메뉴 건너뛰기




Volumn 19, Issue 1, 2006, Pages 95-111

Tractable nonlinear production planning models for semiconductor wafer fabrication facilities

Author keywords

Cycle times; Linear programming; Production planning; Wafer fabrication

Indexed keywords

PRODUCTION PLANNING; SCALED-DOWN MODEL; WAFER FABRICATION;

EID: 33144460387     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2005.863214     Document Type: Conference Paper
Times cited : (125)

References (31)
  • 1
    • 0013367503 scopus 로고    scopus 로고
    • IMPReSS: An automated production planning and delivery quotation system at Harris corporation, semiconductor sector
    • R. C. Leachman, R. F. Benson, C. Liu, and D. J. Raar, "IMPReSS: An automated production planning and delivery quotation system at Harris corporation, semiconductor sector," Interfaces, vol. 26, pp. 6-37, 1996.
    • (1996) Interfaces , vol.26 , pp. 6-37
    • Leachman, R.C.1    Benson, R.F.2    Liu, C.3    Raar, D.J.4
  • 3
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
    • R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, "A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning," HE Trans. Scheduling Logistics, vol. 24, 1992.
    • (1992) HE Trans. Scheduling Logistics , vol.24
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 4
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
    • _, "A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control," HE Trans. Scheduling Logistics, vol. 26, pp. 44-55, 1994.
    • (1994) HE Trans. Scheduling Logistics , vol.26 , pp. 44-55
  • 5
    • 33144459309 scopus 로고    scopus 로고
    • Tractable nonlinear capacity models for production planning Part 1: Modeling and formulations
    • Laboratory Extended Enterprises, Purdue Univ., West Lafayette, IN
    • J. M. Asmundsson, R. L. Rardin, and R. Uzsoy, Tractable nonlinear capacity models for production planning Part 1: Modeling and formulations, Res. Rep., Laboratory Extended Enterprises, Purdue Univ., West Lafayette, IN, 2002.
    • (2002) Res. Rep.
    • Asmundsson, J.M.1    Rardin, R.L.2    Uzsoy, R.3
  • 6
    • 0022741221 scopus 로고
    • A tactical planning model for a job shop
    • S. C. Graves, "A tactical planning model for a job shop," Oper. Res., vol. 34, pp. 552-533, 1986.
    • (1986) Oper. Res. , vol.34 , pp. 552-1533
    • Graves, S.C.1
  • 7
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-inprogress (WIP) and lead-times
    • U. S. Karmarkar, "Capacity loading and release planning with work-inprogress (WIP) and lead-times," J. Manufact, Oper. Manage., vol. 2, 1989.
    • (1989) J. Manufact, Oper. Manage. , vol.2
    • Karmarkar, U.S.1
  • 9
    • 0033314649 scopus 로고    scopus 로고
    • The corrupting influence of variability in semiconductor manufacturing
    • A. K. Schoemig, "The corrupting influence of variability in semiconductor manufacturing," presented at, Winter Simulation Conf. 1999.
    • Winter Simulation Conf. 1999
    • Schoemig, A.K.1
  • 10
    • 0031220255 scopus 로고    scopus 로고
    • Diagnostic scheduling in finite-capacity production environments
    • V. Tardif and M. L. Spearman, "Diagnostic scheduling in finite-capacity production environments," Comput. Indust. Eng., vol. 32, pp. 867-878, 1997.
    • (1997) Comput. Indust. Eng. , vol.32 , pp. 867-878
    • Tardif, V.1    Spearman, M.L.2
  • 11
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • S. T. Hackman and R. C. Leachman, "A general framework for modeling production," Manage. Sci., vol. 35, pp. 478-495, 1989.
    • (1989) Manage. Sci. , vol.35 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 12
    • 0020832935 scopus 로고
    • Mathematical approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
    • P. J. Billington, J. O. McClain, and L. J. Thomas, "Mathematical approaches to capacity-constrained MRP systems: Review, formulation and problem reduction," Manage. Sci., vol. 29, pp. 1126-1141, 1983.
    • (1983) Manage. Sci. , vol.29 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 13
    • 0031381458 scopus 로고    scopus 로고
    • Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints
    • D. Kayton, T. Teyner, C. Schwartz, and R. Uzsoy, "Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints," Production Inventory Manage., pp. 51-57, 1997.
    • (1997) Production Inventory Manage. , pp. 51-57
    • Kayton, D.1    Teyner, T.2    Schwartz, C.3    Uzsoy, R.4
  • 15
    • 0003338125 scopus 로고    scopus 로고
    • Advanced planning and scheduling for manufacturing
    • G. Salvendy, Ed. New York: Wiley
    • K. Musselman and R. Uzsoy, "Advanced planning and scheduling for manufacturing," in Handbook of Industrial Engineering, G. Salvendy, Ed. New York: Wiley, 2001.
    • (2001) Handbook of Industrial Engineering
    • Musselman, K.1    Uzsoy, R.2
  • 16
    • 77950479464 scopus 로고    scopus 로고
    • Planning hierarchy, modeling and advanced planning systems
    • Supply Chain Management: Design, Coordination and Control, A. G. de Kok and S. C. Graves, Eds. Amsterdam, The Netherlands: Elsevier
    • B. Fleischmann and H. Meyr, "Planning hierarchy, modeling and advanced planning systems," in Supply Chain Management: Design, Coordination and Control, A. G. de Kok and S. C. Graves, Eds. Amsterdam, The Netherlands: Elsevier, 2003, vol. 11, Handbooks in Operations Research and Management Science, pp. 457-519.
    • (2003) Handbooks in Operations Research and Management Science , vol.11 , pp. 457-519
    • Fleischmann, B.1    Meyr, H.2
  • 20
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • May
    • Y. F. Hung and R. C. Leachman, "A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations," IEEE Trans. Semiconduct. Manufact., vol. 9, no. 2, pp. 257-269, May 1996.
    • (1996) IEEE Trans. Semiconduct. Manufact. , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 22
    • 0030382379 scopus 로고    scopus 로고
    • Capacity planning and lead time management
    • W. H. M. Zijm and R. Buitenhek, "Capacity planning and lead time management," Int. J. Production Econom., vol. 46-47, pp. 165-179, 1996.
    • (1996) Int. J. Production Econom. , vol.46-47 , pp. 165-179
    • Zijm, W.H.M.1    Buitenhek, R.2
  • 26
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time-varying demand
    • H. Missbauer, "Aggregate order release planning for time-varying demand," Int. J. Production Res., vol. 40, pp. 688-718, 2002.
    • (2002) Int. J. Production Res. , vol.40 , pp. 688-718
    • Missbauer, H.1
  • 27
    • 0027625964 scopus 로고
    • Production planning and control (PPC) systems including load-oriented order release-Problems and research perspectives
    • G. Zapfel and H. Missbauer, "Production planning and control (PPC) systems including load-oriented order release-Problems and research perspectives," Int. J. Production Econom., vol. 30, pp. 107-122, 1993.
    • (1993) Int. J. Production Econom. , vol.30 , pp. 107-122
    • Zapfel, G.1    Missbauer, H.2
  • 28
    • 33144460286 scopus 로고    scopus 로고
    • A single stage multi-product dynamic lot sizing model with work in process and congestion
    • Laboratory Extended Enterprises, Purdue, School Industrial Eng., Purdue Univ. West Lafayette, IN
    • S. Hwang and R. Uzsoy, A single stage multi-product dynamic lot sizing model with work in process and congestion, Res. Rep., Laboratory Extended Enterprises, Purdue, School Industrial Eng., Purdue Univ. West Lafayette, IN, 2005.
    • (2005) Res. Rep.
    • Hwang, S.1    Uzsoy, R.2
  • 29
    • 0000230403 scopus 로고    scopus 로고
    • Foundations of dynamic traffic assignment: The past, the present and the future
    • S. Peeta and A. K. Ziliaskopoulos, "Foundations of dynamic traffic assignment: The past, the present and the future," Networks Spatial Econom., vol. 1, pp. 233-265, 2001.
    • (2001) Networks Spatial Econom. , vol.1 , pp. 233-265
    • Peeta, S.1    Ziliaskopoulos, A.K.2
  • 30
    • 0026208470 scopus 로고
    • An analytic congestion model for closed production systems with IFR processing times
    • M. L. Spearman, "An analytic congestion model for closed production systems with IFR processing times," Manage. Sci., vol. 37, pp. 1015-1029, 1991.
    • (1991) Manage. Sci. , vol.37 , pp. 1015-1029
    • Spearman, M.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.