 58149450316 scopus 로고
    • Drives and the conceptual nervous system
    • Hebb, D. O., 1955 Drives and the Conceptual Nervous System. Psychological Review, 62, 243-253.
    • (1955) Psychological Review , vol.62 , pp. 243-253
    • Hebb, D.O.1
  • 12
    • 0028378035 scopus 로고
    • The relationship between speed and productivity in industry networks: A study of industrial statistics
    • Holström, J., 1994, The relationship between speed and productivity in industry networks: A study of industrial statistics. International Journal of Production Economics, 34, 91-97.
    • (1994) International Journal of Production Economics , vol.34 , pp. 91-97
    • Holström, J.1
  • 13
    • 0016319331 scopus 로고
    • A loading and balancing methodology for job shop control
    • Irastorza, J. C., and Deane, R. H., 1974, A loading and balancing methodology for job shop control. AIIE Transactions, 6(4), 302-307.
    • (1974) AIIE Transactions , vol.6 , Issue.4 , pp. 302-307
    • Irastorza, J.C.1    Deane, R.H.2
  • 14
    • 0028333516 scopus 로고
    • Optimal input control for job-shop type production systems using inverse queuing network analysis
    • Kuroda, M., and Kawada, A., 1994, Optimal input control for job-shop type production systems using inverse queuing network analysis. International Journal of Production Economics, 33, 215-223.
    • (1994) International Journal of Production Economics , vol.33 , pp. 215-223
    • Kuroda, M.1    Kawada, A.2
  • 15
    • 0032667962 scopus 로고    scopus 로고
    • Inventory reduction and productivity growth: Linkages in the Japanese automotive industry
    • Lieberman, M. B., and Demeester, L., 1999, Inventory Reduction and Productivity Growth: Linkages in the Japanese Automotive Industry. Management Science, 45(4), 466-485.
    • (1999) Management Science , vol.45 , Issue.4 , pp. 466-485
    • Lieberman, M.B.1    Demeester, L.2
  • 18
    • 0029732560 scopus 로고    scopus 로고
    • An enhanced loading model for the probabilistic workload control under workload balance
    • Perona, M., and Portioli, A., 1996, An enhanced loading model for the probabilistic workload control under workload balance. Production Planning and Control, 7(1), 68-78.
    • (1996) Production Planning and Control , vol.7 , Issue.1 , pp. 68-78
    • Perona, M.1    Portioli, A.2
  • 19
    • 0032118511 scopus 로고    scopus 로고
    • The impact of parameter setting in load oriented manufacturing control
    • Perona, M., and Portioli, A., 1998, The impact of parameter setting in load oriented manufacturing control. International Journal of Production Economics, 55, 133-142.
    • (1998) International Journal of Production Economics , vol.55 , pp. 133-142
    • Perona, M.1    Portioli, A.2
  • 21
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • Philipoom, P. R., Malhotra, M. K., and Jensen, J. B., 1993, An evaluation of capacity sensitive order review and release procedures in job shops. Decision Sciences, 24(6), 1109-1133.
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1133
    • Philipoom, P.R.1    Malhotra, M.K.2    Jensen, J.B.3
  • 23
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job-shop environment
    • Ragatz, G. L., and Mabert, V. A., 1988, An evaluation of order release mechanisms in a job-shop environment. Decision Sciences, 19, 167-189.
    • (1988) Decision Sciences , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 24
    • 0024073049 scopus 로고
    • The merit of making things fast
    • Fall 1988
    • Schmenner, R. W., 1988, The Merit of Making Things Fast. Sloan Management Review, Fall 1988, pp. 11-17.
    • (1988) Sloan Management Review , pp. 11-17
    • Schmenner, R.W.1
  • 27
    • 0003596545 scopus 로고
    • Competing against time
    • The Free Press
    • Stalk, G., Jr., and Hout, Th. M., 1990, Competing against time. The Free Press.
    • (1990)
    • Stalk G., Jr.1    Hout, Th.M.2
  • 28
    • 0012291581 scopus 로고    scopus 로고
    • Load-based work-order release and its effectiveness on delivery performance improvement
    • (PhD thesis, Eindhoven University of Technology)
    • Van Ooijen, H. P. G., 1996, Load-based work-order release and its effectiveness on delivery performance improvement. (PhD thesis, Eindhoven University of Technology).
    • (1996)
    • Van Ooijen, H.P.G.1
  • 29
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • Wein, L. M., and Chevalier, P. B., 1992, A broader view of the job-shop Scheduling problem. Management Science, 38(7), 1018-1032.
    • (1992) Management Science , vol.38 , Issue.7 , pp. 1018-1032
    • Wein, L.M.1    Chevalier, P.B.2
  • 30
    • 0002274219 scopus 로고
    • Input/output control: A real handle on lead-time
    • 3rd qtr.
    • Wight, O., 1970, Input/Output control: A real handle on lead-time. Production and Inventory Management, 11, 3rd qtr., 9-31.
    • (1970) Production and Inventory Management , vol.11 , pp. 9-31
    • Wight, O.1
  • 31
    • 0021529403 scopus 로고
    • Open and closed models for networks of queues
    • Whitt, W., 1984, Open and closed models for networks of queues. AT&T Bell Laboratories Technical Journal, 63(9), 1911-1979.
    • (1984) AT&T Bell Laboratories Technical Journal , vol.63 , Issue.9 , pp. 1911-1979
    • Whitt, W.1
  • 32


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.