1
-
-
0141454753
-
Neuro-Fuzzy Logic Model for Freeway Work Zone Capacity Estimation
-
H. Adeli andX. Jiang, Neuro-Fuzzy Logic Model for Freeway Work Zone Capacity Estimation, Journal of Transportation Engineering 129(5) (2003), 484-493.
-
(2003)
Journal of Transportation Engineering
, vol.129
, Issue.5
, pp. 484-493
-
-
Adeli, H.1
Jiang, X.2
-
2
-
-
33645530462
-
Dynamic Fuzzy Wavelet Neural Net-work Model for Structural System Identification
-
H. Adeli and X. Jiang, Dynamic Fuzzy Wavelet Neural Net-work Model for Structural System Identification, Journal of StructuralEngineering 132(1) (2006), 102-111.
-
(2006)
Journal of Structural Engineering
, vol.132
, Issue.1
, pp. 102-111
-
-
Adeli, H.1
Jiang, X.2
-
3
-
-
0000191706
-
Scheduling/cost optimization and neu-ral dynamics model for construction
-
H. Adeli and A. Karim, Scheduling/cost optimization and neu-ral dynamics model for construction, Journal of Construction Engineering andManagement 123(4) (1997), 450-458.
-
(1997)
Journal of Construction Engineering AndManagement
, vol.123
, Issue.4
, pp. 450-458
-
-
Adeli, H.1
Karim, A.2
-
4
-
-
0034324290
-
Fuzzy-Wavelet RBFNN Model for Freeway Incident Detection
-
H. Adeli and A. Karim, Fuzzy-Wavelet RBFNN Model for Freeway Incident Detection, Journal of Transportation Engi-neering 126(6) (2000), 464-471.
-
(2000)
Journal of Transportation Engi-neering
, vol.126
, Issue.6
, pp. 464-471
-
-
Adeli, H.1
Karim, A.2
-
5
-
-
0004129218
-
Construction Scheduling
-
Spon Press, London
-
H. Adeli and A. Karim, Construction Scheduling, Cost Op-timization, and Management-A New Model Based on Neu-rocomputing and Object Technologies, Spon Press, London, 2001.
-
(2001)
Cost Op-timization, and Management-A New Model Based on Neu-rocomputing and Object Technologies
-
-
Adeli, H.1
Karim, A.2
-
6
-
-
0029634817
-
A Neural Dynamics Model for Struc-tural Optimization-Theory
-
H. Adeli and H.S. Park, A Neural Dynamics Model for Struc-tural Optimization-Theory, Computers andStructures 57(3) (1995), 383-390.
-
(1995)
Computers AndStructures
, vol.57
, Issue.3
, pp. 383-390
-
-
Adeli, H.1
Park, H.S.2
-
7
-
-
0028866718
-
Optimization of Space Structures by Neural Dynamics
-
H. Adeli and H.S. Park, Optimization of Space Structures by Neural Dynamics, Neural Networks 8(5) (1995), 769-781.
-
(1995)
Neural Networks
, vol.8
, Issue.5
, pp. 769-781
-
-
Adeli, H.1
Park, H.S.2
-
9
-
-
17944372642
-
Real-time holonic scheduling of material handling operations in a dy-namic manufacturing environment
-
R.F. Babiceanu, C.F. Frank and R.H. Sturges, Real-time holonic scheduling of material handling operations in a dy-namic manufacturing environment, Robotics and Computer-IntegratedManufacturing 21(4-5) (2005), 328-337.
-
(2005)
Robotics and Computer-IntegratedManufacturing
, vol.21
, Issue.4-5
, pp. 328-337
-
-
Babiceanu, R.F.1
Frank, C.F.2
Sturges, R.H.3
-
11
-
-
0022807123
-
Slam II simulation study of a simplified flow shop
-
R.T. Barrett and S. Barman, Slam II simulation study of a simplified flow shop, Simulation 47(5) (1986), 181-189.
-
(1986)
Simulation
, vol.47
, Issue.5
, pp. 181-189
-
-
Barrett, R.T.1
Barman, S.2
-
12
-
-
0346636333
-
Decision making in fuzzy en-vironment
-
R.E. Bellman and L.A. Zadeh, Decision making in fuzzy en-vironment, Management Science 17(4) (1970), 141-164.
-
(1970)
Management Science
, vol.17
, Issue.4
, pp. 141-164
-
-
Bellman, R.E.1
Zadeh, L.A.2
-
14
-
-
0003347011
-
Dispatching
-
(Chapter 83), G. Salvendy, ed. John Wiley & Sons, New Jersey
-
K. Bhaskaran and M. Pinedo, Dispatching, in: Handbook of Industrial Engineering, (Chapter 83), G. Salvendy, ed., John Wiley & Sons, New Jersey, 1992.
-
(1992)
Handbook of Industrial Engineering
-
-
Bhaskaran, K.1
Pinedo, M.2
-
15
-
-
0020013653
-
A state of art survey of dispatching rules for manufacturing job shop op-eration
-
J.H. Blackstone, D.T. Phillips and G.L. Hogg, A state of art survey of dispatching rules for manufacturing job shop op-eration, International Journal of Production Research 20(1) (1982), 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.1
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
17
-
-
43149095561
-
Fuzzy Clustering ofSta-bility Diagrams for Vibration-Based Structural Health Moni-toring
-
E.P. Carden and J.M.W. Brownjohn, Fuzzy Clustering ofSta-bility Diagrams for Vibration-Based Structural Health Moni-toring, Computer-Aided Civil and Infrastructure Engineering 23(5) (2008), 360-372.
-
(2008)
Computer-Aided Civil and Infrastructure Engineering
, vol.23
, Issue.5
, pp. 360-372
-
-
Carden, E.P.1
Brownjohn, J.M.W.2
-
18
-
-
70349318547
-
Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
-
D. Castro-Lacouture, G. Süer, J. Gonzalez-Joaqui and J. Yates, Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method, Journal of Construction Engineering and Manage-ment135(11)(2009), 1096-1104.
-
(2009)
Journal of Construction Engineering and Manage-ment
, vol.135
, Issue.11
, pp. 1096-1104
-
-
Castro-Lacouture, D.1
Süer, G.2
Gonzalez-Joaqui, J.3
Yates, J.4
-
20
-
-
1842587322
-
Construction re-source scheduling with genetic algorithms
-
W.T. Chan, D.K.H. Chua and G. Kannan, Construction re-source scheduling with genetic algorithms, Journal ofCon-structionEngineering andManagement 122(2) (1996), 125-132.
-
(1996)
Journal OfCon-structionEngineering AndManagement
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
Kannan, G.3
-
22
-
-
70350515918
-
A Hybrid Framework for Protein Se-quences Clustering and Classification Using Functional Sig-nature Motif Information
-
W.B. Chen and C. Zhang, A Hybrid Framework for Protein Se-quences Clustering and Classification Using Functional Sig-nature Motif Information, Integrated Computer-Aided Engi-neering 16(4) (2009), 353-365.
-
(2009)
Integrated Computer-Aided Engi-neering
, vol.16
, Issue.4
, pp. 353-365
-
-
Chen, W.B.1
Zhang, C.2
-
23
-
-
36049029026
-
Fundamental Tool Path Planning Problem for Circles in Layered Manufacturing
-
S.Y. Chou, C.C. Chou and Y.K. Chen, Fundamental Tool Path Planning Problem for Circles in Layered Manufacturing, In-tegrated Computer- AidedEngineering 15(1) (2008), 37-52.
-
(2008)
Tegrated Computer-AidedEngineering
, vol.15
, Issue.1
, pp. 37-52
-
-
Chou, S.Y.1
Chou, C.C.2
Chen, Y.K.3
-
24
-
-
49249116055
-
Robinson, A soft computing approach to construction performance prediction and diag-nosis
-
M. Dissanayake and A. Fayek, Robinson, A soft computing approach to construction performance prediction and diag-nosis, Canadian Journal of Civil Engineering, CSCE, 35(8) (2008), 764-776.
-
(2008)
Canadian Journal of Civil Engineering, CSCE
, vol.35
, Issue.8
, pp. 764-776
-
-
Dissanayake, M.1
Fayek, A.2
-
26
-
-
0037408628
-
Development of an object-oriented scheduling model for construction projects
-
S.L. Fan, H.P. Tserng and M.T. Wang, Development of an object-oriented scheduling model for construction projects, Automation in Construction 12(3) (2003), 283-302.
-
(2003)
Automation in Construction
, vol.12
, Issue.3
, pp. 283-302
-
-
Fan, S.L.1
Tserng, H.P.2
Wang, M.T.3
-
27
-
-
0032116205
-
Genet-ic multi-criteria approach to flexible line scheduling
-
M.P. Fanti, B. Maione, D. Naso and B. Turchiano, Genet-ic multi-criteria approach to flexible line scheduling, Inter-national Journal of Approximate Reasoning 19(1-2) (1998), 5-21.
-
(1998)
Inter-national Journal of Approximate Reasoning
, vol.19
, Issue.1-2
, pp. 5-21
-
-
Fanti, M.P.1
Maione, B.2
Naso, D.3
Turchiano, B.4
-
28
-
-
0002861004
-
Competitive bidding strategy model and software system for bid preparation
-
A. Fayek, Competitive bidding strategy model and software system for bid preparation, Journal of Construction Engineer-ing andManagement ASCE, 124(1) (1998), 1-10.
-
(1998)
Journal of Construction Engineer-ing AndManagement ASCE
, vol.124
, Issue.1
, pp. 1-10
-
-
Fayek, A.1
-
29
-
-
0003603813
-
Computers and intractability: A guide to the theory of NP-completeness
-
W.H. Freeman, ed. the Mathematical Sciences, San Francisco
-
M.R. Garey and D.S. Johnson, Computers and intractability: a guide to the theory of NP-completeness, in: A Series of Books, W.H. Freeman, ed., the Mathematical Sciences, San Francisco, 1979.
-
(1979)
A Series of Books
-
-
Garey, M.R.1
Johnson, D.S.2
-
31
-
-
0032141635
-
A multi-objective genetic local search algorithm and its application to flowshop scheduling
-
H. Ishibuchi and T. Murata, A multi-objective genetic local search algorithm and its application to flowshop scheduling, IEEE/SMC Trans Part C 28 (1998), 392-403.
-
(1998)
IEEE/SMC Trans Part C
, vol.28
, pp. 392-403
-
-
Ishibuchi, H.1
Murata, T.2
-
32
-
-
43749121111
-
Dynamic Fuzzy Wavelet Neuroem-ulator for Nonlinear Control of Irregular Highrise Building Structures
-
X. Jiang and H. Adeli, Dynamic Fuzzy Wavelet Neuroem-ulator for Nonlinear Control of Irregular Highrise Building Structures, International Journal for Numerical Methods in Engineering 74(7) (2008), 1045-1066.
-
(2008)
International Journal for Numerical Methods in Engineering
, vol.74
, Issue.7
, pp. 1045-1066
-
-
Jiang, X.1
Adeli, H.2
-
33
-
-
69149101992
-
Modelling Risk Allocation Decision-Making in PPP Projects Using Fuzzy Logic
-
X.L. Jin and H. Doloi, Modelling Risk Allocation Decision-Making in PPP Projects Using Fuzzy Logic, Computer-Aided Civil andInfrastructureEngineering 24(7) (2009), 509-524.
-
(2009)
Computer-Aided Civil AndInfrastructureEngineering
, vol.24
, Issue.7
, pp. 509-524
-
-
Jin, X.L.1
Doloi, H.2
-
34
-
-
0000136405
-
A hybrid approach for real-time sequencing and scheduling
-
A. Jones, L. Rabelo and Y. Yih, A hybrid approach for real-time sequencing and scheduling, International Journal of ComputerIntegratedManufacturing 8(2) (1995), 145-154.
-
(1995)
International Journal of ComputerIntegratedManufacturing
, vol.8
, Issue.2
, pp. 145-154
-
-
Jones, A.1
Rabelo, L.2
Yih, Y.3
-
35
-
-
0037201140
-
Pareto-optimality ap-proach for flexible job-shop scheduling problems: Hybridiza-tion ofevolutionary algorithms and fuzzy logic
-
I. Kacem, S. Hammadi and P. Borne, Pareto-optimality ap-proach for flexible job-shop scheduling problems: hybridiza-tion ofevolutionary algorithms and fuzzy logic, Math Comput Simulat 60 (2002), 245-276.
-
(2002)
Math Comput Simulat
, vol.60
, pp. 245-276
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
36
-
-
0032655303
-
Object-Oriented Information Model for Construction Project Management
-
A. Karim and H. Adeli, Object-Oriented Information Model for Construction Project Management, Journal ofConstruc-tionEngineering andManagement 125(5) (1999), 361-367.
-
(1999)
Journal of Construc-tion Engineering and Management
, vol.125
, Issue.5
, pp. 361-367
-
-
Karim, A.1
Adeli, H.2
-
37
-
-
0036145931
-
Comparison of the Fuzzy-Wavelet RBFNN Freeway Incident Detection Model with the Califor-nia Algorithm
-
A. Karim and H. Adeli, Comparison of the Fuzzy-Wavelet RBFNN Freeway Incident Detection Model with the Califor-nia Algorithm, Journal of Transportation Engineering 128(1) (2002), 21-30.
-
(2002)
Journal of Transportation Engineering
, vol.128
, Issue.1
, pp. 21-30
-
-
Karim, A.1
Adeli, H.2
-
38
-
-
34548255790
-
A Multicriteria Decision Support Methodol-ogy for Annual Rehabilitation Programs of Water Networks
-
P. Le Gauffre, H. Haidar, D. Poinard, K. Laffréchine, R. Baur and M. Schiatti, A Multicriteria Decision Support Methodol-ogy for Annual Rehabilitation Programs of Water Networks, Computer-Aided Civil and Infrastructure Engineering 22(7) (2007), 478-488.
-
(2007)
Computer-Aided Civil and Infrastructure Engineering
, vol.22
, Issue.7
, pp. 478-488
-
-
Le Gauffre, P.1
Haidar, H.2
Poinard, D.3
Laffréchine, K.4
Baur, R.5
Schiatti, M.6
-
40
-
-
0001494926
-
A genetic-algorithm-based resource-constrained construction scheduling system
-
S.S. Leu and C.H. Yang, A genetic-algorithm-based resource-constrained construction scheduling system, Construction Management andEconomics 17 (1999), 767-776.
-
(1999)
Construction Management and Economics
, vol.17
, pp. 767-776
-
-
Leu, S.S.1
Yang, C.H.2
-
41
-
-
0034240488
-
Multi-objective programming using uniform design and genetic algorithm
-
Y.W. Leung and Y. Wang, Multi-objective programming using uniform design and genetic algorithm, IEEE/SMC Trans Part C 30 (2000), 293-303.
-
(2000)
IEEE/SMC Trans Part C
, vol.30
, pp. 293-303
-
-
Leung, Y.W.1
Wang, Y.2
-
43
-
-
33847794942
-
Reliability-based Optimal Design of Electrical Transmission Towers Using Multi-objective Genetic Algo-rithms
-
S. Mathakari, P. Gardoni, P. Agarwal, A. Raich and T. Haukaas, Reliability-based Optimal Design of Electrical Transmission Towers Using Multi-objective Genetic Algo-rithms, Computer-Aided Civil andInfrastructure Engineering 22(4) (2007), 282-292.
-
(2007)
Computer-Aided Civil AndInfrastructure Engineering
, vol.22
, Issue.4
, pp. 282-292
-
-
Mathakari, S.1
Gardoni, P.2
Agarwal, P.3
Raich, A.4
Haukaas, T.5
-
44
-
-
34248995496
-
Simulation-based scheduling of module assembly yards: Case study
-
Y. Mohamed, D. Borrego, L. Francisco, M. Al-Hussein, S. Abourizk and U. Hermann, Simulation-based scheduling of module assembly yards: case study, Engineering, Construc-tion andArchitectural Management 14(3) (2007), 293-311.
-
(2007)
Engineering, Construc-tion AndArchitectural Management
, vol.14
, Issue.3
, pp. 293-311
-
-
Mohamed, Y.1
Borrego, D.2
Francisco, L.3
Al-Hussein, M.4
Abourizk, S.5
Hermann, U.6
-
45
-
-
36049009101
-
A Multi-agent System for Building Project Memories to Facilitate De-sign Process
-
D. Monticolov, V. Hilaire, S. Gomes and A. Koukam, A Multi-agent System for Building Project Memories to Facilitate De-sign Process, Integrated Computer-AidedEngineering 15(1) (2008), 3-20.
-
(2008)
Integrated Computer-AidedEngineering
, vol.15
, Issue.1
, pp. 3-20
-
-
Monticolov, D.1
Hilaire, V.2
Gomes, S.3
Koukam, A.4
-
46
-
-
33847789708
-
An Integrated Fuzzy Control System for Structural Vibrations
-
Y Nomura, H. Furuta and M. Hiorkane, An Integrated Fuzzy Control System for Structural Vibrations, Computer-Aided Civil andInfrastructureEngineering 22(4) (2007), 306-316.
-
(2007)
Computer-Aided Civil AndInfrastructureEngineering
, vol.22
, Issue.4
, pp. 306-316
-
-
Nomura, Y.1
Furuta, H.2
Hiorkane, M.3
-
47
-
-
12344320435
-
Robinson, Fuzzy logic ap-proach for activity delay analysis and schedule updating
-
A.V.O. Oliveros and A. Fayek, Robinson, Fuzzy logic ap-proach for activity delay analysis and schedule updating, Journal of Construction Engineering and Management 131(1) (2005), 42-51.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 42-51
-
-
Oliveros, A.V.O.1
Fayek, A.2
-
49
-
-
52249110456
-
(2008) Multiobjective Optimization of Concrete Frames by Simulated Annealing
-
I. Paya, V. Yepes, F. González-Vidosa and A. Hospitaler, (2008), Multiobjective Optimization of Concrete Frames by Simulated Annealing, Computer-Aided Civil and Infrastruc-tureEngineering 23(8) (1996), 596-610.
-
(1996)
Computer-Aided Civil and Infrastruc-tureEngineering
, vol.23
, Issue.8
, pp. 596-610
-
-
Paya, I.1
Yepes, V.2
González-Vidosa, F.3
Hospitaler, A.4
-
51
-
-
34547653934
-
Decision support tool for multi-objective job shop scheduling problems with linguistically quantified decision functions
-
D. Petrovic, A. Duenas and S. Petrovic, Decision support tool for multi-objective job shop scheduling problems with linguistically quantified decision functions, Decision Support Systems 43(4) (2007), 1527-1538.
-
(2007)
Decision Support Systems
, vol.43
, Issue.4
, pp. 1527-1538
-
-
Petrovic, D.1
Duenas, A.2
Petrovic, S.3
-
52
-
-
41449109607
-
Scheduling jobs on parallel machines with setup times and ready times
-
M. Pfund, J.W. Fowler, A. Gadkari and Y Chen, Scheduling jobs on parallel machines with setup times and ready times, Computers andIndustrialEngineering 54(4) (2008), 764-782.
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.4
, pp. 764-782
-
-
Pfund, M.1
Fowler, J.W.2
Gadkari, A.3
Chen, Y.4
-
53
-
-
84892234592
-
-
Springer, NewYork
-
M. Pinedo, Scheduling: Theory, Algorithms, and Systems, Springer, NewYork, 2008.
-
(2008)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
54
-
-
69149100520
-
Predicting and evalu-ating construction trades foremen performance: Fuzzy logic approach
-
C.A. Poveda and A. Robinson Fayek, Predicting and evalu-ating construction trades foremen performance: fuzzy logic approach, Journal of Construction Engineering andManage-ment, ASCE, 135(9) (2009), 920-929.
-
(2009)
Journal of Construction Engineering AndManage-ment, ASCE
, vol.135
, Issue.9
, pp. 920-929
-
-
Poveda, C.A.1
Robinson Fayek, A.2
-
56
-
-
0026898533
-
Experimental inves-tigation of FMS machine and AGV scheduling rules against the mean flow-time criterion
-
I. Sabuncuoglu and D.L. Hommertzheim, Experimental inves-tigation of FMS machine and AGV scheduling rules against the mean flow-time criterion, Int J Prod Res (30) (1992), 1617-1635.
-
(1992)
Int J Prod Res
, vol.30
, pp. 1617-1635
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
59
-
-
0035400597
-
Enhancing Neural Network Incident Detection Algorithms using Wavelets
-
A. Samant and H. Adeli, Enhancing Neural Network Incident Detection Algorithms using Wavelets, Computer-Aided Civil andInfrastructureEngineering 16(4) (2001), 239-245.
-
(2001)
Computer-Aided Civil AndInfrastructureEngineering
, vol.16
, Issue.4
, pp. 239-245
-
-
Samant, A.1
Adeli, H.2
-
60
-
-
0033701953
-
Fuzzy Genetic Algorithm for Opti-mization ofSteel Structures
-
K. Sarma and H. Adeli, Fuzzy Genetic Algorithm for Opti-mization ofSteel Structures,Journal of StructuralEngineering 126(5) (2000), 596-604.
-
(2000)
Journal of StructuralEngineering
, vol.126
, Issue.5
, pp. 596-604
-
-
Sarma, K.1
Adeli, H.2
-
61
-
-
0034324217
-
Fuzzy Discrete Multicriteria Cost Op-timization of Steel Structures
-
K. Sarma and H. Adeli, Fuzzy Discrete Multicriteria Cost Op-timization of Steel Structures, Journal ofStructural Engineer-ing 126(11) (2000), 1339-1347.
-
(2000)
Journal OfStructural Engineer-ing
, vol.126
, Issue.11
, pp. 1339-1347
-
-
Sarma, K.1
Adeli, H.2
-
63
-
-
0030072218
-
Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop
-
H. Sarper and M.C. Henry, Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop, Omega 24(1) (1996), 73-81.
-
(1996)
Omega
, vol.24
, Issue.1
, pp. 73-81
-
-
Sarper, H.1
Henry, M.C.2
-
66
-
-
70350234580
-
Methodology for integrating fuzzy expert systems and dis-crete event simulation in construction engineering
-
A.A. Shaheen, A. Robinson Fayek and S.M. AbouRizk, Methodology for integrating fuzzy expert systems and dis-crete event simulation in construction engineering, Canadian JournalofCivilEngineering, CSCE36(2009), 1478-1490.
-
(2009)
Canadian JournalofCivilEngineering, CSCE
, vol.36
, pp. 1478-1490
-
-
Shaheen, A.A.1
Robinson Fayek, A.2
Abourizk, S.M.3
-
67
-
-
50249149716
-
Fuzzy Mod-eling Approach for Combined Forecasting of Urban Traffic Flow
-
A. Stathopoulos, L. Dimitriou and T. Tsekeris, Fuzzy Mod-eling Approach for Combined Forecasting of Urban Traffic Flow, Computer-Aided Civil and Infrastructure Engineering 23(7) (2008), 521-535.
-
(2008)
Computer-Aided Civil and Infrastructure Engineering
, vol.23
, Issue.7
, pp. 521-535
-
-
Stathopoulos, A.1
Dimitriou, L.2
Tsekeris, T.3
-
68
-
-
68249109469
-
A Model-Checking-Based Approach to Risk Analysis in Supply Chain Consolidations
-
L. Tan and S. Xu, A Model-Checking-Based Approach to Risk Analysis in Supply Chain Consolidations, Integrated Computer-AidedEngineering 16(3) (2009), 243-257.
-
(2009)
Integrated Computer-AidedEngineering
, vol.16
, Issue.3
, pp. 243-257
-
-
Tan, L.1
Xu, S.2
-
69
-
-
3242659739
-
Fuzzy optimization of labor allo-cation by genetic algorithms
-
T.K.L. Tong and C.M. Tam, Fuzzy optimization of labor allo-cation by genetic algorithms, Eng ConstrArchitManage 10(2) (2003), 146-155.
-
(2003)
Eng ConstrArchitManage
, vol.10
, Issue.2
, pp. 146-155
-
-
Tong, T.K.L.1
Tam, C.M.2
-
70
-
-
67649392433
-
A Fuzzy Logic Based Efficient Energy Saving Approach for Domestic Heating Sys-tems
-
J.R. Villar, E. de la Cal and J. Sedano, A Fuzzy Logic Based Efficient Energy Saving Approach for Domestic Heating Sys-tems, Integrated Computer-Aided Engineering 16(2) (2009), 151-163.
-
(2009)
Integrated Computer-Aided Engineering
, vol.16
, Issue.2
, pp. 151-163
-
-
Villar, J.R.1
De La Cal, E.2
Sedano, J.3
-
71
-
-
11944259647
-
Project management decisions with multiple fuzzy goals
-
R.C. Wangand T.F. Liang, Project management decisions with multiple fuzzy goals, ConstrManageEconom 22(11) (2004), 1047-1056.
-
(2004)
ConstrManageEconom
, vol.22
, Issue.11
, pp. 1047-1056
-
-
Wangand, R.C.1
Liang, T.F.2
-
72
-
-
33750013118
-
A genetic algorithms simula-tion approach for the multi-criteria combinatorial dispatching decision problem
-
T. Yang, Y. Kuo and C. Cho, A genetic algorithms simula-tion approach for the multi-criteria combinatorial dispatching decision problem, European Journal of Operational Research 176(3) (2007), 1859-1873.
-
(2007)
European Journal of Operational Research
, vol.176
, Issue.3
, pp. 1859-1873
-
-
Yang, T.1
Kuo, Y.2
Cho, C.3
-
74
-
-
18144388681
-
Toward a generalized theory of uncertainty (GTU)-An outline
-
L.A. Zadeh, Toward a generalized theory of uncertainty (GTU)-An outline, Information Sciences 172(1-2) (2005), 1-40.
-
(2005)
Information Sciences
, vol.172
, Issue.1-2
, pp. 1-40
-
-
Zadeh, L.A.1
-
75
-
-
65749093997
-
Multi-attribute selection form alternative designs of infrastructure components for ac-cidental situations
-
E.K. Zavadskas and E.R. Vaidogas, Multi-attribute selection form alternative designs of infrastructure components for ac-cidental situations, Computer-Aided Civil and Infrastructure Engineering 24(5) (2009), 346-358.
-
(2009)
Computer-Aided Civil and Infrastructure Engineering
, vol.24
, Issue.5
, pp. 346-358
-
-
Zavadskas, E.K.1
Vaidogas, E.R.2
-
76
-
-
33645992444
-
Multimode Project Schedul-ing Based on Particle Swarm Optimization
-
H. Zhang, C.M. Tam and H. Li, Multimode Project Schedul-ing Based On Particle Swarm Optimization, Computer-Aided Civil andInfrastructureEngineering 21(2) (2006), 93-103.
-
(2006)
Computer-Aided Civil AndInfrastructureEngineering
, vol.21
, Issue.2
, pp. 93-103
-
-
Zhang, H.1
Tam, C.M.2
Li, H.3
|