Volumn 19, Issue 2, 2006, Pages 216-225

A problem reduction approach for scheduling semiconductor wafer fabrication facilities

Author keywords

Empirical testing; Heuristic decomposition; Scheduling

Indexed keywords

COMPUTATIONAL REQUIREMENTS; EMPIRICAL TESTING; HEURISTIC DECOMPOSITION; WAFER FABRICATION;

EID: 33646742941     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2006.873510     Document Type: Article
Times cited : (32)

References (22)
  • 2
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
    • R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, "A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning," IIE Trans. Scheduling Logistics, vol. 24, 1992.
    • (1992) IIE Trans. Scheduling Logistics , vol.24
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 3
    • 0001829813 scopus 로고
    • Modeling techniques for automated production planning in the semiconductor industry
    • T. A. Ciriani and R. C. Leachman, Eds. New York: Wiley
    • R. C. Leachman, "Modeling techniques for automated production planning in the semiconductor industry," in Optimization in Industry: Mathematical Programming and Modeling Techniques in Practice, T. A. Ciriani and R. C. Leachman, Eds. New York: Wiley, 1993.
    • (1993) Optimization in Industry: Mathematical Programming and Modeling Techniques in Practice
    • Leachman, R.C.1
  • 5
    • 0042622980 scopus 로고    scopus 로고
    • A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
    • S. J. Mason, J. W. Fowler, and W. M. Carlyle, "A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops," J. Scheduling, vol. 5, pp. 247-262, 2002.
    • (2002) J. Scheduling , vol.5 , pp. 247-262
    • Mason, S.J.1    Fowler, J.W.2    Carlyle, W.M.3
  • 6
    • 0033079535 scopus 로고    scopus 로고
    • A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
    • M. Pinedo and M. Singer, "A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop," Naval Res. Logistics, vol. 46, pp. 1-17, 1999.
    • (1999) Naval Res. Logistics , vol.46 , pp. 1-17
    • Pinedo, M.1    Singer, M.2
  • 7
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor plants
    • May
    • S. Lu, D. Ramaswamy, and P. R. Kumar, "Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor plants," IEEE Trans. Semiconduct. Manufact.. vol. 7, no. 2, pp. 374-388, May 1994.
    • (1994) IEEE Trans. Semiconduct. Manufact. , vol.7 , Issue.2 , pp. 374-388
    • Lu, S.1    Ramaswamy, D.2    Kumar, P.R.3
  • 9
    • 27944458935 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • J. H. Blackstone, D. T. Phillips, and G. L. Hogg, "A state-of-the-art survey of dispatching rules for manufacturing job shop operations," Int. J. Production Res., vol. 31, pp. 2097-2121, 1993.
    • (1993) Int. J. Production Res. , vol.31 , pp. 2097-2121
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 10
    • 0242269826 scopus 로고    scopus 로고
    • Measures of subproblem criticality in decomposition algorithms for job shop scheduling
    • H. Aytug, K. G. Kempf, and R. Uzsoy, "Measures of subproblem criticality in decomposition algorithms for job shop scheduling," Int. J. Production Res., vol. 41, pp. 81-95, 2002.
    • (2002) Int. J. Production Res. , vol.41 , pp. 81-95
    • Aytug, H.1    Kempf, K.G.2    Uzsoy, R.3
  • 11
    • 0000332876 scopus 로고    scopus 로고
    • Decomposition methods for scheduling reentrant flow shops with sequence dependent setup times
    • E. Demirkol and R. Uzsoy, "Decomposition methods for scheduling reentrant flow shops with sequence dependent setup times," J. Scheduling, vol. 3, pp. 155-177, 2000.
    • (2000) J. Scheduling , vol.3 , pp. 155-177
    • Demirkol, E.1    Uzsoy, R.2
  • 12
    • 0034655062 scopus 로고    scopus 로고
    • Performance of decomposition algorithms for job shop scheduling problems with bottleneck machines
    • R. Uzsoy and C. S. Wang, "Performance of decomposition algorithms for job shop scheduling problems with bottleneck machines," Int. J. Production Res., vol. 38, pp. 1271-1286, 2000.
    • (2000) Int. J. Production Res. , vol.38 , pp. 1271-1286
    • Uzsoy, R.1    Wang, C.S.2
  • 14
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
    • R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, "A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control," IIE Trans. Scheduling Logistics, vol. 26, pp. 44-55, 1994.
    • (1994) IIE Trans. Scheduling Logistics , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 15
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • J. Adams, E. Balas, and D. Zawack, "The shifting bottleneck procedure for job shop scheduling," Manage. Sci., vol. 34, pp. 391-401, 1988.
    • (1988) Manage. Sci. , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 16
    • 27944495605 scopus 로고    scopus 로고
    • Implementing global factory schedules in the face of stochastic disruptions
    • A. Barua, R. Narasimhan, A. Upasani, and R. Uzsoy, "Implementing global factory schedules in the face of stochastic disruptions," Int, J. Production Res., vol. 43, pp. 793-818, 2005.
    • (2005) Int, J. Production Res. , vol.43 , pp. 793-818
    • Barua, A.1    Narasimhan, R.2    Upasani, A.3    Uzsoy, R.4
  • 17
    • 33646726655 scopus 로고    scopus 로고
    • 300 mm factory layout and material handling modeling: Phase II report
    • Technol. Transfer 99 113 848B-ENG
    • E. Campbell and J. Ammenhauser, "300 mm factory layout and material handling modeling: Phase II report," International SEMATECH, Technol. Transfer 99 113 848B-ENG, 2000.
    • (2000) International SEMATECH
    • Campbell, E.1    Ammenhauser, J.2
  • 19
    • 0029195265 scopus 로고
    • The one machine problem with delayed precedence constraints and its use in job shop scheduling
    • E. Balas, J. K. Lenstra, and A. Vazacopoulos, "The one machine problem with delayed precedence constraints and its use in job shop scheduling," Manage, Sci., vol. 41, pp. 94-109, 1995.
    • (1995) Manage, Sci. , vol.41 , pp. 94-109
    • Balas, E.1    Lenstra, J.K.2    Vazacopoulos, A.3
  • 20
    • 0030121742 scopus 로고    scopus 로고
    • Extending the shifting bottleneck procedure to real-life applications
    • P. Ivens and M. R. Lambrecht, "Extending the shifting bottleneck procedure to real-life applications," Eur. J. Oper. Res., vol. 90, pp. 252-268, 1996.
    • (1996) Eur. J. Oper. Res. , vol.90 , pp. 252-268
    • Ivens, P.1    Lambrecht, M.R.2
  • 21
    • 2342596201 scopus 로고
    • Practical job shop scheduling
    • Univ. Twente, The Netherlands
    • J. M. J. Schutten, "Practical job shop scheduling," Univ. Twente, The Netherlands, Tech. Rep. LPOM-95-12, 1995.
    • (1995) Tech. Rep. , vol.LPOM-95-12
    • Schutten, J.M.J.1