-
1
-
-
0004146280
-
-
McGraw-Hill, New York
-
Barrie, D., and Paulson, B. (1992). Professional construction management, 3rd Ed., McGraw-Hill, New York.
-
(1992)
Professional Construction Management, 3rd Ed.
-
-
Barrie, D.1
Paulson, B.2
-
2
-
-
0019552530
-
Cost-plus contractor selection: A case study
-
Diekmann, J. E. (1981). "Cost-plus contractor selection: A case study." J. Technical Councils ASCE, 107(TC1), 13-25.
-
(1981)
J. Technical Councils ASCE
, vol.107
, Issue.TC1
, pp. 13-25
-
-
Diekmann, J.E.1
-
3
-
-
0001119781
-
Final contractor selection using analytical hierarchy process
-
Fong, P. S.-W., and Choi, S. K.-Y. (2000). "Final contractor selection using analytical hierarchy process." Constr. Manage. Econom., 18, 547-557.
-
(2000)
Constr. Manage. Econom.
, vol.18
, pp. 547-557
-
-
Fong, P.S.-W.1
Choi, S.K.-Y.2
-
5
-
-
0032023054
-
Contractor selection using multicriteria utility theory: An additive model
-
Hatush, Z., and Skitmore, M. (1998). "Contractor selection using multicriteria utility theory: An additive model." Build. Environ., 33(2), 148-164.
-
(1998)
Build. Environ.
, vol.33
, Issue.2
, pp. 148-164
-
-
Hatush, Z.1
Skitmore, M.2
-
6
-
-
0017416667
-
The evaluation of contractor management during source selection
-
Dept. of Economics, Geography and Management, USAF Academy, Color.
-
Helmer, T. F., and Taylor, R. L. (1977). "The evaluation of contractor management during source selection." Proc., AIIE Spring Annual Conf., Dept. of Economics, Geography and Management, USAF Academy, Color.
-
(1977)
Proc., AIIE Spring Annual Conf.
-
-
Helmer, T.F.1
Taylor, R.L.2
-
7
-
-
0027629681
-
Multiple participant-multiple criteria decision making
-
Hipel, K. W., Radford, K. J., and Fang, L. (1993). "Multiple participant-multiple criteria decision making." IEEE Trans. Syst. Man Cybern. 23, 1184-1189.
-
(1993)
IEEE Trans. Syst. Man Cybern.
, vol.23
, pp. 1184-1189
-
-
Hipel, K.W.1
Radford, K.J.2
Fang, L.3
-
8
-
-
0038734398
-
Applying multi-attribute analysis to contractor selection decisions
-
Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1995). "Applying multi-attribute analysis to contractor selection decisions." Eur. J. Purch. Supply Manage., 1(3), 139-148.
-
(1995)
Eur. J. Purch. Supply Manage.
, vol.1
, Issue.3
, pp. 139-148
-
-
Holt, G.D.1
Olomolaiye, P.O.2
Harris, F.C.3
-
12
-
-
0342327410
-
An efficient structured approach for selection of most promising construction contractors
-
Jaselskisl, E. J., and Russell, J. S. (1991). "An efficient structured approach for selection of most promising construction contractors." Proj. Manage. J., 12(4), 31-39.
-
(1991)
Proj. Manage. J.
, vol.12
, Issue.4
, pp. 31-39
-
-
Jaselskisl, E.J.1
Russell, J.S.2
-
13
-
-
0003705696
-
-
North-Holland, Amsterdam, The Netherlands
-
Kaufmann, A., and Gupta, M. M. (1988). Fuzzy mathematical models in engineering and management science, North-Holland, Amsterdam, The Netherlands.
-
(1988)
Fuzzy Mathematical Models in Engineering and Management Science
-
-
Kaufmann, A.1
Gupta, M.M.2
-
15
-
-
84993073505
-
Neural network model for contractor's prequalification for local authority projects
-
Khosrowshahi, F. (1999). "Neural network model for contractor's prequalification for local authority projects." Eng., Constr., Archit. Manage., 6(3), 315-328.
-
(1999)
Eng., Constr., Archit. Manage.
, vol.6
, Issue.3
, pp. 315-328
-
-
Khosrowshahi, F.1
-
16
-
-
0003521692
-
-
Prentice-Hall, Englewood Cliffs, N.J.
-
Klir, G. J., and Folger, T. A. (1988). Fuzzy sets, uncertainty and information, Prentice-Hall, Englewood Cliffs, N.J.
-
(1988)
Fuzzy Sets, Uncertainty and Information
-
-
Klir, G.J.1
Folger, T.A.2
-
17
-
-
0030147931
-
Contractor evaluation and selection: A Hong Kong perceptive
-
Kumaraswamy, M. M. (1996). "Contractor evaluation and selection: A Hong Kong perceptive." Build. Environ., 31(3), 273-282.
-
(1996)
Build. Environ.
, vol.31
, Issue.3
, pp. 273-282
-
-
Kumaraswamy, M.M.1
-
18
-
-
0035282199
-
A fuzzy neural network approach for contractor prequalification
-
Lam, K. C., Hu, T., Ng, S. T., Skitmore, M., and Cheung, S. O. (2001). "A fuzzy neural network approach for contractor prequalification." Constr. Manage. Econom., 19, 175-188.
-
(2001)
Constr. Manage. Econom.
, vol.19
, pp. 175-188
-
-
Lam, K.C.1
Hu, T.2
Ng, S.T.3
Skitmore, M.4
Cheung, S.O.5
-
19
-
-
84860498580
-
A multi-criteria approach to contractor selection
-
Mahdi, I. M., Riley, M. J., Fereig, S. M., and Alex, A. P. (2002). "A multi-criteria approach to contractor selection." Eng., Constr., Archit. Manage., 9(1), 29-37.
-
(2002)
Eng., Constr., Archit. Manage.
, vol.9
, Issue.1
, pp. 29-37
-
-
Mahdi, I.M.1
Riley, M.J.2
Fereig, S.M.3
Alex, A.P.4
-
20
-
-
0025385269
-
Bid evaluation for the U.K public sector construction contracts
-
Institution of Civil Engineers, London
-
Merna, A., and Smith, N. J. (1990). "Bid evaluation for the U.K public sector construction contracts." Proc., Inst. of Civil Engineers Part 1: Design and Construction, Vol. 88, Institution of Civil Engineers, London, 91-105.
-
(1990)
Proc., Inst. of Civil Engineers Part 1: Design and Construction
, vol.88
, pp. 91-105
-
-
Merna, A.1
Smith, N.J.2
-
21
-
-
12344318910
-
The placing and management of contractor for building and civil engineering works
-
Her Majesty's Stationery Office, London
-
Ministry of Public Building and Works (MPBW). (1964). "The placing and management of contractor for building and civil engineering works." Banwell Rep., Her Majesty's Stationery Office, London.
-
(1964)
Banwell Rep.
-
-
-
22
-
-
0022076106
-
Selecting a contractor for fast track projects. Part 1: Principles of contractor evaluation
-
Moore, M. J. (1985a). "Selecting a contractor for fast track projects. Part 1: Principles of contractor evaluation." Plant Eng., 39(12), 74-75.
-
(1985)
Plant Eng.
, vol.39
, Issue.12
, pp. 74-75
-
-
Moore, M.J.1
-
23
-
-
0022129458
-
Selecting a contractor for fast track projects. Part 2: Quantitative evaluation method
-
Moore, M. J. (1985b). "Selecting a contractor for fast track projects. Part 2: Quantitative evaluation method." Plant Eng., 39(18), 54-56.
-
(1985)
Plant Eng.
, vol.39
, Issue.18
, pp. 54-56
-
-
Moore, M.J.1
-
24
-
-
0022128664
-
Tender evaluation by fuzzy sets
-
Nguyen, V. U. (1985). "Tender evaluation by fuzzy sets." Constr. Eng. Manage., 111(3), 231-243.
-
(1985)
Constr. Eng. Manage.
, vol.111
, Issue.3
, pp. 231-243
-
-
Nguyen, V.U.1
-
25
-
-
0344032254
-
TenSeM: A multicriteria and multidecision-makers' model in tender evaluation
-
Pongpeng, J., and Liston, J. (2003). "TenSeM: A multicriteria and multidecision-makers' model in tender evaluation." Constr. Manage. Econom., 21(1), 21-30.
-
(2003)
Constr. Manage. Econom.
, vol.21
, Issue.1
, pp. 21-30
-
-
Pongpeng, J.1
Liston, J.2
-
26
-
-
0024941244
-
Main sources of inaccurate determination, uncertainty and imprecision in decision models
-
Roy, B. (1989). "Main sources of inaccurate determination, uncertainty and imprecision in decision models." Math. Comput. Modell., 12, 1245-1254.
-
(1989)
Math. Comput. Modell.
, vol.12
, pp. 1245-1254
-
-
Roy, B.1
-
27
-
-
0001582664
-
Decision criteria in contractor prequalification
-
Russell, J. S., and Skibniewski, M. J. (1988). "Decision criteria in contractor prequalification." J. Manage. Eng., 4(2), 148-164.
-
(1988)
J. Manage. Eng.
, vol.4
, Issue.2
, pp. 148-164
-
-
Russell, J.S.1
Skibniewski, M.J.2
-
28
-
-
49449122896
-
A scaling method for priorities in hierarchical structures
-
Saaty, T. L. (1977). "A scaling method for priorities in hierarchical structures." J. Math. Psychoi, 15(1), 234-281.
-
(1977)
J. Math. Psychoi
, vol.15
, Issue.1
, pp. 234-281
-
-
Saaty, T.L.1
-
29
-
-
0020268597
-
Owner's guidelines for selecting safe contracts
-
Samelson, N. M., and Levitt, R. E. (1982). "Owner's guidelines for selecting safe contracts." J. Constr. Div., Am. Soc. Civ, Eng., 108(4), 617-623.
-
(1982)
J. Constr. Div., Am. Soc. Civ, Eng.
, vol.108
, Issue.4
, pp. 617-623
-
-
Samelson, N.M.1
Levitt, R.E.2
-
31
-
-
0001255447
-
A value for n-person games
-
H. W. Kuhn and A. W. Tucker, eds., Annals of mathematics studies, Princeton University Press, Princeton, N.J.
-
Shapley, L. S. (1953). "A value for n-person games." Contribution to the theory of games, Vol. II, H. W. Kuhn and A. W. Tucker, eds., Annals of mathematics studies, Princeton University Press, Princeton, N.J., 307-317.
-
(1953)
Contribution to the Theory of Games
, vol.2
, pp. 307-317
-
-
Shapley, L.S.1
-
32
-
-
34248666540
-
Fuzzy sets
-
Zadeh, L. A. (1965). "Fuzzy sets." Inf. Control, 8, 338-353.
-
(1965)
Inf. Control
, vol.8
, pp. 338-353
-
-
Zadeh, L.A.1
-
33
-
-
0003536841
-
The concept of a linguistic variable and its application to approximate reasoning
-
Berkeley, Calif.
-
Zadeh, L. A. (1973). "The concept of a linguistic variable and its application to approximate reasoning." ERL-M 411, Berkeley, Calif.
-
(1973)
ERL-M 411
-
-
Zadeh, L.A.1
|