Volumn 135, Issue 11, 2009, Pages 1241-1252

Overview of the application of "fuzzy techniques" in construction management research

Author keywords

Construction management; Fuzzy sets; Hybrid methods; Research

Indexed keywords

AUTOMATIC-LEARNING; BUILDING SCIENCE; CHANGING ENVIRONMENT; CONSTRUCTION ENGINEERING; CONSTRUCTION MANAGEMENT; CONSTRUCTION MANAGEMENT RESEARCH; FUZZY LITERATURE; FUZZY MEMBERSHIP FUNCTION; FUZZY TECHNIQUES; HYBRID METHODS; INTERNATIONAL JOURNALS; LINGUISTIC VARIABLE; LITERATURE REVIEWS; NEURO-FUZZY; NEW DIRECTIONS; RESEARCH AREAS; RESEARCH STUDIES; TOP QUALITIES;

EID: 70350051327     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000099     Document Type: Article
Times cited : (150)

References (74)
  • 1
    • 0037402597 scopus 로고    scopus 로고
    • Modelling global risk factors affecting construction cost performance
    • DOI 10.1016/S0263-7863(02)00017-0
    • Baloi, D., and Price, A. D. F. (2003). " Modeling global risk factors affecting construction cost performance.." Int. J. Proj. Manage. 0263-7863, 21 (4), 261-269. 10.1016/S0263-7863(02)00017-0 (Pubitemid 36386768)
    • (2003) International Journal of Project Management , vol.21 , Issue.4 , pp. 261-269
    • Baloi, D.1    Price, A.D.F.2
  • 3
    • 0021788415 scopus 로고
    • ESTIMATION of FUZZY MEMBERSHIPS from HISTOGRAMS.
    • DOI 10.1016/0020-0255(85)90040-4
    • Bharathi-Devi, B., and Sarma, V. V. S. (1985). " Estimation of fuzzy memberships from histograms.." Inf. Sci. (N.Y.) 0020-0255, 35 (1), 43-59. 10.1016/0020-0255(85)90040-4 (Pubitemid 15474331)
    • (1985) Information Sciences , vol.35 , Issue.1 , pp. 43-59
    • Bharathi, D.1    Sarma, V.V.S.2
  • 4
    • 13944250291 scopus 로고    scopus 로고
    • Where do we stand with fuzzy project scheduling?
    • DOI 10.1061/(ASCE)0733-9364(2004)130:1(114)
    • Bonnal, P., Gourc, D., and Lacoste, G. (2004). " Where do we stand with fuzzy project scheduling? " J. Constr. Eng. Manage. 0733-9364, 130 (1), 114-123. 10.1061/(ASCE)0733-9364(2004)130:1(114) (Pubitemid 40265412)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 114-123
    • Bonnal, P.1    Gourc, D.2    Lacoste, G.3
  • 5
    • 84986139296 scopus 로고    scopus 로고
    • Methods and techniques to help quality function deployment
    • 10.1108/14635770010314891
    • Bouchereau, V., and Rowlands, H. (2000). " Methods and techniques to help quality function deployment.." Benchmarking: Int. J., 7 (1), 8-20. 10.1108/14635770010314891
    • (2000) Benchmarking: Int. J. , vol.7 , Issue.1 , pp. 8-20
    • Bouchereau, V.1    Rowlands, H.2
  • 6
    • 84992933636 scopus 로고    scopus 로고
    • Neuro-fuzzy modeling of construction projects' duration. I: Principles
    • 0969-9988, (),. 10.1046/j.1365-232X.2001.00187.x
    • Boussabaine, A. H. (2001a). " Neuro-fuzzy modeling of construction projects' duration. I: Principles.." Eng., Constr., Archit. Manage. 0969-9988, 8 (2), 104-113. 10.1046/j.1365-232X.2001.00187.x
    • (2001) Eng., Constr., Archit. Manage. , vol.8 , Issue.2 , pp. 104-113
    • Boussabaine, A.H.1
  • 7
    • 84993027343 scopus 로고    scopus 로고
    • Neuro-fuzzy modeling of construction projects' duration. II: Application
    • 0969-9988, (),. 10.1046/j.1365-232X.2001.00188.x
    • Boussabaine, A. H. (2001b). " Neuro-fuzzy modeling of construction projects' duration. II: Application.." Eng., Constr., Archit. Manage. 0969-9988, 8 (2), 114-129. 10.1046/j.1365-232X.2001.00188.x
    • (2001) Eng., Constr., Archit. Manage. , vol.8 , Issue.2 , pp. 114-129
    • Boussabaine, A.H.1
  • 8
    • 0141965571 scopus 로고    scopus 로고
    • Applying fuzzy techniques to cash flow analysis
    • 0144-6193.
    • Boussabaine, A. H., and Elhag, T. (1999). " Applying fuzzy techniques to cash flow analysis.." Constr. Manage. Econom. 0144-6193, 17 (6), 746-755.
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.6 , pp. 746-755
    • Boussabaine, A.H.1    Elhag, T.2
  • 9
    • 0003253168 scopus 로고    scopus 로고
    • Fuzzy logic for evaluating new construction technology
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1998)124:4(297)
    • Chao, L. C., and Skibniewski, M. J. (1998). " Fuzzy logic for evaluating new construction technology.." J. Constr. Eng. Manage. 0733-9364, 124 (4), 297-304. 10.1061/(ASCE)0733-9364(1998)124:4(297)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 297-304
    • Chao, L.C.1    Skibniewski, M.J.2
  • 10
    • 0001055467 scopus 로고    scopus 로고
    • The ranking of construction management journals
    • 0144-6193, (),. 10.1080/014461997373150
    • Chau, K. W. (1997). " The ranking of construction management journals.." Constr. Manage. Econom. 0144-6193, 15 (4), 387-398. 10.1080/014461997373150
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.4 , pp. 387-398
    • Chau, K.W.1
  • 11
    • 13944284177 scopus 로고    scopus 로고
    • Object-oriented evolutionary fuzzy neural inference system for construction management
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(461)
    • Cheng, M. Y., and Ko, C. H. (2003). " Object-oriented evolutionary fuzzy neural inference system for construction management.." J. Constr. Eng. Manage. 0733-9364, 129 (4), 461-469. 10.1061/(ASCE)0733-9364(2003)129: 4(461) (Pubitemid 40265461)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 461-469
    • Cheng, M.-Y.1    Ko, C.-H.2
  • 12
    • 13944282970 scopus 로고    scopus 로고
    • Risk assessment methodology for underground construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(258)
    • Choi, H. H., Cho, H. N., and Seo, J. W. (2004). " Risk assessment methodology for underground construction projects.." J. Constr. Eng. Manage. 0733-9364, 130 (2), 258-272. 10.1061/(ASCE)0733-9364(2004)130:2(258) (Pubitemid 40265393)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 258-272
    • Choi, H.-H.1    Cho, H.-N.2    Seo, J.W.3
  • 14
    • 24344498317 scopus 로고    scopus 로고
    • Evaluating project teaming strategies for construction of Taipei 101 using resource-based theory
    • DOI 10.1016/j.ijproman.2005.02.004, PII S0263786305000335
    • Dzeng, R. J., and Wen, K. S. (2005). " Evaluating project teaming strategies for construction of Taipei 101 using resource-based theory.." Int. J. Proj. Manage. 0263-7863, 23 (6), 483-491. 10.1016/j.ijproman.2005.02.004 (Pubitemid 41258479)
    • (2005) International Journal of Project Management , vol.23 , Issue.6 , pp. 483-491
    • Dzeng, R.-J.1    Wen, K.-S.2
  • 15
    • 0002861004 scopus 로고    scopus 로고
    • Competitive bidding strategic model and software system for bid preparation
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1998)124:1(1)
    • Fayek, A. (1998). " Competitive bidding strategic model and software system for bid preparation.." J. Constr. Eng. Manage. 0733-9364, 124 (1), 1-10. 10.1061/(ASCE)0733-9364(1998)124:1(1)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 1-10
    • Fayek, A.1
  • 16
    • 25444440655 scopus 로고    scopus 로고
    • Predicting industrial construction labor productivity using fuzzy expert systems
    • DOI 10.1061/(ASCE)0733-9364(2005)131:8(938)
    • Fayek, A. R., and Oduba, A. (2005). " Predicting industrial construction labour productivity using fuzzy expert systems.." J. Constr. Eng. Manage. 0733-9364, 131 (8), 938-941. 10.1061/(ASCE)0733-9364(2005)131: 8(938) (Pubitemid 41364756)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.8 , pp. 938-941
    • Fayek, A.R.1    Oduba, A.2
  • 19
    • 33745977431 scopus 로고    scopus 로고
    • Quasi-adaptive fuzzy heating control of solar buildings
    • DOI 10.1016/j.buildenv.2005.07.008, PII S0360132305002775
    • Gouda, M. M., Danaher, S., and Underwood, C. P. (2006). " Quasi-adaptive fuzzy heating control of solar buildings.." Build. Environ. 0360-1323, 41 (12), 1881-1891. 10.1016/j.buildenv.2005.07.008 (Pubitemid 44063898)
    • (2006) Building and Environment , vol.41 , Issue.12 , pp. 1881-1891
    • Gouda, M.M.1    Danaher, S.2    Underwood, C.P.3
  • 21
    • 0036832338 scopus 로고    scopus 로고
    • An energy-efficient controller for shading devices self-adapting to the user wishes
    • DOI 10.1016/S0360-1323(01)00113-5, PII S0360132301001135
    • Guillemin, A., and Molteni, S. (2002). " An energy-efficient controller for shading devices self-adapting to the user wishes.." Build. Environ. 0360-1323, 37 (11), 1091-1097. 10.1016/S0360-1323(01)00113-5 (Pubitemid 35016191)
    • (2002) Building and Environment , vol.37 , Issue.11 , pp. 1091-1097
    • Guillemin, A.1    Molteni, S.2
  • 22
    • 0032098746 scopus 로고    scopus 로고
    • Which contractor selection methodology?
    • 0263-7863, (),. 10.1016/S0263-7863(97)00035-5
    • Holt, G. D. (1998). " Which contractor selection methodology? " Int. J. Proj. Manage. 0263-7863, 16 (3), 153-164. 10.1016/S0263-7863(97)00035-5
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.3 , pp. 153-164
    • Holt, G.D.1
  • 23
    • 3342984611 scopus 로고    scopus 로고
    • Fuzzy MCDM approach for planning and design tenders selection in public office buildings
    • DOI 10.1016/j.ijproman.2004.01.002, PII S0263786304000031
    • Hsieh, T. Y., Lu, S. T., and Tzeng, G. H. (2004). " Fuzzy MCDM approach for planning and design tenders selection in public office buildings.." Int. J. Proj. Manage. 0263-7863, 22 (7), 573-584. 10.1016/j.ijproman.2004.01.002 (Pubitemid 38994795)
    • (2004) International Journal of Project Management , vol.22 , Issue.7 , pp. 573-584
    • Hsieh, T.-Y.1    Lu, S.-T.2    Tzeng, G.-H.3
  • 24
    • 33751161912 scopus 로고    scopus 로고
    • Prediction of sulfate expansion of PC mortar using adaptive neuro-fuzzy methodology
    • DOI 10.1016/j.buildenv.2005.11.029, PII S0360132305005081
    • Inan, G., Goktepe, A. B., Ramyar, K., and Sezer, A. (2007). " Prediction of sulfate expansion of PC mortar using adaptive neuro-fuzzy methodology.." Build. Environ. 0360-1323, 42 (3), 1264-1269. 10.1016/j.buildenv.2005.11.029 (Pubitemid 44774631)
    • (2007) Building and Environment , vol.42 , Issue.3 , pp. 1264-1269
    • Inan, G.1    Goktepe, A.B.2    Ramyar, K.3    Sezer, A.4
  • 26
    • 2942635403 scopus 로고    scopus 로고
    • Combining various facets of uncertainty in whole-life cost modelling
    • DOI 10.1080/0144619042000176483
    • Kishk, M. (2004). " Combining various facets of uncertainty in whole-life cost modeling.." Constr. Manage. Econom. 0144-6193, 22 (4), 429-435. 10.1080/0144619042000176483 (Pubitemid 38783513)
    • (2004) Construction Management and Economics , vol.22 , Issue.4 , pp. 429-435
    • Kishk, M.1
  • 27
    • 12744251343 scopus 로고    scopus 로고
    • Use of fuzzy logic for predicting design cost overruns on building projects
    • DOI 10.1061/(ASCE)0733-9364(2002)128:6(503)
    • Knight, K., and Fayek, A. R. (2002). " Use of fuzzy logic for predicting design cost overruns on building projects.." J. Constr. Eng. Manage. 0733-9364, 128 (6), 503-512. 10.1061/(ASCE)0733-9364(2002)128:6(503) (Pubitemid 40265514)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 503-512
    • Knight, K.1    Fayek, A.R.2
  • 28
    • 0035399734 scopus 로고    scopus 로고
    • Use of fuzzy numbers in project risk (criticality) assessment
    • DOI 10.1016/S0263-7863(00)00022-3, PII S0263786300000223
    • Kuchta, D. (2001). " Use of fuzzy numbers in project risk (criticality) assessment.." Int. J. Proj. Manage. 0263-7863, 19 (5), 305-310. 10.1016/S0263-7863(00)00022-3 (Pubitemid 32548509)
    • (2001) International Journal of Project Management , vol.19 , Issue.5 , pp. 305-310
    • Kuchta, D.1
  • 29
    • 84992974062 scopus 로고    scopus 로고
    • Assessment of working capital requirements by fuzzy set theory
    • " 0969-9988, (),. 10.1046/j.1365-232X.2000.00141.x
    • Kumar, V. S. S., Hanna, A. S., and Adams, T. (2000). " Assessment of working capital requirements by fuzzy set theory.." Eng., Constr., Archit. Manage. 0969-9988, 7 (1), 93-103. 10.1046/j.1365-232X.2000.00141.x
    • (2000) Eng., Constr., Archit. Manage. , vol.7 , Issue.1 , pp. 93-103
    • Kumar, V.S.S.1    Hanna, A.S.2    Adams, T.3
  • 30
    • 23144461632 scopus 로고    scopus 로고
    • Fuzzy control for the illumination and temperature comfort in a test chamber
    • DOI 10.1016/j.buildenv.2004.11.008, PII S0360132304003300
    • Lah, M. T., Zupancic, B., and Krainer, A. (2005). " Fuzzy control for the illumination and temperature comfort in a test chamber.." Build. Environ. 0360-1323, 40 (12), 1626-1637. 10.1016/j.buildenv.2004.11.008 (Pubitemid 41086630)
    • (2005) Building and Environment , vol.40 , Issue.12 , pp. 1626-1637
    • Lah, M.T.1    Zupancic, B.2    Krainer, A.3
  • 31
    • 0035282199 scopus 로고    scopus 로고
    • A fuzzy neural network approach for contractor prequalification
    • DOI 10.1080/01446190150505108
    • Lam, K. C., Hu, T., Ng, S. T., Skitmore, M., and Cheung, S. O. (2001a). " A fuzzy neural network approach for contractor prequalification.." Constr. Manage. Econom. 0144-6193, 19 (2), 175-188. 10.1080/01446190150505108 (Pubitemid 32228859)
    • (2001) Construction Management and Economics , vol.19 , Issue.2 , pp. 175-188
    • Lam, K.C.1    Hu, T.2    Ng, S.T.3    Skitmore, M.4    Cheoung, S.O.5
  • 32
    • 0001276267 scopus 로고    scopus 로고
    • Modelling financial decisions in construction firms
    • 10.1080/014461999371204 0144-6193
    • Lam, K. C., and Runeson, G. (1999). " Modelling financial decisions in construction firms.." Construct. Manag. Econ., 17 (5), 589-602. 10.1080/014461999371204 0144-6193
    • (1999) Construct. Manag. Econ. , vol.17 , Issue.5 , pp. 589-602
    • Lam, K.C.1    Runeson, G.2
  • 33
    • 0242663158 scopus 로고    scopus 로고
    • An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making
    • " 0144-6193, (),. 10.1080/014461901452085
    • Lam, K. C., So, A. T. P., Hu, T., Ng, T., Yuen, R. K. K., Lo, S. M., Cheung, S. O., and Yang, H. W. (2001b). " An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making.." Constr. Manage. Econom. 0144-6193, 19 (1), 63-76. 10.1080/014461901452085
    • (2001) Constr. Manage. Econom. , vol.19 , Issue.1 , pp. 63-76
    • Lam, K.C.1    So, A.T.P.2    Hu, T.3    Ng, T.4    Yuen, R.K.K.5    Lo, S.M.6    Cheung, S.O.7    Yang, H.W.8
  • 34
    • 25844517320 scopus 로고    scopus 로고
    • Using the principal component analysis method as a tool in contractor pre-qualification
    • DOI 10.1080/01446190500041263
    • Lam, K. M., Tang, C. M., and Lee, W. C. (2005). " Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects.." Constr. Manage. Econom. 0144-6193, 23 (2), 127-145. 10.1080/01446190500041263 (Pubitemid 41388507)
    • (2005) Construction Management and Economics , vol.23 , Issue.7 , pp. 673-684
    • Lam, K.C.1    Hu, T.S.2    Ng, S.T.3
  • 35
    • 33947316086 scopus 로고    scopus 로고
    • Car-parking guidance with fuzzy knowledge-based decision making
    • DOI 10.1016/j.buildenv.2005.08.034, PII S0360132305003999
    • Leephakpreeda, T. (2007). " Car-parking guidance with fuzzy knowledge-based decision making.." Build. Environ. 0360-1323, 42 (2), 803-809. 10.1016/j.buildenv.2005.08.034 (Pubitemid 44444331)
    • (2007) Handbook of Environmental Chemistry, Volume 5: Water Pollution , vol.42 , Issue.2 , pp. 803-809
    • Leephakpreeda, T.1
  • 36
    • 0035193271 scopus 로고    scopus 로고
    • GA-based fuzzy optimal model for construction time-cost trade-off
    • DOI 10.1016/S0263-7863(99)00035-6
    • Leu, S. S., Chen, A. T., and Yang, C. H. (2001). " A GA-based fuzzy optimal model for construction time-cost trade off.." Int. J. Proj. Manage. 0263-7863, 19 (1), 47-58. 10.1016/S0263-7863(99)00035-6 (Pubitemid 32020457)
    • (2001) International Journal of Project Management , vol.19 , Issue.1 , pp. 47-58
    • Leu, S.-S.1    Chen, A.-T.2    Yang, C.-H.3
  • 37
    • 5844274751 scopus 로고    scopus 로고
    • Determinants of knowledge-based expert system success in construction engineering
    • 0961-3218, (),. 10.1080/096132197370480
    • Li, H. (1997). " Determinants of knowledge-based expert system success in construction engineering.." Build. Res. Inf. 0961-3218, 25 (2), 101-106. 10.1080/096132197370480
    • (1997) Build. Res. Inf. , vol.25 , Issue.2 , pp. 101-106
    • Li, H.1
  • 38
    • 0036649107 scopus 로고    scopus 로고
    • Supporting the decision-making process for sustainable housing
    • DOI 10.1080/01446190210146812
    • Li, H., and Shen, Q. (2002). " Supporting the decision-making process for sustainable housing.." Constr. Manage. Econom. 0144-6193, 20 (5), 387-390. 10.1080/01446190210146812 (Pubitemid 34891024)
    • (2002) Construction Management and Economics , vol.20 , Issue.5 , pp. 387-390
    • Li, H.1    Shen, Q.2
  • 39
    • 3342977741 scopus 로고    scopus 로고
    • Bid/no-bid decision-making - A fuzzy linguistic approach
    • DOI 10.1016/j.ijproman.2004.01.005, PII S0263786304000158
    • Lin, C. T., and Chen, Y. T. (2004). " Bid/no-bid decision-making: A linguistic approach.." Int. J. Proj. Manage. 0263-7863, 22 (7), 585-593. 10.1016/j.ijproman.2004.01.005 (Pubitemid 38994796)
    • (2004) International Journal of Project Management , vol.22 , Issue.7 , pp. 585-593
    • Lin, C.-T.1    Chen, Y.-T.2
  • 40
    • 70350084927 scopus 로고
    • The Third Wave Cultural Business, Taipei, Taiwan.
    • Lin, S. S., and Pang, K. F. (1994). Fuzzy theory analysis, The Third Wave Cultural Business, Taipei, Taiwan.
    • (1994) Fuzzy Theory Analysis
    • Lin, S.S.1    Pang, K.F.2
  • 42
    • 0043065381 scopus 로고    scopus 로고
    • Using fuzzy neural network approach to estimate contractors' markup
    • DOI 10.1016/S0360-1323(03)00135-5
    • Liu, M., and Ling, Y. Y. (2003). " Using fuzzy neural network approach to estimate contractors.." Build. Environ. 0360-1323, 38 (11), 1303-1308. 10.1016/S0360-1323(03)00135-5 (Pubitemid 36990890)
    • (2003) Building and Environment , vol.38 , Issue.11 , pp. 1303-1308
    • Liu, M.1    Ling, Y.Y.2
  • 43
    • 15944390626 scopus 로고    scopus 로고
    • Modeling a contractor's markup estimation
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(391)
    • Liu, M., and Ling, Y. Y. (2005). " Modeling a contractor's markup estimation.." J. Constr. Eng. Manage. 0733-9364, 131 (4), 391-399. 10.1061/(ASCE)0733-9364(2005)131:4(391) (Pubitemid 40430135)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 391-399
    • Liu, M.1    Ling, Y.Y.2
  • 44
    • 0000732919 scopus 로고    scopus 로고
    • Project-network analysis using fuzzy sets theory
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1996)122:4(308)
    • Lorterapong, P., and Moselhi, O. (1996). " Project-network analysis using fuzzy sets theory.." J. Constr. Eng. Manage. 0733-9364, 122 (4), 308-318. 10.1061/(ASCE)0733-9364(1996)122:4(308)
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.4 , pp. 308-318
    • Lorterapong, P.1    Moselhi, O.2
  • 45
    • 22944450458 scopus 로고    scopus 로고
    • An online approach for distributor benchmarking
    • DOI 10.1108/14635770410546782
    • Ma, H., Deng, Z., and Solvang, W. D. (2004). " An online approach for distributor benchmarking.." Benchmarking: Int. J., 11 (4), 385-402. 10.1108/14635770410546782 (Pubitemid 41137093)
    • (2004) Benchmarking , vol.11 , Issue.4 , pp. 385-402
    • Ma, H.1    Deng, Z.2    Solvang, W.D.3
  • 46
    • 13944282080 scopus 로고    scopus 로고
    • Fuzzy clustering model for estimating haulers' travel time
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(878)
    • Marzouk, M., and Moselhi, O. (2004). " Fuzzy clustering model for estimating haulers' travel time.." J. Constr. Eng. Manage. 0733-9364, 130 (6), 878-886. 10.1061/(ASCE)0733-9364(2004)130:6(878) (Pubitemid 40265321)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 878-886
    • Marzouk, M.1    Moselhi, O.2
  • 47
    • 0036540210 scopus 로고    scopus 로고
    • Fuzzy membership functions of procurement selection criteria
    • DOI 10.1080/01446190210121288
    • Ng, S. T., Luu, D. T., Chen, S. E., and Lam, K. C. (2002). " Fuzzy membership functions of procurement selection criteria.." Constr. Manage. Econom. 0144-6193, 20 (3), 285-296. 10.1080/01446190210121288 (Pubitemid 34468250)
    • (2002) Construction Management and Economics , vol.20 , Issue.3 , pp. 285-296
    • Ng, S.T.1    Luu, D.T.2    Chen, S.E.3    Lam, K.C.4
  • 49
    • 0037603787 scopus 로고    scopus 로고
    • A model for subcontractor selection in refurbishment projects
    • 0144-6193, (),. 10.1080/014461999371529
    • Okoroh, M. I., and Torrance, V. B. (1999). " A model for subcontractor selection in refurbishment projects.." Constr. Manage. Econom. 0144-6193, 17 (3), 315-327. 10.1080/014461999371529
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.3 , pp. 315-327
    • Okoroh, M.I.1    Torrance, V.B.2
  • 50
    • 12344320435 scopus 로고    scopus 로고
    • Fuzzy logic approach for activity delay analysis and schedule updating
    • DOI 10.1061/(ASCE)0733-9364(2005)131:1(42)
    • Oliveros, A. V. O., and Fayek, A. R. (2005). " Fuzzy logic approach for activity delay analysis and schedule updating.." J. Constr. Eng. Manage. 0733-9364, 131 (1), 42-51. 10.1061/(ASCE)0733-9364(2005)131:1(42) (Pubitemid 40135231)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 42-51
    • Oliveros, A.V.O.1    Fayek, A.R.2
  • 51
    • 0038169798 scopus 로고
    • Oxford University.., Oxford University Press, New York.
    • Oxford University. (1993). Oxford dictionary, Oxford University Press, New York.
    • (1993) Oxford Dictionary
  • 53
    • 0001362287 scopus 로고    scopus 로고
    • Neural network model for estimating construction productivity
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1997)123:4(399)
    • Portas, J., and AbouRizk, S. (1997). " Neural network model for estimating construction productivity.." J. Constr. Eng. Manage. 0733-9364, 123 (4), 399-410. 10.1061/(ASCE)0733-9364(1997)123:4(399)
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.4 , pp. 399-410
    • Portas, J.1    Abourizk, S.2
  • 54
    • 23244462328 scopus 로고    scopus 로고
    • Multiple-criteria evaluation for value management in civil engineering
    • DOI 10.1061/(ASCE)0742-597X(2005)21:3(131)
    • Sánchez, M., Prats, F., Agell, N., and Ormazabal, G. (2005). " Multiple-criteria evaluation for value management in civil engineering.." J. Manage. Eng. 0742-597X, 21 (3), 131-137. 10.1061/(ASCE)0742-597X(2005)21:3(131) (Pubitemid 41090386)
    • (2005) Journal of Management in Engineering , vol.21 , Issue.3 , pp. 131-137
    • Sanchez, M.1    Prats, F.2    Agell, N.3    Ormazabal, G.4
  • 55
    • 13944252920 scopus 로고    scopus 로고
    • Fuzzy decision-making tool for environmental sustainable buildings
    • DOI 10.1061/(ASCE)0733-9364(2004)130:3(415)
    • Seo, S., Aramaki, T., Hwang, Y., and Hanaki, K. (2004). " Fuzzy decision-making tool for environmental sustainable buildings.." J. Constr. Eng. Manage. 0733-9364, 130 (3), 415-423. 10.1061/(ASCE)0733-9364(2004)130: 3(415) (Pubitemid 40265374)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.3 , pp. 415-423
    • Seo, S.1    Aramaki, T.2    Hwang, Y.3    Hanaki, K.4
  • 57
    • 12344271940 scopus 로고    scopus 로고
    • A fuzzy decision framework for contractor selection
    • DOI 10.1061/(ASCE)0733-9364(2005)131:1(62)
    • Singh, D., and Tong, R. L. K. (2005). " A fuzzy decision framework for contractor selection.." J. Constr. Eng. Manage. 0733-9364, 131 (1), 62-69. 10.1061/(ASCE)0733-9364(2005)131:1(62) (Pubitemid 40135233)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 62-70
    • Singh, D.1    Tiong, R.L.K.2
  • 58
    • 33748902591 scopus 로고    scopus 로고
    • Prediction of thermal conductivity of rock through physico-mechanical properties
    • DOI 10.1016/j.buildenv.2005.08.022, PII S0360132305003549
    • Singh, T. N., Sinha, S., and Singh, V. K. (2007). " Prediction of thermal conductivity of rock through physico-mechanical properties.." Build. Environ. 0360-1323, 42 (1), 146-155. 10.1016/j.buildenv.2005.08.022 (Pubitemid 44426596)
    • (2007) Building and Environment , vol.42 , Issue.1 , pp. 146-155
    • Singh, T.N.1    Sinha, S.2    Singh, V.K.3
  • 59
    • 0035501609 scopus 로고    scopus 로고
    • Theoretical and experimental FUZZY modelling of building thermal dynamic response
    • DOI 10.1016/S0360-1323(00)00053-6, PII S0360132300000536
    • Skrjanc, I., Zupancic, B., Furlan, B., and Krainer, A. (2001). " Theoretical and experimental fuzzy modeling of building thermal dynamic response.." Build. Environ. 0360-1323, 36 (9), 1023-1038. 10.1016/S0360-1323(00)00053-6 (Pubitemid 32926092)
    • (2001) Building and Environment , vol.36 , Issue.9 , pp. 1023-1038
    • Skrjanc, I.1    Zupancic, B.2    Furlan, B.3    Krainer, A.4
  • 60
    • 0013337442 scopus 로고    scopus 로고
    • A proposal for construction project risk assessment using fuzzy logic
    • 10.1080/01446190050024905 0144-6193
    • Tah, J. H. M., and Carr, V. (2000). " A proposal for construction project risk assessment using fuzzy logic.." Construct. Manag. Econ., 18 (4), 491-500. 10.1080/01446190050024905 0144-6193
    • (2000) Construct. Manag. Econ. , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2
  • 61
    • 0036568542 scopus 로고    scopus 로고
    • Non-structural fuzzy decision support system for evaluation of construction safety management system
    • DOI 10.1016/S0263-7863(00)00055-7, PII S0263786300000557
    • Tam, C. M., Tong, T. K. L., Chiu, G. C. W., and Fung, I. W. H. (2002a). " Non-structural fuzzy decision support system for evaluation of construction safety management system.." Int. J. Proj. Manage. 0263-7863, 20 (4), 303-313. 10.1016/S0263-7863(00)00055-7 (Pubitemid 34276408)
    • (2002) International Journal of Project Management , vol.20 , Issue.4 , pp. 303-313
    • Tam, C.M.1    Tong, T.K.L.2    Chiu, G.C.W.3    Fung, I.W.H.4
  • 62
    • 2342435265 scopus 로고    scopus 로고
    • Site layout planning using nonstructural fuzzy decision support system
    • DOI 10.1061/(ASCE)0733-9364(2002)128:3(220)
    • Tam, C. M., Tong, T. K. L., Leung, A. W. T., and Chiu, G. W. C. (2002b). " Site layout planning using nonstructural fuzzy decision support system.." J. Constr. Eng. Manage. 0733-9364, 128 (3), 220-231. 10.1061/(ASCE)0733-9364(2002)128:3(220) (Pubitemid 40265547)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.3 , pp. 220-231
    • Tam, C.M.1    Tong, T.K.L.2    Leung, A.W.T.3    Chiu, G.W.C.4
  • 63
    • 3242659739 scopus 로고    scopus 로고
    • Fuzzy optimization of labor allocation by genetic algorithms
    • 0969-9988, (),. 10.1108/09699980310466613
    • Tong, T. K. L., and Tam, C. M. (2003). " Fuzzy optimization of labor allocation by genetic algorithms.." Eng., Constr., Archit. Manage. 0969-9988, 10 (2), 146-155. 10.1108/09699980310466613
    • (2003) Eng., Constr., Archit. Manage. , vol.10 , Issue.2 , pp. 146-155
    • Tong, T.K.L.1    Tam, C.M.2
  • 64
    • 0347516587 scopus 로고    scopus 로고
    • Novel approach to multi-functional project team formation
    • DOI 10.1016/S0263-7863(03)00058-9
    • Tseng, B. T. L., Huang, C. C., Chu, H. W., and Cung, R. R. (2004). " Novel approach to multi-functional project team formation.." Int. J. Proj. Manag., 22 (2), 147-159. 10.1016/S0263-7863(03)00058-9 0263-7863 (Pubitemid 38013313)
    • (2004) International Journal of Project Management , vol.22 , Issue.2 , pp. 147-159
    • Tseng, T.-L.B.1    Huang, C.-C.2    Chu, H.-W.3    Gung, R.R.4
  • 65
    • 0030122631 scopus 로고    scopus 로고
    • Contract type selector: A KBS for training young engineers
    • " 0263-7863, (),. 10.1016/0263-7863(95)00062-3
    • Wang, R., Hawwash, K. I. M., and Perry, J. G. (1996). " Contract type selector: A KBS for training young engineers.." Int. J. Proj. Manage. 0263-7863, 14 (2), 95-102. 10.1016/0263-7863(95)00062-3
    • (1996) Int. J. Proj. Manage. , vol.14 , Issue.2 , pp. 95-102
    • Wang, R.1    Hawwash, K.I.M.2    Perry, J.G.3
  • 66
    • 11944259647 scopus 로고    scopus 로고
    • Project management decisions with multiple fuzzy goals
    • DOI 10.1080/0144619042000241453
    • Wang, R. C., and Liang, T. F. (2004). " Project management decisions with multiple fuzzy goals.." Constr. Manage. Econom. 0144-6193, 22 (10), 1047-1056. 10.1080/0144619042000241453 (Pubitemid 40102685)
    • (2004) Construction Management and Economics , vol.22 , Issue.10 , pp. 1047-1056
    • Wang, R.-C.1    Liang, T.-F.2
  • 67
    • 8844258256 scopus 로고    scopus 로고
    • A comprehensive framework for selecting and ERP system
    • 0263-7863, (),. 10.1016/S0263-7863(02)00064-9
    • Wei, C. C., and Wang, M. M. J. (2004). " A comprehensive framework for selecting and ERP system.." Int. J. Proj. Manage. 0263-7863, 22 (2), 161-169. 10.1016/S0263-7863(02)00064-9
    • (2004) Int. J. Proj. Manage. , vol.22 , Issue.2 , pp. 161-169
    • Wei, C.C.1    Wang, M.M.J.2
  • 68
    • 14544267876 scopus 로고    scopus 로고
    • A fuzzy stochastic technique for project selection
    • " 0144-6193, (),. 10.1080/01446190050024824
    • Wong, E. T., Norman, G., and Flanagan, R. (2000). " A fuzzy stochastic technique for project selection.." Constr. Manage. Econom. 0144-6193, 18 (4), 407-414. 10.1080/01446190050024824
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.4 , pp. 407-414
    • Wong, E.T.1    Norman, G.2    Flanagan, R.3
  • 69
    • 34248666540 scopus 로고
    • Fuzzy sets
    • 0019-9958,. 10.1016/S0019-9958(65)90241-X
    • Zadeh, L. A. (1965). " Fuzzy sets.." Inf. Control. 0019-9958, 8, 338-353. 10.1016/S0019-9958(65)90241-X
    • (1965) Inf. Control. , vol.8 , pp. 338-353
    • Zadeh, L.A.1
  • 70
    • 13944255098 scopus 로고    scopus 로고
    • Quantitative assessment for piles productivity factors
    • DOI 10.1061/(ASCE)0733-9364(2004)130:3(405)
    • Zayed, T. M., and Halpin, D. W. (2004). " Quantitative assessment for piles productivity factors.." J. Constr. Eng. Manage. 0733-9364, 130 (3), 405-414. 10.1061/(ASCE)0733-9364(2004)130:3(405) (Pubitemid 40265373)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.3 , pp. 405-414
    • Zayed, T.M.1    Halpin, D.W.2
  • 71
    • 9144254022 scopus 로고    scopus 로고
    • Fuzzy discrete-event simulation for modeling uncertain activity duration
    • " 0969-9988, (),. 10.1108/09699980410570184
    • Zhang, H., Li, H., and Tam, C. M. (2004). " Fuzzy discrete-event simulation for modeling uncertain activity duration.." Eng., Constr., Archit. Manage. 0969-9988, 11 (6), 426-437. 10.1108/09699980410570184
    • (2004) Eng., Constr., Archit. Manage. , vol.11 , Issue.6 , pp. 426-437
    • Zhang, H.1    Li, H.2    Tam, C.M.3
  • 72
    • 28344439194 scopus 로고    scopus 로고
    • Fuzzy decision-making for dynamic resource allocation
    • DOI 10.1080/0144619032000065108
    • Zhang, H., and Tam, C. M. (2003). " Fuzzy decision-making for dynamic resource allocation.." Constr. Manage. Econom. 0144-6193, 21 (1), 31-41. 10.1080/0144619032000065108 (Pubitemid 41716146)
    • (2003) Construction Management and Economics , vol.21 , Issue.1 , pp. 31-41
    • Zhang, H.1    Tam, C.M.2
  • 73
    • 12744266507 scopus 로고    scopus 로고
    • Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
    • DOI 10.1061/(ASCE)0733-9364(2005)131:2(176)
    • Zheng, D. X. M., and Ng, T. (2005). " Stochastic time-cost optimization model incorporating fuzzy sets theory and non-replacement.." J. Constr. Eng. Manage. 0733-9364, 131 (2), 176-186. 10.1061/(ASCE)0733- 9364(2005)131:2(176) (Pubitemid 40155177)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.2 , pp. 176-186
    • Zheng, D.X.M.1    Ng, S.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.