Volumn 12, Issue 4, 2005, Pages 391-409

An intelligent risk assessment system for distributed construction teams

Author keywords

Architecture; Construction engineering; Fuzzy logic; Risk assessment; Worldwide web

Indexed keywords

COMPUTER ARCHITECTURE; CONCURRENT ENGINEERING; CONSTRUCTION INDUSTRY; DISTRIBUTED PARAMETER CONTROL SYSTEMS; FUZZY SETS; RISK ASSESSMENT; USER INTERFACES; WORLD WIDE WEB;

EID: 23444455143     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980510608839     Document Type: Article
Times cited : (28)

References (28)
  • 1
  • 2
    • 3042764877 scopus 로고
    • Fuzzy structural modelling-based method for evaluation of computerized production systems
    • Sydney, July
    • Amagasa, M. and Vlacic, L. (1993), "Fuzzy structural modelling-based method for evaluation of computerized production systems", Proceedings of IFAC 12th Triennial World Congress, Sydney, July, pp. 279-85.
    • (1993) Proceedings of IFAC 12th Triennial World Congress , pp. 279-285
    • Amagasa, M.1    Vlacic, L.2
  • 6
    • 0037402597 scopus 로고    scopus 로고
    • Modelling global risk factors affecting construction cost performance
    • Baloi, D. and Price, A.D.F. (2003), "Modelling global risk factors affecting construction cost performance", International Journal of Project Management, Vol. 21, pp. 261-9.
    • (2003) International Journal of Project Management , vol.21 , pp. 261-269
    • Baloi, D.1    Price, A.D.F.2
  • 8
  • 9
    • 0031258020 scopus 로고    scopus 로고
    • Project risk analysis and management - PRAM: The generic process
    • Chapman, C. (1997), "Project risk analysis and management - PRAM: the generic process", International Journal of Project Management, Vol. 15 No. 5, pp. 273-81.
    • (1997) International Journal of Project Management , vol.15 , Issue.5 , pp. 273-281
    • Chapman, C.1
  • 12
    • 0032332292 scopus 로고    scopus 로고
    • ConSERV, a project specific risk management concept
    • Conroy, G. and Soltan, H. (1998), "ConSERV, a project specific risk management concept", International Journal of Project Management, Vol. 16 No. 6, pp. 353-66.
    • (1998) International Journal of Project Management , vol.16 , Issue.6 , pp. 353-366
    • Conroy, G.1    Soltan, H.2
  • 17
    • 12744251343 scopus 로고    scopus 로고
    • Use of fuzzy logic for predicting design cost overruns on building projects
    • Knight, K. and Fayek, A.R. (2002), "Use of fuzzy logic for predicting design cost overruns on building projects", Journal of Construction Engineering and Management, Vol. 128 No. 6, pp. 503-12.
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 503-512
    • Knight, K.1    Fayek, A.R.2
  • 20
    • 0013337442 scopus 로고    scopus 로고
    • A proposal for construction project risk assessment using fuzzy logic
    • Tah, J.H.M. and Carr, V. (2000), "A proposal for construction project risk assessment using fuzzy logic", Journal of Construction Management and Economics, Vol. 18, pp. 451-500.
    • (2000) Journal of Construction Management and Economics , vol.18 , pp. 451-500
    • Tah, J.H.M.1    Carr, V.2
  • 21
    • 0035398703 scopus 로고    scopus 로고
    • Knowledge-based approach to construction project risk management
    • Tah, J.H.M. and Carr, V. (2001), "Knowledge-based approach to construction project risk management", Journal of Computing in Civil Engineering, Vol. 15 No. 3, pp. 170-7.
    • (2001) Journal of Computing in Civil Engineering , vol.15 , Issue.3 , pp. 170-177
    • Tah, J.H.M.1    Carr, V.2
  • 22
    • 0033177429 scopus 로고    scopus 로고
    • Applying a risk management process (RMP) to manage cost risk for an EHV transmission line project
    • Tummala, V.M.R. and Burchett, J.F. (1999), "Applying a risk management process (RMP) to manage cost risk for an EHV transmission line project", International Journal of Project Management, Vol. 17 No. 4, pp. 223-35.
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 223-235
    • Tummala, V.M.R.1    Burchett, J.F.2
  • 23
    • 0032595613 scopus 로고    scopus 로고
    • Assessing and managing important risks
    • Ward, S.C. (1999), "Assessing and managing important risks", International Journal of Project Management, Vol. 17 No. 6, pp. 331-6.
    • (1999) International Journal of Project Management , vol.17 , Issue.6 , pp. 331-336
    • Ward, S.C.1
  • 24
  • 27
    • 0016458950 scopus 로고
    • The concepts of a linguistic variable and its application to approximate reasoning I, II, III
    • Zadeh, L.A. (1975), "The concepts of a linguistic variable and its application to approximate reasoning I, II, III", Information Science, Vol. 8, pp. 199-257.
    • (1975) Information Science , vol.8 , pp. 199-257
    • Zadeh, L.A.1
  • 28
    • 0011127465 scopus 로고
    • Risk management for overseas construction projects
    • Zhi, H. (1995), "Risk management for overseas construction projects", International Journal of Project Management, Vol. 13 No. 4, pp. 231-7.
    • (1995) International Journal of Project Management , vol.13 , Issue.4 , pp. 231-237
    • Zhi, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.