메뉴 건너뛰기




Volumn 26, Issue 8, 2011, Pages 612-631

An expert system for auditing quality management systems in construction

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION FIRMS; CONSTRUCTION QUALITY MANAGEMENT; CONTINUOUS QUALITY IMPROVEMENT; FUZZY LOGIC TOOLBOX; INTERACTIVE USER INTERFACES; ISO 9000 STANDARD; ISO-9000; MANAGEMENT PROCESS; QUALITY MANAGEMENT SYSTEMS; QUALITY REQUIREMENTS; RECORDING EVIDENCE; RULE BASE; TEST EQUIPMENTS;

EID: 80052900954     PISSN: 10939687     EISSN: 14678667     Source Type: Journal    
DOI: 10.1111/j.1467-8667.2011.00721.x     Document Type: Article
Times cited : (33)

References (106)
  • 2
    • 17444387915 scopus 로고
    • A novel approach to expert systems for design of large structures
    • Winter 1988
    • Adeli, H. & Balasubramanyam, K. V. (1988), A novel approach to expert systems for design of large structures, AI Magazine, Winter 1988, 54-63.
    • (1988) AI Magazine , pp. 54-63
    • Adeli, H.1    Balasubramanyam, K.V.2
  • 3
    • 0026369206 scopus 로고
    • A hierarchical expert system for design of floors in highrise buildings
    • Adeli, H. & Hawkins, D. (1991), A hierarchical expert system for design of floors in highrise buildings, Computers and Structures, 41(4), 773-88.
    • (1991) Computers and Structures , vol.41 , Issue.4 , pp. 773-788
    • Adeli, H.1    Hawkins, D.2
  • 4
    • 0141454753 scopus 로고    scopus 로고
    • Neuro-fuzzy logic model for freeway work zone capacity estimation
    • Adeli, H. & Jiang, X. (2003), Neuro-fuzzy logic model for freeway work zone capacity estimation, Journal of Transportation Engineering, 129(5), 484-93.
    • (2003) Journal of Transportation Engineering , vol.129 , Issue.5 , pp. 484-493
    • Adeli, H.1    Jiang, X.2
  • 5
    • 33645530462 scopus 로고    scopus 로고
    • Dynamic fuzzy wavelet neural network model for structural system identification
    • Adeli, H. & Jiang, X. (2006), Dynamic fuzzy wavelet neural network model for structural system identification, Journal of Structural Engineering, 132(1), 102-11.
    • (2006) Journal of Structural Engineering , vol.132 , Issue.1 , pp. 102-111
    • Adeli, H.1    Jiang, X.2
  • 6
    • 0031275751 scopus 로고    scopus 로고
    • Neural network model for optimization of cold-formed steel beams
    • Adeli, H. & Karim, A. (1997a), Neural network model for optimization of cold-formed steel beams, Journal of Structural Engineering, ASCE, 123(11), 1535-43.
    • (1997) Journal of Structural Engineering, ASCE , vol.123 , Issue.11 , pp. 1535-1543
    • Adeli, H.1    Karim, A.2
  • 7
    • 0000191706 scopus 로고    scopus 로고
    • Scheduling/cost optimization and neural dynamics model for construction
    • Adeli, H. & Karim, A. (1997b), Scheduling/cost optimization and neural dynamics model for construction, Journal of Construction Management and Engineering, ASCE, 123(4), 450-58.
    • (1997) Journal of Construction Management and Engineering, ASCE , vol.123 , Issue.4 , pp. 450-458
    • Adeli, H.1    Karim, A.2
  • 8
    • 0029357335 scopus 로고
    • Counter propagation neural network in structural engineering
    • Adeli, H. & Park, H. S. (1995a), Counter propagation neural network in structural engineering, Journal of Structural Engineering, ASCE, 121(8), 1205-12.
    • (1995) Journal of Structural Engineering, ASCE , vol.121 , Issue.8 , pp. 1205-1212
    • Adeli, H.1    Park, H.S.2
  • 9
    • 0029634817 scopus 로고
    • A neural dynamics model for structural optimization-theory
    • Adeli, H. & Park, H. S. (1995b), A neural dynamics model for structural optimization-theory, Computers and Structures, 57(3), 383-90.
    • (1995) Computers and Structures , vol.57 , Issue.3 , pp. 383-390
    • Adeli, H.1    Park, H.S.2
  • 10
    • 0028866718 scopus 로고
    • Optimization of space structures by neural dynamics
    • Adeli, H. & Park, H. S. (1995c), Optimization of space structures by neural dynamics, Neural Networks, 8(5), 769-81.
    • (1995) Neural Networks , vol.8 , Issue.5 , pp. 769-781
    • Adeli, H.1    Park, H.S.2
  • 13
    • 77958031946 scopus 로고    scopus 로고
    • Enhanced probabilistic neural network with local decision circles: a robust classifier
    • Ahmadlou, M. & Adeli, H. (2010), Enhanced probabilistic neural network with local decision circles: a robust classifier, Integrated Computer-Aided Engineering, 17(3), 197-210.
    • (2010) Integrated Computer-Aided Engineering , vol.17 , Issue.3 , pp. 197-210
    • Ahmadlou, M.1    Adeli, H.2
  • 15
    • 0037967381 scopus 로고    scopus 로고
    • Assessing the corporate service quality of design/build contractors using quality function deployment
    • Arditi, D. & Lee, D.-E. (2003), Assessing the corporate service quality of design/build contractors using quality function deployment, Construction Management and Economics, 21(2), 175-85.
    • (2003) Construction Management and Economics , vol.21 , Issue.2 , pp. 175-185
    • Arditi, D.1    Lee, D.-E.2
  • 16
    • 1842843003 scopus 로고    scopus 로고
    • Service quality performance of design/build contractors using quality function deployment
    • Arditi, D. & Lee, D.-E. (2004), Service quality performance of design/build contractors using quality function deployment, Construction Management and Economics, 22(1), 123-27.
    • (2004) Construction Management and Economics , vol.22 , Issue.1 , pp. 123-127
    • Arditi, D.1    Lee, D.-E.2
  • 17
    • 0242328816 scopus 로고    scopus 로고
    • Contribution of quality management tools and practices to project management performance
    • Barad, M. & Raz, T. (2000), Contribution of quality management tools and practices to project management performance, International Journal of Quality and Reliability Management, 17(4/5), 571-83.
    • (2000) International Journal of Quality and Reliability Management , vol.17 , Issue.4-5 , pp. 571-583
    • Barad, M.1    Raz, T.2
  • 20
    • 0021788415 scopus 로고
    • Estimation of fuzzy memberships from histograms
    • Bharathi-Devi, B. & Sarma, V. V. S. (1985), Estimation of fuzzy memberships from histograms, Information Sciences, 35, 43-59.
    • (1985) Information Sciences , vol.35 , pp. 43-59
    • Bharathi-Devi, B.1    Sarma, V.V.S.2
  • 24
    • 43149095561 scopus 로고    scopus 로고
    • Fuzzy clustering of stability diagrams for vibration-based structural health monitoring
    • Carden, E. P. & Brownjohn, J. M. W. (2008), Fuzzy clustering of stability diagrams for vibration-based structural health monitoring, Computer-Aided Civil and Infrastructure Engineering, 23(5), 360-72.
    • (2008) Computer-Aided Civil and Infrastructure Engineering , vol.23 , Issue.5 , pp. 360-372
    • Carden, E.P.1    Brownjohn, J.M.W.2
  • 25
    • 70350051327 scopus 로고    scopus 로고
    • Overview of the application of "fuzzy techniques" in construction management research
    • Chan, A. P. C., Chan, D. W. M. & Yeung, J. F. Y. (2009), Overview of the application of "fuzzy techniques" in construction management research, Journal of Construction Engineering and Management, 135(11), 1241-52.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.11 , pp. 1241-1252
    • Chan, A.P.C.1    Chan, D.W.M.2    Yeung, J.F.Y.3
  • 28
    • 1642587217 scopus 로고    scopus 로고
    • PPMS: a web-based construction project performance monitoring system
    • Cheung, S. O., Suen, H. C. H. & Cheung, K. K. W. (2004), PPMS: a web-based construction project performance monitoring system, Automation in Construction, 13(3), 361-76.
    • (2004) Automation in Construction , vol.13 , Issue.3 , pp. 361-376
    • Cheung, S.O.1    Suen, H.C.H.2    Cheung, K.K.W.3
  • 29
    • 13944251106 scopus 로고    scopus 로고
    • A study of ISO 9000 implementation and quality management practices in Hong Kong construction industry
    • Choi, T. W. & Chin, K. S. (2000), A study of ISO 9000 implementation and quality management practices in Hong Kong construction industry, The Asian Journal of Quality, 2(2), 1-23.
    • (2000) The Asian Journal of Quality , vol.2 , Issue.2 , pp. 1-23
    • Choi, T.W.1    Chin, K.S.2
  • 34
    • 0040999723 scopus 로고
    • 1st edn. Greenwood Press, Westport, Connecticut
    • Fowles, J. (1978), Handbook of Futures Research, 1st edn. Greenwood Press, Westport, Connecticut.
    • (1978) Handbook of Futures Research
    • Fowles, J.1
  • 35
    • 0038954164 scopus 로고
    • The use of expert data in human resource planning: guidelines for strategic forecasting
    • Gatewood, R. D. & Gatewood, E. J. (1983), The use of expert data in human resource planning: guidelines for strategic forecasting. Human Resource Planning, 5(1), 83-94.
    • (1983) Human Resource Planning , vol.5 , Issue.1 , pp. 83-94
    • Gatewood, R.D.1    Gatewood, E.J.2
  • 38
    • 0023830478 scopus 로고
    • Technology forecasting: a hydroelectric company experience
    • Harvard Business School Press
    • Hanson, W. H. & Ramani, N. (1988), Technology forecasting: a hydroelectric company experience. Technology Management Publication, 1(3), 266-70, Harvard Business School Press.
    • (1988) Technology Management Publication , vol.1 , Issue.3 , pp. 266-270
    • Hanson, W.H.1    Ramani, N.2
  • 39
    • 0040360368 scopus 로고    scopus 로고
    • Applying the ISO standards to a construction company: a case study
    • Hiyassat, M. A. S. (2000), Applying the ISO standards to a construction company: a case study, International Journal of Project Management, 18(4), 275-80.
    • (2000) International Journal of Project Management , vol.18 , Issue.4 , pp. 275-280
    • Hiyassat, M.A.S.1
  • 42
    • 65249160502 scopus 로고    scopus 로고
    • Performance assessment modelling for the integrated management system in construction projects
    • Ismail, A., Abd, A. M., Chik, Z. & Zain, M. F. M. (2009), Performance assessment modelling for the integrated management system in construction projects, European Journal of Scientific Research, 29(2), 269-80.
    • (2009) European Journal of Scientific Research , vol.29 , Issue.2 , pp. 269-280
    • Ismail, A.1    Abd, A.M.2    Chik, Z.3    Zain, M.F.M.4
  • 43
    • 80052885542 scopus 로고
    • ISO 8402:1994., Quality management and quality assurance - vocabulary, International Organization for Standardization (ISO). Geneva: ISO
    • ISO 8402:1994. (1994), Quality management and quality assurance - vocabulary, International Organization for Standardization (ISO). Geneva: ISO.
    • (1994)
  • 44
    • 80052912131 scopus 로고
    • ISO 9000-1:1994., Quality management and quality assurance standards-Part 1: Guideline for selection and use, International Organization for Standardization (ISO). Geneva: ISO
    • ISO 9000-1:1994. (1994), Quality management and quality assurance standards-Part 1: Guideline for selection and use, International Organization for Standardization (ISO). Geneva: ISO.
    • (1994)
  • 45
    • 80052904351 scopus 로고    scopus 로고
    • ISO 9001:2000., Quality management systems-requirements, International Organization for Standardization (ISO). Geneva: ISO
    • ISO 9001:2000. (2000), Quality management systems-requirements, International Organization for Standardization (ISO). Geneva: ISO.
    • (2000)
  • 46
    • 80052873009 scopus 로고    scopus 로고
    • ISO 10011-1:2000., Standard for planning and performing quality audits, International Organization for Standardization (ISO). Geneva: ISO
    • ISO 10011-1:2000. (2000), Standard for planning and performing quality audits, International Organization for Standardization (ISO). Geneva: ISO.
    • (2000)
  • 47
    • 80052905047 scopus 로고
    • ISO 10011-2:1991., Guideline for auditing quality systems-Part 2: Qualification criteria for quality system auditors, International Organization for Standardization (ISO). Geneva: ISO
    • ISO 10011-2:1991. (1991), Guideline for auditing quality systems-Part 2: Qualification criteria for quality system auditors, International Organization for Standardization (ISO). Geneva: ISO.
    • (1991)
  • 48
    • 80052878886 scopus 로고
    • ISO 10011-3:1991., Guideline for auditing quality systems-Part 3: Management of audit programs, International Organization for Standardization (ISO). Geneva: ISO
    • ISO 10011-3:1991. (1991), Guideline for auditing quality systems-Part 3: Management of audit programs, International Organization for Standardization (ISO). Geneva: ISO.
    • (1991)
  • 50
    • 1642496868 scopus 로고    scopus 로고
    • Fuzzy clustering approach for accurate embedding dimension identification in chaotic time series
    • Jiang, X. & Adeli, H. (2003), Fuzzy clustering approach for accurate embedding dimension identification in chaotic time series, Integrated Computer-Aided Engineering, 10(3), 287-302.
    • (2003) Integrated Computer-Aided Engineering , vol.10 , Issue.3 , pp. 287-302
    • Jiang, X.1    Adeli, H.2
  • 51
    • 69149101992 scopus 로고    scopus 로고
    • Modeling risk allocation in privately financed infrastructure project using fuzzy logic
    • Jin, X.-H. & Doloi, H. (2009), Modeling risk allocation in privately financed infrastructure project using fuzzy logic, Computer-Aided Civil and Infrastructure Engineering, 24, 509-24.
    • (2009) Computer-Aided Civil and Infrastructure Engineering , vol.24 , pp. 509-524
    • Jin, X.-H.1    Doloi, H.2
  • 52
    • 0141746131 scopus 로고    scopus 로고
    • Radial basis function neural network for work zone capacity and queue estimation
    • Karim, A. & Adeli, H. (2003), Radial basis function neural network for work zone capacity and queue estimation, Journal of Transportation Engineering, 129(5), 494-503.
    • (2003) Journal of Transportation Engineering , vol.129 , Issue.5 , pp. 494-503
    • Karim, A.1    Adeli, H.2
  • 53
    • 12744251343 scopus 로고    scopus 로고
    • Use of fuzzy logic for predicting design cost overruns on building projects
    • Knight, K. & Fayek, A. R. (2002), Use of fuzzy logic for predicting design cost overruns on building projects, Journal of Construction Engineering and Management, ASCE, 128(6), 503-12.
    • (2002) Journal of Construction Engineering and Management, ASCE , vol.128 , Issue.6 , pp. 503-512
    • Knight, K.1    Fayek, A.R.2
  • 55
    • 0000579111 scopus 로고    scopus 로고
    • ISO 9001 within the Swedish construction sector
    • Landin, A. (2000), ISO 9001 within the Swedish construction sector, Construction Management and Economics, 18, 509-18.
    • (2000) Construction Management and Economics , vol.18 , pp. 509-518
    • Landin, A.1
  • 56
    • 33645512505 scopus 로고    scopus 로고
    • Total quality performance of design/build firms using quality function deployment
    • Lee, D.-E. & Arditi, D. (2006), Total quality performance of design/build firms using quality function deployment, Journal of Construction Engineering and Management, 132(1), 49-57.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.1 , pp. 49-57
    • Lee, D.-E.1    Arditi, D.2
  • 57
    • 0024765763 scopus 로고
    • An expert system for experimental design in off-line quality control
    • Lee, N. S., Phadke, M. S. & Keny, R. (1989), An expert system for experimental design in off-line quality control, Expert System, 6(4), 238-49.
    • (1989) Expert System , vol.6 , Issue.4 , pp. 238-249
    • Lee, N.S.1    Phadke, M.S.2    Keny, R.3
  • 58
    • 0029197606 scopus 로고
    • Choosing a technological forecasting method
    • Levary, R. R. & Han, D. (1995), Choosing a technological forecasting method. Industrial Management, 37(1), 14-18.
    • (1995) Industrial Management , vol.37 , Issue.1 , pp. 14-18
    • Levary, R.R.1    Han, D.2
  • 60
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, P. E. D. & Li, H. (2000a), Quantifying the causes and costs of rework in construction, Construction Management and Economics, 18(4), 479-90.
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 61
    • 13944274245 scopus 로고    scopus 로고
    • Overcoming the problems associated with quality certification
    • Love, P. E. D. & Li, H. (2000b), Overcoming the problems associated with quality certification, Construction Management and Economics, 18(2), 139-49.
    • (2000) Construction Management and Economics , vol.18 , Issue.2 , pp. 139-149
    • Love, P.E.D.1    Li, H.2
  • 63
    • 0016451032 scopus 로고
    • An experiment in linguistic synthesis with a fuzzy logic controller
    • Mamdani, E. H. & Assilian, S. (1975), An experiment in linguistic synthesis with a fuzzy logic controller, International Journal of Man-Machine Studies, 7(1), 1-13.
    • (1975) International Journal of Man-Machine Studies , vol.7 , Issue.1 , pp. 1-13
    • Mamdani, E.H.1    Assilian, S.2
  • 64
    • 17644402222 scopus 로고
    • Technological forecasting - an overview
    • Martino, J. P. (1980), Technological forecasting - an overview, Management Science, 26(1), 28-33.
    • (1980) Management Science , vol.26 , Issue.1 , pp. 28-33
    • Martino, J.P.1
  • 65
    • 72249096184 scopus 로고    scopus 로고
    • MATLAB., The MathWorks, Inc., Natick, MA
    • MATLAB. (2008), Fuzzy Logic Toolbox 2 - User's Guide, The MathWorks, Inc., Natick, MA.
    • (2008) Fuzzy Logic Toolbox 2 - User's Guide
  • 66
    • 0039781696 scopus 로고
    • Chapman and Hall, London, UK
    • Mills, D. (1993), Quality Auditing, Chapman and Hall, London, UK.
    • (1993) Quality Auditing
    • Mills, D.1
  • 68
    • 0022077364 scopus 로고
    • Expert systems for process control
    • Moore, R. (1995), Expert systems for process control, TAPPI Journal, 6, 64-67.
    • (1995) TAPPI Journal , vol.6 , pp. 64-67
    • Moore, R.1
  • 69
    • 80052872355 scopus 로고    scopus 로고
    • Cost of failure in a major civil engineering project. Licentiate thesis, Division of Construction Management and Economics, Depart of Real Estate and Construction Management, Royal Institute of Technology, Stockholm
    • Nylén, K.-O. (1996), Cost of failure in a major civil engineering project. Licentiate thesis, Division of Construction Management and Economics, Depart of Real Estate and Construction Management, Royal Institute of Technology, Stockholm.
    • (1996)
    • Nylén, K.-O.1
  • 71
    • 0037603787 scopus 로고    scopus 로고
    • A model for subcontractor selection in refurbishment projects
    • Okoroh, M. I. & Torrance, V. B. (1999), A model for subcontractor selection in refurbishment projects, Construction Management and Economics, 17(3), 315-27.
    • (1999) Construction Management and Economics , vol.17 , Issue.3 , pp. 315-327
    • Okoroh, M.I.1    Torrance, V.B.2
  • 73
    • 0025496121 scopus 로고
    • Structural design language for coupled knowledge-based systems
    • Paek, Y. & Adeli, H. (1990), Structural design language for coupled knowledge-based systems, Advances in Engineering Software and Workstations, 12(4), 154-66.
    • (1990) Advances in Engineering Software and Workstations , vol.12 , Issue.4 , pp. 154-166
    • Paek, Y.1    Adeli, H.2
  • 74
    • 0034138524 scopus 로고    scopus 로고
    • An expert system approach to quality control
    • Paladini, E. P. (2000), An expert system approach to quality control, Expert System with Applications, 18, 133-51.
    • (2000) Expert System with Applications , vol.18 , pp. 133-151
    • Paladini, E.P.1
  • 75
    • 62749176440 scopus 로고    scopus 로고
    • Recurrent neural network for approximate earthquake time and location prediction using multiple seismicity indicators
    • Panakkat, A. & Adeli, H. (2009), Recurrent neural network for approximate earthquake time and location prediction using multiple seismicity indicators, Computer-Aided Civil and Infrastructure Engineering, 24(4), 280-92.
    • (2009) Computer-Aided Civil and Infrastructure Engineering , vol.24 , Issue.4 , pp. 280-292
    • Panakkat, A.1    Adeli, H.2
  • 76
    • 0031185995 scopus 로고    scopus 로고
    • Distributed neural dynamics algorithms for optimization of large steel structures
    • Park, H. S. & Adeli, H. (1997), Distributed neural dynamics algorithms for optimization of large steel structures, Journal of Structural Engineering, ASCE, 123(7), 880-88.
    • (1997) Journal of Structural Engineering, ASCE , vol.123 , Issue.7 , pp. 880-888
    • Park, H.S.1    Adeli, H.2
  • 78
    • 14744297414 scopus 로고    scopus 로고
    • Gap analysis of homeowners' expectations of smart features in intelligent condominiums
    • Pheng, L. S. & Nguan, Y. S. (2004), Gap analysis of homeowners' expectations of smart features in intelligent condominiums, Journal of Architectural Engineering, 10(1), 34-41.
    • (2004) Journal of Architectural Engineering , vol.10 , Issue.1 , pp. 34-41
    • Pheng, L.S.1    Nguan, Y.S.2
  • 80
    • 78649562500 scopus 로고    scopus 로고
    • A multi-criteria optimization framework for industrial shop scheduling using fuzzy set theory
    • Rokni S. & Fayek, A. R. (2010), A multi-criteria optimization framework for industrial shop scheduling using fuzzy set theory, Integrated Computer-Aided Engineering, 17(3), 175-96.
    • (2010) Integrated Computer-Aided Engineering , vol.17 , Issue.3 , pp. 175-196
    • Rokni, S.1    Fayek, A.R.2
  • 83
    • 0025664283 scopus 로고
    • OMAX+ an advanced quality improvement measurement system
    • Elsevier Ltd
    • Safford, R. R., Gobeli, D. H. & Suen, K. P. (1990), OMAX+ an advanced quality improvement measurement system, Computer and Industrial Engineering, Elsevier Ltd., 19(1), 267-71.
    • (1990) Computer and Industrial Engineering , vol.19 , Issue.1 , pp. 267-271
    • Safford, R.R.1    Gobeli, D.H.2    Suen, K.P.3
  • 84
    • 0033701953 scopus 로고    scopus 로고
    • Fuzzy genetic algorithm for optimization of steel structures
    • Sarma, K. & Adeli, H. (2000a), Fuzzy genetic algorithm for optimization of steel structures, Journal of Structural Engineering, 126(5), 596-604.
    • (2000) Journal of Structural Engineering , vol.126 , Issue.5 , pp. 596-604
    • Sarma, K.1    Adeli, H.2
  • 85
    • 0034324217 scopus 로고    scopus 로고
    • Fuzzy discrete multi-criteria cost optimization of steel structures
    • Sarma, K. & Adeli, H. (2000b), Fuzzy discrete multi-criteria cost optimization of steel structures, Journal of Structural Engineering, 126(11), 1339-47.
    • (2000) Journal of Structural Engineering , vol.126 , Issue.11 , pp. 1339-1347
    • Sarma, K.1    Adeli, H.2
  • 89
    • 0027656905 scopus 로고
    • AI and CAD for earthquake damage evaluation
    • Shwe, T. T. & Adeli, H. (1993), AI and CAD for earthquake damage evaluation, Engineering Structures, 15(5), 315-19.
    • (1993) Engineering Structures , vol.15 , Issue.5 , pp. 315-319
    • Shwe, T.T.1    Adeli, H.2
  • 92
    • 0030107606 scopus 로고    scopus 로고
    • Blueprint for measuring project quality
    • Stevens, J. D. (1996), Blueprint for measuring project quality, Journal of Management in Engineering, 12(2), 34-39.
    • (1996) Journal of Management in Engineering , vol.12 , Issue.2 , pp. 34-39
    • Stevens, J.D.1
  • 95
    • 0000858055 scopus 로고    scopus 로고
    • Total quality management, ISO 9000 certification and performance improvement
    • Sun, H. (2000), Total quality management, ISO 9000 certification and performance improvement, International Journal of Quality and Reliability Management, 17(2), 168-79.
    • (2000) International Journal of Quality and Reliability Management , vol.17 , Issue.2 , pp. 168-179
    • Sun, H.1
  • 96
    • 0013337442 scopus 로고    scopus 로고
    • A proposal for construction project risk assessment using fuzzy logic
    • Tah, J. H. M. & Carr, V. (2000), A proposal for construction project risk assessment using fuzzy logic, Construction Management and Economics, 18(4), 491-500.
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2
  • 97
    • 0031682461 scopus 로고    scopus 로고
    • Total quality management and the performance measurement barrier
    • Van Schalkwyk, J. C. (1998), Total quality management and the performance measurement barrier, The TQM Magazine, 10(2), 124-31.
    • (1998) The TQM Magazine , vol.10 , Issue.2 , pp. 124-131
    • Van Schalkwyk, J.C.1
  • 98
    • 67649392433 scopus 로고    scopus 로고
    • A fuzzy logic based efficient energy saving approach for domestic heating systems
    • Villar, J.R., de la Cal, E. & Sedano, J. (2009), A fuzzy logic based efficient energy saving approach for domestic heating systems, Integrated Computer-Aided Engineering, 16(2), 151-63.
    • (2009) Integrated Computer-Aided Engineering , vol.16 , Issue.2 , pp. 151-163
    • Villar, J.R.1    de la Cal, E.2    Sedano, J.3
  • 99
    • 0033717621 scopus 로고    scopus 로고
    • A knowledge-based system for evaluation of superload permit applications
    • Waheed, A. & Adeli, H. (2000), A knowledge-based system for evaluation of superload permit applications, Expert Systems with Applications, 18(1), 51-58.
    • (2000) Expert Systems with Applications , vol.18 , Issue.1 , pp. 51-58
    • Waheed, A.1    Adeli, H.2
  • 100
    • 0026370122 scopus 로고
    • Developing a quality performance measurement system, in Proceedings of the Project Management Institute Annual Seminar Symposium, Managing for Quality, Dallas, TX
    • Wall, D. E. (1991), Developing a quality performance measurement system, in Proceedings of the Project Management Institute Annual Seminar Symposium, Managing for Quality, Dallas, TX, 336-40.
    • (1991) , pp. 336-340
    • Wall, D.E.1
  • 101
    • 84982071852 scopus 로고
    • Trends in technology forecasting
    • Wissema, J. G. (1982), Trends in technology forecasting. R & D Management, 12(1), 27-36.
    • (1982) R & D Management , vol.12 , Issue.1 , pp. 27-36
    • Wissema, J.G.1
  • 103
    • 77958067568 scopus 로고    scopus 로고
    • Automated nonlinear system modeling with multiple fuzzy neural networks and kernel smoothing
    • Yu, W. & Li, X. (2010), Automated nonlinear system modeling with multiple fuzzy neural networks and kernel smoothing, International Journal of Neural Systems, 20(5), 429-35.
    • (2010) International Journal of Neural Systems , vol.20 , Issue.5 , pp. 429-435
    • Yu, W.1    Li, X.2
  • 105
    • 28344439194 scopus 로고    scopus 로고
    • Fuzzy decision-making for dynamic resource allocation
    • Zhang, H. & Tam, C. M. (2003), Fuzzy decision-making for dynamic resource allocation, Construction Management and Economics, 21(1), 31-41.
    • (2003) Construction Management and Economics , vol.21 , Issue.1 , pp. 31-41
    • Zhang, H.1    Tam, C.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.