-
1
-
-
0013367503
-
IMPReSS: An automated production planning and delivery quotation system at Harris corporation, semiconductor sector
-
R. C. Leachman, R. F. Benson, C. Liu, and D. J. Raar, "IMPReSS: An automated production planning and delivery quotation system at Harris corporation, semiconductor sector," Interfaces, vol. 26, pp. 6-37, 1996.
-
(1996)
Interfaces
, vol.26
, pp. 6-37
-
-
Leachman, R.C.1
Benson, R.F.2
Liu, C.3
Raar, D.J.4
-
3
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
-
R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, "A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning," HE Trans. Scheduling Logistics, vol. 24, 1992.
-
(1992)
HE Trans. Scheduling Logistics
, vol.24
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
4
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
-
_, "A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control," HE Trans. Scheduling Logistics, vol. 26, pp. 44-55, 1994.
-
(1994)
HE Trans. Scheduling Logistics
, vol.26
, pp. 44-55
-
-
-
5
-
-
33144459309
-
Tractable nonlinear capacity models for production planning Part 1: Modeling and formulations
-
Laboratory Extended Enterprises, Purdue Univ., West Lafayette, IN
-
J. M. Asmundsson, R. L. Rardin, and R. Uzsoy, Tractable nonlinear capacity models for production planning Part 1: Modeling and formulations, Res. Rep., Laboratory Extended Enterprises, Purdue Univ., West Lafayette, IN, 2002.
-
(2002)
Res. Rep.
-
-
Asmundsson, J.M.1
Rardin, R.L.2
Uzsoy, R.3
-
6
-
-
0022741221
-
A tactical planning model for a job shop
-
S. C. Graves, "A tactical planning model for a job shop," Oper. Res., vol. 34, pp. 552-533, 1986.
-
(1986)
Oper. Res.
, vol.34
, pp. 552-1533
-
-
Graves, S.C.1
-
7
-
-
0000153439
-
Capacity loading and release planning with work-inprogress (WIP) and lead-times
-
U. S. Karmarkar, "Capacity loading and release planning with work-inprogress (WIP) and lead-times," J. Manufact, Oper. Manage., vol. 2, 1989.
-
(1989)
J. Manufact, Oper. Manage.
, vol.2
-
-
Karmarkar, U.S.1
-
8
-
-
33144463228
-
-
Pittsburgh, PA, Graduate School Industrial Administration, Carnegie-Mellon Univ., Pittsburgh, PA
-
A. Srinivasan, M. Carey, and T. E. Morton, Resource pricing and aggregate scheduling in manufacturing systems. Pittsburgh, PA, Graduate School Industrial Administration, Carnegie-Mellon Univ., Pittsburgh, PA, 1988.
-
(1988)
Resource Pricing and Aggregate Scheduling in Manufacturing Systems
-
-
Srinivasan, A.1
Carey, M.2
Morton, T.E.3
-
9
-
-
0033314649
-
The corrupting influence of variability in semiconductor manufacturing
-
A. K. Schoemig, "The corrupting influence of variability in semiconductor manufacturing," presented at, Winter Simulation Conf. 1999.
-
Winter Simulation Conf. 1999
-
-
Schoemig, A.K.1
-
10
-
-
0031220255
-
Diagnostic scheduling in finite-capacity production environments
-
V. Tardif and M. L. Spearman, "Diagnostic scheduling in finite-capacity production environments," Comput. Indust. Eng., vol. 32, pp. 867-878, 1997.
-
(1997)
Comput. Indust. Eng.
, vol.32
, pp. 867-878
-
-
Tardif, V.1
Spearman, M.L.2
-
11
-
-
0000204502
-
A general framework for modeling production
-
S. T. Hackman and R. C. Leachman, "A general framework for modeling production," Manage. Sci., vol. 35, pp. 478-495, 1989.
-
(1989)
Manage. Sci.
, vol.35
, pp. 478-495
-
-
Hackman, S.T.1
Leachman, R.C.2
-
12
-
-
0020832935
-
Mathematical approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
-
P. J. Billington, J. O. McClain, and L. J. Thomas, "Mathematical approaches to capacity-constrained MRP systems: Review, formulation and problem reduction," Manage. Sci., vol. 29, pp. 1126-1141, 1983.
-
(1983)
Manage. Sci.
, vol.29
, pp. 1126-1141
-
-
Billington, P.J.1
McClain, J.O.2
Thomas, L.J.3
-
13
-
-
0031381458
-
Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints
-
D. Kayton, T. Teyner, C. Schwartz, and R. Uzsoy, "Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints," Production Inventory Manage., pp. 51-57, 1997.
-
(1997)
Production Inventory Manage.
, pp. 51-57
-
-
Kayton, D.1
Teyner, T.2
Schwartz, C.3
Uzsoy, R.4
-
15
-
-
0003338125
-
Advanced planning and scheduling for manufacturing
-
G. Salvendy, Ed. New York: Wiley
-
K. Musselman and R. Uzsoy, "Advanced planning and scheduling for manufacturing," in Handbook of Industrial Engineering, G. Salvendy, Ed. New York: Wiley, 2001.
-
(2001)
Handbook of Industrial Engineering
-
-
Musselman, K.1
Uzsoy, R.2
-
16
-
-
77950479464
-
Planning hierarchy, modeling and advanced planning systems
-
Supply Chain Management: Design, Coordination and Control, A. G. de Kok and S. C. Graves, Eds. Amsterdam, The Netherlands: Elsevier
-
B. Fleischmann and H. Meyr, "Planning hierarchy, modeling and advanced planning systems," in Supply Chain Management: Design, Coordination and Control, A. G. de Kok and S. C. Graves, Eds. Amsterdam, The Netherlands: Elsevier, 2003, vol. 11, Handbooks in Operations Research and Management Science, pp. 457-519.
-
(2003)
Handbooks in Operations Research and Management Science
, vol.11
, pp. 457-519
-
-
Fleischmann, B.1
Meyr, H.2
-
18
-
-
0003929853
-
-
Homewood, IL: Irwin
-
T. E. Vollmann, W. L. Berry, and D. C. Whybark, Manufacturing Planning and Control Systems, 2nd ed. Homewood, IL: Irwin, 1988.
-
(1988)
Manufacturing Planning and Control Systems, 2nd Ed.
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
-
20
-
-
0030150549
-
A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
-
May
-
Y. F. Hung and R. C. Leachman, "A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations," IEEE Trans. Semiconduct. Manufact., vol. 9, no. 2, pp. 257-269, May 1996.
-
(1996)
IEEE Trans. Semiconduct. Manufact.
, vol.9
, Issue.2
, pp. 257-269
-
-
Hung, Y.F.1
Leachman, R.C.2
-
22
-
-
0030382379
-
Capacity planning and lead time management
-
W. H. M. Zijm and R. Buitenhek, "Capacity planning and lead time management," Int. J. Production Econom., vol. 46-47, pp. 165-179, 1996.
-
(1996)
Int. J. Production Econom.
, vol.46-47
, pp. 165-179
-
-
Zijm, W.H.M.1
Buitenhek, R.2
-
24
-
-
1642436935
-
Benchmarking of a stochastic production planning model in a simulation testbed
-
G. Riano, R. Serfozo, S. Hackman, S. H. Ng, L. P. Chan, and P. Lendermann, "Benchmarking of a stochastic production planning model in a simulation testbed," presented at, Winter Simulation Conf. 2003.
-
Winter Simulation Conf. 2003
-
-
Riano, G.1
Serfozo, R.2
Hackman, S.3
Ng, S.H.4
Chan, L.P.5
Lendermann, P.6
-
26
-
-
0037085145
-
Aggregate order release planning for time-varying demand
-
H. Missbauer, "Aggregate order release planning for time-varying demand," Int. J. Production Res., vol. 40, pp. 688-718, 2002.
-
(2002)
Int. J. Production Res.
, vol.40
, pp. 688-718
-
-
Missbauer, H.1
-
27
-
-
0027625964
-
Production planning and control (PPC) systems including load-oriented order release-Problems and research perspectives
-
G. Zapfel and H. Missbauer, "Production planning and control (PPC) systems including load-oriented order release-Problems and research perspectives," Int. J. Production Econom., vol. 30, pp. 107-122, 1993.
-
(1993)
Int. J. Production Econom.
, vol.30
, pp. 107-122
-
-
Zapfel, G.1
Missbauer, H.2
-
28
-
-
33144460286
-
A single stage multi-product dynamic lot sizing model with work in process and congestion
-
Laboratory Extended Enterprises, Purdue, School Industrial Eng., Purdue Univ. West Lafayette, IN
-
S. Hwang and R. Uzsoy, A single stage multi-product dynamic lot sizing model with work in process and congestion, Res. Rep., Laboratory Extended Enterprises, Purdue, School Industrial Eng., Purdue Univ. West Lafayette, IN, 2005.
-
(2005)
Res. Rep.
-
-
Hwang, S.1
Uzsoy, R.2
-
29
-
-
0000230403
-
Foundations of dynamic traffic assignment: The past, the present and the future
-
S. Peeta and A. K. Ziliaskopoulos, "Foundations of dynamic traffic assignment: The past, the present and the future," Networks Spatial Econom., vol. 1, pp. 233-265, 2001.
-
(2001)
Networks Spatial Econom.
, vol.1
, pp. 233-265
-
-
Peeta, S.1
Ziliaskopoulos, A.K.2
-
30
-
-
0026208470
-
An analytic congestion model for closed production systems with IFR processing times
-
M. L. Spearman, "An analytic congestion model for closed production systems with IFR processing times," Manage. Sci., vol. 37, pp. 1015-1029, 1991.
-
(1991)
Manage. Sci.
, vol.37
, pp. 1015-1029
-
-
Spearman, M.L.1
|