메뉴 건너뛰기




Volumn 21, Issue 1, 2003, Pages 31-41

Fuzzy decision-making for dynamic resource allocation

Author keywords

Dynamic decision making; Fuzzy sets; Resource allocation; Simulation

Indexed keywords

COMPUTER SIMULATION; FUZZY SETS; PUBLIC POLICY; RESOURCE ALLOCATION;

EID: 28344439194     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/0144619032000065108     Document Type: Article
Times cited : (13)

References (20)
  • 1
    • 84970257715 scopus 로고
    • Simulation approach to PERT network analysis
    • Badiru, A. B. (1991) Simulation approach to PERT network analysis. Simulation, 57, 245-55.
    • (1991) Simulation , vol.57 , pp. 245-255
    • Badiru, A.B.1
  • 2
    • 0346636333 scopus 로고
    • Decision-making in a fuzzy environment
    • Bellman, R. E. and Zadeh, L. A. (1970) Decision-making in a fuzzy environment. Management Science, 17(4) 141-64.
    • (1970) Management Science , vol.17 , Issue.4 , pp. 141-164
    • Bellman, R.E.1    Zadeh, L.A.2
  • 6
    • 0017539255 scopus 로고
    • Cyclone: A method for modeling job site processes
    • Halpin, D. W. (1976) Cyclone: a method for modeling job site processes. Journal of the Constuction Division ASCE, 103(3), 489-99.
    • (1976) Journal of the Constuction Division ASCE , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 8
    • 0022699580 scopus 로고
    • Strategy related characteristics of discrete-event languages and models
    • Hopper, J. W. (1986) Strategy related characteristics of discrete-event languages and models. Simulation, 46(4), 153-9.
    • (1986) Simulation , vol.46 , Issue.4 , pp. 153-159
    • Hopper, J.W.1
  • 9
    • 1642582825 scopus 로고    scopus 로고
    • Lean production theory: Moving beyond 'can do'
    • Howell, G. and Ballard, G. (1997) Lean production theory: moving beyond 'can do'. Lean Construction, 17-23.
    • (1997) Lean Construction , pp. 17-23
    • Howell, G.1    Ballard, G.2
  • 12
    • 0001494926 scopus 로고    scopus 로고
    • A genetic-algorithm-based resource-constrained construction scheduling system
    • Leu, S. S. and Yang, C. H. (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17, 767-76.
    • (1999) Construction Management and Economics , vol.17 , pp. 767-776
    • Leu, S.S.1    Yang, C.H.2
  • 13
    • 84898905470 scopus 로고
    • Graphical object-oriented discrete-event simulation system
    • IEEE, Piscataway, NJ
    • Liu, L. Y. and Ioannou, P. G. (1992) Graphical object-oriented discrete-event simulation system. Proceedings of the 1992 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 1285 - 91.
    • (1992) Proceedings of the 1992 Winter Simulation Conference , pp. 1285-1291
    • Liu, L.Y.1    Ioannou, P.G.2
  • 16
    • 0033311742 scopus 로고    scopus 로고
    • The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    • Reyck, B. D. and Herroelen, W. (1999) The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research, 119, 538-56.
    • (1999) European Journal of Operational Research , vol.119 , pp. 538-556
    • Reyck, B.D.1    Herroelen, W.2
  • 17
    • 0002928657 scopus 로고
    • Fuzzy decision-making including unequal objectives
    • Ronald, R. Y. (1978) Fuzzy decision-making including unequal objectives. Fuzzy Sets and Systems, 87-95.
    • (1978) Fuzzy Sets and Systems , pp. 87-95
    • Ronald, R.Y.1
  • 18
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
    • Tommelein, I. D. (1998) Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique. Journal of Construction Engineering and Management ASCE, 124(4), 279-88.
    • (1998) Journal of Construction Engineering and Management ASCE , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 19
    • 0028740224 scopus 로고
    • Knowledge-based assembly of simulation networks using construction designs, plans, and methods
    • IEEE, Piscataway, NJ
    • Tommelein, I. D. and Odeh, A. M. (1994) Knowledge-based assembly of simulation networks using construction designs, plans, and methods. In Proceedings of the 1994 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 1145-58.
    • (1994) Proceedings of the 1994 Winter Simulation Conference , pp. 1145-1158
    • Tommelein, I.D.1    Odeh, A.M.2
  • 20
    • 0032210453 scopus 로고    scopus 로고
    • Using tabu search to schedule activities of stochastic resource-constrained projects
    • Tsai, Y. W. and Douglas, D. G. (1998) Using tabu search to schedule activities of stochastic resource-constrained projects. European Journal of Operational Research, 111, 129-41.
    • (1998) European Journal of Operational Research , vol.111 , pp. 129-141
    • Tsai, Y.W.1    Douglas, D.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.