-
1
-
-
84970257715
-
Simulation approach to PERT network analysis
-
Badiru, A. B. (1991) Simulation approach to PERT network analysis. Simulation, 57, 245-55.
-
(1991)
Simulation
, vol.57
, pp. 245-255
-
-
Badiru, A.B.1
-
2
-
-
0346636333
-
Decision-making in a fuzzy environment
-
Bellman, R. E. and Zadeh, L. A. (1970) Decision-making in a fuzzy environment. Management Science, 17(4) 141-64.
-
(1970)
Management Science
, vol.17
, Issue.4
, pp. 141-164
-
-
Bellman, R.E.1
Zadeh, L.A.2
-
3
-
-
0003812906
-
-
World Scientific, Singapore
-
Bojadziev, G. and Bojadziev, M. (1997) Fuzzy Logic for Business, Finance, and Management, World Scientific, Singapore.
-
(1997)
Fuzzy Logic for Business, Finance, and Management
-
-
Bojadziev, G.1
Bojadziev, M.2
-
4
-
-
0030416296
-
Advanced uses for Micro Saint simulation software
-
IEEE, Piscataway, NJ
-
Catherine, E. D. and Laughery, K. R. (1996) Advanced uses for Micro Saint simulation software. Proceedings of 1996 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 510-6.
-
(1996)
Proceedings of 1996 Winter Simulation Conference
, pp. 510-516
-
-
Catherine, E.D.1
Laughery, K.R.2
-
6
-
-
0017539255
-
Cyclone: A method for modeling job site processes
-
Halpin, D. W. (1976) Cyclone: a method for modeling job site processes. Journal of the Constuction Division ASCE, 103(3), 489-99.
-
(1976)
Journal of the Constuction Division ASCE
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
8
-
-
0022699580
-
Strategy related characteristics of discrete-event languages and models
-
Hopper, J. W. (1986) Strategy related characteristics of discrete-event languages and models. Simulation, 46(4), 153-9.
-
(1986)
Simulation
, vol.46
, Issue.4
, pp. 153-159
-
-
Hopper, J.W.1
-
9
-
-
1642582825
-
Lean production theory: Moving beyond 'can do'
-
Howell, G. and Ballard, G. (1997) Lean production theory: moving beyond 'can do'. Lean Construction, 17-23.
-
(1997)
Lean Construction
, pp. 17-23
-
-
Howell, G.1
Ballard, G.2
-
12
-
-
0001494926
-
A genetic-algorithm-based resource-constrained construction scheduling system
-
Leu, S. S. and Yang, C. H. (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17, 767-76.
-
(1999)
Construction Management and Economics
, vol.17
, pp. 767-776
-
-
Leu, S.S.1
Yang, C.H.2
-
13
-
-
84898905470
-
Graphical object-oriented discrete-event simulation system
-
IEEE, Piscataway, NJ
-
Liu, L. Y. and Ioannou, P. G. (1992) Graphical object-oriented discrete-event simulation system. Proceedings of the 1992 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 1285 - 91.
-
(1992)
Proceedings of the 1992 Winter Simulation Conference
, pp. 1285-1291
-
-
Liu, L.Y.1
Ioannou, P.G.2
-
16
-
-
0033311742
-
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
-
Reyck, B. D. and Herroelen, W. (1999) The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research, 119, 538-56.
-
(1999)
European Journal of Operational Research
, vol.119
, pp. 538-556
-
-
Reyck, B.D.1
Herroelen, W.2
-
17
-
-
0002928657
-
Fuzzy decision-making including unequal objectives
-
Ronald, R. Y. (1978) Fuzzy decision-making including unequal objectives. Fuzzy Sets and Systems, 87-95.
-
(1978)
Fuzzy Sets and Systems
, pp. 87-95
-
-
Ronald, R.Y.1
-
18
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I. D. (1998) Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique. Journal of Construction Engineering and Management ASCE, 124(4), 279-88.
-
(1998)
Journal of Construction Engineering and Management ASCE
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
19
-
-
0028740224
-
Knowledge-based assembly of simulation networks using construction designs, plans, and methods
-
IEEE, Piscataway, NJ
-
Tommelein, I. D. and Odeh, A. M. (1994) Knowledge-based assembly of simulation networks using construction designs, plans, and methods. In Proceedings of the 1994 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 1145-58.
-
(1994)
Proceedings of the 1994 Winter Simulation Conference
, pp. 1145-1158
-
-
Tommelein, I.D.1
Odeh, A.M.2
-
20
-
-
0032210453
-
Using tabu search to schedule activities of stochastic resource-constrained projects
-
Tsai, Y. W. and Douglas, D. G. (1998) Using tabu search to schedule activities of stochastic resource-constrained projects. European Journal of Operational Research, 111, 129-41.
-
(1998)
European Journal of Operational Research
, vol.111
, pp. 129-141
-
-
Tsai, Y.W.1
Douglas, D.G.2
|