1
-
-
33144486490
-
A survey of automated material handling systems in 300-mm semiconductor fabs
-
DOI 10.1109/TSM.2005.863217
-
Agrawal, G.K. and Heragu, S.S. (2006) 'A survey of automated material handling systems in 300-mm semiconductor fabs', IEEE Transactions on Semiconductor Manufacturing, Vol. 19, pp.112-120. (Pubitemid 43269771)
-
(2006)
IEEE Transactions on Semiconductor Manufacturing
, vol.19
, Issue.1
, pp. 112-120
-
-
Agrawal, G.K.1
Heragu, S.S.2
-
2
-
-
33144460387
-
Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
-
DOI 10.1109/TSM.2005.863214
-
Asmundsson, J., Rardin, R.L. and Uzsoy, R. (2006) 'Tractable nonlinear production planning models for semiconductor wafer fabrication facilities', IEEE Transactions on Semiconductor Manufacturing, Vol. 19, pp.95-111. (Pubitemid 43269770)
-
(2006)
IEEE Transactions on Semiconductor Manufacturing
, vol.19
, Issue.1
, pp. 95-111
-
-
Asmundsson, J.1
Rardin, R.L.2
Uzsoy, R.3
-
3
-
-
49749120601
-
Simulation results and formalism for global-local scheduling in semiconductor manufacturing facilities
-
Bureau, M., Dauzère-Pérès, S., Yugma, C., Vermariën, L. and Maria, J-B. (2007) 'Simulation results and formalism for global-local scheduling in semiconductor manufacturing facilities', Proceedings of the 2007 Winter Simulation Conference, pp.1768-1773.
-
(2007)
Proceedings of the 2007 Winter Simulation Conference
, pp. 1768-1773
-
-
Bureau, M.1
Dauzère-Pérès, S.2
Yugma, C.3
Vermariën, L.4
Maria, J.-B.5
-
4
-
-
40249114802
-
Made in Taiwan: Shifting paradigms in high-tech industries
-
Chien, C-F. (2007) 'Made in Taiwan: shifting paradigms in high-tech industries', Industrial Engineer, Vol. 39, No. 2, pp.47-49.
-
(2007)
Industrial Engineer
, vol.39
, Issue.2
, pp. 47-49
-
-
Chien, C.-F.1
-
5
-
-
60749129941
-
Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes
-
Chien, C-F., Dauzère-Pérès, S., Ehm, H., Fowler, J.W., Jiang, Z., Krishnaswamy, S., Mönch, L. and Uzsoy, R. (2008) 'Modeling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes', Proceedings of the 2008 Modelling and Analysis of Semiconductor Manufacturing Conference (MASM 2008), pp.2093-2099.
-
(2008)
Proceedings of the 2008 Modelling and Analysis of Semiconductor Manufacturing Conference (MASM 2008)
, pp. 2093-2099
-
-
Chien, C.-F.1
Dauzère-Pérès, S.2
Ehm, H.3
Fowler, J.W.4
Jiang, Z.5
Krishnaswamy, S.6
Mönch, L.7
Uzsoy, R.8
-
6
-
-
79951644125
-
Development and analysis of a customer-demand driven semiconductor supply chain model using the high-level architecture
-
Chong, C.S, Lendermann, P., Gan, B.P., Duarte, M.B., Fowler, J.W. and Callarman, T.E. (2006) 'Development and analysis of a customer-demand driven semiconductor supply chain model using the high-level architecture', International Journal of Simulation and Process Modelling, Vol. 2, Nos. 3/4, pp.210-221.
-
(2006)
International Journal of Simulation and Process Modelling
, vol.2
, Issue.3-4
, pp. 210-221
-
-
Chong, C.S.1
Lendermann, P.2
Gan, B.P.3
Duarte, M.B.4
Fowler, J.W.5
Callarman, T.E.6
-
7
-
-
85009199450
-
On the importance of sequencing decisions in production planning and scheduling
-
Dauzère-Pérés, S. and Lasserre, J-B. (2002) 'On the importance of sequencing decisions in production planning and scheduling', International Transactions in Operational Research, Vol. 9, No. 6, pp.779-793.
-
(2002)
International Transactions in Operational Research
, vol.9
, Issue.6
, pp. 779-793
-
-
Dauzère-Pérés, S.1
Lasserre, J.-B.2
-
8
-
-
0036923656
-
Parameterization of fast and accurate simulations for complex supply networks
-
Duarte, B.M., Fowler, J.W., Knutson, K., Gel, E. and Shunk, D. (2002) 'Parameterization of fast and accurate simulations for complex supply networks', Proceedings of the 2002 Winter Simulation Conference, pp.1327-1336.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1327-1336
-
-
Duarte, B.M.1
Fowler, J.W.2
Knutson, K.3
Gel, E.4
Shunk, D.5
-
9
-
-
41749121495
-
Demand signal modelling: A short-range panel forecasting algorithm for semiconductor firm device-level demand
-
DOI 10.1504/EJIE.2008.017686
-
Elias, R.J., Montgomery, D.C., Low, S.A. and Kulahci, M. (2008) 'Demand signal modelling: a short-range panel forecasting algorithm for semiconductor firm device-level demand', European Journal of Industrial Engineering, Vol. 2, No. 3, pp.253-278. (Pubitemid 351486194)
-
(2008)
European Journal of Industrial Engineering
, vol.2
, Issue.3
, pp. 253-278
-
-
Elias, R.J.1
Montgomery, D.C.2
Low, S.A.3
Kulahci, M.4
-
10
-
-
0032255790
-
Operational modeling & simulation in semiconductor manufacturing
-
Fowler, J.W., Fu, M.C., Schruben, L.W., Brown, S., Chance, F., Cunningham, S., Hilton, C., Janakiram, M., Stafford, R. and Hutchby, J. (1998) 'Operational modeling & simulation in semiconductor manufacturing', Proceedings of the 1998 Winter Simulation Conference, pp.1035-1040.
-
(1998)
Proceedings of the 1998 Winter Simulation Conference
, pp. 1035-1040
-
-
Fowler, J.W.1
Fu, M.C.2
Schruben, L.W.3
Brown, S.4
Chance, F.5
Cunningham, S.6
Hilton, C.7
Janakiram, M.8
Stafford, R.9
Hutchby, J.10
-
11
-
-
33847042377
-
Analysis of a borderless fab using interoperating AutoSched AP models
-
Gan, B.P., Liow, M., Gupta, A.K., Lendermann, P., Turner, S.J. and Wang, X.G. (2007) 'Analysis of a borderless fab using interoperating AutoSched AP models', International Journal of Production Research, Vol. 45, No. 3, pp.675-697.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.3
, pp. 675-697
-
-
Gan, B.P.1
Liow, M.2
Gupta, A.K.3
Lendermann, P.4
Turner, S.J.5
Wang, X.G.6
-
12
-
-
33750548214
-
Operational planning and control of semiconductor wafer production
-
DOI 10.1080/09537280600900733, PII K2343P41X032W260
-
Gupta, J.N.D., Ruiz, R., Fowler, J.W. and Mason, S.J. (2006) 'Operational planning and control of semiconductor wafer production', Production Planning & Control, Vol. 17, No. 7, pp.639-647. (Pubitemid 44673510)
-
(2006)
Production Planning and Control
, vol.17
, Issue.7
, pp. 639-647
-
-
Gupta, J.N.D.1
Ruiz, R.2
Fowler, J.W.3
Mason, S.J.4
-
13
-
-
21144477219
-
Re-entrant lines
-
Special Issue on Queueing Networks
-
Kumar, P.R. (1993) 'Re-entrant lines', Queueing Systems: Theory and Applications, Special Issue on Queueing Networks, Vol. 13, pp.87-110.
-
(1993)
Queueing Systems: Theory and Applications
, vol.13
, pp. 87-110
-
-
Kumar, P.R.1
-
14
-
-
0013367503
-
IMPReSS: An automated production planning and delivery quotation system at Harris corporation - Semiconductor sector
-
Leachman, R.C., Benson, R.F., Liu, C. and Raar, D.J. (1996) 'IMPReSS: an automated production planning and delivery quotation system at Harris corporation - semiconductor sector', Interfaces, Vol. 26, pp.6-37.
-
(1996)
Interfaces
, vol.26
, pp. 6-37
-
-
Leachman, R.C.1
Benson, R.F.2
Liu, C.3
Raar, D.J.4
-
15
-
-
35348898603
-
Economie efficiency analysis of wafer fabrication
-
DOI 10.1109/TASE.2007.906142
-
Leachman, R.C., Ding, S. and Chien, C-F. (2007) 'Economic efficiency analysis of wafer fabrication', IEEE Transactions on Automation Science and Engineering, Vol. 4, No. 4, pp.501-512. (Pubitemid 47573845)
-
(2007)
IEEE Transactions on Automation Science and Engineering
, vol.4
, Issue.4
, pp. 501-512
-
-
Leachman, R.C.1
Ding, S.2
Chien, C.-F.3
-
16
-
-
0036058918
-
SLIM: Short cycle time and low inventory in manufacturing at samsung electronics
-
Leachman, R.C., Kang, J. and Lin, V. (2002) 'SLIM: short cycle time and low inventory in manufacturing at Samsung Electronics', Interfaces, Vol. 32, No. 1, pp.61-77.
-
(2002)
Interfaces
, vol.32
, Issue.1
, pp. 61-77
-
-
Leachman, R.C.1
Kang, J.2
Lin, V.3
-
18
-
-
77958508404
-
Semiconductor manufacturing automation
-
Shimon Y. Nof (Ed.), Chapter 52, Springer
-
Lee, T-E. (2009) 'Semiconductor manufacturing automation', in Shimon Y. Nof (Ed.): Handbook of Automation, Chapter 52, pp.911-926, Springer.
-
(2009)
Handbook of Automation
, pp. 911-926
-
-
Lee, T.-E.1
-
19
-
-
46149096495
-
About the need for distributed simulation technology for the resolution of real-world manufacturing and logistics problems
-
Lendermann, P. (2006) 'About the need for distributed simulation technology for the resolution of real-world manufacturing and logistics problems', Proceedings of the 2006 Winter Simulation Conference, pp.1119-1128.
-
(2006)
Proceedings of the 2006 Winter Simulation Conference
, pp. 1119-1128
-
-
Lendermann, P.1
-
20
-
-
34848819441
-
The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab
-
DOI 10.1080/00207540600595793, PII 772272288
-
Liu, H.R., Jiang, Z.B. and Fung, R.Y.K. (2007) 'The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300mm wafer FAB', International Journal of Production Research, Vol. 45, No. 21, pp.5017-5056. (Pubitemid 47507497)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.21
, pp. 5017-5056
-
-
Liu, H.1
Jiang, Z.2
Fung, R.Y.K.3
-
21
-
-
33746921229
-
A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor
-
DOI 10.1007/s00170-005-2585-1
-
Mathirajan, M. and Sivakumar, A.I. (2006) 'Literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor', International Journal of Advanced Manufacturing Technology, Vol. 29, pp.990-1001. (Pubitemid 44195225)
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.29
, Issue.9-10
, pp. 990-1001
-
-
Mathirajan, M.1
Sivakumar, A.I.2
-
22
-
-
33750718514
-
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
-
DOI 10.1016/j.ejor.2005.12.020, PII S0377221705008532
-
Mönch, L., Schabacker, R., Pabst, D. and Fowler, J.W. (2007) 'Genetic algorithm based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops', European Journal of Operational Research, Vol. 177, No. 3, pp.2100-2118. (Pubitemid 44709466)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2100-2118
-
-
Monch, L.1
Schabacker, R.2
Pabst, D.3
Fowler, J.W.4
-
23
-
-
33750536437
-
The FABMAS multi-agent-system prototype for production control of water fabs: Design, implementation and performance assessment
-
DOI 10.1080/09537280600901269, PII G1075T5N75214713
-
Mönch, L., Stehli, M., Zimmermann, J. and Habenicht, I. (2006) 'The FABMAS multi-agent-system prototype for production control of waferfabs: design, implementation, and performance assessment', Production Planning & Control, Vol. 17, No. 7, pp.701-716. (Pubitemid 44673515)
-
(2006)
Production Planning and Control
, vol.17
, Issue.7
, pp. 701-716
-
-
Monch, L.1
Stehli, M.2
Zimmermann, J.3
Habenicht, I.4
-
24
-
-
33750535173
-
A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs
-
DOI 10.1080/09537280600900774, PII R52367542V47G153
-
Montoya-Torres, J.R. (2006) 'A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs', Production Planning & Control, Vol. 17, No. 6, pp.648-663. (Pubitemid 44673511)
-
(2006)
Production Planning and Control
, vol.17
, Issue.7
, pp. 648-663
-
-
Montoya-Torres, J.R.1
-
25
-
-
84955263052
-
Dispatching and scheduling in semiconductor manufacturing: State of the art and survey of needs
-
J. Herrmann, (Ed.), Springer, Heidelberg
-
Pfund, M., Mason, S. and Fowler, J.W. (2006) 'Dispatching and scheduling in semiconductor manufacturing: state of the art and survey of needs', in J. Herrmann, (Ed.): Handbook of Production Scheduling, pp.213-241, Springer, Heidelberg.
-
(2006)
Handbook of Production Scheduling
, pp. 213-241
-
-
Pfund, M.1
Mason, S.2
Fowler, J.W.3
-
26
-
-
33847059566
-
A service-oriented integration framework for semiconductor manufacturing systems
-
Qui, R.G. (2007) 'A service-oriented integration framework for semiconductor manufacturing systems', International Journal Manufacturing Technology and Management, Vol. 10, Nos. 2/3, pp.177-191.
-
(2007)
International Journal Manufacturing Technology and Management
, vol.10
, Issue.2-3
, pp. 177-191
-
-
Qui, R.G.1
-
27
-
-
33845487579
-
Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
-
DOI 10.1007/s10951-006-0325-5
-
Sourirajan, K. and Uzsoy, R. (2007) 'Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication', Journal of Scheduling, Vol. 10, pp.41-65. (Pubitemid 44914828)
-
(2007)
Journal of Scheduling
, vol.10
, Issue.1
, pp. 41-65
-
-
Sourirajan, K.1
Uzsoy, R.2
-
28
-
-
33646753792
-
Enterprise-wide semiconductor resource planning
-
Stray, J., Fowler, J.W., Carlyle, M. and Rastogi, A.P. (2006) 'Enterprise-wide semiconductor resource planning', IEEE Transactions on Semiconductor Manufacturing, Vol. 19, No. 2, pp.259-268.
-
(2006)
IEEE Transactions on Semiconductor Manufacturing
, vol.19
, Issue.2
, pp. 259-268
-
-
Stray, J.1
Fowler, J.W.2
Carlyle, M.3
Rastogi, A.P.4
-
30
-
-
33646742941
-
A problem reduction approach for scheduling semiconductor wafer fabrication facilities
-
Upasani, A., Uzsoy, R. and Sourirajan, K. (2006) 'A problem reduction approach for scheduling semiconductor wafer fabrication facilities', IEEE Transactions on Semiconductor Manufacturing, Vol. 19, pp.216-225.
-
(2006)
IEEE Transactions on Semiconductor Manufacturing
, vol.19
, pp. 216-225
-
-
Upasani, A.1
Uzsoy, R.2
Sourirajan, K.3
-
31
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
-
Uzsoy, R., Lee, C.Y. and Martin-Vega, L.A. (1992) 'A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning', IIE Transactions on Scheduling and Logistics, Vol. 24, pp.47-61.
-
(1992)
IIE Transactions on Scheduling and Logistics
, vol.24
, pp. 47-61
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
32
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
-
Uzsoy, R., Lee, C.Y. and Martin-Vega, L.A. (1994) 'A review of production planning and scheduling models in the semiconductor industry part II: shop-floor control', IIE Transactions on Scheduling and Logistics, Vol. 26, pp.44-55.
-
(1994)
IIE Transactions on Scheduling and Logistics
, vol.26
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
33
-
-
79961059020
-
A survey of dispatching rules for operational control in wafer fabrication
-
to appear
-
Varadarajan, A. and Sarin, S.C. (2010) 'A survey of dispatching rules for operational control in wafer fabrication', Production Planning and Control, to appear.
-
(2010)
Production Planning and Control
-
-
Varadarajan, A.1
Sarin, S.C.2
-
34
-
-
77951536152
-
Cycle time distributions of semiconductor workstations using aggregate modeling
-
Veeger, C., Etmann, P., Rooda, J. and van Herk, J. (2009) 'Cycle time distributions of semiconductor workstations using aggregate modeling', Proceedings of the 2009 Winter Simulation Conference, pp.1610-1621.
-
(2009)
Proceedings of the 2009 Winter Simulation Conference
, pp. 1610-1621
-
-
Veeger, C.1
Etmann, P.2
Rooda, J.3
Van Herk, J.4
-
35
-
-
43449116079
-
Modeling strategic semiconductor assembly outsourcing decisions and an empirical study
-
Wu, J-Z. and Chien, C-F. (2008) 'Modeling strategic semiconductor assembly outsourcing decisions and an empirical study', OR Spectrum, Vol. 30, pp.401-430.
-
(2008)
OR Spectrum
, vol.30
, pp. 401-430
-
-
Wu, J.-Z.1
Chien, C.-F.2
-
36
-
-
38949143264
-
A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints
-
DOI 10.1109/TSM.2007.914388
-
Yoon, H.J. and Shen, W. (2008) 'A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints', IEEE Transactions on Semiconductor Manufacturing, Vol. 21, No. 1, pp.83-91. (Pubitemid 351229821)
-
(2008)
IEEE Transactions on Semiconductor Manufacturing
, vol.21
, Issue.1
, pp. 83-91
-
-
Yoon, H.J.1
Shen, W.2
-
37
-
-
77951587948
-
Heuristic based scheduling system for diffusion in semiconductor manufacturing
-
Yurtsever, T., Kutanoglu, E. and Johns, J. (2009) 'Heuristic based scheduling system for diffusion in semiconductor manufacturing', Proceedings of the 2009 Winter Simulation Conference, pp.1677-1685.
-
(2009)
Proceedings of the 2009 Winter Simulation Conference
, pp. 1677-1685
-
-
Yurtsever, T.1
Kutanoglu, E.2
Johns, J.3
|