메뉴 건너뛰기




Volumn 5, Issue 3, 2011, Pages 254-271

Modelling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes

Author keywords

Future research directions; Panel discussion; Production planning and control; Semiconductor manufacturing; Supply chain management

Indexed keywords

PRODUCTION CONTROL; SEMICONDUCTOR DEVICE MANUFACTURE; SUPPLY CHAIN MANAGEMENT;

EID: 79961091500     PISSN: 17515254     EISSN: 17515262     Source Type: Journal    
DOI: 10.1504/EJIE.2011.041616     Document Type: Article
Times cited : (72)

References (38)
  • 1
    • 33144486490 scopus 로고    scopus 로고
    • A survey of automated material handling systems in 300-mm semiconductor fabs
    • DOI 10.1109/TSM.2005.863217
    • Agrawal, G.K. and Heragu, S.S. (2006) 'A survey of automated material handling systems in 300-mm semiconductor fabs', IEEE Transactions on Semiconductor Manufacturing, Vol. 19, pp.112-120. (Pubitemid 43269771)
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.1 , pp. 112-120
    • Agrawal, G.K.1    Heragu, S.S.2
  • 2
    • 33144460387 scopus 로고    scopus 로고
    • Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
    • DOI 10.1109/TSM.2005.863214
    • Asmundsson, J., Rardin, R.L. and Uzsoy, R. (2006) 'Tractable nonlinear production planning models for semiconductor wafer fabrication facilities', IEEE Transactions on Semiconductor Manufacturing, Vol. 19, pp.95-111. (Pubitemid 43269770)
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.1 , pp. 95-111
    • Asmundsson, J.1    Rardin, R.L.2    Uzsoy, R.3
  • 4
    • 40249114802 scopus 로고    scopus 로고
    • Made in Taiwan: Shifting paradigms in high-tech industries
    • Chien, C-F. (2007) 'Made in Taiwan: shifting paradigms in high-tech industries', Industrial Engineer, Vol. 39, No. 2, pp.47-49.
    • (2007) Industrial Engineer , vol.39 , Issue.2 , pp. 47-49
    • Chien, C.-F.1
  • 9
    • 41749121495 scopus 로고    scopus 로고
    • Demand signal modelling: A short-range panel forecasting algorithm for semiconductor firm device-level demand
    • DOI 10.1504/EJIE.2008.017686
    • Elias, R.J., Montgomery, D.C., Low, S.A. and Kulahci, M. (2008) 'Demand signal modelling: a short-range panel forecasting algorithm for semiconductor firm device-level demand', European Journal of Industrial Engineering, Vol. 2, No. 3, pp.253-278. (Pubitemid 351486194)
    • (2008) European Journal of Industrial Engineering , vol.2 , Issue.3 , pp. 253-278
    • Elias, R.J.1    Montgomery, D.C.2    Low, S.A.3    Kulahci, M.4
  • 12
    • 33750548214 scopus 로고    scopus 로고
    • Operational planning and control of semiconductor wafer production
    • DOI 10.1080/09537280600900733, PII K2343P41X032W260
    • Gupta, J.N.D., Ruiz, R., Fowler, J.W. and Mason, S.J. (2006) 'Operational planning and control of semiconductor wafer production', Production Planning & Control, Vol. 17, No. 7, pp.639-647. (Pubitemid 44673510)
    • (2006) Production Planning and Control , vol.17 , Issue.7 , pp. 639-647
    • Gupta, J.N.D.1    Ruiz, R.2    Fowler, J.W.3    Mason, S.J.4
  • 13
    • 21144477219 scopus 로고
    • Re-entrant lines
    • Special Issue on Queueing Networks
    • Kumar, P.R. (1993) 'Re-entrant lines', Queueing Systems: Theory and Applications, Special Issue on Queueing Networks, Vol. 13, pp.87-110.
    • (1993) Queueing Systems: Theory and Applications , vol.13 , pp. 87-110
    • Kumar, P.R.1
  • 14
    • 0013367503 scopus 로고    scopus 로고
    • IMPReSS: An automated production planning and delivery quotation system at Harris corporation - Semiconductor sector
    • Leachman, R.C., Benson, R.F., Liu, C. and Raar, D.J. (1996) 'IMPReSS: an automated production planning and delivery quotation system at Harris corporation - semiconductor sector', Interfaces, Vol. 26, pp.6-37.
    • (1996) Interfaces , vol.26 , pp. 6-37
    • Leachman, R.C.1    Benson, R.F.2    Liu, C.3    Raar, D.J.4
  • 16
    • 0036058918 scopus 로고    scopus 로고
    • SLIM: Short cycle time and low inventory in manufacturing at samsung electronics
    • Leachman, R.C., Kang, J. and Lin, V. (2002) 'SLIM: short cycle time and low inventory in manufacturing at Samsung Electronics', Interfaces, Vol. 32, No. 1, pp.61-77.
    • (2002) Interfaces , vol.32 , Issue.1 , pp. 61-77
    • Leachman, R.C.1    Kang, J.2    Lin, V.3
  • 18
    • 77958508404 scopus 로고    scopus 로고
    • Semiconductor manufacturing automation
    • Shimon Y. Nof (Ed.), Chapter 52, Springer
    • Lee, T-E. (2009) 'Semiconductor manufacturing automation', in Shimon Y. Nof (Ed.): Handbook of Automation, Chapter 52, pp.911-926, Springer.
    • (2009) Handbook of Automation , pp. 911-926
    • Lee, T.-E.1
  • 19
    • 46149096495 scopus 로고    scopus 로고
    • About the need for distributed simulation technology for the resolution of real-world manufacturing and logistics problems
    • Lendermann, P. (2006) 'About the need for distributed simulation technology for the resolution of real-world manufacturing and logistics problems', Proceedings of the 2006 Winter Simulation Conference, pp.1119-1128.
    • (2006) Proceedings of the 2006 Winter Simulation Conference , pp. 1119-1128
    • Lendermann, P.1
  • 20
    • 34848819441 scopus 로고    scopus 로고
    • The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab
    • DOI 10.1080/00207540600595793, PII 772272288
    • Liu, H.R., Jiang, Z.B. and Fung, R.Y.K. (2007) 'The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300mm wafer FAB', International Journal of Production Research, Vol. 45, No. 21, pp.5017-5056. (Pubitemid 47507497)
    • (2007) International Journal of Production Research , vol.45 , Issue.21 , pp. 5017-5056
    • Liu, H.1    Jiang, Z.2    Fung, R.Y.K.3
  • 21
    • 33746921229 scopus 로고    scopus 로고
    • A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor
    • DOI 10.1007/s00170-005-2585-1
    • Mathirajan, M. and Sivakumar, A.I. (2006) 'Literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor', International Journal of Advanced Manufacturing Technology, Vol. 29, pp.990-1001. (Pubitemid 44195225)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.9-10 , pp. 990-1001
    • Mathirajan, M.1    Sivakumar, A.I.2
  • 22
    • 33750718514 scopus 로고    scopus 로고
    • Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
    • DOI 10.1016/j.ejor.2005.12.020, PII S0377221705008532
    • Mönch, L., Schabacker, R., Pabst, D. and Fowler, J.W. (2007) 'Genetic algorithm based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops', European Journal of Operational Research, Vol. 177, No. 3, pp.2100-2118. (Pubitemid 44709466)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2100-2118
    • Monch, L.1    Schabacker, R.2    Pabst, D.3    Fowler, J.W.4
  • 23
    • 33750536437 scopus 로고    scopus 로고
    • The FABMAS multi-agent-system prototype for production control of water fabs: Design, implementation and performance assessment
    • DOI 10.1080/09537280600901269, PII G1075T5N75214713
    • Mönch, L., Stehli, M., Zimmermann, J. and Habenicht, I. (2006) 'The FABMAS multi-agent-system prototype for production control of waferfabs: design, implementation, and performance assessment', Production Planning & Control, Vol. 17, No. 7, pp.701-716. (Pubitemid 44673515)
    • (2006) Production Planning and Control , vol.17 , Issue.7 , pp. 701-716
    • Monch, L.1    Stehli, M.2    Zimmermann, J.3    Habenicht, I.4
  • 24
    • 33750535173 scopus 로고    scopus 로고
    • A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs
    • DOI 10.1080/09537280600900774, PII R52367542V47G153
    • Montoya-Torres, J.R. (2006) 'A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs', Production Planning & Control, Vol. 17, No. 6, pp.648-663. (Pubitemid 44673511)
    • (2006) Production Planning and Control , vol.17 , Issue.7 , pp. 648-663
    • Montoya-Torres, J.R.1
  • 25
    • 84955263052 scopus 로고    scopus 로고
    • Dispatching and scheduling in semiconductor manufacturing: State of the art and survey of needs
    • J. Herrmann, (Ed.), Springer, Heidelberg
    • Pfund, M., Mason, S. and Fowler, J.W. (2006) 'Dispatching and scheduling in semiconductor manufacturing: state of the art and survey of needs', in J. Herrmann, (Ed.): Handbook of Production Scheduling, pp.213-241, Springer, Heidelberg.
    • (2006) Handbook of Production Scheduling , pp. 213-241
    • Pfund, M.1    Mason, S.2    Fowler, J.W.3
  • 26
    • 33847059566 scopus 로고    scopus 로고
    • A service-oriented integration framework for semiconductor manufacturing systems
    • Qui, R.G. (2007) 'A service-oriented integration framework for semiconductor manufacturing systems', International Journal Manufacturing Technology and Management, Vol. 10, Nos. 2/3, pp.177-191.
    • (2007) International Journal Manufacturing Technology and Management , vol.10 , Issue.2-3 , pp. 177-191
    • Qui, R.G.1
  • 27
    • 33845487579 scopus 로고    scopus 로고
    • Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
    • DOI 10.1007/s10951-006-0325-5
    • Sourirajan, K. and Uzsoy, R. (2007) 'Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication', Journal of Scheduling, Vol. 10, pp.41-65. (Pubitemid 44914828)
    • (2007) Journal of Scheduling , vol.10 , Issue.1 , pp. 41-65
    • Sourirajan, K.1    Uzsoy, R.2
  • 30
    • 33646742941 scopus 로고    scopus 로고
    • A problem reduction approach for scheduling semiconductor wafer fabrication facilities
    • Upasani, A., Uzsoy, R. and Sourirajan, K. (2006) 'A problem reduction approach for scheduling semiconductor wafer fabrication facilities', IEEE Transactions on Semiconductor Manufacturing, Vol. 19, pp.216-225.
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , pp. 216-225
    • Upasani, A.1    Uzsoy, R.2    Sourirajan, K.3
  • 31
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.Y. and Martin-Vega, L.A. (1992) 'A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning', IIE Transactions on Scheduling and Logistics, Vol. 24, pp.47-61.
    • (1992) IIE Transactions on Scheduling and Logistics , vol.24 , pp. 47-61
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 32
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
    • Uzsoy, R., Lee, C.Y. and Martin-Vega, L.A. (1994) 'A review of production planning and scheduling models in the semiconductor industry part II: shop-floor control', IIE Transactions on Scheduling and Logistics, Vol. 26, pp.44-55.
    • (1994) IIE Transactions on Scheduling and Logistics , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 33
    • 79961059020 scopus 로고    scopus 로고
    • A survey of dispatching rules for operational control in wafer fabrication
    • to appear
    • Varadarajan, A. and Sarin, S.C. (2010) 'A survey of dispatching rules for operational control in wafer fabrication', Production Planning and Control, to appear.
    • (2010) Production Planning and Control
    • Varadarajan, A.1    Sarin, S.C.2
  • 35
    • 43449116079 scopus 로고    scopus 로고
    • Modeling strategic semiconductor assembly outsourcing decisions and an empirical study
    • Wu, J-Z. and Chien, C-F. (2008) 'Modeling strategic semiconductor assembly outsourcing decisions and an empirical study', OR Spectrum, Vol. 30, pp.401-430.
    • (2008) OR Spectrum , vol.30 , pp. 401-430
    • Wu, J.-Z.1    Chien, C.-F.2
  • 36
    • 38949143264 scopus 로고    scopus 로고
    • A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints
    • DOI 10.1109/TSM.2007.914388
    • Yoon, H.J. and Shen, W. (2008) 'A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints', IEEE Transactions on Semiconductor Manufacturing, Vol. 21, No. 1, pp.83-91. (Pubitemid 351229821)
    • (2008) IEEE Transactions on Semiconductor Manufacturing , vol.21 , Issue.1 , pp. 83-91
    • Yoon, H.J.1    Shen, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.